FY24 Sampling PWS.pdf
PDF 305 KB Posted
- Attached to
- USCG BASE KODIAK SAMPLING & ANALYSIS OF REGULATED WASTE Federal contract opportunity
- Solicitation number
- 70Z04523QKODI0231
About this file
This performance work statement outlines waste sampling and analysis services required by the U.S. Coast Guard Base in Kodiak, Alaska. The contractor shall provide sampling, shipment, and analytical testing of all regulated waste delivered to the base's transfer, storage, and disposal facilities, including building and storage lockers. Services include sampling and analysis of oil, water, solid, and open matrix wastes for parameters such as RCRA metals, VOCs, SVOCs, and petroleum products. The contractor must utilize an Alaska-certified laboratory and adhere to EPA and state holding time requirements. The contractor will serve as the primary point of contact and provide standard seven to ten day turnaround times on analytical reports to the base's environmental division. The performance period is for one year from date of award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12. SF18 RFQ - updated close date.pdf | ||
| Wage Determinations.pdf | ||
| SF-1449 Clauses and Provisions (Supply and Service) JUN2023.docx | DOCX document | |
| SF18 RFQ.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement Waste Sampling
U.S. Coast Base Kodiak Environmental
Kodiak, Alaska
1. GENERAL
U.S. Coast Guard (USCG) Base Kodiak is located on the east side of Kodiak Island, approximately 8 miles south of the City of Kodiak (population 5,983 as of 2020). The base covers approximately
25,000 acres with 190 buildings. Approximately 1200 active duty Coast Guard personnel are assigned to the base, with over 460 dependents. Over 200 civilians work on base each day. Various
Coast Guard tenants occupy the site: Air Station Kodiak, Electronics Support Detachment, two cutters, as well as visiting vessels. In addition, 17 federal, state, and local organizations maintain a physical presence and operations at the Base.
2. CONTRACTOR SUPPORT
USCG Base Kodiak requires services for the sampling and analysis of all regulated waste delivered to the Transfer Storage and Disposal Facility (TSDF), to include Building N48, N102 and Storage
Lockers.
2.1 Unless otherwise specified, the Contractor shall provide all labor, materials, supplies, administrative, technical and managerial expertise and efforts necessary to accomplish the proper collection/shipment of requested samples and analytical review. Sampling and analysis must be performed in compliance with EPA requirements.
2.2 The Contractor shall provide a Project Manager as a point of contact (POC) to Base Kodiak personnel. The Base Kodiak POC will be the Supervisor of the Environmental Division as well as the TSDF Manager. The contractor will have provisions for the Base Kodiak POC to be able to communicate with laboratory personnel if the situation arises.
2.3 The Contractor shall provide standard turnaround times (TAT) of not less than 7 to 10 working days (except holidays and weekends).
2.4 The Contractor shall be able to provide rush TAT not greater than 3 to 5 working days (except holidays and weekends.)
2.5 The Contractor shall utilize a laboratory certified by state and federal agencies, which have jurisdiction of laboratories performing analytical testing of hazardous materials and hazardous waste products of the State of Alaska.
2.5.1 The Contractor shall provide a copy of the laboratory’s certification and/or letters from the appropriate regulatory agencies stating current certification to Base Kodiak
Environmental.
2.5.2 Should the Contractor laboratory fail to meet certification requirements, the Contractor, at its own expense, shall provide samples to a certified laboratory that can conduct the analytical testing within the holding time required by regulation.
2.6 The Contractor shall, at its own expense, provide re-sampling efforts for samples that are in the custody of the contractor or laboratory which exceed holding times. There shall be no expense to Base Kodiak for this breach by the Contractor.
3. SAMPLE / ANALYTICAL REQUIREMENTS
3.1 The contractor shall be capable of providing sampling and analytical results for the requirement parameters in oil, water, solid, or open matrix, as outlined in Section 6.2.
3.2 Base Kodiak may require other analytical testing; the Contractor shall provide the same services identified in section 2.0 at the same rate provided for the specified parameter requirements in section 3.1.
3.3 Sampling requirements are not a batch/quarterly requisite and will need performed on an “as needed” basis per individual waste as accumulated, with work initiated by the government via e-mail.
4. NOTIFICATIONS
4.1 The service performed under this contract is to be performed during normal Base Kodiak working days/hours unless otherwise approved by the Contracting Officer (KO). Services will not be scheduled to be performed on a regular Federal Holiday (see below), or one designated by Presidential proclamation. Normal hours of operation under this contract will be between the hours of 8:00am and 4:00pm AST.
4.1.1 Federal Holidays
New Year’s Day – 1 January*
Martin Luther King’s Birthday – 3rd Monday in January
President’s Day – 3rd Monday in February
Memorial Day – Last Monday in May
Independence Day – 4 July*
Labor Day – 1st Monday in September
Columbus Day – 2nd Monday in October
Veterans Day – 11 November*
Thanksgiving Day – 4th Thursday in November
Christmas Day – 25 December*
*This holiday is observed on the preceding Friday or the following Monday when the holiday occurs on Saturday or Sunday, respectively.
4.2 All Contractor personnel performing work under this Performance Work Statement (PWS) shall be qualified via training and experience, corresponding with duties being fulfilled, to the minimum requirements under relevant 29 CFR-OSHA, 40 CFR-EPA, 49-CFR-DOT, E385 Standards and updates thereto. The Contractor shall be responsible for, and complete in appropriate timeframes, all initial and refresher training required of Contractor personnel.
Upon request by the Government, the Contractor shall provide proof that these trainings were completed.
4.3 Contractor employees performing services under this order will be controlled, directed and supervised by management personnel of the contractor. Contractor management will ensure that employees properly comply with the performance work standards outlined in the PWS.
Contractor employees will perform their duties independent of, and without supervision of any Government official. The tasks, duties and responsibilities set forth in the task order may not be interpreted or implemented in any manner that results in any contractor employee creating or modifying Federal policy, obligating the appropriated funds of the United States
Government, overseeing the work of Federal employees, providing direct personal services to any Federal employee, or otherwise violating the prohibitions set forth in Parts 7.5 and 37.1 of the Federal Acquisition Regulation (FAR). The Government will control access to the facility and will perform inspection and acceptance of the completed work. *Contractor personnel may NOT represent the U.S. Coast Guard in any manner, including before any government or private panel, board or association.*
4.4 GOVERNMENT FURNISHED EQUIPMENT AND/OR FACILITIES:
FACILITY AND COMPUTER ACCESS
Trusted Associate Sponsorship System (TASS)
(a) "Contractor employee" means an employee of a firm, or an individual, under contract or subcontract to the Coast Guard to provide services who also requires one or more of the following:
• Physical access to multiple Coast Guard facilities or multiple federally controlled facilities within the Base Kodiak footprint, on behalf of the Coast Guard on a recurring basis.
(b) Homeland Security Presidential Directive (HSPD)-12 mandates a Federal standard for secure and reliable forms of identification for Federal employees and contractor employees.
The Common Access Card (CAC) is a personal identification card for the Department of
Defense/Uniformed Services and complies with HSPD-12. The Coast Guard has instituted the CAC as its HSPD-12 compliant personal identification card for contractor and subcontractor employees who are required to access a Coast Guard, Department of Defense
(DOD), or other federally-controlled computer information system and/or facility, or need public key infrastructure (PKI) authentication to perform their contractual duties. The
Trusted Associate Sponsorship System (TASS) is the automated application process for obtaining a CAC.
(c) Contractor and subcontractor employees working pursuant to this contract who are required to access a Coast Guard, DOD, or other federally-controlled computer information system and/or facility, or need PKI authentication to perform their contractual duties shall use TASS to obtain a CAC.
(d) The Contracting Officer Representative (COR) or Assisting Contracting Officer
Representative (ACOR) is the TASS Trusted Agent (TA) and initiates contractor accounts in the TASS, approving, returning, or rejecting CAC applications (as applicable); re-verifying assigned contractors every six months; revoking contractor and employee eligibility for a
CAC.
(e) The TA ensures that contractor personnel satisfy the security requirements for CAC issuance prior to creating the CAC application in TASS. Current investigative requirements shall be verified according to Commandant Instruction COMDTINST 5500.18, Coast Guard https://www.dhs.gov/homeland-security-presidential-directive-12
Trusted Associate Sponsorship System. The initial CAC issuance requires a favorably adjudicated Tier 1 investigation (equivalent or higher) or a Tier 1 background investigation
(BI) (equivalent or higher) package that has been successfully scheduled with the investigative service provider (ISP) and a FBI fingerprint check with favorable results. The
TA and Sponsor or other appropriate Federal Government representative must coordinate with the unit BI Verifier (Command Security Officer /Trusted Agent Security Manager) or the U.S. Coast Guard Security (SECCEN) to confirm the appropriate investigation has been favorably adjudicated or scheduled at the ISP with favorable FBI fingerprint results.
(f) The COR or Contracting Officer provides such forms to, or requests such information from, contractor employees that may be necessary for obtaining a CAC via the TASS. The
Contractor submits completed forms and information as directed by the COR or Contracting
Officer. Contractors are responsible for the accuracy and completeness of the information submitted and for any liability resulting from the Government's reliance on inaccurate or incomplete information.
(g) Contractor employees who are declined via the TASS are ineligible to perform work under this contract.
(h) When an employee with a CAC is no longer performing day to day operations under this contract, the employee must return the CAC to the COR/TA or Contracting Officer on the same day the employee stops working or contract expires.
(i) The contractor shall insert this clause in all subcontracts when a subcontractor's employee is required to access a Coast Guard, DOD, or other federally-controlled computer information system and/or facility, or need PKI authentication to perform contractual duties.
(End of Clause)
5. DELIVERABLES
5.1 The Contractor shall furnish the following reports, documents and electronic copies within 30 days of the analytical testing.
5.1.1 A report outlining the results of the analytical for each sample tested, annotating if the waste is a solid waste that exhibits any of the characteristics of hazardous waste and if the hazardous waste is prohibited from land disposal as outlined in 40 CFR Parts 260 to
279. The Contractor may e-mail a copy of these results in advance of sending the original documents to Base Kodiak Environmental.
5.1.2 Quality Assurance/Quality Control (QA/QC) reports as required by state and federal regulations.
5.1.3 A copy of the laboratory’s certification and/or letters from the appropriate regulatory agencies stating current certification.
5.1.4 Training records for Contractor employees performing work under this PWS.
5.2 LOCATION:
U.S. Coast Guard Base Kodiak
Kodiak, Alaska
5.3 PERIOD OF PERFORMACE:
365 Days from Date of Award
5.4 LIAISON:
The U.S. Coast Guard technical POC, who will serve as the Contracting Officer’s
Representative (COR) is:
Jennifer Nutt
Email: Jennifer.N.Nutt@uscg.mil
Phone: (907)487-5170 x6698
Or
Sarah Zurflueh
Email: Sarah.L.Zurflueh@uscg.mil
Phone: (907)487-5588
6. SUPPORTING DOCUMENTS
6.1 USCG Base Kodiak, Waste Analysis Three-Year Average
Required Parameters Method(s)
Average # of Samples
Per Year
(65)*
Full TCLP SW1311 0
TCLP VOC SW1311/8260 45
TCLP SVOC SW1311/8270 12
TCLP Metals SW1311/6010/7000 0
TCLP Pesticides SW1311/8081 0
TCLP Herbicides SW1311/8150 0
TCLP Extraction Metals SW1311 0
TCLP Metals Sb,Be,Th,V SW1311/6010/7000 11
TCLP Lead 0
TCLP RCRA metals 48
TCLP Benzene 0
TCLP VOA 0
Characterization SW1311 0
Ignitability SW1020 0
Reactivity SW846 2
PH, Corrosivity SW9045 10
Flash Point Closed Cup 12
Benzene SW8021 0
RCRA Metals SW6010/7000 0
Oil Burn Specs 40CFR279.11 3
PCB’s SW8082 0
VOC SW8260 0
SVOC SW8270 0
VOA 0
SVOA 0
Asbestos PCM or TEM 0
Total Mercury SW7470/7471 0
Lead in Paint SW6010 0
Glycol 0
BTU/lbs 0
GRO 15
DRO / RRO 16
THP EPA 1664 3
*Note: Additional samples will be required to comply with the three year analysis frequency outlined in Section 6.2.
6.2 USCG Base Kodiak Sampling Outline
REGULATED WASTE SAMPLING AND ANALYSIS OUTLINE (Section 6.2)
*New waste streams must be tested IAW the material type.*
Location Description
Bldg # Waste Stream Process Disposal Method
Required Analysis
Analysis Frequency
Aids To Navigation Team Kodiak
20 POL Contaminated Rags
General Maint & Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
Airstation Area Zero Catch Basins
Tarmac Catch Basin Sludge / Sediment
Routine Cleanout HWSB DRO,RRO, GRO
Each Batch
LOWS and Enviromental Storage
N66 OWS Sludge / Sediment
Routine Cleanout HWSB DRO,RRO, GRO
Each Batch
Airstation Hangar 1
14 POL Contaminated Rags
General Maint & Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
Airstation Hangar 1
14 Solvent Contaminated rags
Equipment Maintenance &
Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
Airstation Hangar 1
14 Blast Grit Surface Preparation
HWSB TCLP RCRA
Metals
Once every 3 years
Airstation Hangar 1
14 Spent Parts Cleaner General Maint & Repair
HWSB Flash Point, TCLP RCRA
Metals, TCLP UHC
Metals (Sb,Tl,Ni,Be
), TCLP
8260 VOC
Full List, TCLP 8270
SVOC
Once every 3 years
Airstation Hangar 1
14 Used Oil, Synthetic General Maint & Repair
HWSB Oil Burn Specs
Once every 3 years
Airstation Hangar 1
14 OWS Sludge / Sediment
Routine Cleanout HWSB TCLP RCRA Metals, TCLP 8260
VOC Full
List
Once every 3 years
Building 20 -
ATON
20 POL Contaminated Rags
General Maint & Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
Building 20 / Hangar 2 Wash Rack
20 OWS Sludge / Sediment
Routine Cleanout HWSB TCLP RCRA Metals, TCLP 8260
VOC Full
List
Once every 3 years
Airstation Hangar 3
15 Battery Electrolyte, Nickel Cadmium
Used
Equipment Maintenance &
Repair
HWSB pH, TCLP
RCRA
Metals, TCLP UHC
Metals
(Sb,Tl,Ni,Be
Once every 3 years
Airstation Hangar 3
15 Blast Grit Surface Preparation
HWSB TCLP RCRA
Metals
Once every 3 years
Airstation Hangar 3
15 POL Contaminated Rags
General Maint & Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
Airstation Hangar 3
15 Solvent Contaminated rags
Equipment Maintenance &
Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
Airstation Hangar 3
15 Spent Aluminum Cleaner
Surface Preparation
HWSB pH, TCLP
RCRA
Metals
Once every 3 years
Airstation Hangar 3
15 Spent Parts Cleaner General Maint & Repair
HWSB Flash Point, TCLP RCRA
Metals, Once
TCLP UHC
Metals
(Sb,Tl,Ni,Be
), TCLP
8260 VOC
Full List, TCLP 8270
SVOC
Airstation Hangar 3
15 Used Oil, Synthetic General Maint & Repair
LOWS *Follow
LOWS
BMP*
N/A
Airstation Hangar 3
15 Waste Paint Related Materials
PaintingMaint & Repair Work
HWSB Flash Point, TCLP RCRA
Metals, TCLP UHC
Metals (Sb,Tl,Ni,Be
), TCLP
8260 VOC
Full List, TCLP SVOC
Each Batch
Airstation Hangar 3
15 OWS Sludge / Sediment
Routine Cleanout HWSB TCLP RCRA Metals, TCLP 8260
VOC Full
List
Once every 3 years
Airstation Hangar 3 Composite Shop
15 Blast Grit Surface Preparation
HWSB TCLP RCRA
Metals
Each Batch
Airstation Hangar 3 Composite Shop
15 Downdraft Table Filters
Equipment Maintenance &
Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC
Each Batch
Airstation Sumps 1,2,&3
14 / 20 / N21
Sump Sludge / Sediment
Routine Cleanout HWSB DRO,RRO, GRO
Each Batch
ATON 20 Solvent Contaminated rags
Equipment Maintenance &
Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
ATON 20 Spent Parts Cleaner General Maint & Repair
HWSB Flash Point, TCLP RCRA
Metals, TCLP UHC
Metals (Sb,Tl,Ni,Be
), TCLP
8260 VOC
Full List, TCLP 8270
SVOC
Once
BOSS Air Station Fuel Farm
N21 POL Contaminated Rags
Fuel QC Sampling/Filter Maintenance
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
BOSS Air Station Fuel Farm
N21 Waste JP-5 Fuel QC Sampling/Filter Maintenance
LOWS *Follow
LOWS
BMP*
N/A
BOSS
Automotive Repair Shop
N1 Antifreeze for Recycling
Automotive & EquipMaint. & Repair Work
Recycle Onsite
TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
BOSS
Automotive Repair Shop
N1 Brake Fluid Automotive & EquipMaint. & Repair Work
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
BOSS
Automotive Repair Shop
N1 Paint Booth Filters Automotive & EquipMaint. & Repair Work
HWSB TCLP RCRA
Metals, TCLP 8260
VOC
Each Batch
BOSS
Automotive Repair Shop
N1 POL Contaminated Rags
Automotive & EquipMaint. & Repair Work
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
BOSS
Automotive Repair Shop
N1 Solvent Contaminated Rags
Automotive & EquipMaint. & Repair Work
HWSB TCLP RCRA
Metals, TCLP UHC
Metals
(Sb,Tl,Ni,Be
), TCLP
8260 VOC
Full List
Once every 3 years
BOSS
Automotive Repair Shop
N1 Solvent RecyclingStill Bottoms
Solvent Recycling HWSB Paint Filter Test, Flash Point, TCLP
RCRA
Metals, TCLP UHC
Metals
(Sb,Tl,Ni,Be
), TCLP
8260 VOC
Full List, TCLP SVOC
Once every 3 years
BOSS
Automotive Repair Shop
N1 Used Oil, Petroleum Automotive & EquipMaint. & Repair Work
LOWS *Follow
LOWS
BMP*
N/A
BOSS
Automotive Repair Shop
N1 Waste Paint Related Materials
Automotive & EquipMaint. & Repair Work
HWSB Flash Point, TCLP RCRA
Metals, TCLP UHC
Once
(Sb,Tl,Ni,Be
), TCLP
8260 VOC
Full List, TCLP SVOC
BOSS Bulk Fuel Farm, JP-5
Pumphouse
N11 JP-5 Fuel Sampling/Fuel
Filter Maint.
LOWS *Follow
LOWS
BMP*
N/A
BOSS Bulk Fuel Farm, JP-5
Pumphouse
N11 POL Contaminated Rags
Fuel Sampling/Fuel
Filter Maint
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
BOSS Central Heating Plant
N24 Boiler #1 Fly Ash CHPMaint & Repair Work
HWSB TCLP RCRA
Metals
Each Batch
BOSS Central Heating Plant
N24 Boiler #1 Rinse Water
CHPMaint & Repair Work
HWSB pH, TCLP
RCRA
Metals, TPH
Each Batch
BOSS Central Heating Plant
N24 Boiler #2 Fly Ash CHPMaint & Repair Work
HWSB TCLP RCRA
Metals
Each Batch
BOSS Central Heating Plant
N24 Boiler #2 Rinse Water
CHPMaint & Repair Work
HWSB pH, TCLP
RCRA
Metals, TPH
Each Batch
BOSS Central Heating Plant
N24 Boiler #3 Fly Ash CHPMaint & Repair Work
HWSB TCLP RCRA
Metals
Each Batch
BOSS Central Heating Plant
N24 Boiler #3 Rinse Water
CHPMaint & Repair Work
HWSB pH, TCLP
RCRA
Metals, TPH
Each Batch
BOSS Central Heating Plant
N24 Boiler #4 Fly Ash CHPMaint & Repair Work
HWSB TCLP RCRA
Metals
Each Batch
BOSS Central Heating Plant
N24 Boiler #4 Rinse Water
CHPMaint & Repair Work
HWSB pH, TCLP
RCRA
Metals, TPH
Each Batch
BOSS Central Heating Plant
N24 Economizer #1 Rinse Water
CHPMaint & Repair Work
HWSB pH, TCLP
RCRA
Metals
Each Batch
BOSS Central Heating Plant
N24 Economizer #2 Rinse Water
CHPMaint & Repair Work
HWSB pH, TCLP
RCRA
Metals
Each Batch
BOSS Central Heating Plant
N24 Economizer #3 Rinse Water
CHPMaint & Repair Work
HWSB pH, TCLP
RCRA
Metals
Each Batch
BOSS Central Heating Plant
N24 Economizer #4 Rinse Water
CHPMaint & Repair Work
HWSB pH, TCLP
RCRA
Metals
Each Batch
BOSS Central Heating Plant
N24 POL Contaminated Rags
CHPMaint & Repair Work
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once
BOSS Central Heating Plant
N24 Used Oil, Petroleum CHPMaint & Repair Work
LOWS *Follow
LOWS
BMP*
na
BOSS Fuel Farm Pump House
N11 OWS Sludge / Sediment
Routine Cleanout HWSB TCLP RCRA Metals, TCLP 8260
VOC Full
List
Once every 3 years
BOSS Fuel Pier Containment
621 OWS Sludge / Sediment
Routine Cleanout HWSB TCLP RCRA Metals, TCLP 8260
VOC Full
List
Once every 3 years
BOSS Fuel Pier Valve Pit
621 JP-5/Diesel Fuel Fuel QC Sampling LOWS *Follow
LOWS
BMP*
N/A
BOSS Fuels Lab
BUILDI
NG 20
Fuel Sampling Debris/Lab Waste
Fuel QC Sampling HWSB TCLP RCRA Metals, TCLP 8260
VOC Full
List
Once every 3 years
BOSS Fuels Lab
BLDG
JP-5/Diesel Fuel Fuel QC Sampling LOWS *Follow
LOWS
BMP*
N/A
BOSS Heavy Equipment Shop
N1A POL Contaminated Rags
Vehicle & EquipmentMaint.
& Repair Work
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
BOSS Heavy Equipment Shop
N1A Solvent Contaminated Rags
Vehicle & EquipmentMaint.
& Repair Work
HWSB TCLP RCRA
Metals, TCLP UHC
Metals
(Sb,Tl,Ni,Be
), TCLP
8260 VOC
Full List
Once every 3 years
BOSS Heavy Equipment Shop
N1A Used Oil, Petroleum Vehicle & EquipmentMaint.
& Repair Work
LOWS *Follow
LOWS
BMP*
N/A
BOSS Heavy Equipment Shop
N1A Used Oil, Synthetic Hydraulic
Vehicle & EquipmentMaint.
& Repair Work
HWSB Oil Burn Specs
Once every 3 years
BOSS LOWS
Facility
N56 POL Contaminated Rags
Oily Water Processing
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
BOSS LOWS
Facility
N56 Strainer Debris Oily Water Processing
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once
BOSS LOWS
Facility
N56 Tank Sludge, GST Oily Water Processing
HWSB Flash Point, TCLP RCRA
Metals, TCLP UHC
Metals (Sb,Tl,Ni,Be
), TCLP
8260 VOC
Full List, TCLP SVOC
8270, Reactive Sulfides
Each Batch
BOSS LOWS
Facility
N56 Tank Sludge, Oil Holding Tanks 4&5
Oily Water Processing
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
BOSS LOWS
Facility
N56 Tank Sludge, Oil Processing Tank 2
Oily Water Processing
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
BOSS LOWS
Facility
N56 Tank Sludge, Water Holding Tanks 6,7,&8
Oily Water Processing
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
BOSS LOWS
Facility
N56 Tank Sludge, Water Holding Tanks 6,7,&8
Oily Water Processing
HWSB DRO,RRO,
GRO
Each Batch
BOSS LOWS
Facility
N56 Tank Sludge, Water Processing Tank 3
Oily Water Processing
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full List, pH
Once every 3 years
BOSS LOWS
Facility
N56 Used Filter Bags Oily WaterProcessing
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
BOSS
Maintenance Shops
19 Metal Cutting Fluid General Maint & Repair
HWSB Flash Point, TCLP RCRA
Metals, TCLP UHC
Metals (Sb,Tl,Ni,Be
), TCLP
8260 VOC
Full List
Once every 3 years
BOSS
Maintenance Shops
19 POL Contaminated Rags
General Maint & Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once
BOSS
Maintenance Shops
19 Used Oil, Petroleum General Maint & Repair
LOWS *Follow
LOWS
BMP*
N/A
BOSS
Maintenance Shops, South side of Bldg.
19 Used Refrigeration Oil
General Maint & Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
BOSS
Motorpool
N1 Antifreeze Automotive & EquipMaint. & Repair Work
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Each Batch
BOSS
Motorpool
N1 OWS Sludge / Sediment
Routine Cleanout HWSB TCLP RCRA Metals, TCLP 8260
VOC Full
List
Once every 3 years
BOSS
Motorpool
N1 OWS Sludge / Sediment
Routine Cleanout HWSB DRO,RRO, GRO
Each Batch
BOSS Paint Shop
N1-3 Solvent Contaminated Rags
PaintingMaint. & Repair
HWSB TCLP RCRA
Metals, TCLP UHC
Metals
(Sb,Tl,Ni,Be
), TCLP
8260 VOC
Full List
Once every 3 years
BOSS Paint Shop
N1-3 Waste Paint Related Materials
PaintingMaint & Repair Work
HWSB Flash Point, TCLP RCRA
Metals, TCLP UHC
Metals (Sb,Tl,Ni,Be
), TCLP
8260 VOC
Full List, TCLP SVOC
Once every 3 years
BOSS Roads & Grounds
N94-1 POL Contaminated Rags
EquipmentMainten ance/Cleaning
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
BOSS Roads & Grounds
N94-1 Used Oil, Petroleum Equipment Maintenance
LOWS *Follow
LOWS
BMP*
N/A
BOSS Utility Maintenance Shop
NA POL Contaminated Rags
General Maint & Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
BOSS Utility Maintenance Shop
NA Solvent Contaminated rags
General Maint & Repair
HWSB TCLP RCRA
Metals, TCLP UHC
Once
(Sb,Tl,Ni,Be
), TCLP
8260 VOC
Full List
BOSS Waste Water Treatment Plant
N2 POL Contaminated Rags
Equipment Maintenance &
Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
BOSS Waste Water Treatment Plant
N2 Used Oil, Petroleum Equipment Maintenance &
Repair
LOWS *Follow
LOWS
BMP*
N/A
BOSS Waste Water Treatment Plant
N2 POL Contaminated Rags
Equipment Maintenance &
Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
BOSS Waste Water Treatment Plant
N2 POL Contaminated Rags
Equipment Maintenance &
Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
BOSS Waste Water Treatment Plant
N2 POL Contaminated Rags
Equipment Maintenance &
Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
Base Building
12 OWS Sludge / Sediment
Routine Cleanout HWSB DRO,RRO, GRO
Each Batch
CGC
ACUSHNET
N/A POL Contaminated Rags
General Maint & Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
CGC ALEX
HALEY
N/A Antifreeeze, Coolant General Maint & Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
CGC ALEX
HALEY
N/A Antifreeze, Small Boat
General Maint & Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
CGC ALEX
HALEY
N/A Solvent Contaminated rags
Equipment Maintenance &
Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
CGC ALEX
HALEY
N/A POL Contaminated Rags
General Maint & Repair
HWSB TCLP RCRA
Metals, TCLP 8260
Once
VOC Full List
CGC JARVIS N/A Used Oil, Synthetic Hydraulic
General Maint & Repair
HWSB *Follow
LOWS
BMP*
N/A
CGC
MIDGETT
N/A POL Contaminated Rags
General Maint & Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
CGC
SHERMAN
N/A Spent Engine Jacket Water
General Maint & Repair
LOWS TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
CGC ALEX
HALEY
N/A Solvent Contaminated rags
Equipment Maintenance &
Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
CGC
CYPRESS
*New Vessel*
N/A POL Contaminated Rags
General Maint & Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
CGC
CYPRESS
*New Vessel*
N/A Solvent Contaminated rags
Equipment Maintenance &
Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
CGC
CYPRESS
*New Vessel*
N/A Antifreeeze, Coolant General Maint & Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
CGC
CYPRESS
*New Vessel*
N/A Blast Grit Surface Preparation
HWSB TCLP RCRA
Metals
Each Batch
CGC
WAESCHE
N/A Spent Engine Jacket Water
General Maint & Repair
LOWS TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
Visiting Cutters
N/A Spent- Antifreeeze, Coolant
General Maint & Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Each batch annually
Visiting Cutters
N/A Spent Engine Jacket Water
General Maint & Repair
LOWS TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Each batch annually
Visiting Cutters
N/A POL Contaminated Rags
General Maint & Repair
HWSB TCLP RCRA
Metals, Each batch annually
TCLP 8260
VOC Full
List
Visiting Cutters
N/A Solvent Contaminated rags
Equipment Maintenance &
Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Each batch annually
Electronics Support Unit
N/A Used Oil, Synthetic Hydraulic
General Maint & Repair
HWSB Oil Burn Specs
Once every 3 years
Base Fire Burn Pit
576 POL Contaminated Rags
General Maint & Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
Base Fire Station Catch Basin
Z25 OWS Sludge / Sediment
Routine Cleanout HWSB TCLP RCRA Metals, TCLP 8260
VOC Full
List
Once every 3 years
Base Fire Station Wash Rack
N64 Catch Basin Sludge / Sediment
Routine Cleanout HWSB DRO,RRO, GRO
Each Batch
N48 Base Hazardous Waste Storage Building
N64 OWS Sludge / Sediment
Routine Cleanout HWSB DRO,RRO, GRO
Each Batch
Base N6 Liftstation
N48 Aerosol Can Drainings
Hazardous Waste Treatment
HWSB Flashpoint, pH, TCLP
RCRA
Metals, TCLP 8260
VOC Full
List, TCLP
8270 SVOC
Full List
Each Batch
Base N6 Liftstation
N6 OWS Sludge / Sediment
Routine Cleanout HWSB TCLP RCRA Metals, TCLP 8260
VOC Full List, PCB
Once every 3 years
Base N6 Liftstation
N6 OWS Sludge / Sediment
Routine Cleanout HWSB DRO,RRO, GRO
Each Batch
MWR Auto Hobby Shop
614 Antifreeze Automotive & EquipMaint. & Repair Work
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Each Batch
MWR Auto Hobby Shop
614 POL Contaminated Rags
Automotive & EquipMaint. & Repair Work
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once
MWR Auto Hobby Shop
614 Solvent Contaminated rags
Automotive & EquipMaint. & Repair Work
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Each Batch
MWR Auto Hobby Shop
614 Spent Parts Cleaner Automotive & EquipMaint. & Repair Work
HWSB Flash Point, TCLP RCRA
Metals, TCLP UHC
Metals (Sb,Tl,Ni,Be
), TCLP
8260 VOC
Full List, TCLP 8270
SVOC
Each Batch
MWR Auto Hobby Shop
614 Used Oil, Petroleum Automotive & EquipMaint. & Repair Work
LOWS *Follow
LOWS
BMP*
N/A
MWR Auto Hobby Shop
614 Used Oil, Synthetic Automotive & EquipMaint. & Repair Work
LOWS *Follow
LOWS
BMP*
N/A
MWR Auto Hobby Shop
614 Antifreeze Automotive & EquipMaint. & Repair Work
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Each Batch
MWR Auto Hobby Shop
614 POL Contaminated Rags
Automotive & EquipMaint. & Repair Work
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
MWR Auto Hobby Shop
614 Solvent Contaminated rags
Automotive & EquipMaint. & Repair Work
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Each Batch
MWR Auto Hobby Shop
614 Spent Parts Cleaner Automotive & EquipMaint. & Repair Work
HWSB Flash Point, TCLP RCRA
Metals, TCLP UHC
Metals (Sb,Tl,Ni,Be
), TCLP
8260 VOC
Full List, TCLP 8270
SVOC
Each Batch
MWR Auto Hobby Shop
614 Used Oil, Petroleum Automotive & EquipMaint. & Repair Work
LOWS *Follow
LOWS
BMP*
N/A
MWR
Boathouse
614 Used Oil, Synthetic Automotive & EquipMaint. & Repair Work
LOWS *Follow
LOWS
BMP*
N/A
MWR
Boathouse
8 POL Contaminated Rags
General Maint & Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
MWR
Boathouse
8 Solvent Contaminated rags
Equipment Maintenance &
Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
Navy SEALS 8 Used Oil, Synthetic General Maint & Repair
LOWS *Follow
LOWS
BMP*
N/A
Navy SEALS N/A Antifreeze General Maint & Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
Navy SEALS N/A Antifreeze, Dowtherm General Maint & Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
Navy SEALS N/A POL Contaminated Rags
General Maint & Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
NOAA Vessel McArthur II
N/A Solvent Contaminated Rags
Equipment Maintenance &
Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
NOAA Vessel Fairweather
N/A POL Contaminated Rags
General Maint & Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
NOAA Vessel Rainier
N/A POL Contaminated Rags
General Maint & Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
Various Locations
N/A Antifreeze General Maint & Repair
HWSB TCLP RCRA
Metals, TCLP 8260
VOC Full
List
Once every 3 years
Various Locations
N/A Gasoline/Used Oil Mixture
General Maint & Repair Work /
Error
HWSB Flash Point, TCLP RCRA
Metals, TCLP UHC
Metals (Sb,Tl,Ni,Be
), TCLP
Each Batch
8260 VOC
Full List
Various Locations
N/A OWS/Sump/Catch Basin Sludge
Routine Cleanout HWSB DRO,RRO, GRO
Each Batch
Various Locations
N/A Petroleum Contaminated Soil
Spill Cleanups HWSB DRO,RRO, GRO
Each Batch
Various Locations
N/A Sand Blast Media Surface Preparation
HWSB TCLP RCRA
Metals, TCLP UHC
Metals
(Sb,Tl,Ni,Be
Each Batch
Various Locations
N/A Waste Paint Related Materials- PAINT
SLOPS
PaintingMaint & Repair Work
HWSB Flash Point, TCLP RCRA
Metals, TCLP UHC
Metals (Sb,Tl,Ni,Be
), TCLP
8260 VOC
Full List, TCLP SVOC
Each Batch
File details come from the government source that posted it. Updated .