These are the construction documents for the Fremont High School Boiler Equipment Package project for Weber School District in Plain City, Utah. The comprehensive mechanical, electrical, and construction drawings detail a complete boiler replacement project at Fremont High School, located at 1975 N 4700 W, with a mandatory project start date of May 27, 2025 and a required completion date of September 15, 2025. The project involves replacing existing boilers, unit heaters, pumps, expansion tanks, and associated mechanical and electrical infrastructure, with liquidated damages of $200 per day assessed for late completion.
The bid documents specify technical requirements for two Bryan RV700-W water tube boilers with 7,000,000 BTU input, three Modine unit heaters, multiple pumps, and related mechanical systems. Electrical documentation includes details for variable frequency drives, power connections, and equipment schedules. A 5% bid security is required, and bidders must attend a mandatory job walk on May 8, 2025 at 9:00 a.m. to be eligible to submit a bid. The Weber School District reserves the right to accept or reject any bid, with the lowest bid not automatically guaranteeing contract award. The project is funded through the school district's capital improvement budget, with specific electrical and mechanical system upgrades designed to modernize the school's heating infrastructure.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Fremont HS Boiler Replacement Bid Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
181 East 5600 South Murray, Utah 84107 O: (801) 530-3148 www.resolutgroup.com Resolut project #: 250035
FREMONT HIGH SCHOOL
BOILER EQUIPMENT PACKAGE
1975 N 4700 W, PLAIN CITY, UT 84404
WEBER SCHOOL DISTRICT
SITE MAP
L I C
E N
S E D
PROFESS IONA
L
E N
G I N
E E
R
No. 4775391-2202
S
T A
T E OF U
TA
H
SPENCER W.
HOWELL
DRAWN BY:
CHECKED BY:
PROJ. NO:
DRAWING NO:
DRAWING TITLE:
PROJECT NAME:
THIS SQUARE APPEARS 1/2"x1/2"
ON FULL SIZE SHEETS
CLIENT:
SEAL
A u to d e s k D o c s /2
-F re m o n t H ig h S c h o o l B o ile r R e p la c e m e n t- M
E C
H v
/2
F re m o n t H ig h
S c h o o l B o ile r R e p la c e m e n t_
M E
C H v
.r v t
/3
/2
:4
:1
A
M
C001
KD
WB
250122
COVER
Fremont High School Boiler Equipment Package
1975 N 4700 W, Plain City, UT 84404
WEBER SCHOOL
DISTRICT
CONSTRUCTION
DOCUMENTS
4/30/2025
Image Attribution: Imagery ©2025 Google, Imagery ©2025 Airbus, Maxar Technologies, USDA/FPAC/GEO, Map Data ©2025
NO DATE REVISION
KEYNOTE
CONTINUATION SYMBOL
NUMBER OF SHEET WHERE DETAIL APPEARS
NUMBER OF DETAIL ON SHEET
REVISION NUMBER - SHOWN ON PLANS
GENERAL MECHANICAL SYMBOLS
ROOM NAME AND NUMBER
POINT WHERE NEW CONNECTS TO EXISTING
ITEM TO BE DEMOLISHED
AREA NOT IN CONTRACT
20"x8"
20"/8"FO
(E)
FD
SD
MD
MBD
BD
CD
20"Ø
EA
OA
TA
RLA
RA
SA
EXHAUST AIR
OUTSIDE AIR
RELIEF AIR
RETURN AIR
SUPPLY AIR - LOW PRESSURE
TRANSFER AIR
GRILLES, REGISTERS & DIFFUSERS SYMBOLS AND TAGS
CFMID
NECK SIZE
EXISTING DUCT TAG
OVAL DUCT SIZE TAG (WIDTH / HEIGHT)
SQUARE DUCT SIZE TAG (WIDTH x HEIGHT)
HVAC SYMBOLS
RECTANGULAR SUPPLY/OUTSIDE AIR DUCT RISE
RECTANGULAR RETURN/TRANSFER AIR DUCT RISE
MECHANICAL EQUIPMENT TAGS
ROUND DUCT SIZE TAG (DIAMETER)
CFMTYPE (SEE SCHEDULE)
NUMBER OF SLOTS / SLOT WIDTH /
ACTIVE SLOT LENGTH (PLENUM LENGTH)
/ NECK SIZE
DUCT BEING DEMOLISHED
ROUND SUPPLY/OUTSIDE AIR DUCT RISE
ROUND RETURN/TRANSFER AIR DUCT RISE
RECTANGULAR EXHAUST/RELIEF AIR DUCT RISE
ROUND EXHAUST/RELIEF AIR DUCT RISE
DROP
DROP
DROP
DROP
DROP
DROP
GEA GREASE EXHAUST AIR
SEA SMOKE EXHAUST AIR
EQUIPMENT BY OTHERS
(REFER TO OTHER DISCIPLINE
FOR ADDITIONAL INFORMATION)
EXISTING EQUIPMENT
TO REMAIN
FLUE EXHAUST GAS FLUE
CA COMBUSTION AIR
OA CONDITIONED OUTSIDE AIR
VAV-XX
10' - 0"
(E)VAV-XX
VAV-XX
Ø ROUND
ABV ABOVE
AC AIR CONDITIONING
AD AREA DRAIN
ADD ADDENDUM
AFF ABOVE FINISHED FLOOR
AFUE ANNUAL FUEL UTILIZATION EFFICIENCY
ALT ALTERNATE
AP ACCESS PANEL
ARCH ARCHITECT/ARCHITECTURAL
BFF BELOW FINISHED FLOOR
BLW BELOW
BTU BRITISH THERMAL UNITS
BTUH BRITISH THERMAL UNITS PER HOUR
CAP CAPACITY
CB CATCH BASIN
CFM CUBIC FEET PER MINUTE
CLG CEILING
CO CLEAN OUT
D DEGREE
DB DRY BULB
DCW DOMESTIC COLD WATER
DHW DOMESTIC HOT WATER
DIA DIAMETER
DN DOWN
DW DISTILLED WATER
EA EACH
EAT ENTERING AIR TEMPERATURE
ELEC ELECTRICAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWT ENTERING WATER TEMPERATURE
EA EXHAUST AIR
EXIST EXISTING
F DEGREES FAHRENHEIT
FCO FLOOR CLEAN OUT
FD FLOOR DRAIN
FD FIRE DAMPER
FDV FIRE DEPARTMENT VALVE
FL FLOOR
FO FUEL OIL
FOV FUEL OIL VENT
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FPM FEET PER MINUTE
FS FLOOR SINK
FT FOOT/FEET
FTR FIN TUBE RADIATION
GAL GALLON
GC GENERAL CONTRACTOR
GPM GALLONS PER MINUTE
GW GREASE WASTE
HB HOSE BIB
HP HORSE POWER
HTG HEATING
HTR HEATER
HYD HYDRANT
ID INDIRECT
IN INCH
INV INVERT
LB POUND
LB/HR POUNDS PER HOUR
LAT LEAVING AIR TEMPERATURE
LP LOW PRESSURE
LPG LIQUEFIED PETROLEUM GAS
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
MA MIXED AIR
MAX MAXIMUM
MBH ONE THOUSAND BTU PER HOUR
MCF ONE THOUSAND CUBIC FEET
MD MOTORIZED DAMPER
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTR MOTOR
MUA MAKE-UP/AIR
NC NOISE CRITERIA
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NUMBER
NO NORMALLY OPEN
NTS NOT TO SCALE
O OXYGEN
OA OUTSIDE AIR
PD PRESSURE DROP
PIV POST INDICATOR VALVE
PLBG PLUMBING
PRESS PRESSURE
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAUGE
PWR POWER
R DUCT RISER
RA RETURN AIR
RCP RADIANT CEILING PANEL
RD ROOF DRAIN
RDO ROOF DRAIN OVERFLOW
REC RECESSED
RED REDUCER
RH RELATIVE HUMIDITY
RL/A RELIEF AIR
RM ROOM
RPM REVOLUTIONS PER MINUTE
RW RAIN WATER
SF SQUARE FOOT
SA SUPPLY AIR
SAN SANITARY
SF SQUARE FOOT
SD SMOKE DAMPER
SM SURFACE MOUNT
SP STANDPIPE
SP STATIC PRESSURE
STM STEAM
T THERMOSTAT
TD TRENCH DRAIN
TDR TEMPERATURE DROP
TEMP TEMPERATURE
TYP TYPICAL
UG UNDERGROUND
VAC VACUUM
V VENT
VAV VARIABLE AIR VOLUME
VENT VENTILATION
VTR VENT THROUGH ROOF
W WASTE
WB WET BULB
WCO WALL CLEAN OUT
WH WALL HYDRANT
ABBREVIATIONS
SECTION TOTAL TRACK LENGTH
BOTTOM OF EQUIPMENT
ELEVATION
590 lb
RTU-XX
4.0 ton
RTU-XX
115000 Btu/h
115 CFH
RTU-XX
Htg: 3.7 GPM
VAV-XX
HEATING
COIL
FLOW OPERATING WEIGHT
NOT INCLUDING CURB
FUEL INPUT
GAS PIPE FLOW
NOMINAL COOLING
CAPACITY
VAV BOX
ROOFTOP UNIT
DATA DEVICE TAGS
DAMPER TAGS
VAV-XX
RTU-XX
EQUIPMENT ID
SYMBOL
MANUAL BALANCING DAMPER
BACKDRAFT DAMPER
COMBINATION FIRE/SMOKE
DAMPER
FIRE DAMPER
SMOKE DAMPER
MOTORIZED DAMPER
SENSOR
MANUAL SWITCH
THERMOSTAT
TEMPERATURE SENSOR
TEMPERATURE & HUMIDITY SENSOR
HUMIDITY SENSOR
NITROGEN DIOXIDE SENSOR
CARBON MONOXIDE SENSOR
CARBON DIOXIDE SENSOR
HUMIDISTAT
EXISTING RELOCATED
EQUIPMENT (R)VAV-XX
POINT WHERE EXISTING IS TO BE DEMOLISHED
Room
EXISTING PIPE TAG
PIPING BEING DEMOLISHED
ABOVE GROUND PIPING
PIPE SIZE TAG (DIAMETER)
BELOW GROUND PIPING
PIPE INVERT ELEVATION TAG
PIPE SLOPE TAG
1/8" / 12" SLOPE
INVERT: -105' - 1"
(E)
HVAC SYMBOLS
SQUARE
SUPPLY DIFFUSER
RECTANGULAR
SUPPLY DIFFUSER
RECTANGULAR
RETURN GRILLE
SQUARE
RETURN GRILLE
ROUND SUPPLY
DIFFUSER
RECTANGULAR
EXHAUST GRILLE
SQUARE
EXHAUST GRILLE
SA SUPPLY AIR - MEDIUM PRESSURE
6"Ø
CD1 /100
8"x8"
CD1 /200
12"x12"
RG1 /500
8"Ø
RG2 /180
12"Ø
EG2 /300
8"x8"
EG3 /150
BLOW PATTERNS
3-WAY
4-WAY
2-WAY
2-WAY
CORNER
1-WAY
CEILING
SIDEWALL
14"x14"
SWS1 /300
16"x16"
SWE1 /400
28"x12"
SWR1 /600
LS1 /200
2/1.00"/5'-0"/10"Ø
5' - 0"
LINEAR SLOT
24"x24"
RG4 /800
PLENUM RETURN GRILLE
WITH SOUND BOOT
12"Ø
CD5 /400 LINEAR BAR GRILLES
48"x6"
LB1 /300
2"
PIPING SYMBOLS
* NOTE *
THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS SHEET MAY OR MAY NOT BE USED IN
THIS SET OF DRAWINGS.
CHWS
CWV
CA
CD
LPCR
CWR
CWS
DCW
FCW
SCW
DHW
DHW140°
DHWR
DHWR140°
GV
GW
HWR
HWS
NG
OV
OW
PD
V
W
SHWR
SHWS
LPS
RD
RDO
CHWR CHILLED WATER RETURN
CHILLED WATER SUPPLY
COMBINATION WASTE & VENT
COMPRESSED AIR
CONDENSATE DRAINAGE
LOW PRESSURE CONDENSATE RETURN
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
DOMESTIC COLD WATER
FILTERED COLD WATER
SOFT COLD WATER
HOT WATER
HOT WATER 140°
HOT WATER RECIRCULATION
HOT WATER RECIRCULATION 140°
GREASE VENT
GREASE WASTE
HEATING WATER RETURN
HEATING WATER SUPPLY
NATURAL GAS
OIL VENT
OIL WASTE
PUMP DISCHARGE
SANITARY VENT
SANITARY SEWER
SOLAR HOT WATER RETURN
SOLAR HOT WATER SUPPLY
LOW PRESSURE STEAM
ROOF DRAIN
ROOF DRAIN OVERFLOW
REFL
REFS
REFRIGERANT-LIQUID
REFRIGERANT-SUCTION
2"
4"
4"
REFHG REFRIGERANT-HOT GAS DRAIN SIZE
PIPE RISE
PIPE DROP
PIPE TEE REDUCING 45
DEGREE TEE
45 DEGREE TEE
PG PROPANE GAS
TYPE (SEE SCHEDULE)
RO REVERSE OSMOSIS WATER
IW INDIRECT WASTE
4000 SF
6" RD-1
4" FD-1FLOOR DRAIN 4" AD-6 AREA DRAIN
4" FS-4FLOOR SINK
4" DD-29 DECK DRAIN4" FD-3PFLOOR DRAIN
8 WFU
4" FD-13
HUB DRAIN
DRAIN TAGS
"P" - INDICATES
PRIMER CONNECTION
FIXTURE UNITS
FLOW CONTROL
DRAIN
4" RD-12
COMBINATION
DRAINS
ROOF DRAIN4" RD-15
ROOF AREA
SERVED BY DRAIN
2" DOM. WM
PIPE ACCESSORY TAGS
DOMESTIC WATER METER
BALANCING VALVE
1/4 TURN BALL VALVE
CHECK VALVE
3-WAY MIXING VALVE
MOTORIZED CONTROL VALVE
3 WAY MOTORIZED CONTROL
VALVE
PRESSURE REDUCING VALVE
REFRIGERANT SOLENOID VALVE
BUTTERFLY VALVE
2" BALANCING
2" SHUTOFF
2" CHECK
2" TMV
2" M-CNTRL
2" 3-WAY CNTRL
2" PRV
3/8" SOLENOID
2" BUTTERFLY
WATER CLOSET -
WALL HUNG - ADA WC-1
U-1
1 WFU
LAV-1A
1.5 CWFU
1.5 HWFU
LAV-1A
FIXTURE UNITS
4" WCO
PIPE ACCESORY
TAG
PLUMBING FIXTURE TAGS
4" WCO
TYPE (SEE SCHEDULE)
WC-1A
CAP
PLUG
GWR
GWS
GROUND LOOP WATER RETURN
GROUND LOOP WATER SUPPLY
NPCW NON-POTABLE COLD WATER
NPHW NON-POTABLE HOT WATER
8" COTG CLEANOUT TO GRADE
PIPE CONNECTION SIZE
NER NET ENERGY LOOP RETURN
NES NET ENERGY LOOP SUPPLY
HPCR
HPS
HIGH PRESSURE CONDENSATE RETURN
HIGH PRESSURE STEAM
CO2 MEDICAL GAS - CARBON DIOXIDE (CO2)
HE MEDICAL GAS - HELIUM (HE)
IA MEDICAL GAS - INSTRUMENT AIR
MA MEDICAL GAS - MEDICAL AIR
MV MEDICAL GAS – MEDICAL VACUUM
N2 MEDICAL GAS – NITROGEN (N2)
N2O MEDICAL GAS – NITROUS OXIDE (N2O)
O2 MEDICAL GAS – OXYGEN (O2)
WAGD WASTE ANESTHESIA GAS DISPOSAL
GHWR GLYCOL HEATING WATER RETURN
GHWS GLYCOL HEATING WATER SUPPLY
VALVE SIZE
L I C
E N
S E D
PROFESS IONA
L
E N
G I N
E E
R
No. 4775391-2202
S
T A
T E OF U
TA
H
SPENCER W.
HOWELL
DRAWN BY:
CHECKED BY:
PROJ. NO:
DRAWING NO:
DRAWING TITLE:
PROJECT NAME:
THIS SQUARE APPEARS 1/2"x1/2"
ON FULL SIZE SHEETS
CLIENT:
SEAL
A u to d e s k D o c s /2
-F re m o n t H ig h S c h o o l B o ile r R e p la c e m e n t- M
E C
H v
/2
F re m o n t H ig h
S c h o o l B o ile r R e p la c e m e n t_
M E
C H v
.r v t
/3
/2
:4
:1
A
M
M000
Author
Checker
250122
MECHANICAL TITLE
SHEET
Fremont High School Boiler Equipment Package
1975 N 4700 W, Plain City, UT 84404
WEBER SCHOOL
DISTRICT
CONSTRUCTION
DOCUMENTS
4/30/2025
MECHANICAL SHEET INDEX
C001 COVER
M000 MECHANICAL TITLE SHEET
M001 MECHANICAL GENERAL NOTES
M401 MECHANICAL ENLARGED VIEWS
M501 MECHANICAL DETAILS
M601 MECHANICAL SCHEDULES
MECHANICAL GENERAL NOTES
1. THE CONTRACTOR SHALL INFORM THE DESIGNER OF ANY PROPOSED DEVIATIONS FROM THE
CONTRACT DOCUMENTS.
2. SUPPLY AND RETURN PIPING TO COILS ARE THE SAME SIZE.
MECHANICAL PIPING GENERAL NOTES
1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL
COMPLETE AND OPERABLE PIPING SYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED AND
AS REQUIRED BY CODE.
2. UNLESS OTHERWISE NOTED: ALL MECHANICAL PIPING IS OVERHEAD TO RUN ABOVE DUCTWORK AND
TIGHT TO UNDERSIDE OF STRUCTURE.
3. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES, AND OTHER
APPURTENANCES REQUIRING ACCESS ARE ACCESSIBLE.
4. ALL VALVES SHALL BE INSTALLED SO THAT VALVES REMAINS IN SERVICE WHEN EQUIPMENT OR
PIPING ON EQUIPMENT SIDE OF VALVE IS REMOVED.
5. PROVIDE AIR VENT AT HIGH POINT OF EACH DROP IN THE HEATING AND CHILLED WATER PIPING
SYSTEM.
6. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY OPERATION AND TAGGED.
7. PROVIDE ISOLATION VALVES AT EACH EXIST/ENTRANCE INTO SHAFT WHETHER OR NOT SHOWN.
8. COORDINATE LOCATION OF THERMOSTAT WITH ARCHITECTURAL FURNISHING PLANS. MOUNT
THERMOSTAT AT HEIGHT AS SPECIFIED ON ARCHITECTURAL PLANS OR SPECIFICATIONS.
9. DRAIN PANS SHALL BE INSTALLED UNDER ANY PIPING THAT MAY CONTAIN WATER INSTALLED IN AN ELECTRICAL, DATA, IT, OR OTHER ROOM WITH SENSITIVE ELECTRICAL EQUIPMENT. THIS INCLUDES, BUT IS NOT LIMITED TO HYDRONIC, WASTE, DOMESTIC, ROOF DRAIN, ETC.
PROJECT GENERAL NOTES
1. THE PROJECT GENERAL NOTES APPLY TO ALL DISCIPLINES.
2. REMOVE ALL UNUSED PIPING, DUCTWORK, EQUIPMENT, AND ACCESSORIES.
3. THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING CONDITIONS FOR PLUMBING AND MECHANICAL SYSTEMS WITHIN THE TENANT SPACE AND WITHIN CLOSE PROXIMITY TO THE TENANT SPACE. THE CONTRACTOR WILL FIELD VERIFY AS MUCH AS IS REASONABLE BEFORE THE FINAL BID. AFTER THE FINAL BID THE CONTRACTOR WILL NOTIFY THE
OWNER, ARCHITECT, AND MECHANICAL DESIGN ENGINEER IMMEDIATELY UPON DISCOVERY OF
EXISTING CONDITIONS THAT MAY AFFECT THE DESIGN.
4. WHERE FLOOR DRAINS OCCUR WITH THE LIMITS OF CONSTRUCTION, PREVENT CONSTRUCTION
DEBRIS FROM ENTERING DRAIN BODY BY SEALING DRAIN OPENING PRIOR TO START OF WORK.
UNSEAL DRAINS AT COMPLETION OF CONSTRUCTION.
5. COORDINATE INSTALLATION OF PIPING, DUCTWORK, CONDUIT, LIGHTS, CABLE TRAY, STRUCTURE, EQUIPMENT, CEILINGS, ARCHITECTURAL COMPONENTS, AND ANYTHING ELSE PERTAINING TO THE
PROJECT TO PREVENT CONFLICTS.
6. THE CONTRACTOR SHALL BE FAMILIAR WITH ALL THE CONDITIONS BOTH EXISTING AND THOSE ILLUSTRATED BY THESE DOCUMENTS AND THOSE OF OTHER DISCIPLINES, INCLUDING, BUT NOT LIMITED TO ARCHITECTURAL, CIVIL, ELECTRICAL, VENTILATION, PLUMBING, AND OTHER SYSTEMS
INVOLVED ON THIS PROJECT.
7. FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING SYSTEM, AND SHALL CONFORM TO ALL REQUIREMENTS OF APPLICABLE FEDERAL, STATE, AND LOCAL CODES, INCLUDING BUT NOT LIMITED TO THE INTERNATIONAL BUILDING CODE, INTERNATIONAL MECHANICAL CODE, AND INTERNATIONAL
PLUMBING CODE.
8. LOCATE EQUIPMENT REQUIRING ACCESS 2'-0" MAXIMUM ABOVE CEILING.
9. ALL ROOF MOUNTED EQUIPMENT SHALL BE A MINIMUM 10'-0" FROM EDGE OF ROOF.
10. COORDINATE INSTALLATION OF DUCTWORK, PIPING AND MECHANICAL EQUIPMENT WITH NEC
CLEARANCES INCLUDING THE SPACE ABOVE ELECTRICAL PANELS, TRANSFORMERS AND OTHER
ELECTRICAL EQUIPMENT. NO PIPING OR DUCTWORK TO RUN OVER ELECTRICAL PANELS, VFD'S OR MCC'S. PROTECT EQUIPMENT WITH A 42" DEEP ZONE IN FRONT OF PANELS, VFD'S AND MCC'S.
PROVIDE PANS IF REQUIRED UNDER PIPING.
11. FIRE SEAL AROUND DUCT AND PIPING PENETRATIONS OF FIRE RATED WALLS. THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR CAULKING AND SEALING ALL PENETRATIONS IN FIRE
AND SMOKE RATED PARTITIONS TO MAINTAIN RATINGS. REFER TO SPECIFICATION.
12. TRANSITION PIPING AND DUCTWORK SIZES TO MATCH THE SIZE OF EQUIPMENT CONNECTION.
13. REFER TO PLUMBING SERIES DRAWINGS FOR GAS PIPING.
14. ALL PIPE AND DUCT SIZES SHOWN SHALL BE CONTINUED IN THE DIRECTION OF FLOW UNTIL
ANOTHER SIZE IS SHOWN.
15. FOR DETAILS, EQUIPMENT CONNECTIONS, AND PIPE SIZES NOT SHOWN ON THE SEGMENTS, REFER
TO DETAILS, SCHEDULES, AND SPECIFICATIONS.
16. INSTALL ALL EQUIPMENT IN ACCORDANCE WITH THE RESPECTIVE MANUFACTURER'S WRITTEN
INSTALLATION INSTRUCTIONS, AT A LEVEL OF WORKMANSHIP CONSISTENT WITH THE
SPECIFICATIONS.
17. MECHANICAL CONTRACTOR SHALL ENSURE THAT ALL EQUIPMENT IS PROVIDED AND INSTALLED
WITH CLEARANCES PER MANUFACTURERS RECOMMENDATIONS. THE CONTRACTOR SHALL MAINTAIN
PROPER SERVICE SPACE FOR COIL PULLS, BAS DEVICES, MAINTENANCE ACCESS, ETC.
18. LOCATIONS OF PIPING, DUCTWORK AND EQUIPMENT, AS INDICATED ON THE DRAWING, ARE APPROXIMATE AND SUBJECT TO MINOR ADJUSTMENTS IN THE FIELD, INCLUDING, BUT NOT LIMITED TO, OFFSETS AND TRANSITIONS. NEW DUCTWORK, PIPING AND EQUIPMENT SHALL BE COORDINATED
WITH STRUCTURE, LIGHTS, REFLECTED CEILING PLANS, CABLE TRAY, ELECTRICAL CONDUIT,
PLUMBING, MECHANICAL AND FIRE PROTECTION PIPING, MEDICAL GASES, ALL OTHER TRADES AND
ALL OTHER EXISTING CONDITIONS TO AVOID INTERFERENCE IN THE FIELD.
19. THE CONTRACTOR SHALL INFORM THE DESIGNER OF ANY PROPOSED DEVIATIONS FROM THE
CONTRACT DOCUMENTS.
20. IF CONTRACTOR ENCOUNTERS MATERIAL WHICH MAY CONTAIN ASBESTOS, IMMEDIATELY STOP
WORK IN THIS AREA AND NOTIFY THE OWNER.
21. DETAILS REFERENCE ALL SHEETS.
22. INSTALL ALL PIPING AND DUCTWORK WITHOUT FORCING OR SPRINGING.
23. LOCATE VALVING, ACCESSORIES, AND EQUIPMENT IN ACCESSIBLE LOCATIONS.
24. CONTRACTOR TO PROVIDE DELEGATED DESIGN OF SEISMIC BRACING AS A DEFERRED SUBMITTAL.
SEE SPECIFICATION 23 0548 - VIBRATION AND SEISMIC CONTROLS FOR HVAC.
L I C
E N
S E D
PROFESS IONA
L
E N
G I N
E E
R
No. 4775391-2202
S
T A
T E OF U
TA
H
SPENCER W.
HOWELL
DRAWN BY:
CHECKED BY:
PROJ. NO:
DRAWING NO:
DRAWING TITLE:
PROJECT NAME:
THIS SQUARE APPEARS 1/2"x1/2"
ON FULL SIZE SHEETS
CLIENT:
SEAL
A u to d e s k D o c s /2
-F re m o n t H ig h S c h o o l B o ile r R e p la c e m e n t- M
E C
H v
/2
F re m o n t H ig h
S c h o o l B o ile r R e p la c e m e n t_
M E
C H v
.r v t
/3
/2
:4
:1
A
M
M001
Author
Checker
250122
MECHANICAL GENERAL
NOTES
Fremont High School Boiler Equipment Package
1975 N 4700 W, Plain City, UT 84404
WEBER SCHOOL
DISTRICT
CONSTRUCTION
DOCUMENTS
4/30/2025
* NOTE *
ALL OF THE GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER DRAWINGS IN THIS SET.
P-4 P-3 P-2
P-20
P-1
P-5 P-6
ET-3
ET-2
ET-1
B-2
B-1
GFU-1
(E)AH-7
(E)AH-8
UH-3A UH-3B
PF
20"Ø FLUE
20"Ø FLUE
(E)GHWR
UH-3C
(E) 6" HWR
(E) 6" GHWS
(E) 6" GHWR
(E)GHWS
(E)GHWR
(E)HWS
4" 5"
5"
6"
4" 4"
4" 4"
6"
6 6
4"
4"
4" 10
6"
6"
T
(E) 2" NG
(E) 2" NG
(E) 1" NG
(E
1/
4" N
G
(E) 1 1/2" NG
5"
(E)CHWS
6"6"
6" 6" 6"
6" DN
6" DN
6" DN
5" DN
(E)P-4 (E)P-3 (E)P-2
(E)P-20
(E)P-1
(E)P-5 (E)P-6
(E)AH-7
(E)AH-8
(E)ET-3
(E)ET-2
(E)ET-1
B-2
B-1
(E)GF
UH-3 UH-3
UH-3
(E)POT
FEEDER
2 2
(E)HWR
(E)GHWS
(E)GHWR
3 3 3 3 3
(E) 1" NG
(E) 1 1/2" NG
(E
1/
4" N
G
(E) 1" NG
(E) 1 1/4" NG
(E) 2" NG
(E) 2" NG
L I C
E N
S E D
PROFESS IONA
L
E N
G I N
E E
R
No. 4775391-2202
S
T A
T E OF U
TA
H
SPENCER W.
HOWELL
DRAWN BY:
CHECKED BY:
PROJ. NO:
DRAWING NO:
DRAWING TITLE:
PROJECT NAME:
THIS SQUARE APPEARS 1/2"x1/2"
ON FULL SIZE SHEETS
CLIENT:
SEAL
A u to d e s k D o c s /2
-F re m o n t H ig h S c h o o l B o ile r R e p la c e m e n t- M
E C
H v
/2
F re m o n t H ig h
S c h o o l B o ile r R e p la c e m e n t_
M E
C H v
.r v t
/3
/2
:4
:1
A
M
M401
ML
250122
MECHANICAL ENLARGED
VIEWS
Fremont High School Boiler Equipment Package
1975 N 4700 W, Plain City, UT 84404
WEBER SCHOOL
DISTRICT
CONSTRUCTION
DOCUMENTS
4/30/2025
KEYNOTES
1 DEMOLISH AND REMOVE EXISTING BOILERS
2 DEMO PIPING TO BOILER BACK FAR ENOUGH TO PIPE UP THE NEW BOILER, AND
INCLUDE ALL THE NEW PIPING ACCESSORIES AND VALVES SHOWN IN THE PIPING
DETAILS.
3 DEMOLISH PUMPS. ALSO REMOVE PIPING BACK FAR ENOUGH TO ADAPT TO NEW
PUMPS AND INSTALL ALL THE NEW VALVES AND ACCESSORIES AS SHOWN IN THE
PUMP DETAIL.
4 GLYCOL FEED TANK TO BE REPLACED AND RELOCATED. SEE NEW PLANS AND
ELECTRICAL PLANS.
5 UNIT HEATERS TO BE REPLACED. REMOVE EXISTING UNIT HEATERS.
6 INSTALL NEW UNIT HEATER AND FLUES. SIZE FLUES ACCORDING TO
MANUFACTURER'S RECOMMENDATIONS. IF EXISTING FLUE IS EQUAL TO OR
LARGER THAN NEW FLUE THE NEW TRANSITION TO THE LARGER SIZE AND REUSE
THE SAME ROOF PENETRATION, BUT ALL DUCTWORK AND CAPS SHALL BE NEW.
TERMINATE FLUE 24" ABOVE THE ROOF WITH A CAP THAT IS APPROVED MY THE
UNIT HEATER MANUFACTURER.
7 THIS NEW EXPANSION TANK CAN BE TIED INTO EXISTING PIPING. THE PRESSURE
GAUGES AND PRESSURE RELIEF VALVES SHALL BE REPLACED ALONG WITH THIS
TANK.
8 THIS NEW EXPANSION TANK SHALL BE INSTALLED AND RE-PIPED PER THE DETAIL
WITH A NEW VALVES AND ACCESSORIES. SEE DETAIL 5/M501
9 PIPE EXPANSION TANK PRESSURE RELIEF VALVE BACK TO GLYCOL FEED TANK.
PIPE TO SLOPE FROM RELIEF VALVE TO TANK.
10 NO NEW MECHANICAL PIPING SHALL USE VICTAULIC COUPLERS. ALL NEW PIPING
SHOULD BE WELDED STEEL. SEE SPECIFICATIONS.
11 VFD TO BE PROVIDED BY ELECTRICAL. SEE ELECTRICAL SHEETS. VFDS TO
CONTROL PUMP TO DIFFERENTIAL SETPOINT SEE DETAIL THAT INDICATES
GENERAL LOCATIONS OF THESE DIFFERENTIAL PRESSURE SENSORS. SEE DETAIL
6/M501
12 INSTALL DRIP PANS UNDER PIPING TO PROTECT VFDS
13 INSTALL NEW BMS INTEGRATED THERMOSTAT A MINIMUM OF 30" AWAY FROM
DOOR IN AN ACCESSIBLE LOCATION. THAT WILL CONTROL ALL 3 NEW UNIT
HEATERS SIMULTANEOUSLY. ENSURE THAT THE THERMOSTAT AND OTHER
CONTROL ACCESSORIES PROVIDED ARE COMPATIBLE WITH CONTROLLING THE
PROVIDED UNITS SIMULTANEOUSLY.
14 BEFORE WORK CAN BE DONE ON THE GLYCOL SYSTEM. THE GLYCOL MUST BE
DRAINED AND CONTAINED.
15 MODIFY EXISTING GAS SUPPLY AND VENT LINES AS NEEDED TO INSTALL NEW UNIT
HEATERS AND PRESSURE REGULATORS. SEE NATURAL GAS SPECIFICATION
SECTION.
16 MODIFY EXISTING GAS SUPPLY AND VENT LINES AS NEEDED TO INSTALL NEW UNIT
BOILERS ALONG WITH THEIR NEW GAS TRAIN INSTALL NEW SHUT OFF VALVE
REGULATOR, AND ANY OTHER SOLENOIDS OR ACCESSORIES PROVIDED WITH
BOILER TO MEET BOILER MANUFACTURE'S RECOMMENDATIONS AND CURRENT
CODE.. SEE NATURAL GAS SPECIFICATION SECTION.
17 EXISTING BOILER FLUE SHALL BE DEMOLISHED.
18 PROVIDE BOILER SHUT OFF BUTTON AT EACH EXIT. SEE ALSO CONTROLS
SPECIFICATION.
19 PROVIDE 100% NEW BOILER FLUE. PROVIDE TRANSITIONS AND ROUTING TO USE
EXISTING ROOF OPENING. TERMINATE FLUE 24" ABOVE THE ROOF WITH A CAP
THAT IS APPROVED MY THE BOILER MANUFACTURER.
1/4" = 1'-0"M401
2 BOILER RM FLOOR MECHANICAL PLAN
1/4" = 1'-0"M401
1 BOILER RM FLOOR MECHANICAL DEMO PLAN
0-150 PSI
0-150 PSI
0-150 PSI
PRESSURE GAUGE
UNION
CALIBRATED BALANCING VALVE
NON SLAM CHECK VALVE
SHUT OFF VALVE
FLEXIBLE CONNECTION
THERMOMETER
S U
C T
IO
N
D
IS
C H
A R
G E
STRAINER BLOWDOWN
FULL SIZE TO FLOOR
DRAIN WITH CAP
ISOLATOR PAD. SEE
SPECIFICATIONS (TYPICAL)
CONCRETE 4" BASE WITH #4 BARS 12"
O.C. BEBEL EACH WAY EDGE ALL
AROUND
ANCHOR BOLT WITH NUT
AND WASHER (TYPICAL)
REDUCER (TYPICAL)
1" BALL VALVE WITH PLUG
INSTALL AS CLOSE AS POSSIBLE
TO TOP OF CHECK VALVE.
2' M
IN
EXHAUST
TERMINAL
EXHAUST PIPE. SEE PLAN FOR SIZE
FLASHING
ROOF
EXHAUST
PIPE
FAN
GAS CONNECTION
SUPPORTS
INSTALL WITH PROPLER
CLEARANCES ON THE
INTAKE SIDE OF THE FAN.
NOTE:
TO DRAIN
HWS
TEMPERATURE AND
PRESSURE RELIEF
VALVE (45 PSI)
(TYPICAL)
BOILER
SHUT-OFF VALVE
LOW WATER CUTOFF.
INSTALL PER
MANUFACTURER'S
RECOMENDATIONS.
BURNER
G
GAS TRAIN INCLUDING PRESSURE
REGULATOR, SOLENOIDS, AND
VALVES PROVIDED WITH BOILER
INSTALLED BY MECHANICAL
CONTRACTOR.
GAS SHUT OFF VALVE
TO EXISTING PIPING
PRESSURE
GAUGE
DRAIN FOR TESTING LOW
WATER CUTOFF. PIPE TO
DRAIN
EXISTING CONCRETE
HOUSEKEEPING PAD
THERMOMETER
(TYPICAL)
FOR HEATING WATER PUMP INSTALLATION AND RELATED PIPING.
PT PLUG
REFER TO DRAWINGS
HWR
PT PLUG
3/4" DRAIN WITH VALVE
AND HOSE CONNECTION
(TYPICAL)
HEAT EXCHANGERHEAT EXCHANGER
RE-USE THE EXISTING CONTROL
VALVES. THE FLANGES MAY NEED TO
BE REPLACED IN THE SWITCH TO
WELDED PIPE. ATC TO WIRE ALL 3
VALVES PER BOILER INTO THE
EXISTING BMS.
(TYPICAL)
TO EXISTING PIPING
TO EXISTING PIPING
PIPE THE DRAINS WITH BALL VALVES TO THE
FLOOR DRAIN TERMINATE WITH AN AIR GAP AND
TURNDOWN. SIZE PIPE TO MATCH CONNECTION
SIZE. COMBINED PIPE TO BE 2"
STRAINER WITH BLOWDOWN
AND HOSE CONNECTION.
(TYPICAL)
CALIBRATED BALANCING VALVE.
(TYPICAL)
GLYCOL
FEED
TANK
STRAINER BLOWDOWN (TYPICAL)
CHECK VALVE (TYPICAL)
SHUT-OFF VALVE (TYPICAL)
SYSTEM PIPING
TO EXISTING EXPANSION
TANK PIPING.
3/4" DRAIN WITH VALVE
AND HOSE CONNECTION
BLADDER TYPE
EXPANSION TANK
SIZE PER
EXPANSION TANK CONNECTION
TAPPING
PRESSURE RELIEF VAVLE
SEE SCHEDULE FOR SETTING
0-100 PSI
PRESSURE
GAUGE
WITH COCK
WATER
AIR
PIPE TO GLYCOL FEED TANK FOR GLYCOL SYSTEM
BOILER ROOM
INSTALL NEW DIFFERENTIAL PRESSURE
SENSORS IN THE CHILLED AND HOT WATER
PIPING IN THE AIR HANDLER ROOM AT THIS
LOCATION.
A1
A2
B1
B2
C
D
E
F
L I C
E N
S E D
PROFESS IONA
L
E N
G I N
E E
R
No. 4775391-2202
S
T A
T E OF U
TA
H
SPENCER W.
HOWELL
DRAWN BY:
CHECKED BY:
PROJ. NO:
DRAWING NO:
DRAWING TITLE:
PROJECT NAME:
THIS SQUARE APPEARS 1/2"x1/2"
ON FULL SIZE SHEETS
CLIENT:
SEAL
A u to d e s k D o c s /2
-F re m o n t H ig h S c h o o l B o ile r R e p la c e m e n t- M
E C
H v
/2
F re m o n t H ig h
S c h o o l B o ile r R e p la c e m e n t_
M E
C H v
.r v t
/3
/2
:4
:1
A
M
M501
Author
Checker
250122
MECHANICAL DETAILS
Fremont High School Boiler Equipment Package
1975 N 4700 W, Plain City, UT 84404
WEBER SCHOOL
DISTRICT
CONSTRUCTION
DOCUMENTS
4/30/2025
NOT TO SCALEM501
1 CLOSE COUPLED END SUCTION PUMP DETAIL
NOT TO SCALEM501
2 GAS FIRED UNIT HEATER THRU ROOF DETAIL
NOT TO SCALEM501
4 BOILER PIPING DIAGRAM
NOT TO SCALEM501
3 GLYCOL FEED UNIT DETAIL
NOT TO SCALEM501
5 FLOOR MOUNTED EXPANSION TANK -GLYCOL SYSTEM - DETAIL
NOT TO SCALEM501
6 DIFFERENTIAL PRESSURE SENSOR LOCATIONS FOR NEW PUMP VFD CONTROL
L I C
E N
S E D
PROFESS IONA
L
E N
G I N
E E
R
No. 4775391-2202
S
T A
T E OF U
TA
H
SPENCER W.
HOWELL
DRAWN BY:
CHECKED BY:
PROJ. NO:
DRAWING NO:
DRAWING TITLE:
PROJECT NAME:
THIS SQUARE APPEARS 1/2"x1/2"
ON FULL SIZE SHEETS
CLIENT:
SEAL
A u to d e s k D o c s /2
-F re m o n t H ig h S c h o o l B o ile r R e p la c e m e n t- M
E C
H v
/2
F re m o n t H ig h
S c h o o l B o ile r R e p la c e m e n t_
M E
C H v
.r v t
/3
/2
:4
:1
A
M
M601
ML
250122
MECHANICAL
SCHEDULES
Fremont High School Boiler Equipment Package
1975 N 4700 W, Plain City, UT 84404
WEBER SCHOOL
DISTRICT
CONSTRUCTION
DOCUMENTS
4/30/2025
4. PUMP ON VFD BY DIVISION 26.
3. P-5 AND P-6 ARE PARALLEL PUMPS
2. P-3 AND P-4 ARE PARALLEL PUMPS
1. PUMP SHALL BE NON-OVERLOADING
P-20 TACO 4009 D BOILER ROOM CHILLER PRIMARY CLOSE COUPLED 560 30% P.G. 40 77 BRONZE FITTED 10 7.57 1760 460/3/60 1
P-6 TACO 2510C BOILER ROOM HEATING WATER CLOSE COUPLED 350 WATER 87 78 BRONZE FITTED 15 9.82 1760 460/3/60 1,3,4
P-5 TACO 2510C BOILER ROOM HEATING WATER CLOSE COUPLED 350 WATER 87 78 BRONZE FITTED 15 9.82 1760 460/3/60 1,3,4
P-4 TACO 3011D BOILER ROOM CHW - PREHEAT LOOP CLOSE COUPLED 500 30% P.G. 95 80 BRONZE FITTED 20 15.55 1760 460/3/60 1,2,4
P-3 TACO 3011D BOILER ROOM CHW - PREHEAT LOOP CLOSE COUPLED 500 30% P.G. 95 80 BRONZE FITTED 20 15.55 1760 460/3/60 1,2,4
P-2 TACO 4009 D BOILER ROOM CHILLER PRIMARY CLOSE COUPLED 560 30% P.G. 40 77 BRONZE FITTED 10 7.57 1760 460/3/60 1
P-1 TACO 2507D BOILER ROOM CHILLER PRIMARY CLOSE COUPLED 265 30% P.G. 40 76 BRONZE FITTED 5 3.63 1760 460/3/60 1
ID MODEL NUMBER LOCATION USE TYPE (GPM) FLUID (FT) (%) CONSTRUCTION (HP) (HP) (RPM) VOLT/PH/HZ NOTES
AND RATE WORKING LOSS EFFICIENCY SIZE BHP SPEED
MANUFACTURER FLOW HEAD MOTOR MOTOR MOTOR
FLUID PUMP ELECTRICAL
PUMP SCHEDULE
3. UNIT TO COME WITH PRESSURE REGULATOR. BUILDING LINE PRESSURE IS 4 OZ.
2. CONNECT TO NEW BMS INTEGRATED THERMOSTAT.
1. GAS HEATING INPUT AND OUTPUT AT SEA LEVEL.
UH-3C MODINE PDP 250 BOILER ROOM NATURAL GAS 6 3700 250,000 207,500 120/1/60 7.75 1,2,3
UH-3B MODINE PDP 250 BOILER ROOM NATURAL GAS 6 3700 250,000 207,500 120/1/60 7.75 1,2,3
UH-3A MODINE PDP 250 BOILER ROOM NATURAL GAS 6 3700 250,000 207,500 120/1/60 7.75 1,2,3
ID MODEL NUMBER LOCATION TYPE (IN) (CFM) (BTU/H) (BTU/H) VOLT/PH/HZ FLA NOTES
AND SIZE RATE LOAD LOAD
MANUFACTURER FLUE AIRFLOW HEATING HEATING
INPUT OUTPUT
ELECTRICAL
FUEL FIRED UNIT HEATER SCHEDULE
1. 65 GALLON GLYCOL CAPACITY.
PF-1 (SEE SPECIFICATION) MECH. ROOM POT FEEDER WATER -
GFU-1 (SEE SPECIFICATION) MECH. ROOM GLYCOL FEEDER 30% PROPYLENE GLYCOL 120/1/60 31 / 65 1
ID MODEL NUMBER LOCATION TYPE FLUID VOLT/PH/HZ (IN) NOTES
AND WORKING HEIGHT
MANUFACTURER DIAMETER/
FLUID ELECTRICAL PHYSICAL
CHEMICAL FEED SYSTEM SCHEDULE
9. CONTRACTOR TO INSTALL THIS EQUIPMENT AND ASSOCIATED ACCESSORIES. SEE ALSO BOILER SPEC FOR INSTALLATION AND STARTUP REQUIREMENTS.
8. BOILER TO COME WITH FUEL TRAIN. INCLUDING ALL NECESSARY NATURAL GAS REGULATORS, SOLENOIDS AND VALVES. LINE PRESSURE AT BOILER GAS LINE BRANCH IS 5 PSIG.
7. SINGLE POINT ELECTRICAL CONNECTION. ONBOARD TRANSFORMER INCLUDED FOR LOWER CONTROL VOLTAGE.
6. SIEMENS LMV5 CONTROLS OR APPROVED EQUIVALENT.
5. MINIMUM TURNDOWN OF 5:1
4. LOW EMISSIONS TO MEET UTAH CODE OF <9PPM NOx AND <400PPM CO.
3. PROVIDE WITH 2 INSERTION COILS FOR GLYCOL PREHEAT. 163 GPM EACH WITH <6 PSI PRESSURE DROP / 326 TOTAL GPM BETWEEN BOTH COILS, EWT=77, LWT=90. 30% PROPYLENE GLYCOL.
2. OUTPUT AT ALTITUDE OF 4300 FT. ELEVATION
1. ASME CERTIFIED
B-2 BRYAN RV700-W-WT-FDG-LX BOILER ROOM FORCED DRAFT WATER TUBE BOILER NAT GAS 7,000,000 5,880,000 350 160/180 WATER 4.8 1 10 460/3/60 17 20 176/50/90 1,2,3,4,5,6,7,8,9
B-1 BRYAN RV700-W-WT-FDG-LX BOILER ROOM FORCED DRAFT WATER TUBE BOILER NAT GAS 7,000,000 5,880,000 350 160/180 WATER 4.8 1 10 460/3/60 17 20 176/50/90 1,2,3,4,5,6,7,8,9
ID MODEL NUMBER LOCATION TYPE TYPE (BTU/H) (BTU/H) (GPM) (°F) FLUID (FT) QUAN. (HP) VOLT/PH/HZ FLA (IN) (IN) NOTES
AND FUEL LOAD LOAD RATE TEMP. WORKING LOSS MOTOR SIZE MOTOR DIAMETER HEIGHT
MANUFACTURER INPUT OUTPUT FLOW LEAVING HEAD MOTOR STACK WIDTH/
LEVEL ALTITUDE ENTERING/ BURNER LENGTH/
SEA SITE FLUID ELECTRICAL PHYSICAL
OWNER FURNISHED CONTRACTOR INSTALLED EQUPMENT
3. RELIEF VALVE TO BE PIPED OVER TO GLYCOL FEED TANK SO ANY BLOW-OFF IS AUTOMATICALLY CONTAINED.
2. NEW RELEIF VALVES TO BE INSTALLED WITH TANK.
1. ASME CERTIFIED 125 PSI
ET-3 CA1400-125 BOILER ROOM VERT BLADDER FULL WATER 370 370 13 45 36 / 103 1,2,3
ET-2 CA1400-125 BOILER ROOM VERT BLADDER FULL WATER 370 370 13 45 36 / 103 1,2,3
ET-1 CA450-125 BOILER ROOM VERT BLADDER FULL 30% PG 105 119 13 45 24 / 78 1,2,3
ID MODEL NUMBER LOCATION TYPE FLUID (GAL) (GAL) (PSIG) (PSIG) (IN) NOTES
AND WORKING ACCEPTANCE SIZE FILL PRESS. VALVE HEIGHT
MANUFACTURER MIN. TANK/ TANK INITAIL RELIEF DIA./
FLUID PHYSICAL
EXPANSION TANK SCHEDULE
(S) (S) SIMPLEX (D) DUPLEX (Q) QUADPLEX OR DOUBLE DUPLEX(D) (Q)
STANDARD CONVENIENCE OUTLET 18"
CONVENIENCE OUTLET, GFCI 18"
STANDARD CONVENIENCE OUTLET, HOSPITAL 18"
STANDARD CONVENIENCE OUTLET, SWITCHED 18"
STANDARD CONVENIENCE OUTLET, CUSTOM HEIGHT (6)
48"UNLESS
NOTED
CONVENIENCE OUTLET, GFCI, CUSTOM HEIGHT (6)
48"UNLESS
NOTED
CONVENIENCE OUTLET, ISOLATED GROUND 18"
CONVENIENCE OUTLET, FLOOR FLOOR
CONVENIENCE OUTLET, CEILING CEILING
2 CIRCUITS TO EACH DEVICE 18"
COMBINATION POWER AND COMMUNICATION FLOOR BOX FLOOR
SPECIAL PURPOSE OUTLET
DIRECT CONNECTION TO EQUIPMENT
CORD DROP OUTLET SUSPENDED
D
POWER/VOICE-DATA SERVICE POLE AS NOTED
DJU DISTRIBUTION JUNCTION UNIT
VFD VARIABLE FREQUENCY DRIVE
SPD SURGE PROTECTION DEVICE
J JUNCTION BOX AS NOTED (12)
J JUNCTION BOX, WALL AS NOTED (12)
J JUNCTION BOX, FLOOR FLOOR (12)
C CLOCK OUTLET (*)
M S
MANUAL MOTOR CONTROLLER SWITCH WITHOUT
TERMINAL OVERLOAD PROTECTION
P
S SWITCH WITH PILOT LIGHT
TH
S MANUAL SWITCH WITH THERMAL OVERLOAD
X
S SINGLE POLE DOOR SWITCH
PUSH BUTTON SWITCH, SINGLE AS NOTED
PUSH BUTTON SWITCH, DOUBLE AS NOTED
BUSH BUTTON SWITCH, TRIPLE AS NOTED
EMERGENCY POWER OFF (EPO) SWITCH
NON-FUSED DISCONNECT SWITCH (13) (14)
F FUSED DISCONNECT SWITCH (13) (14)
MAGNETIC STARTER (13) (14)
MAGNETIC STARTER WITH FUSED DISCONNECT (13) (14)
MAGNETIC STARTER WITH BREAKER DISCONNECT (13) (14)
R POWER RELAY (13) (14)
MOTOR OUTLET
MOTOR OUTLET, ROOF MOUNTED ROOF
LIGHTNING PROTECTION AIR TERMINAL ROOF
LIGHTNING PROTECTION BOND PLATE
LIGHTNING PROTECTION GROUND ROD GROUND
UTILITY POWER POLE SEE PLANS
M TRANSFORMER SEE PLANS
T TRANSFORMER SEE PLANS
G EMERGENCY GENERATOR SEE PLANS
CABLE TRAY
MAIN DISTRIBUTION POWER PANEL
PANEL BOARD, SURFACE 6'-6" TO TOP
PANEL BOARD, RECESSED 6'-6" TO TOP
ELECTRICAL SYMBOL SCHEDULE
SYMBOL DEVICE/FIXTURE DESCRIPTION COMMENTSMOUNTING
POKETHRU
CORD REEL OUTLET SUSPENDED
CR
GAP GENERATOR ANNUNCIATOR PANEL SEE PLANS
ATS AUTOMATIC TRANSFER SWITCH SEE PLANS
POKE THRU, POWER FLOOR
POKE THRU, POWER AND DATA FLOOR
J POKE THRU, POWER AND DATA W/AV FLOOR
DUPLEX OUTLET, POP-UP COUNTERTOP
CONVENIENCE OUTLET, GFCI, CUSTOM HEIGHT, HOSPITAL (6)
48"UNLESS
NOTED
ABBREVIATIONS
A AMPS
AFC AVAILABLE FAULT CURRENT
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AIC AMPS INTERRUPTING
CAPACITY
AWG AMERICAN WIRE GAUGE
B BATTERY
BC BARE COPPER
BFC BELOW FINISHED CEILING
BFG BELOW FINISHED GRADE
C CONDUIT
CO CARBON MONOXIDE
CT CURRENT TRANSDUCER
CU COPPER MATERIAL
DED DEDICATED
DFA DROP FROM ABOVE
EC ELECTRICAL CONTRACTOR
EF EXHAUST FAN
EM EMERGENCY/EGRESS
EMT ELECTRICAL METALLIC
TUBING
ENT ELECTRICAL NON-METALLIC
TUBING
ER EXISTING TO BE RELOCATED
EX EXISTING TO REMAIN
FMC FLEXIBLE METAL CONDUIT
GC GENERAL CONTRACTOR
GEC GROUND ELECTRICAL
CONDUCTOR AT SES
GFCI GROUND FAULT CIRCUIT
INTERRUPTER
GFEP GROUND FAULT EQUIPMENT
PROTECTOR
GND GROUND
IMC INTERMEDIATE METAL CONDUIT
IG ISOLATED GROUND
KCMIL 1000 CIRCULAR MILS (MCM)
LF LOW FREQUENCY, 520 HZ
LFMC LIQUID-TIGHT FLEXIBLE METAL
CONDUIT
LFNC LIQUID-TIGHT FLEXIBLE NON-
METAL CONDUIT
MC MECHANICAL CONTRACTOR
MCA MINIMUM CIRCUIT AMPS
N1 NEMA 1
N3R NEMA 3R
N NEW
NL NIGHT LIGHT, BYPASS LOCAL
SWITCHING
PC PLUMBING CONTRACTOR
POC POINT OF CONNECTION
POS POINT OF SALES
R RELOCATED
RX RECEIVER
RM ROOF MOUNTED
RMC RIGID METALLIC CONDUIT
RNC RIGID NON-METALLIC
CONDUIT
SBJ SYSTEM BONDING JUMPER
SCA SHORT CIRCUIT AMPERES
TX TRANSMITTER
TC TEMPERATURE CONTROL
CONTROLLER
TR TAMPERPROOF
UG UNDERGROUND
UNO UNLESS NOTED
OTHERWISE
VA VOLT/AMPS
VIF VERIFY IN FIELD
W WATTS
WP WEATHERPROOF/NEMA 3R
XP EXPLOSION PROOF
XR EXISTING TO BE REMOVED
1. THE ELECTRICAL SYSTEMS DEFINED BY THESE PLANS AND SPECIFICATIONS ARE TO BE
CONSTRUCTED AS COMPLETE AND OPERABLE SYSTEMS AND SHALL BE BID WITH THIS
INTENT. THE CONTRACTOR SHALL VISIT THE SITE, READ ALL THE RELEVANT
DOCUMENTS AND BECOME FAMILIAR WITH THE TYPE OF CONSTRUCTION AND WORK TO
BE ACCOMPLISHED. SHOULD ANY ERROR, OMISSION OR CONFLICT EXIST IN EITHER THE
PLANS OR SPECIFICATIONS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IN
WRITING BEFORE SUBMITTING HIS BID PRICE SO A CHANGE CAN BE ISSUED IN A PRE-BID
ADDENDUM. OTHERWISE, THE CONTRACTOR AND/OR EQUIPMENT SUPPLIER SHALL
SUPPLY THE PROPER MATERIALS AND LABOR TO INSTALL COMPLETE AND OPERABLE
SYSTEMS AT THEIR OWN EXPENSE. WHEN EACH ELECTRICAL SYSTEM IS COMPLETE,
THE CONTRACTOR SHALL TEST AND CONFIRM IT'S PROPER OPERATION. ANY
INCOMPLETE SYSTEM SHALL BE MADE COMPLETE AND OPERABLE.
2. THE ARCHITECTURAL AND MECHANICAL PLANS ARE CONSIDERED A PART OF THE
ELECTRICAL DOCUMENTS SO FAR AS ANY ELECTRICAL ITEMS THEY MAY CONTAIN. THE
ELECTRICAL CONTRACTOR SHALL REFER TO AND COORDINATE WITH THEM. NO EXTRA
COST SHALL BE ALLOWED FOR FAILURE TO COORDINATE THE CONTRACT DOCUMENTS
WITH OTHER TRADES AND/OR IF EQUIPMENT DIMENSIONS ARE GREATER THAN
SPECIFIED AND/OR DIMENSIONED ON THE PLANS.
3. NO ADDITIONS TO THE CONTRACTOR BID WILL BE ALLOWED FOR CHANGES MADE
NECESSARY BY INTERFERENCE WITH OTHER WORK.
4. THE ELECTRICAL CONTRACTOR SHALL PROVIDE EQUIPMENT, MATERIALS AND LABOR
FOR THE CONNECTIONS OF ALL EQUIPMENT SHOWN ON THE PLANS - ARCHITECTURAL,
MECHANICAL, ETC.
5. THIS PROJECT IS TO BE INSTALLED IN STRICT ACCORDANCE WITH LOCAL AND STATE
CODES AND THE NEC. IF AT ANY TIME DURING CONSTRUCTION, OR AFTER, SOMETHING
IS FOUND TO BE INSTALLED IN VIOLATION OF THE CODES LISTED ABOVE, IT SHALL BE
CORRECTED AT THE CONTRACTORS EXPENSE.
6. ALL EQUIPMENT PROVIDED BY THE ELECTRICAL CONTRACTOR SHALL BE LISTED AND
LABELED BY A NATIONALLY RECOGNIZED TESTING AGENCY, ACCEPTABLE TO THE
AUTHORITY HAVING JURISDICTION, AND BE PROPERLY INSTALLED FOR THE CONDITIONS
AND SPACE THAT EQUIPMENT IS BEING INSTALLED WITHIN.
7. THE ELECTRICAL CONTRACTOR SHALL COORDINATE AND CONFIRM THE EXACT
LOCATION OF THE POWER PANELS FROM WHICH NEW CIRCUITS ARE BEING FED FROM.
VERIFY EXISTING BRANCH CIRCUIT BREAKERS AND PROVIDE NEW BREAKERS AS
NECESSARY FOR A COMPLETE AND OPERABLE SYSTEM.
8. THE ELECTRICAL CONTRACTOR SHALL COORDINATE AND CONFIRM THE EXACT
LOCATION OF THE TELE/DATA ROOM FROM WHICH NEW TELE/DATA OUTLETS WILL BE
FED FROM. VERIFY EXISTING PATCH PANEL SPACES AND PROVIDE NEW PATCH PANELS
AS NECESSARY TO LAND ALL NEW TELE/DATA CABLING.
9. THE ELECTRICAL CONTRACTOR SHALL INSTALL A SEPARATE EQUIPMENT GROUNDING
CONDUCTOR IN EACH CONDUIT RUN. CONDUIT SHALL NOT BE USED AS AN EQUIPMENT
GROUNDING CONDUCTOR. THE ELECTRICAL CONTRACTOR SHALL GROUND THE
ELECTRICAL SYSTEM IN ACCORDANCE WITH LOCAL AND NATIONAL CODES.
10. THE ELECTRICAL CONTRACTOR SHALL CONFIRM MINIMUM CODE (NEC) WORKING
CLEARANCE BEFORE INSTALLING ANY ELECTRICAL PANELS OR CABINETS AND SHALL
MOVE THE PANELS AT HIS EXPENSE IF REJECTED BY AN INSPECTOR. IF CLEARANCE IS
NOT POSSIBLE, THE DESIGNER SHALL BE NOTIFIED IMMEDIATELY IN WRITING.
11. CONDUIT LAYOUTS SHOWN ON THE PLANS ARE DIAGRAMATIC, NOT INDICATING THE
ROUTING REQUIRED. THE EC SHALL ROUTE THE CONDUITS AS REQUIRED BY THE
CONDITIONS OF THE INSTALLATION AND SHALL COORDINATE WITH DUCTWORK, PIPING,
EQUIPMENT, BUILDING STRUCTURE AND OTHER POTENTIAL OBSTRUCTIONS.
12. THE CONTRACTOR SHALL ALLOW THE MOVEMENT, BEFORE ROUGH-IN, OF ANY
ELECTRICAL PANEL, DEVICE, LUMINAIRE, ETC. A DISTANCE OF 10 FEET WITHOUT
REQUIRING ADDITIONAL COST TO THE PROJECT.
13. THE ELECTRICAL CONTRACTOR SHALL SECURE ALL CONDUIT TO THE STRUCTURE AS IT
IS SET IN PLACE USING INDUSTRY STANDARD METHODS AND PRACTICES.
14. MINIMUM SIZE CONDUIT SHALL BE 3/4". ABOVE GROUND CONDUIT SHALL BE EMT WITH
STEEL SET SCREW FITTINGS. UNDERGROUND CONDUIT SHALL BE PVC (SCH40) WITH
GRC ELBOWS AND RISERS WRAPPED IN CORROSION RESISTANT MATERIALS WHERE IN
DIRECT CONTACT WITH THE SOIL.
15. FLEXIBLE CONDUIT SHALL BE LIMITED TO CONNECTIONS TO LIGHT FIXTURES AND FINAL
CONNECTIONS TO MOTORS OR OTHER EQUIPMENT SUBJECT TO VIBRATION. LENGTHS
OF FLEXIBLE OR SEALTITE CONDUIT SHALL NOT BE GREATER THAN 72" INCHES.
16. WIRING DEVICES SHALL MATCH EXISTING COLOR AND FACEPLATE TYPE.
17. TO ASSURE ALL DEVICES ARE RIGIDLY SET, THE ELECTRICAL CONTRACTOR SHALL
SECURE ALL DEVICE BOXES WITH BRACKETS, HANGERS, ETC. DESIGNED FOR THE
APPLICATION. ANY DEVICE BOXES NOT SECURED WILL BE MADE SECURE AT THE
CONTRACTORS EXPENSE.
18. THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL EMPTY CONDUITS WITH 200LB
RATED NYLON PULL CORD.
19. BEFORE ANY ELECTRICAL CONDUIT, BOXES, ETC. ARE COVERED (FLOOR, CEILINGS,
WALLS, ETC.), THEY SHALL BE APPROVED BY THE INSPECTING OFFICER (INSPECTOR).
THE UNCOVERING AND REPLACEMENT OF ELECTRICAL WORK FOR THE INSPECTION
PURPOSES WILL BE AT THE COST OF THE ELECTRICAL CONTRACTOR.
20. ALL BATTERY POWERED OR CONTINUOUS BURN LUMINAIRES SHOWN ON THE PLANS,
SUCH AS EXIT LIGHTS, NIGHT LIGHTS, OR EMERGENCY LIGHTS, SHALL BE CONNECTED
TO THE UN-SWITCHED LEG OF THE LIGHTING CIRCUIT FEEDING THAT AREA.
21. LUMINAIRES INSTALLED IN THE MECHANICAL ROOM SHALL BE PLACED SO THAT ALL
EQUIPMENT IS ADEQUATELY ILLUMINATED AFTER THE MECHANICAL EQUIPMENT IS IN
PLACE.
22. ALL LUMINAIRES SHALL BE SUPPORTED FROM THE BUILDING STRUCTURE AND NOT
SOLELY FROM THE CEILING GRID OR OTHER NONSTRUCTURAL MEMBER.
23. TO MAINTAIN CONSISTENT LIGHT QUALITY, FOR ANY ONE LAMP TYPE SUPPLIED, LAMPS
SHALL BE OF THE SAME MANUFACTURE, SURFACE TEMPERATURE, COLOR RENDERING
INDEX, LAMP EFFICACY, LUMEN OUTPUT AND STARTING CHARACTERISTICS FOR ALL
INSTALLED.
24. WHERE WIRE SIZE IS NOT SHOWN ON THE DRAWINGS FOR 20A, 120/277VAC BRANCH
CIRCUITS, THE CIRCUIT SHALL CONSIST OF 2#12(CU,THHN)+1#12(CU,THHN)GND IN 3/4"
EMT CONDUIT. THIS WIRE SIZE SHALL BE INCREASED TO #10(CU,THHN) FOR 120VAC
BRANCH CIRCUITS WITH OVERALL LENGTHS EXCEEDING 125' TO ACCOMMODATE FOR
VOLTAGE DROP. REFER TO EQUIPMENT SCHEDULES, FEEDER SCHEDULES AND NOTES
ON DRAWINGS FOR ALL OTHER BRANCH CIRCUIT AND FEEDER WIRE/CONDUIT SIZING.
25. CONDUCTORS SHALL BE COPPER, 600VAC RATED, TYPE THHN/THWN-2 UNLESS
OTHERWISE NOTED. CONDUCTORS SIZES UP TO #10AWG SHALL BE SOLID AND #8AWG
AND LARGER SHALL BE STRANDED.
26. ELECTRICAL CONTRACTOR SHALL COORDINATE WITH EQUIPMENT SUPPLIERS ON THE
EXACT LOCATIONS OF ALL EQUIPMENT AND ELECTRICAL CONNECTIONS, WIRES, AND
OVERCURRENT PROTECTION PRIOR TO ROUGH-IN. THE ELECTRICAL CONTRACTOR
SHALL MAKE THE FINAL CONNECTION TO ALL EQUIPMENT UNLESS OTHERWISE
DIRECTED BY THE EQUIPMENT SUPPLIER.
27. THE ELECTRICAL CONTRACTOR SHALL CLEAN THE ENTIRE ELECTRICAL SYSTEM AFTER
COMPLETION OF THE INSTALLATION. REMOVE ALL FINGER PRINTS, FOREIGN MATTER,
PAINT, DIRT, GREASE, UN-NEEDED LABELS OR STICKERS FROM FIXTURES AND
EQUIPMENT. REMOVE ALL RUBBISH AND DEBRIS ACCUMULATED DURING INSTALLATION
FROM THE PREMISES.
28. OBTAIN FROM SUPPLIERS ALL WIRING DIAGRAMS FOR EQUIPMENT PRIOR TO ANY
ROUGH-IN. TO ASSURE THAT PROPER CHARACTERISTICS ARE PROVIDED, ANY
INCORRECT WIRING OR DEVICES INSTALLED BY THE ELECTRICAL CONTRACTOR
WITHOUT THE WIRING DIAGRAM SHALL BE CORRECTED AT THE CONTRACTOR'S
EXPENSE. PROVIDE COPIES OF WIRING DIAGRAMS WITHIN EACH PIECE OF EQUIPMENT
AND ADDITIONAL COPIES WITH THE OPERATION AND MAINTENANCE MANUALS.
29. THE ELECTRICAL CONTRACTOR SHALL COORDINATE WITH THE MECHANICAL
CONTRACTOR TO PROVIDE CONDUIT AND DEVICE MOUNTING BOXES FOR
THERMOSTATS AND OTHER MECHANICAL CONTROLS.
30. IT IS THE INTENT OF THE CONSTRUCTION DOCUMENTS FOR ALL DEVICES TO BE FLUSH
MOUNTED AND CONDUIT/CABLING INSTALLED CONCEALED WITHIN WALLS/CEILINGS. IN
AREAS WHERE CONDUIT MUST BE INSTALLED EXPOSED IT SHALL BE COORDINATED
WITH THE ARCHITECT AND/OR ENGINEER. ALL EFFORTS SHALL BE MADE TO CONCEAL
WIRING METHODS.
31. PROVIDE AN UPDATED, TYPED PANEL CIRCUIT DIRECTORY FOR ALL PANELS WHERE
CIRCUITS HAVE BEEN MODIFIED, ADDED, OR REMOVED BY THE SCOPE OF THIS
PROJECT. CIRCUIT DESCRIPTIONS ON THE DIRECTORY SHALL BE UNIQUE AND INDICATE
THE ROOM AND EQUIPMENT/DEVICE IT IS FEEDING. DATE DIRECTORY WITH PROJECT
COMPLETION DATE. MODIFIED CIRCUITS TO BE IN BOLD.
32. SUBMIT A SCALED LAYOUT (1/4" = 1') OF ALL ELECTRICAL ROOMS BASED ON THE
ELECTRICAL GEAR AND EQUIPMENT SUBMITTALS.
33. PROVIDE A CLEAR, TYPED LABEL ON THE FACEPLATE OF ALL RECEPTACLES AND LIGHT
SWITCHES INDICATING THE CIRCUIT IT IS TIED TO. USE LABELING CONVENTION XX-xx, WHERE "XX" IS THE NAME OF THE PANEL AND "xx" IS THE BRANCH CIRCUIT NUMBER.
LABELS LENGTH SHALL NOT EXCEED 1/4" ON EITHER SIDE OF TEXT.
34. FUSED DISCONNECTS TO BE HEAVY DUTY.
35. ALL TELECOMMUNICATIONS WIRING SHALL BE INSTALLED WITHIN CONDUIT UNLESS
INSTALLED ABOVE ACCESSIBLE CEILINGS. MINIMUM CONDUIT SIZE FOR
TELECOMMUNICATIONS CABLING SHALL BE 1-1/4" EMT, UNLESS OTHERWISE NOTED.
36. PROVIDE A DEDICATED NEUTRAL FOR EACH BRANCH CIRCUIT. SHARED NEUTRALS ARE
NOT ALLOWED UNLESS NOTED OTHERWISE.
GENERAL NOTES
NOTES
(1) SEE LUMINAIRE SCHEDULE FOR FIXTURE TYPES AND DETAILS.
(2) SEE LUMINAIRE SCHEDULE FOR MOUNTING REQUIREMENTS.
(3) WIRE LIGHT FIXTURE FROM ADJACENT J-BOX.
(4) CONNECT NEAREST UN-SWITCHED HOT CONDUCTOR TO EMERGENCY BALLAST.
(5) DIRECTIONAL ARROWS INDICATE REQUIRED CHEVRONS.
(6) COORDINATE FINAL MOUNTING HEIGHT WITH ARCHITECTURAL INTERIOR ELEVATIONS AND
APPROVED MILLWORK SHOP DRAWINGS.
(7) USE WITH POWER PACK.
(8) "X" IN SYMBOL IS INCHES BETWEEN RECEPTACLE ALONG WIREWAY. SEE DRAWINGS.
(9) PROVIDE UL LISTED DEVICE COMPATIBLE WITH THE FIRE ALARM PANEL/SYSTEM.
(10) MATCH THE VOLTAGE OF THE RELAY WITH THAT OF THE CONTROLLING CIRCUIT.
(11) USE A 4" X 4" BOX WITH A MUD RING TO MATCH THE DEVICE AND INSTALLATION.
(12) PROVIDE MUD RING AND/OR BOX COVER APPROPRIATE FOR DEVICES/FIXTURE SERVED.
(13) USE HEAVY DUTY DEVICE FOR 480 VOLT.
(14) SIZE TO THE EQUIPMENT BEING CONTROLLED.
(15) FIRE ALARM PANELS: FACP: FIRE ALARM CONTROL PANEL, NAC: NOTIFICATION APPLIANCE
CIRCUIT PANEL, ANNUN: GRAPHIC ANNUNCIATOR PANEL, AND SES: SMOKE EVACUATION
SYSTEM PANEL.
(16) LIGHT FIXTURES ARE SCALED WITHIN THE DRAWINGS BASED ON ACTUAL DIMENSIONS.
FUSE
CIRCUIT BREAKER
GROUND/GROUND ROD
HOME RUN TO PANEL
X
XX.X DIAGRAM/DETAIL CALLOUT
X LUMINAIRE TYPE
X KITCHEN EQUIP. CALLOUT OR AS NOTED BY ARCH.
X-1 KITCHEN EQUIP. CALLOUT
XX
X MECHANICAL/PLUMBING EQUIPMENT CALLOUT
EQUIPMENT CONNECTION
CONDUIT STUB
CONDUIT STUB DOWN
CONDUIT STUB UP
CONDUIT BREAK/CONTINUATION
CONDUIT RUN CONCEALED IN WALL/CEILING
CONDUIT RUN CONCEALED IN GROUND/FLOORUG
SURFACE RACEWAY/WIREMOLD
LOW VOLTAGE CONDUIT RUN
DEMOLITION
EXISTING L
I
C E
N S
E D
P R
OFE SS I ONA
L
E N
G I N
E E
R
No. 9075170
S
T A
T E OF U
T
A H
LEWIS WONG
Project #: 250122
Contact: Sydnee Anderson
DRAWN BY:
CHECKED BY:
PROJ. NO:
DRAWING NO:
DRAWING TITLE:
PROJECT NAME:
CONSTRUCTION
DOCUMENTS
THIS SQUARE APPEARS 1/2"x1/2"
ON FULL SIZE SHEETS
CLIENT:
SEAL
4/30/2025
A u to d e s k D o c s
/2
-F re m o n t H ig h
S c h o o l B o ile r R e p la c e m e n t- M
E C
H v
/2
F re m o n t H ig h
S c h o o l B o ile r R e p la c e m e n t_ E
L E
C v rv t.
rv t
/3
/2
:4
:3
P
M
E001
LA
LW
250122
ELECTRICAL TITLE
SHEET
Fremont High School Boiler Equipment Package
1975 N 4700 W, Plain City, UT 84404
WEBER SHCOOL
DISTRICT
ELECTRICAL SHEET INDEX
E001 ELECTRICAL TITLE SHEET
E601 ELECTRICAL SCHEDULES & DETAILS
E101 BOILER ROOM ELECTRICAL PLANS
VFD VFD
FRONT VIEW SIDE VIEW
TO EQUIPMENT
VFD POWER
C-CHANNEL SUPPORT
WITH CLAMPS. PER NEC
CONDUIT (QTY AND SIZE
AS REQUIRED)
BRACING AS REQUIRED
UNISTRUT SUPPORT
(P1000T OR BETTER)
ADJUSTABLE
BRACE
FITTINGS
CONCRETE INSERTS
EQUIPMENT
(TYP)
NOTE:
1. CONTRACTOR SHALL
PROVIDE AND INSTALL
UNISTRUT SUPPORT
SYSTEM DESIGNED FOR THE
SPECIFIC APPLICATION
PROVIDING ALL REQUIRED
NUTS, BOLTS, ANCHORS,
ETC. TO MEET ALL
REQUIRED SEISMIC LOADS.
TO EQUIPMENT
VFD POWER
STRUCTURE
STRUCTURE
STRUCTURE STRUCTURE
ALL THREAD (SIZE AS
REQUIRED) 3/8" MIN.
BEAM CLAMPS OR
HANGER CLAMPS (AS
REQUIRED BY WEIGHT
SUPPORTED)
RACEWAY. (3/4" - 6")
CONDUIT HANGER
BEAM CLAMPS OR
HANGER CLAMPS
(AS
REQUIRED BY
WEIGHT
SUPPORTED)
RACEWAY. (3/4" - 6")
NOTES:
1. WIRE SHALL NOT BE USED AS A
COMPONENT OF ANY RACEWAY
HANGER SYSTEM.
2. DO NOT NOT SUPPORT ANY
RACEWAY LARGER THAN 1" FROM
BOTTOM CHORD OF STEEL
TRUSSES.
CL
6"
LC
5 4
(TYP.)
EMT
(TYP.)
EMT
EMT
EMT
NOTES:
1. TYP. FOR WOOD AND METAL STUD ROUGH-IN.
2. PLASTER RINGS NOT SHOWN. COORDINATE RING DEPTH TO BE
FLUSH WITH FINISHED SURFACE, UNLESS NOTED OTHERWISE.
3. LOCATE ALL OUTLET BOXES IN ACCORDANCE WITH ARCH. AND
MECH. DRAWINGS, AND WITH ALL APPLICABLE SHOP DRAWINGS.
4. OUTLET BOXES ON OPPOSITE SIDES OF WALLS OR PARTITIONS IN
THE SAME STUD SPACEMUST BE SEPARATED BY A MIN. OF 6"
HORIZONTAL DISTANCE.
5. ELECTRICAL BOXES INSTALLED IN FIRE RESISTANT WALLS OR
PARTITIONS SHALL COMPLY WITH IBC 714.3.2.
6. INSULATED THROAT EMT CONNECTOR.
7. CADDY FASTENER, THROUGH STUD CABLE/CONDUIT SUPPORT
'FB12P'.
8. ADUSTABLE BAR HANGER.
9. TYPICAL DEVICE JUNCTION BOX.
REFER TO SECTION
FOR ATTACHMENT OF
ALL THREAD ROD TO
KINDORF CHANNEL
1 1/2"x1 1/2"-12GA. KINDORF
CHANNEL OR APPROVED
SUBSTITUTE
3/8" ALL THREAD,
MINIMUM. INCREASE
ROD SIZE IF WEIGHT
REQUIRES PER ROD
MANUFACTURERS
RECOMMENDATIONS.SUPPORT CONDUIT
WITH KINDORF STRAP
OR APPROVED
SUBSTITUTE.
BEAM CLAMPS OR
HANGER CLAMPS AS
REQUIRED BY WEIGHT
SUPPORTED
PROVIDE 25% SPACE CAPACITY
NUT
WASHER
WASHER
NUT
L I
C E
N S
E D
P R
OFE SS I ONA
L
E N
G I N
E E
R
No. 9075170
S
T A
T E OF U
T
A H
LEWIS WONG
Project #: 250122
Contact: Sydnee Anderson
DRAWN BY:
CHECKED BY:
PROJ. NO:
DRAWING NO:
DRAWING TITLE:
PROJECT NAME:
CONSTRUCTION
DOCUMENTS
THIS SQUARE APPEARS 1/2"x1/2"
ON FULL SIZE SHEETS
CLIENT:
SEAL
4/30/2025
A u to d e s k D o c s
/2
-F re m o n t H ig h
S c h o o l B o ile r R e p la c e m e n t- M
E C
H v
/2
F re m o n t H ig h
S c h o o l B o ile r R e p la c e m e n t_ E
L E
C v rv t.
rv t
/3
/2
:4
:3
P
M
E601
LA
Checker
250122
ELECTRICAL
SCHEDULES & DETAILS
Fremont High School Boiler Equipment Package
1975 N 4700 W, Plain City, UT 84404
WEBER SHCOOL
DISTRICT
EQUIPMENT SCHEDULE
TYPE DESCRIPTION
ELECTRICAL REMARKS CIRCUITING
VOLT PHASE HP FLA LOAD
WIRE
CONDUIT SIZE MOCP PANELSETS QTY SIZE GND
GFU-1 GLYCOL FEEDER 120 V 1 0.00 hp 2.0 A 240 VA 1 1 12 12 3/4" 20 4A DL1B
P-3 CHW PUMP 480 V 3 20.00 hp 27.0 A 22447 VA 1 3 8 10 3/4" 45 11A MCC-D1A
P-4 CHW PUMP 480 V 3 20.00 hp 27.0 A 22447 VA 1 3 8 10 3/4" 45 11A MCC-D1A
P-5 HEATING WATER PUMP 480 V 3 15.00 hp 21.0 A 17459 VA 1 3 10 10 3/4" 35 11A MCC-D1A
P-6 HEATING WATER PUMP 480 V 3 15.00 hp 21.0 A 17459 VA 1 3 10 10 3/4" 35 11A MCC-D1A
UH-3A UNIT HEATER 120 V 1 0.00 hp 7.8 A 930 VA 1 1 12 12 3/4" 20 4A DL1B
UH-3B UNIT HEATER 120 V 1 0.00 hp 7.8 A 930 VA 1 1 12 12 3/4" 20 4A DL1B
UH-3C UNIT HEATER 120 V 1 0.00 hp 7.8 A 930 VA 1 1 12 12 3/4" 20 4A DL1B
B. THE DIVISION 26 CONTRACTOR MAY INCREASE THE CONDUIT SIZE BY ONE INCREMENTAL SIZE TO FACILITATE INSTALLATION OR TO HELP WITH MATERIAL AVAILABILITY/COST.
ELECTRICAL ENGINEER OF RECORD IN WRITING PRIOR TO ROUGH-IN.
A. THE EC SHALL COORDINATE ALL REQUIREMENTS (IE: MOCP SIZE, UNIT THERMAL PROTECTION, ETC) WITH APPROVED MECHANICAL SHOP DRAWINGS/SUBMITTALS AND BRING UP ANY DISCREPANCIES WITH THE
GENERAL NOTES:
17. SPLIT SYSTEM. INDOOR UNIT FED FROM OUTDOOR UNIT.
16. LM-EB DISCONNECT W/CNTRL WIRING TO VFD
15. CONTROLLED WITH LIGHTS
TO TIE TO FIRE ALARM FOR AUTOMATIC SHUT OFF.
14. DUCT DETECTOR IN RETURN AIR DUCT. PROVIDE RELAY/CONTROL MODULE AND 120V POWER AS REQUIRED
13. DIRECT CONNECTION
12. RECEPTACLE/SPECIAL PURPOSE OUTLET/ETC.
11. VARIABLE FREQUENCY DRIVE
10. NEMA 3R NON-FUSED DISCONNECT SWITCH
9. NEMA 3R FUSED DISCONNECT SWITCH C2 = MAGNETIC ONLY CIRCUIT BREAKER
8. SOFT STARTER WITH FUSED DISCONNECT COMBINATION C1 = THERMAL MAGNETIC CIRCUIT BREAKER
7. MAGNETIC STR/NON-FUSED DISCONNECT COMBINATION OCPD TYPES:
6. MAGNETIC STARTER
5. MANUAL MOTOR CONTROLLER W/OUT THERMAL OVERLOAD E. FURNISHED AND INSTALLED UNDER DIV 26 REQUIRING CONNECTION UNDER ANOTHER DIVISION.
4. MANUAL STARTER WITH THERMAL OVERLOAD D. FURNISHED, INSTALLED AND CONNECTED UNDER ANOTHER DIVISION.
3. BREAKER IN ENCLOSURE C. FURNISHED UNDER ANOTHER DIVISION BUT INSTALLED AND CONNECTED UNDER DIV 26.
2. NEMA 1 NON-FUSED DISCONNECT SWITCH B. FURNISHED AND INSTALLED UNDER ANOTHER DIVISION REQUIRING CONNECTION UNDER DIV 26.
1. NEMA 1 FUSED DISCONNECT SWITCH A. FURNISHED, INSTALLED AND CONNECTED UNDER DIVISION 26.
REMARKS: REMARKS:
W = WATTS MCA = MINIMUM CIRCUIT AMPACITY PL = POLE
HP = HORSEPOWER FLA = FULL LOAD AMPERES STR = STARTER MOCP = MAXIMUM OCPD (LISTED BY THE MANUFACTURER)
V/PH = VOLTAGE/PHASE KVA = KILOVOLT AMPERES GND = GROUND COND = CONDUIT
KW = KILOWATTS VA = VOLT AMPERES DISC = DISCONNECT OCPD = OVERCURRENT PROTECTIVE DEVICE
ABBREVIATIONS:
Assembly Code
EQUIPMENT W/ DISCONNECT SCHEDULE
TYPE DESCRIPTION
ELECTRICAL OVERCURRENT PROTECTION REMARKS CIRCUITING
VOLT PHASE HP FLA LOAD
WIRE
CONDUIT SIZE MOCP
DISCONNECT
PANELSETS QTY SIZE GND SIZE POLES FUSE
B-1 BOILER 480 V 3 7.50 hp 17.0 A 14134 VA 1 3 10 10 3/4" 30 30 3 30.0 A 1A MCC-D1A
B-2 BOILER 480 V 3 7.50 hp 17.0 A 14134 VA 1 3 10 10 3/4" 30 30 3 30.0 A 1A MCC-D1A
P-1 CHILLER PUMP 480 V 3 5.00 hp 7.6 A 6319 VA 1 3 12 12 3/4" 20 30 3 20.0 A 8A MCC-D1A
P-2 CHILLER PUMP 480 V 3 10.00 hp 14.0 A 11639 VA 1 3 10 10 3/4" 25 30 3 25.0 A 8A MCC-D1A
P-20 CHILLER PUMP 480 V 3 10.00 hp 14.0 A 11639 VA 1 3 10 10 3/4" 25 30 3 25.0 A 8A MCC-D1A
NO SCALEE601
1 EQUIPMENT RACK MOUNTED ON CONCRETE DETAIL
NO SCALEE601
3 RACEWAY SUPPORT METHODS DIAGRAM
NO SCALEE601
4 ROUGH-IN DETAIL
NO SCALEE601
5 TRAPEZE SUPPORT DETAIL
THTH
TH
F F
TH
VFD VFD
VFDVFD
UH-3
B-1
UH-3UH-3
B-2
(E)ET-3
(E)ET-2
(E)ET-1
(E)P-5 (E)P-6
(E )P
-4
(E )P
-3
(E )P
-2
(E )P
-2
(E )P
-1
(E)GF
DST
WH-2
DSTDST
(E)AH-8
(E)AH-7
ATC
COMPRESSOR
(E)AS-XX
(E)AS-XX
P O
T F
E E
D E
R
MCC-D1A
D2 D2
D2
D2
D2 D2
D2
D2 D2 D2 D2 D2 D2
UH-3A UH-3B
B-1
B-2
DST DST
ET-3
ET-2
ET-1
DST
WH-2
(E)AH-8
(E)AH-7
GFU-1
ATC
COMPRESSOR
(E)AS-XX
MCC-D1A
MCC-D1A
P18
P15
DL1B
DL1B
DL1B
P16
P16
P16
DL1B
UH-3C
P -4
P -3
P -2
P -2
P -1
MCC-D1A
P19
P-5
P-6
P17
MCC-D1A
P19
P19
P14
MCC-D1A
A. EC SHALL COORDINATE WITH ALL OTHER TRADES DURING
DEMOLITION AND CONSTRUCTION TO FACILITATE TIMELY WORK.
B. ALL AREAS ARE TO BE KEPT CLEAN AND CLEAR OF DEBRIS AT ALL
TIMES.
C. CONTRACTOR SHALL PATCH AND REPAIR ALL WALLS, CEILINGS
ETC. TO MATCH EXISTING CONDITIONS.
D. ROUTE ALL CONDUIT IN A NEAT AND ORDERLY FASHION. ALL
CONDUIT IN FINISHED SPACES SHALL BE CONCEALED ABOVE
CEILINGS OR IN WALLS UNLESS OTHERWISE INDICATED ON THE
PLANS.
E. PROVIDE TAMPER-RESISTANT RECEPTACLES FOR SPACES
IDENTIFIED IN NEC 406.12.
F. BRANCH CIRCUITS SHALL NOT EXCEED 3% VOLTAGE DROP.
G. PROVIDE CLEAR, TYPED, P-TOUCH LABELS ON THE COVERPLATE
OF ALL RECEPTACLES INDICATING THE PANEL AND CIRCUIT
NUMBER IT IS TIED TO. LABEL SHALL BE 1/8” LONGER THAN TEXT
ON BOTH ENDS.
H. PROVIDE UPDATED TYPED CIRCUIT DIRECTORY WITH UNIQUE
CIRCUIT DESCRIPTIONS PER NEC 408.4 FOR PANELS AFFECTED BY
THIS PROJECT.
I. PROVIDE HOUSEKEEPING PADS FOR ALL FLOOR MOUNTED AND
GRADE MOUNTED ELECTRICAL EQUIPMENT. MINIMUM
REQUIREMENTS: 4" HIGH, 4% AIR ENTRAINED, POLYFIBER
REINFORCED CONCRETE, 4" WIDER AND 4" LONGER THAN
EQUIPMENT TO BE PLACED ON IT. REFER TO ELECTRICAL DETAIL
DRAWINGS FOR TRANSFORMER, GENERATOR, OR SWITCHGEAR
PADS THAT MAY EXCEED THESE REQUIREMENTS.
J. WIRE COUNTS FOR CIRCUIT CONDUCTORS ARE NOT SHOWN.
PROVIDE PROPER NUMBER OF CONDUCTORS TO ACHIEVE CIRCUIT
AND SWITCHING CONNECTIONS SHOWN.
K. CIRCUIT NUMBERS AT DEVICES CORRESPOND TO BREAKERS (SEE
PANELBOARD SCHEDULE). BRANCH CIRCUITS SHALL BE SIZED
ACCORDING TO THE CIRCUIT BREAKER RATING, UNLESS
INDICATED OTHERWISE ON THE ELECTRICAL EQUIPMENT
SCHEDULE.
L. DEVICES/EQUIPMENT SHOWN IN GRAY ARE EXISTING TO REMAIN.
PRESERVE AND PROTECT. MAINTAIN EXISTING CIRCUIT
INTEGRITY.
GENERAL POWER NOTES
A. EC SHALL COORDINATE WITH ALL OTHER TRADES
DURING DEMOLITION AND CONSTRUCTION TO
FACILITATE TIMELY WORK.
B. ALL AREAS ARE TO BE KEPT CLEAN AND CLEAR OF
DEBRIS AT ALL TIMES.
C. CONTRACTOR SHALL PATCH AND REPAIR ALL WALLS,
CEILINGS ETC. TO MATCH EXISTING CONDITIONS.
PENETRATIONS SHALL BE SEALED WITH FIRE RATED
CAULK.
D. ROUTE ALL CONDUIT IN A NEAT AND ORDERLY FASHION.
ALL CONDUIT SHALL BE CONCEALED ABOVE CEILINGS OR
IN WALLS OR FINISHED SPACES UNLESS OTHERWISE
INDICATED ON THE PLANS.
E. DEVICES SHOWN ON DEMOLITION SHEETS ARE
GATHERED FROM AS-BUILT DRAWINGS AND FIELD
INVESTIGATION. NOT ALL DEVICES ARE SHOWN. DEVICE
PLACEMENT IS SCHEMATIC AND NOT EXACT.
CONTRACTOR TO FIELD VERIFY FOR EXACT LOCATIONS
AND COORDINATE WORK WITH ALL OTHER DEVICES,
EQUIPMENT, CONDUIT, ETC. WHETHER OR NOT SHOWN
TO COMPLETE PROJECT.
F. CONTRACTOR TO COORDINATE WITH OWNER FOR ITEMS
TO BE SALVAGED PRIOR TO DEMOLITION. CONTRACTOR
RESPONSIBLE FOR DISPOSING OF ANY MATERIAL THAT
THE OWNER DOES NOT WANT TO KEEP.
G. CAP AND LABEL ALL EMPTY CONDUIT TO REMAIN.
H. DEVICES/EQUIPMENT SHOWN IN GRAY ARE EXISTING TO
REMAIN. PRESERVE AND PROTECT.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .