Sol_G15PS00081.pdf
PDF 459 KB Posted
- Attached to
- POLE BUILIDNG Federal contract opportunity
- Solicitation number
- G15PS00081
About this file
G15PS00081
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_G15PS00081_Amd_000001.pdf | ||
| Attachment_1_-_Wage_Determination_WI140003.pdf | ||
| Attachment_3_-_Certified_Payroll_Form.WH-347.pdf | ||
| Attachment_2_-_Release_of_Claims.rtf | RTF text file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040183312
USGS OAG DENVER ACQUISITION BRANCH
PO BOX 25046
204 DENVER FEDERAL CENTER
DENVER CO 80225-0046
GDB
USGS Office of Acquisitions and Grants
Attn: Melissa Hutchison Denver Federal Center, Bldg 810, MS 204 Denver, CO 80225
Melissa Hutchison 303-236-9319
112/22/2014
G15PS00081
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Pole building for boat storage in La Crosse, WI. Refer to the full Solicitation and all attachments.
There will be an organized site visit. Refer to clause 52.236-27 Site Visit
(Construction). (Feb 1995) in the attached Body.
Also note FAR Clause 52.228-13 Alternative Payment Protections.
The estimated price range is between $25,000 and $100,000.
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
15 30 calendar days and complete it within ________________ ________________ calendar days after receiving
01/15/2015
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
USGS OAG DENVER ACQUISITION BRANCH
PO BOX 25046
204 DENVER FEDERAL CENTER
DENVER CO 80225-0046
GDB
Melissa Hutchison
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 35
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
G15PS00081
Delivery: 30 Days After Notice to Proceed
Delivery Location Code: 0006366995
USGS Upper Midwest Environ Sci Ctr
2630 Fanta Reed Road
LaCrosse WI 54603 US
FOB: Destination
00010 Services, non-personal, to provide all plant, equipment, materials and labor (unless otherwise provided herein) necessary to construct a pole building for boat storage in accordance with the attached Statement of Work.
Offeror shall quote a firm-fixed price for this requirement.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Table of Contents
Statement of Work 52.252-2 Clauses Incorporated by Reference. (FEB 1998) 52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) - Alternate I (APR 1984) 52.219-28 Post-Award Small Business Program Rerepresentation. (JUL 2013) 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts. (JUL 2012) 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items. (MAY 2008) 52.223-11 Ozone-Depleting Substances. (MAY 2001) 52.225-9 Buy American - Construction Materials. (MAY 2014) 52.228-13 Alternative Payment Protections. (JUL 2000) 52.000S-5078 Technical Liaison – Technical Direction. (OCT 1997) 1452.204-70 Release of Claims (JUL 1996) 1452.228-70 Liability Insurance (JUL 1996) GS1126 Invoicing and Performance Statements (Construction). (JUL 2001) GS1326 Indemnity. (JUL 2001) GS1329 Interpretation of Contract Requirements. (JUL 2001) GS1338 Notice to the Government of Delays. (JUL 2001) GS1346 Compliance With Occupational Safety and Health Act – Government-Owned Facilities/Equipment. (APR 2003) GS1348 Accident Reporting. (APR 2003) GS1354 List of Subcontractors (Construction). (JUL 2001) GS1366 Nondiscrimination Notice to U.S. Department of the Interior Contractors, Subcontractors, and Lessors. (JAN 2000) GS1440 Wage Determination Applicable. (JUL 2001) Deobligation of Unexpended Funds DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (April 2013) 52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998) 52.204-8 Annual Representations and Certifications. (NOV 2014) 52.222-5 Construction Wage Rate Requirements-Secondary Site of the Work. (MAY 2014) 52.222-22 Previous Contracts and Compliance Reports. (FEB 1999) 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction. (FEB 1999) 52.225-10 Notice of Buy American Requirement - Construction Materials. (MAY 2014) - Alternate I
(MAY 2014)
52.225-20 Prohibition on Conducting Restricted Business Operations in Sudan--Certification. (AUG 2009) 52.236-27 Site Visit (Construction). (FEB 1995) - Alternate I (FEB 1995) Basis of Award Bidding Requirements Lowest Price Technically Acceptable Pass/Fail Criteria and Evaluation Plan Quotation Preparation Question Cutoff Quotation Submission
Statement of Work
Background: The USGS Upper Midwest Environmental Science Center (UMESC) is one of the leading research centers conducting ecological research to support the Department of the Interior's and other local, state, and federal resource agencies management of natural resources, fish, and wildlife.
For more than half a century, the USGS UMESC has served the public and its partners by generating quality relevant scientific products and information for the improved management of our natural resources, including, wildlife, and land.
The purpose of this requirement is to construct a three-sided Pole storage building at the USGS, UMESC, 2630 Fanta Reed Road, La Crosse, WI 54603. Within its existing facility complex in La Crosse, WI, the USGS UMESC requires a shelter for boat storage. The Center has a large number of boats and trailers that need to be protected from the elements.
Tasks: The building shall be a three-sided Pole Barn 56 feet by 48 feet with an opening height at the entrance of 11 feet. The entrance shall have a 3-foot overhang to shelter the entrance from the elements. There shall be three 16-foot wide stalls and one 8-foot wide stall opening. The buildings siding and roof color shall match the existing adjacent building. The building shall be constructed over level compacted gravel suitable for boats and vehicles.
Work under this contract shall be completed within 30 days of award.
Materials:
Wood roof, flat rafter, 2" x 4", 12" OC Metal Siding, 26 Gage Steel, corrugated Roofing, 26 Gage Steel, corrugated
Time of Work Performance: The contractor shall perform the work during NORMAL hours only.
The specified time of day in which the work may be performed is:
Weekdays (Mon-Fri) from 7:00 am to 4:30 pm Work shall not be completed on Federal holidays
Code of Compliance: The contractor shall perform all work in accordance with all Federal, state, and local laws, codes, and regulations.
Schedule of Construction: The contractor shall submit to the Technical Liaison (USGS TL) a written schedule of construction for the project. The schedule shall indicate the dates the contractor and/or subcontractors will be on site. The schedule shall indicate the start date and estimated completion date.
When preparing the schedule, the contractor shall consider lead times for material procurement, and shall consider the permitted hours of work indicated in Time of Work Performance clause above. The contractor shall notify the USGS TL immediately if any anticipated on-site date is expected to change from the original schedule.
Work Site Cleanliness: The contractor shall keep the worksite clean and free of debris. All materials to be discarded shall be removed from the site at the end of each work day.
Transporting of Debris and Material: The contractor shall be responsible for the transportation and removal of all debris and material discarded from the worksite. Should the contractor desire to place on site a dumpster to facilitate debris and material removal, a request to the USGS TL, including the size of container and anticipated dates needed, shall be given a minimum of 48 hours in advance of the scheduled date. The COR will identify acceptable location for placement of the dumpster.
Government Furnished Materials: The Government shall furnish no materials for this project. On site electrical service is available. There is no access to the USGS building's restroom facilities.
Contractor Furnished Materials: The contractor shall furnish all construction materials and provide a port-a-potty, necessary for the completion of the work described in this SOW.
General Provisions
SCHEDULE AND DELIVERY OF PERFORMANCE
Delivery of Performance
Location of Work: US Geological Survey Upper Midwest Environmental Sciences Center (UMESC) 2630 Fanta Reed Road La Crosse, WI 54603 Commencement, Prosecution, and Completion of Work
Contractor is responsible for visiting the worksite to verify measurements and to ascertain the nature and location of the work to be performed and the general and local conditions which can affect the work or the cost thereof. Failure to do so will not relieve the contractor of his responsibility for estimating properly the difficulty of cost of successfully performing the work.
Any changes affecting the scope of work shall originate from or be approved by the Contracting Officer. Modifications, when needed, will be requested by the USGS TL. All modifications shall be in writing. Modifications can specify a change in quantity required, location, special instructions and/or completion time.
All materials and workmanship shall be subject to the inspection and approval of the USGS TL. All work unsatisfactorily performed shall be promptly corrected and made acceptable to the Government at no additional Cost. Final inspection and acceptance shall be performed with the contractor, on site by the USGS TL upon completion of job performance.
ACCIDENT PREVENTION AND FIRE HAZARDS -The contractor shall take all necessary precautions to prevent fires or injury to the public, building occupant(s), or damage to property of others during the performance of this contract. For the purpose of this contract, the public or building occupant shall include all persons not employed by the contractor or subcontractor working under his/her direction.
JOB CONDITIONS
A. The contractor shall minimize all disruptions as much as possible to the rest of the building during construction. The Contractor shall notify the Technical Liaison in advance of any power outages or major disruptions.
B. All equipment and materials shall be staged or stored on paved surfaces in areas designated by the Technical Liaison.
C. Transporting materials on turf areas shall be minimized and routes shall be approved by the Technical Liaison.
D. The Contractor shall keep the work area neat and orderly during construction. All construction debris shall be removed daily from the building.
E. After all work is completed according to the specifications of this contract; the contractor shall clean the work area and perform all other tasks incidental to leaving a neat and professional finish to the job.
Work Site, Security, & Safety
A. The contractor shall provide acknowledgement and understanding of the site security and safety requirements, procedures, and guidelines (federal, state, or municipality) from each Contractor employee onsite.
B. Work is to be performed during normal business/duty hours - Monday through Friday, 7:00 a.m.
to 4:30 p.m.
QUALITY ASSURANCE
A. The Contractor shall be responsible for complying with all National, Federal, State and local laws, codes and regulations in connection with the execution of the work, including but not limited:
UBC – Uniform Building Code UMC – Uniform Mechanical Code UPC – Uniform Plumbing Code
B. Fully-qualified work personnel shall be available for work within 15 days from the date of the NTP and shall be maintained throughout the period of performance.
C. Contractor is responsible for visiting the work site to verify measurements and to ascertain the nature and location of the work to be performed and the general and local conditions, which can affect the work or the cost thereof. Failure to do so will not relieve the contractor of his responsibility for estimating properly the difficulty or cost of successfully performing the work.
D. All materials and workmanship shall be subject to the inspection and approval of the Contracting Officer or the USGS TL. All work unsatisfactorily performed shall be promptly corrected and made acceptable to the Government at no additional cost.
E. Final inspection and acceptance shall be performed with the contractor, on site, by the Technical Liaison upon completion of job performance.
SCHEDULE AND DELIVERY OF PERFORMANCE
Commencement, Prosecution, and Completion of Work - FAR 52.211-10
The contractor shall be required to (a) commence work under this contract within fifteen (15) calendar days after the date the Contractor receives the notice to proceed (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 calendar days after the date the Contractor receives the notice to proceed.
The time stated for completion shall include final cleanup of the premises.
General Site Safety Requirements
For the protection of the federal, state, local, and general public, the Contractor shall take all necessary precautions to prevent injury to the public, building occupants, and damage to property of others.
MATERIALS
The contractor shall furnish all supplies, materials (other than fasteners and nails provided by the government), and equipment necessary for performance of the work included in this contract unless otherwise specified. Materials and supplies to be used shall be commercially available products of reputable manufacturers or suppliers and shall be of a quality to conform to applicable Federal Specifications.
SPECIFICATIONS
In any case of discrepancy in the specifications, the matter shall be immediately submitted to the Contracting Officer, without whose decision said discrepancy shall not be adjusted by the Contractor, save only at his own risk and expense. Any changes affecting the scope of the work shall originate from and be approved by the Contracting Officer.
SCHEDULING CONTRACT WORK
The contractor shall make necessary arrangements with the Project Manager to perform the work and shall arrange and schedule the work so that the minimum amount of interference with government activities will result.
CONDITIONS AFFECTING THE WORK
It will be the responsibility of the contractor to inspect the site, determine quality of work involved, compare the specifications with the work to be done, and inform themselves as to all conditions, including other work, if any, being performed. Failure to do so will in no way relieve the successful contractor from the necessity of furnishing any materials or performing any work that may be required to carry out the contract in accordance with the true intent and meaning of the specifications without additional cost to the Government.
EMPLOYEES
The contractor shall be responsible at all times for the supervision and control of the employees that may be assigned to render services under the contract. Fully qualified work personnel shall be available for work at project beginning and shall be maintained throughout the period of performance. At all times, the work under this contract shall be carried out in such a way that there is a minimum of interference with Government activities.
LICENSES-PERMITS
The contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses or permits, and for complying with any Federal, State, and Municipal laws, codes and regulations in connection with the execution of the work.
INDEMNITY
The contractor shall confirm all work on Government premises to areas authorized or approved by the Contracting Officer or Project Manager. The contractor shall save and keep harmless and indemnify the Government against any and all liability claims, and costs of whatsoever kind and nature of injury to or death of any person or persons and for loss or damage to any property (Government or otherwise) occurring in connection with or in any way incident to or arising out of the occupancy, use, service, operations, or performance of work in connection with this contract, resulting in whole or part from the negligent acts or omissions of the contractor.
The Contractor shall comply with Section 9002 of the Farm Security and Rural Investment Act of 2002 (FSRIA), Executive Order (EO) 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” and the Federal Acquisition Regulation to provide biobased products.
The Contractor shall utilize products and material made from biobased materials (e.g., insulating foam, composite panels, and concrete and asphalt release fluids) to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the USGS Technical Liaison (TL).
The following is an example list of products that may be used in this contract for minor construction for which biobased products are available. The list is not all inclusive. It is desirable that vendors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.
Graffiti and grease removers Insulating foam Concrete and asphalt release fluids Fluid-filled transformers Wood and concrete sealers Composite panels Adhesive and mastic removers Carpets
Roof coatings Hydraulic fluid Water tank coatings
Biobased products that are designated for preferred procurement under USDA’s BioPreferred program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their biobased products such as biobased content and source of biobased material (i.e. particular crop or livestock).
In addition to the biobased products designated by the U.S. Department of Agriculture in the BioPreferred Program, the Contractor is encouraged to use other commercially available biobased products.
The Contractor shall comply with the provision at FAR 52.223-1, Biobased Product Certification.
The Contractor shall comply with the clause at FAR 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
GS0340 ENVIRONMENTALLY PREFERABLE BUILDING PRODUCTS AND MATERIALS
(MAY 2008)
(a) The contractor shall use environmentally preferable products and materials where economically feasible. Environmentally preferable products have a lesser or reduced effect on human health and the environment when compared to other products and services that serve the same purpose.
(b) Refer to EPA's environmentally preferable products web site, www.epa.gov/opptintr/epp. In general, environmentally preferable products and materials do one or more of the following -
(1) Contain recycled material, are biobased, or have other positive environmental attributes;
(2) Minimize the consumption of resources, energy, or water;
(3) Prevent the creation of solid waste, air pollution, or water pollution;
(4) Promote the use of non-toxic substances and avoid toxic materials or processes.
(c) See FAR 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts, for related bio-based product requirements.
(d) See FAR 52.223-17, Affirmative Procurement of EPA-designated Items in Service and Construction Contracts, for related recycled content requirements.
(e) If this contract includes janitorial services, the contractor specifically must -
(1) use the following recycled content products - towels, tissue products, and plastic trash can liners, and
(2) use biobased and/or environmentally preferable cleaning products.
GS0342 HAZARDOUS MATERIAL IDENTIFICATION (MAR 2008)
(a) In accordance with clause FAR 52.223-3, Hazardous Material Identification and Material Safety Data, Alternate I, the contractor shall provide Materials Safety Data Sheets (MSDS) for the following products prior to their use under this contract: adhesives, caulking, sealants, insulating materials, fireproofing or fire-stopping materials, paints, carpets, floor and wall patching or leveling materials, lubricants, clear finish for wood surfaces, janitorial cleaning products, pesticides, rodenticides, and herbicides.
(b) The Government reserves the right to review such products at any time. The Contracting Officer may eliminate from permitted use under this contract products with significant quantities of toxic, flammable, corrosive or carcinogenic material and products with potential for harmful chemical emissions.
GS0343 ENERGY EFFICIENT PRODUCTS (MAR 2008)
(a) When acquiring energy-using products, the contractor shall purchase ENERGY STAR® or other energy-efficient items listed on the Department of Energy’s Federal Energy Management Program (FEMP) Product Energy Efficiency Recommendations product list. This clause applies to any power-consuming equipment to be installed or used in USGS facilities, whether title to the equipment will pass to the Government or be retained by the Contractor.
(b) For products that consume power in a standby mode (as listed on FEMP’s Standby Power Devices product listing), the contractor shall -
(1) Purchase items which meet FEMP’s standby power wattage recommendation or document the reason for not purchasing such items; or
(2) If FEMP has listed a product without a corresponding wattage recommendation, purchase items which use no more than one watt in their standby power consuming mode. When it is impracticable to meet the one watt requirement, purchase items with the lowest standby wattage practicable.
(c) The requirements of this clause do not apply if (1) no compliant product’s utility and performance can meet the contractor’s need or contract specifications, (2) compliance would not be life-cycle cost-effective, or (3) compliant solutions are otherwise not available.
(d) Information is available via the Internet about - ENERGY STAR® at http://www.energystar.gov/; and FEMP at http://www.eere.energy.gov/femp/procurement .
GS0346 CONSTRUCTION WASTE MANAGEMENT (MAR 2008)
(a) Items and material existing in the space or to be removed from the space during the demolition phase are eligible for reuse in the construction phase of the project. The reuse of items and materials is preferable to recycling them; however, items considered for reuse must be in refurbishable condition, and must meet the quality standards set forth by the Government in this solicitation/contract. In the absence of definitive quality standards, the contractor is to ensure that the quality of the item(s) in question will meet or exceed accepted industry or trade standards for first quality commercial grade applications. Before use, the contractor shall submit a reuse plan to the Contracting Officer. The Government will not pay for existing fixtures and other existing improvements accepted in place.
(b) Recycling construction waste means providing all services necessary to furnish construction materials or wastes to organizations which will employ these materials or wastes in the production of new materials. Recycling includes required labor and equipment necessary to separate individual materials from the assemblies of which they form a part.
(c) The Offeror shall maintain a recycling program to dispose of or recycle construction waste in compliance with this clause. The program must cover the following requirements.
(1) The contractor will provide continuous facilities for the recycling of incidental construction waste during initial construction.
(2) Products may be excluded from the recycling program when the small quantity of material involved, the extraordinarily complex nature of the waste disposal method, or prohibitive expense for recycling would represent a genuine hardship.
(3) Records of construction materials recycled shall be maintained and accessible to the Contracting Officer. Records shall include materials recycled or landfilled, quantity, date, and identification of hazardous wastes.
(d) As a minimum, the contractor will recycle lighting and associated support system, carpet and carpet pad, hardware, drywall, and electrical components during both the demolition and construction phases of the project, subject to economic evaluation and feasibility.
(e) If any waste materials encountered during the demolition or construction phase are found to contain lead, asbestos, PCBs (such as fluorescent lamp ballasts), or other harmful substances, they are to be handled and removed in accordance with State and Federal laws and requirements concerning hazardous waste.
(f) The requirements of paragraphs (b) through (d) of this clause do not apply when no construction recycling and salvage operation is reasonably available in the locality where work is to be performed.
GS0347 INDOOR AIR QUALITY DURING CONSTRUCTION (MAR 2008)
(a) Items and material existing in the space or to be removed from the space during the demolition phase are eligible for reuse in the construction phase of the project. The reuse of items and materials is preferable to recycling them; however, items considered for reuse must be in refurbishable condition, and must meet the quality standards set forth by the Government in this solicitation/contract. In the absence of definitive quality standards, the contractor is to ensure that the quality of the item(s) in question will meet or exceed accepted industry or trade standards for first quality commercial grade applications. Before use, the contractor shall submit a reuse plan to the Contracting Officer. The Government will not pay for existing fixtures and other existing improvements accepted in place.
(b) Recycling construction waste means providing all services necessary to furnish construction materials or wastes to organizations which will employ these materials or wastes in the production of new materials. Recycling includes required labor and equipment necessary to separate individual materials from the assemblies of which they form a part.
(c) The Offeror shall maintain a recycling program to dispose of or recycle construction waste in compliance with this clause. The program must cover the following requirements.
(1) The contractor will provide continuous facilities for the recycling of incidental construction waste during initial construction.
(2) Products may be excluded from the recycling program when the small quantity of material involved, the extraordinarily complex nature of the waste disposal method, or prohibitive expense for recycling would represent a genuine hardship.
(3) Records of construction materials recycled shall be maintained and accessible to the Contracting Officer. Records shall include materials recycled or landfilled, quantity, date, and identification of hazardous wastes.
(d) As a minimum, the contractor will recycle lighting and associated support system, carpet and carpet pad, hardware, drywall, and electrical components during both the demolition and construction phases of the project, subject to economic evaluation and feasibility.
(e) If any waste materials encountered during the demolition or construction phase are found to contain lead, asbestos, PCBs (such as fluorescent lamp ballasts), or other harmful substances, they are to be handled and removed in accordance with State and Federal laws and requirements concerning hazardous waste.
(f) The requirements of paragraphs (b) through (d) of this clause do not apply when no construction recycling and salvage operation is reasonably available in the locality where work is to be performed.
GS0348 ENVIRONMENTAL REQUIREMENTS - SELECTED CONSTRUCTION MATERIALS
(MAR 2008)
(a) Asbestos
No asbestos-containing fireproofing or insulation on building structures, acoustical treatment, molded or wet-applied ceiling or wall finishes/decorations, or pipe and boiler insulation (including duct, tank, etc.) will be permitted in new materials provided by the contractor under this contract.
(b) Lighting: Interior and Parking
(1) Modern diffused, fluorescent fixtures using solid state octron ballasts with energy efficient lamps (T-8 or better) and electronic ballasts shall be provided if new fixtures are to be used. Fixtures shall be capable of producing and maintaining a uniform lighting level of 50-foot candles at working surface height throughout the space. In addition, restroom lighting shall be 30 foot candles measured at counter height and 20 foot-candles measured at the floor in enclosed corridors.
(2) Exterior parking areas, vehicle driveways, pedestrian walkways and building perimeter shall have a minimum of 1 foot-candle measured at the ground of illumination and be designed based on Illumination Engineering Society standards. Exterior lighting and indoor parking shall be sufficient to accommodate security monitoring (i.e., closed circuit television camera). Indoors parking shall have a minimum of 10 foot-candles measured at the floor and be designed based on Illumination Engineering Society standards.
(3) The contractor shall provide occupancy sensors and/or scheduling controls through building automation system to reduce the hours the lights are on when the space is unoccupied. Daylight dimming controls shall be used in atriums or other space where daylight can contribute to energy savings.
(4) Lighting shall be controlled by occupancy sensors arranged to control open areas, individual offices, conference rooms, toilet rooms, and all other programmed spaces or rooms within the facility to be constructed, remodeled, or maintained hereunder. The control system shall provide an optimal mix of infrared and ultrasonic sensors suitable for the configuration and type of space. Occupancy sensors shall be located so that they have a clear view of the room or area they are monitoring. No more than 1,000 BOMA Usable Square Feet of open space shall be controlled by one occupancy sensor. All occupancy sensors shall have manual switches to override the light control with an adjustable timer to control the amount of time the lighting is manually activated. Such switches shall be located by door openings in accordance with the Americans With Disabilities Act Accessibility Guidelines and the Uniform Federal Accessibility Standards.
(c) Potable Water Supply
Solder and flux in joining potable water supply piping shall not contain more than 0.2 percent lead and domestic water pipes or pipefittings shall not contain more than 8 percent lead. In addition, the contractor is to meet standards set forth in EPA's in "Drinking Water Standards for Schools, and Non-Residential Buildings", A Publication 812-B-94-002, April 1994.
(d) Wood Products
(1) For all new installations of wood products, the contractor is encouraged to use independently certified forest products. For information on certification and certified wood products, see web sites for the Forest Stewardship Council or the Certified Forest Products Council at www.fscus.org/ and www.certifiedwood.org/.
(2) New installations of wood products used under this contract must not contain wood from endangered wood species, as listed by the Convention on International Trade and Endangered Species (CITES). The list of species can be found at www.certifiedwood.org/Resources/CITES/ CITESContent.html.
(3) Particle board, strawboard and plywood materials shall comply with HUD Standards for VOC emissions (particleboard: 0.2 ppm of formaldehyde, plywood: 0.3 ppm of formaldehyde).
(e) Adhesives and Sealants
All adhesives employed on this project (including, but not limited to, adhesives for carpet, carpet tile, plastic laminate, wallcoverings, wood adhesive, or sealants) shall be those with the lowest possible Volatile Organic Compound (VOC) content below 20 g/L. and which meet the requirements of the manufacturer of the products adhered or involved. The contractor shall use adhesives and sealants with no formaldehyde or heavy metals.
(f) Insulation - Thermal, Acoustic, and HVAC
(1) All insulation products shall contain recovered materials as required by EPA's Comprehensive Procurement Guideline and related recycled content recommendations.
(2) No insulation installed with this project shall be material manufactured using chlorofluorocarbons (CFCs), nor shall CFCs be used in the installation of the product.
(3) All insulation containing fibrous materials exposed to air flow must be rated for that exposure or encapsulated.
(4) Insulating properties for all materials must meet or exceed applicable industry standards. Polystyrene products shall meet ASTM C578-91.
(g) Floor Covering
All Floor covering must meet EPA and OSHA environmental health and safety requirements. In addition, the indoor air standard for 4-phenylcyclohexene (4-PC) appears as follows: to protect against induction of multiple chemical sensitivity - .005PPB; to protect against acute irritant effects - 01.7 PPB. Testing will be required on the finished flooring to establish a product content standard for 4-PC that will assure compliance with the indoor air standard.
52.252-2 Clauses Incorporated by Reference. (FEB 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far/ http://www.doi.gov/pam/aindex.html
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (JUL 2013)
52.204-13 System for Award Management Maintenance. (JUL 2013)
52.222-3 Convict Labor. (JUN 2003)
52.222-6 Construction Wage Rate Requirements. (MAY 2014)
52.222-7 Withholding of Funds. (MAY 2014)
52.222-8 Payrolls and Basic Records. (MAY 2014)
52.222-9 Apprentices and Trainees. (JUL 2005)
52.222-10 Compliance with Copeland Act Requirements. (FEB 1988)
52.222-11 Subcontracts (Labor Standards). (MAY 2014)
52.222-12 Contract Termination - Debarment. (MAY 2014)
52.222-13 Compliance With Construction Wage Rate Requirements and Related Regulations. (MAY 2014)
52.222-14 Disputes Concerning Labor Standards. (FEB 1988)
52.222-15 Certification of Eligibility. (MAY 2014)
52.222-21 Prohibition of Segregated Facilities. (FEB 1999)
52.222-26 Equal Opportunity. (MAR 2007)
52.222-27 Affirmative Action Compliance Requirements for Construction. (FEB 1999)
52.222-36 Equal Opportunity for Workers with Disabilities. (JUL 2014)
52.222-50 Combating Trafficking in Persons. (FEB 2009)
52.223-3 Hazardous Material Identification and Material Safety Data. (JAN 1997)
52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2011)
52.223-10 Waste Reduction Program. (MAY 2011)
52.223-15 Energy Efficiency in Energy-Consuming Products. (DEC 2007) http://www.acquisition.gov/far/ http://www.doi.gov/pam/aindex.html
52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts. (MAY 2008)
52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. (AUG 2011)
52.225-13 Restrictions on Certain Foreign Purchases. (JUN 2008)
52.227-1 Authorization and Consent. (DEC 2007)
52.232-5 Payments Under Fixed-Price Construction Contracts. (MAY 2014)
52.232-27 Prompt payment for construction contracts. (MAY 2014)
52.232-33 Payment by Electronic Funds Transfer - System for Award Management. (JUL 2013)
52.232-39 Unenforceability of Unauthorized Obligations. (JUN 2013)
52.232-40 Providing Accelerated Payments to Small Business Subcontractors. (DEC 2013)
52.233-1 Disputes. (MAY 2014)
52.233-3 Protest after Award. (AUG 1996)
52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004)
52.236-2 Differing Site Conditions. (APR 1984)
52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)
52.236-5 Material and Workmanship. (APR 1984)
52.236-6 Superintendence by the Contractor. (APR 1984)
52.236-7 Permits and Responsibilities. (NOV 1991)
52.236-8 Other Contracts. (APR 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984)
52.236-10 Operations and Storage Areas. (APR 1984)
52.236-11 Use and Possession Prior to Completion. (APR 1984)
52.236-12 Cleaning Up. (APR 1984)
52.236-13 Accident Prevention. (NOV 1991)
52.236-14 Availability and Use of Utility Services. (APR 1984)
52.242-14 Suspension of Work. (APR 1984)
52.243-5 Changes and Changed Conditions. (APR 1984)
52.244-6 Subcontracts for Commercial Items. (OCT 2014)
52.246-12 Inspection of Construction. (APR 1996)
52.246-21 Warranty of Construction. (MAR 1994)
52.249-2 Termination for Convenience of the Government (Fixed-Price). (APR 2012) - Alternate I (SEP 1996)
52.249-10 Default (Fixed-Price Construction). (APR 1984)
52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) - Alternate I (APR 1984) The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 calendar days after the contractor receives the notice to proceed.. The time stated for completion shall include final cleanup of the premises.
52.219-28 Post-Award Small Business Program Rerepresentation. (JUL 2013)
(a) Definitions. As used in this clause-
Long-term contract means a contract of more than five years in duration, including options.
However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.
Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is "not dominant in its field of operation" when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.
(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:
(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.
(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.
(3) For long-term contracts-
(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and
(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.
(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code assigned to this contract. The small business size standard corresponding to this NAICS code can be found at http://www.sba.gov/content/table-small-business-size-standards.
(d) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a contract other than a construction or service contract, is 500 employees.
(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation required by paragraph (b) of this clause by validating or updating all its representations in the Reprensentations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause that the data have been validated or updated, and provide the date of the validation or update.
(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.
(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:
The Contractor represents that it ___ is, ___ is not a small business concern under NAICS Code 236220 assigned to contract number [insert contract number]. (Contractor to sign and date and insert authorized signer's name and title).
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
(JUL 2012)
(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of Agriculture (USDA)-designated items unless-
(1) The product cannot be acquired-
(i) Competitively within a time frame providing for compliance with the contract performance schedule;
(ii) Meeting contract performance requirements; or
(iii) At a reasonable price.
(2) The product is to be used in an application covered by a USDA categorical exemption (see 7 CFR 3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:
(i) Spacecraft system and launch support equipment.
(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.
(b) Information about this requirement and these products is available at http://www.biopreferred.gov.
(c) In the performance of this contract, the Contractor shall-
(1) Report to the environmental point of contact identified in paragraph (d) of this clause, with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30;
(2) Submit this report no later than-
(i) October 31 of each year during contract performance; and
(ii) At the end of contract performance; and
(3) Contact the environmental point of contact to obtain the preferred submittal format, if that format is not specified in this contract.
(d) The environmental point of contact for this contract is: Melissa Hutchison 303-236-9319;
mhutchison@usgs.gov
52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items. (MAY 2008)
(a) Definitions. As used in this clause-
"Postconsumer material" means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item.
Postconsumer material is a part of the broader category of "recovered material."
"Recovered material" means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.
(b) The Contractor, on completion of this contract, shall-
(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of post-consumer material content; and
(2) Submit this estimate to [].
52.223-11 Ozone-Depleting Substances. (MAY 2001)
(a) Definition. "Ozone-depleting substance," as used in this clause, means any substance the Environmental Protection Agency designates in 40 CFR part 82 as--
(1) Class I, including, but not limited to, chlorofluorocarbons, halons, carbon tetrachloride, and methyl chloroform; or mailto:mhutchison@usgs.gov
(2) Class II, including, but not limited to, hydrochlorofluorocarbons.
(b) The Contractor shall label products which contain or are manufactured with ozone-depleting substances in the manner and to the extent required by 42 U.S.C. 7671j (b), (c), and (d) and 40 CFR Part 82, Subpart E, as follows:
Warning
Contains (or manufactured with, if applicable) *_____, a substance(s) which harm(s) public health and environment by destroying ozone in the upper atmosphere.
* The Contractor shall insert the name of the substance(s).
52.225-9 Buy American - Construction Materials. (MAY 2014)
(a) Definitions. As used in this clause-
Commercially available off-the-shelf (COTS) item- (1) Means any item of supply (including construction material) that is-
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of…