Fremont HS Boiler Replacement Bid Drawings (1).pdf

PDF 4 MB Posted

Attached to
Fremont Boiler Replacement State and local contract opportunity
Solicitation number
JH250013
Issued by
Weber County, Utah

About this file

These are the construction documents for the Fremont High School Boiler Equipment Package project for Weber School District in Plain City, Utah. The comprehensive mechanical, electrical, and construction drawings detail a complete boiler replacement project at Fremont High School, located at 1975 N 4700 W, with a mandatory project start date of May 27, 2025 and a required completion date of September 15, 2025. The project involves replacing existing boilers, unit heaters, pumps, expansion tanks, and associated mechanical and electrical infrastructure, with liquidated damages of $200 per day assessed for late completion.

The bid documents specify technical requirements for two Bryan RV700-W water tube boilers with 7,000,000 BTU input, three Modine unit heaters, multiple pumps, and related mechanical systems. Electrical documentation includes details for variable frequency drives, power connections, and equipment schedules. A 5% bid security is required, and bidders must attend a mandatory job walk on May 8, 2025 at 9:00 a.m. to be eligible to submit a bid. The Weber School District reserves the right to accept or reject any bid, with the lowest bid not automatically guaranteeing contract award. The project is funded through the school district's capital improvement budget, with specific electrical and mechanical system upgrades designed to modernize the school's heating infrastructure.

View the file

Other files for this state and local contract opportunity

Other files attached to Fremont Boiler Replacement, newest first.
File Type Posted
Fremont HS Boiler Replacement Bid Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

181 East 5600 South Murray, Utah 84107 O: (801) 530-3148 www.resolutgroup.com Resolut project #: 250035

FREMONT HIGH SCHOOL

BOILER EQUIPMENT PACKAGE

1975 N 4700 W, PLAIN CITY, UT 84404

WEBER SCHOOL DISTRICT

SITE MAP

L I C

E N

S E D

PROFESS IONA

L

E N

G I N

E E

R

No. 4775391-2202

S

T A

T E OF U

TA

H

SPENCER W.

HOWELL

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

THIS SQUARE APPEARS 1/2"x1/2"

ON FULL SIZE SHEETS

CLIENT:

SEAL

A u to d e s k D o c s /2

-F re m o n t H ig h S c h o o l B o ile r R e p la c e m e n t- M

E C

H v

/2

F re m o n t H ig h

S c h o o l B o ile r R e p la c e m e n t_

M E

C H v

.r v t

/3

/2

:4

:1

A

M

C001

KD

WB

250122

COVER

Fremont High School Boiler Equipment Package

1975 N 4700 W, Plain City, UT 84404

WEBER SCHOOL

DISTRICT

CONSTRUCTION

DOCUMENTS

4/30/2025

Image Attribution: Imagery ©2025 Google, Imagery ©2025 Airbus, Maxar Technologies, USDA/FPAC/GEO, Map Data ©2025

NO DATE REVISION

KEYNOTE

CONTINUATION SYMBOL

NUMBER OF SHEET WHERE DETAIL APPEARS

NUMBER OF DETAIL ON SHEET

REVISION NUMBER - SHOWN ON PLANS

GENERAL MECHANICAL SYMBOLS

ROOM NAME AND NUMBER

POINT WHERE NEW CONNECTS TO EXISTING

ITEM TO BE DEMOLISHED

AREA NOT IN CONTRACT

20"x8"

20"/8"FO

(E)

FD

SD

MD

MBD

BD

CD

20"Ø

EA

OA

TA

RLA

RA

SA

EXHAUST AIR

OUTSIDE AIR

RELIEF AIR

RETURN AIR

SUPPLY AIR - LOW PRESSURE

TRANSFER AIR

GRILLES, REGISTERS & DIFFUSERS SYMBOLS AND TAGS

CFMID

NECK SIZE

EXISTING DUCT TAG

OVAL DUCT SIZE TAG (WIDTH / HEIGHT)

SQUARE DUCT SIZE TAG (WIDTH x HEIGHT)

HVAC SYMBOLS

RECTANGULAR SUPPLY/OUTSIDE AIR DUCT RISE

RECTANGULAR RETURN/TRANSFER AIR DUCT RISE

MECHANICAL EQUIPMENT TAGS

ROUND DUCT SIZE TAG (DIAMETER)

CFMTYPE (SEE SCHEDULE)

NUMBER OF SLOTS / SLOT WIDTH /

ACTIVE SLOT LENGTH (PLENUM LENGTH)

/ NECK SIZE

DUCT BEING DEMOLISHED

ROUND SUPPLY/OUTSIDE AIR DUCT RISE

ROUND RETURN/TRANSFER AIR DUCT RISE

RECTANGULAR EXHAUST/RELIEF AIR DUCT RISE

ROUND EXHAUST/RELIEF AIR DUCT RISE

DROP

DROP

DROP

DROP

DROP

DROP

GEA GREASE EXHAUST AIR

SEA SMOKE EXHAUST AIR

EQUIPMENT BY OTHERS

(REFER TO OTHER DISCIPLINE

FOR ADDITIONAL INFORMATION)

EXISTING EQUIPMENT

TO REMAIN

FLUE EXHAUST GAS FLUE

CA COMBUSTION AIR

OA CONDITIONED OUTSIDE AIR

VAV-XX

10' - 0"

(E)VAV-XX

VAV-XX

Ø ROUND

ABV ABOVE

AC AIR CONDITIONING

AD AREA DRAIN

ADD ADDENDUM

AFF ABOVE FINISHED FLOOR

AFUE ANNUAL FUEL UTILIZATION EFFICIENCY

ALT ALTERNATE

AP ACCESS PANEL

ARCH ARCHITECT/ARCHITECTURAL

BFF BELOW FINISHED FLOOR

BLW BELOW

BTU BRITISH THERMAL UNITS

BTUH BRITISH THERMAL UNITS PER HOUR

CAP CAPACITY

CB CATCH BASIN

CFM CUBIC FEET PER MINUTE

CLG CEILING

CO CLEAN OUT

D DEGREE

DB DRY BULB

DCW DOMESTIC COLD WATER

DHW DOMESTIC HOT WATER

DIA DIAMETER

DN DOWN

DW DISTILLED WATER

EA EACH

EAT ENTERING AIR TEMPERATURE

ELEC ELECTRICAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EWT ENTERING WATER TEMPERATURE

EA EXHAUST AIR

EXIST EXISTING

F DEGREES FAHRENHEIT

FCO FLOOR CLEAN OUT

FD FLOOR DRAIN

FD FIRE DAMPER

FDV FIRE DEPARTMENT VALVE

FL FLOOR

FO FUEL OIL

FOV FUEL OIL VENT

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FPM FEET PER MINUTE

FS FLOOR SINK

FT FOOT/FEET

FTR FIN TUBE RADIATION

GAL GALLON

GC GENERAL CONTRACTOR

GPM GALLONS PER MINUTE

GW GREASE WASTE

HB HOSE BIB

HP HORSE POWER

HTG HEATING

HTR HEATER

HYD HYDRANT

ID INDIRECT

IN INCH

INV INVERT

LB POUND

LB/HR POUNDS PER HOUR

LAT LEAVING AIR TEMPERATURE

LP LOW PRESSURE

LPG LIQUEFIED PETROLEUM GAS

LVR LOUVER

LWT LEAVING WATER TEMPERATURE

MA MIXED AIR

MAX MAXIMUM

MBH ONE THOUSAND BTU PER HOUR

MCF ONE THOUSAND CUBIC FEET

MD MOTORIZED DAMPER

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MTR MOTOR

MUA MAKE-UP/AIR

NC NOISE CRITERIA

NC NORMALLY CLOSED

NIC NOT IN CONTRACT

NO NUMBER

NO NORMALLY OPEN

NTS NOT TO SCALE

O OXYGEN

OA OUTSIDE AIR

PD PRESSURE DROP

PIV POST INDICATOR VALVE

PLBG PLUMBING

PRESS PRESSURE

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIG POUNDS PER SQUARE INCH GAUGE

PWR POWER

R DUCT RISER

RA RETURN AIR

RCP RADIANT CEILING PANEL

RD ROOF DRAIN

RDO ROOF DRAIN OVERFLOW

REC RECESSED

RED REDUCER

RH RELATIVE HUMIDITY

RL/A RELIEF AIR

RM ROOM

RPM REVOLUTIONS PER MINUTE

RW RAIN WATER

SF SQUARE FOOT

SA SUPPLY AIR

SAN SANITARY

SF SQUARE FOOT

SD SMOKE DAMPER

SM SURFACE MOUNT

SP STANDPIPE

SP STATIC PRESSURE

STM STEAM

T THERMOSTAT

TD TRENCH DRAIN

TDR TEMPERATURE DROP

TEMP TEMPERATURE

TYP TYPICAL

UG UNDERGROUND

VAC VACUUM

V VENT

VAV VARIABLE AIR VOLUME

VENT VENTILATION

VTR VENT THROUGH ROOF

W WASTE

WB WET BULB

WCO WALL CLEAN OUT

WH WALL HYDRANT

ABBREVIATIONS

SECTION TOTAL TRACK LENGTH

BOTTOM OF EQUIPMENT

ELEVATION

590 lb

RTU-XX

4.0 ton

RTU-XX

115000 Btu/h

115 CFH

RTU-XX

Htg: 3.7 GPM

VAV-XX

HEATING

COIL

FLOW OPERATING WEIGHT

NOT INCLUDING CURB

FUEL INPUT

GAS PIPE FLOW

NOMINAL COOLING

CAPACITY

VAV BOX

ROOFTOP UNIT

DATA DEVICE TAGS

DAMPER TAGS

VAV-XX

RTU-XX

EQUIPMENT ID

SYMBOL

MANUAL BALANCING DAMPER

BACKDRAFT DAMPER

COMBINATION FIRE/SMOKE

DAMPER

FIRE DAMPER

SMOKE DAMPER

MOTORIZED DAMPER

SENSOR

MANUAL SWITCH

THERMOSTAT

TEMPERATURE SENSOR

TEMPERATURE & HUMIDITY SENSOR

HUMIDITY SENSOR

NITROGEN DIOXIDE SENSOR

CARBON MONOXIDE SENSOR

CARBON DIOXIDE SENSOR

HUMIDISTAT

EXISTING RELOCATED

EQUIPMENT (R)VAV-XX

POINT WHERE EXISTING IS TO BE DEMOLISHED

Room

EXISTING PIPE TAG

PIPING BEING DEMOLISHED

ABOVE GROUND PIPING

PIPE SIZE TAG (DIAMETER)

BELOW GROUND PIPING

PIPE INVERT ELEVATION TAG

PIPE SLOPE TAG

1/8" / 12" SLOPE

INVERT: -105' - 1"

(E)

HVAC SYMBOLS

SQUARE

SUPPLY DIFFUSER

RECTANGULAR

SUPPLY DIFFUSER

RECTANGULAR

RETURN GRILLE

SQUARE

RETURN GRILLE

ROUND SUPPLY

DIFFUSER

RECTANGULAR

EXHAUST GRILLE

SQUARE

EXHAUST GRILLE

SA SUPPLY AIR - MEDIUM PRESSURE

6"Ø

CD1 /100

8"x8"

CD1 /200

12"x12"

RG1 /500

8"Ø

RG2 /180

12"Ø

EG2 /300

8"x8"

EG3 /150

BLOW PATTERNS

3-WAY

4-WAY

2-WAY

2-WAY

CORNER

1-WAY

CEILING

SIDEWALL

14"x14"

SWS1 /300

16"x16"

SWE1 /400

28"x12"

SWR1 /600

LS1 /200

2/1.00"/5'-0"/10"Ø

5' - 0"

LINEAR SLOT

24"x24"

RG4 /800

PLENUM RETURN GRILLE

WITH SOUND BOOT

12"Ø

CD5 /400 LINEAR BAR GRILLES

48"x6"

LB1 /300

2"

PIPING SYMBOLS

* NOTE *

THE SYMBOLS AND ABBREVIATIONS SHOWN ON THIS SHEET MAY OR MAY NOT BE USED IN

THIS SET OF DRAWINGS.

CHWS

CWV

CA

CD

LPCR

CWR

CWS

DCW

FCW

SCW

DHW

DHW140°

DHWR

DHWR140°

GV

GW

HWR

HWS

NG

OV

OW

PD

V

W

SHWR

SHWS

LPS

RD

RDO

CHWR CHILLED WATER RETURN

CHILLED WATER SUPPLY

COMBINATION WASTE & VENT

COMPRESSED AIR

CONDENSATE DRAINAGE

LOW PRESSURE CONDENSATE RETURN

CONDENSER WATER RETURN

CONDENSER WATER SUPPLY

DOMESTIC COLD WATER

FILTERED COLD WATER

SOFT COLD WATER

HOT WATER

HOT WATER 140°

HOT WATER RECIRCULATION

HOT WATER RECIRCULATION 140°

GREASE VENT

GREASE WASTE

HEATING WATER RETURN

HEATING WATER SUPPLY

NATURAL GAS

OIL VENT

OIL WASTE

PUMP DISCHARGE

SANITARY VENT

SANITARY SEWER

SOLAR HOT WATER RETURN

SOLAR HOT WATER SUPPLY

LOW PRESSURE STEAM

ROOF DRAIN

ROOF DRAIN OVERFLOW

REFL

REFS

REFRIGERANT-LIQUID

REFRIGERANT-SUCTION

2"

4"

4"

REFHG REFRIGERANT-HOT GAS DRAIN SIZE

PIPE RISE

PIPE DROP

PIPE TEE REDUCING 45

DEGREE TEE

45 DEGREE TEE

PG PROPANE GAS

TYPE (SEE SCHEDULE)

RO REVERSE OSMOSIS WATER

IW INDIRECT WASTE

4000 SF

6" RD-1

4" FD-1FLOOR DRAIN 4" AD-6 AREA DRAIN

4" FS-4FLOOR SINK

4" DD-29 DECK DRAIN4" FD-3PFLOOR DRAIN

8 WFU

4" FD-13

HUB DRAIN

DRAIN TAGS

"P" - INDICATES

PRIMER CONNECTION

FIXTURE UNITS

FLOW CONTROL

DRAIN

4" RD-12

COMBINATION

DRAINS

ROOF DRAIN4" RD-15

ROOF AREA

SERVED BY DRAIN

2" DOM. WM

PIPE ACCESSORY TAGS

DOMESTIC WATER METER

BALANCING VALVE

1/4 TURN BALL VALVE

CHECK VALVE

3-WAY MIXING VALVE

MOTORIZED CONTROL VALVE

3 WAY MOTORIZED CONTROL

VALVE

PRESSURE REDUCING VALVE

REFRIGERANT SOLENOID VALVE

BUTTERFLY VALVE

2" BALANCING

2" SHUTOFF

2" CHECK

2" TMV

2" M-CNTRL

2" 3-WAY CNTRL

2" PRV

3/8" SOLENOID

2" BUTTERFLY

WATER CLOSET -

WALL HUNG - ADA WC-1

U-1

1 WFU

LAV-1A

1.5 CWFU

1.5 HWFU

LAV-1A

FIXTURE UNITS

4" WCO

PIPE ACCESORY

TAG

PLUMBING FIXTURE TAGS

4" WCO

TYPE (SEE SCHEDULE)

WC-1A

CAP

PLUG

GWR

GWS

GROUND LOOP WATER RETURN

GROUND LOOP WATER SUPPLY

NPCW NON-POTABLE COLD WATER

NPHW NON-POTABLE HOT WATER

8" COTG CLEANOUT TO GRADE

PIPE CONNECTION SIZE

NER NET ENERGY LOOP RETURN

NES NET ENERGY LOOP SUPPLY

HPCR

HPS

HIGH PRESSURE CONDENSATE RETURN

HIGH PRESSURE STEAM

CO2 MEDICAL GAS - CARBON DIOXIDE (CO2)

HE MEDICAL GAS - HELIUM (HE)

IA MEDICAL GAS - INSTRUMENT AIR

MA MEDICAL GAS - MEDICAL AIR

MV MEDICAL GAS – MEDICAL VACUUM

N2 MEDICAL GAS – NITROGEN (N2)

N2O MEDICAL GAS – NITROUS OXIDE (N2O)

O2 MEDICAL GAS – OXYGEN (O2)

WAGD WASTE ANESTHESIA GAS DISPOSAL

GHWR GLYCOL HEATING WATER RETURN

GHWS GLYCOL HEATING WATER SUPPLY

VALVE SIZE

L I C

E N

S E D

PROFESS IONA

L

E N

G I N

E E

R

No. 4775391-2202

S

T A

T E OF U

TA

H

SPENCER W.

HOWELL

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

THIS SQUARE APPEARS 1/2"x1/2"

ON FULL SIZE SHEETS

CLIENT:

SEAL

A u to d e s k D o c s /2

-F re m o n t H ig h S c h o o l B o ile r R e p la c e m e n t- M

E C

H v

/2

F re m o n t H ig h

S c h o o l B o ile r R e p la c e m e n t_

M E

C H v

.r v t

/3

/2

:4

:1

A

M

M000

Author

Checker

250122

MECHANICAL TITLE

SHEET

Fremont High School Boiler Equipment Package

1975 N 4700 W, Plain City, UT 84404

WEBER SCHOOL

DISTRICT

CONSTRUCTION

DOCUMENTS

4/30/2025

MECHANICAL SHEET INDEX

C001 COVER

M000 MECHANICAL TITLE SHEET

M001 MECHANICAL GENERAL NOTES

M401 MECHANICAL ENLARGED VIEWS

M501 MECHANICAL DETAILS

M601 MECHANICAL SCHEDULES

MECHANICAL GENERAL NOTES

1. THE CONTRACTOR SHALL INFORM THE DESIGNER OF ANY PROPOSED DEVIATIONS FROM THE

CONTRACT DOCUMENTS.

2. SUPPLY AND RETURN PIPING TO COILS ARE THE SAME SIZE.

MECHANICAL PIPING GENERAL NOTES

1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL

COMPLETE AND OPERABLE PIPING SYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED AND

AS REQUIRED BY CODE.

2. UNLESS OTHERWISE NOTED: ALL MECHANICAL PIPING IS OVERHEAD TO RUN ABOVE DUCTWORK AND

TIGHT TO UNDERSIDE OF STRUCTURE.

3. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES, AND OTHER

APPURTENANCES REQUIRING ACCESS ARE ACCESSIBLE.

4. ALL VALVES SHALL BE INSTALLED SO THAT VALVES REMAINS IN SERVICE WHEN EQUIPMENT OR

PIPING ON EQUIPMENT SIDE OF VALVE IS REMOVED.

5. PROVIDE AIR VENT AT HIGH POINT OF EACH DROP IN THE HEATING AND CHILLED WATER PIPING

SYSTEM.

6. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY OPERATION AND TAGGED.

7. PROVIDE ISOLATION VALVES AT EACH EXIST/ENTRANCE INTO SHAFT WHETHER OR NOT SHOWN.

8. COORDINATE LOCATION OF THERMOSTAT WITH ARCHITECTURAL FURNISHING PLANS. MOUNT

THERMOSTAT AT HEIGHT AS SPECIFIED ON ARCHITECTURAL PLANS OR SPECIFICATIONS.

9. DRAIN PANS SHALL BE INSTALLED UNDER ANY PIPING THAT MAY CONTAIN WATER INSTALLED IN AN ELECTRICAL, DATA, IT, OR OTHER ROOM WITH SENSITIVE ELECTRICAL EQUIPMENT. THIS INCLUDES, BUT IS NOT LIMITED TO HYDRONIC, WASTE, DOMESTIC, ROOF DRAIN, ETC.

PROJECT GENERAL NOTES

1. THE PROJECT GENERAL NOTES APPLY TO ALL DISCIPLINES.

2. REMOVE ALL UNUSED PIPING, DUCTWORK, EQUIPMENT, AND ACCESSORIES.

3. THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING CONDITIONS FOR PLUMBING AND MECHANICAL SYSTEMS WITHIN THE TENANT SPACE AND WITHIN CLOSE PROXIMITY TO THE TENANT SPACE. THE CONTRACTOR WILL FIELD VERIFY AS MUCH AS IS REASONABLE BEFORE THE FINAL BID. AFTER THE FINAL BID THE CONTRACTOR WILL NOTIFY THE

OWNER, ARCHITECT, AND MECHANICAL DESIGN ENGINEER IMMEDIATELY UPON DISCOVERY OF

EXISTING CONDITIONS THAT MAY AFFECT THE DESIGN.

4. WHERE FLOOR DRAINS OCCUR WITH THE LIMITS OF CONSTRUCTION, PREVENT CONSTRUCTION

DEBRIS FROM ENTERING DRAIN BODY BY SEALING DRAIN OPENING PRIOR TO START OF WORK.

UNSEAL DRAINS AT COMPLETION OF CONSTRUCTION.

5. COORDINATE INSTALLATION OF PIPING, DUCTWORK, CONDUIT, LIGHTS, CABLE TRAY, STRUCTURE, EQUIPMENT, CEILINGS, ARCHITECTURAL COMPONENTS, AND ANYTHING ELSE PERTAINING TO THE

PROJECT TO PREVENT CONFLICTS.

6. THE CONTRACTOR SHALL BE FAMILIAR WITH ALL THE CONDITIONS BOTH EXISTING AND THOSE ILLUSTRATED BY THESE DOCUMENTS AND THOSE OF OTHER DISCIPLINES, INCLUDING, BUT NOT LIMITED TO ARCHITECTURAL, CIVIL, ELECTRICAL, VENTILATION, PLUMBING, AND OTHER SYSTEMS

INVOLVED ON THIS PROJECT.

7. FINAL PRODUCT SHALL BE A COMPLETE AND FUNCTIONING SYSTEM, AND SHALL CONFORM TO ALL REQUIREMENTS OF APPLICABLE FEDERAL, STATE, AND LOCAL CODES, INCLUDING BUT NOT LIMITED TO THE INTERNATIONAL BUILDING CODE, INTERNATIONAL MECHANICAL CODE, AND INTERNATIONAL

PLUMBING CODE.

8. LOCATE EQUIPMENT REQUIRING ACCESS 2'-0" MAXIMUM ABOVE CEILING.

9. ALL ROOF MOUNTED EQUIPMENT SHALL BE A MINIMUM 10'-0" FROM EDGE OF ROOF.

10. COORDINATE INSTALLATION OF DUCTWORK, PIPING AND MECHANICAL EQUIPMENT WITH NEC

CLEARANCES INCLUDING THE SPACE ABOVE ELECTRICAL PANELS, TRANSFORMERS AND OTHER

ELECTRICAL EQUIPMENT. NO PIPING OR DUCTWORK TO RUN OVER ELECTRICAL PANELS, VFD'S OR MCC'S. PROTECT EQUIPMENT WITH A 42" DEEP ZONE IN FRONT OF PANELS, VFD'S AND MCC'S.

PROVIDE PANS IF REQUIRED UNDER PIPING.

11. FIRE SEAL AROUND DUCT AND PIPING PENETRATIONS OF FIRE RATED WALLS. THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR CAULKING AND SEALING ALL PENETRATIONS IN FIRE

AND SMOKE RATED PARTITIONS TO MAINTAIN RATINGS. REFER TO SPECIFICATION.

12. TRANSITION PIPING AND DUCTWORK SIZES TO MATCH THE SIZE OF EQUIPMENT CONNECTION.

13. REFER TO PLUMBING SERIES DRAWINGS FOR GAS PIPING.

14. ALL PIPE AND DUCT SIZES SHOWN SHALL BE CONTINUED IN THE DIRECTION OF FLOW UNTIL

ANOTHER SIZE IS SHOWN.

15. FOR DETAILS, EQUIPMENT CONNECTIONS, AND PIPE SIZES NOT SHOWN ON THE SEGMENTS, REFER

TO DETAILS, SCHEDULES, AND SPECIFICATIONS.

16. INSTALL ALL EQUIPMENT IN ACCORDANCE WITH THE RESPECTIVE MANUFACTURER'S WRITTEN

INSTALLATION INSTRUCTIONS, AT A LEVEL OF WORKMANSHIP CONSISTENT WITH THE

SPECIFICATIONS.

17. MECHANICAL CONTRACTOR SHALL ENSURE THAT ALL EQUIPMENT IS PROVIDED AND INSTALLED

WITH CLEARANCES PER MANUFACTURERS RECOMMENDATIONS. THE CONTRACTOR SHALL MAINTAIN

PROPER SERVICE SPACE FOR COIL PULLS, BAS DEVICES, MAINTENANCE ACCESS, ETC.

18. LOCATIONS OF PIPING, DUCTWORK AND EQUIPMENT, AS INDICATED ON THE DRAWING, ARE APPROXIMATE AND SUBJECT TO MINOR ADJUSTMENTS IN THE FIELD, INCLUDING, BUT NOT LIMITED TO, OFFSETS AND TRANSITIONS. NEW DUCTWORK, PIPING AND EQUIPMENT SHALL BE COORDINATED

WITH STRUCTURE, LIGHTS, REFLECTED CEILING PLANS, CABLE TRAY, ELECTRICAL CONDUIT,

PLUMBING, MECHANICAL AND FIRE PROTECTION PIPING, MEDICAL GASES, ALL OTHER TRADES AND

ALL OTHER EXISTING CONDITIONS TO AVOID INTERFERENCE IN THE FIELD.

19. THE CONTRACTOR SHALL INFORM THE DESIGNER OF ANY PROPOSED DEVIATIONS FROM THE

CONTRACT DOCUMENTS.

20. IF CONTRACTOR ENCOUNTERS MATERIAL WHICH MAY CONTAIN ASBESTOS, IMMEDIATELY STOP

WORK IN THIS AREA AND NOTIFY THE OWNER.

21. DETAILS REFERENCE ALL SHEETS.

22. INSTALL ALL PIPING AND DUCTWORK WITHOUT FORCING OR SPRINGING.

23. LOCATE VALVING, ACCESSORIES, AND EQUIPMENT IN ACCESSIBLE LOCATIONS.

24. CONTRACTOR TO PROVIDE DELEGATED DESIGN OF SEISMIC BRACING AS A DEFERRED SUBMITTAL.

SEE SPECIFICATION 23 0548 - VIBRATION AND SEISMIC CONTROLS FOR HVAC.

L I C

E N

S E D

PROFESS IONA

L

E N

G I N

E E

R

No. 4775391-2202

S

T A

T E OF U

TA

H

SPENCER W.

HOWELL

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

THIS SQUARE APPEARS 1/2"x1/2"

ON FULL SIZE SHEETS

CLIENT:

SEAL

A u to d e s k D o c s /2

-F re m o n t H ig h S c h o o l B o ile r R e p la c e m e n t- M

E C

H v

/2

F re m o n t H ig h

S c h o o l B o ile r R e p la c e m e n t_

M E

C H v

.r v t

/3

/2

:4

:1

A

M

M001

Author

Checker

250122

MECHANICAL GENERAL

NOTES

Fremont High School Boiler Equipment Package

1975 N 4700 W, Plain City, UT 84404

WEBER SCHOOL

DISTRICT

CONSTRUCTION

DOCUMENTS

4/30/2025

* NOTE *

ALL OF THE GENERAL NOTES ON THIS SHEET ARE TO BE APPLIED TO ALL OTHER DRAWINGS IN THIS SET.

P-4 P-3 P-2

P-20

P-1

P-5 P-6

ET-3

ET-2

ET-1

B-2

B-1

GFU-1

(E)AH-7

(E)AH-8

UH-3A UH-3B

PF

20"Ø FLUE

20"Ø FLUE

(E)GHWR

UH-3C

(E) 6" HWR

(E) 6" GHWS

(E) 6" GHWR

(E)GHWS

(E)GHWR

(E)HWS

4" 5"

5"

6"

4" 4"

4" 4"

6"

6 6

4"

4"

4" 10

6"

6"

T

(E) 2" NG

(E) 2" NG

(E) 1" NG

(E

1/

4" N

G

(E) 1 1/2" NG

5"

(E)CHWS

6"6"

6" 6" 6"

6" DN

6" DN

6" DN

5" DN

(E)P-4 (E)P-3 (E)P-2

(E)P-20

(E)P-1

(E)P-5 (E)P-6

(E)AH-7

(E)AH-8

(E)ET-3

(E)ET-2

(E)ET-1

B-2

B-1

(E)GF

UH-3 UH-3

UH-3

(E)POT

FEEDER

2 2

(E)HWR

(E)GHWS

(E)GHWR

3 3 3 3 3

(E) 1" NG

(E) 1 1/2" NG

(E

1/

4" N

G

(E) 1" NG

(E) 1 1/4" NG

(E) 2" NG

(E) 2" NG

L I C

E N

S E D

PROFESS IONA

L

E N

G I N

E E

R

No. 4775391-2202

S

T A

T E OF U

TA

H

SPENCER W.

HOWELL

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

THIS SQUARE APPEARS 1/2"x1/2"

ON FULL SIZE SHEETS

CLIENT:

SEAL

A u to d e s k D o c s /2

-F re m o n t H ig h S c h o o l B o ile r R e p la c e m e n t- M

E C

H v

/2

F re m o n t H ig h

S c h o o l B o ile r R e p la c e m e n t_

M E

C H v

.r v t

/3

/2

:4

:1

A

M

M401

ML

250122

MECHANICAL ENLARGED

VIEWS

Fremont High School Boiler Equipment Package

1975 N 4700 W, Plain City, UT 84404

WEBER SCHOOL

DISTRICT

CONSTRUCTION

DOCUMENTS

4/30/2025

KEYNOTES

1 DEMOLISH AND REMOVE EXISTING BOILERS

2 DEMO PIPING TO BOILER BACK FAR ENOUGH TO PIPE UP THE NEW BOILER, AND

INCLUDE ALL THE NEW PIPING ACCESSORIES AND VALVES SHOWN IN THE PIPING

DETAILS.

3 DEMOLISH PUMPS. ALSO REMOVE PIPING BACK FAR ENOUGH TO ADAPT TO NEW

PUMPS AND INSTALL ALL THE NEW VALVES AND ACCESSORIES AS SHOWN IN THE

PUMP DETAIL.

4 GLYCOL FEED TANK TO BE REPLACED AND RELOCATED. SEE NEW PLANS AND

ELECTRICAL PLANS.

5 UNIT HEATERS TO BE REPLACED. REMOVE EXISTING UNIT HEATERS.

6 INSTALL NEW UNIT HEATER AND FLUES. SIZE FLUES ACCORDING TO

MANUFACTURER'S RECOMMENDATIONS. IF EXISTING FLUE IS EQUAL TO OR

LARGER THAN NEW FLUE THE NEW TRANSITION TO THE LARGER SIZE AND REUSE

THE SAME ROOF PENETRATION, BUT ALL DUCTWORK AND CAPS SHALL BE NEW.

TERMINATE FLUE 24" ABOVE THE ROOF WITH A CAP THAT IS APPROVED MY THE

UNIT HEATER MANUFACTURER.

7 THIS NEW EXPANSION TANK CAN BE TIED INTO EXISTING PIPING. THE PRESSURE

GAUGES AND PRESSURE RELIEF VALVES SHALL BE REPLACED ALONG WITH THIS

TANK.

8 THIS NEW EXPANSION TANK SHALL BE INSTALLED AND RE-PIPED PER THE DETAIL

WITH A NEW VALVES AND ACCESSORIES. SEE DETAIL 5/M501

9 PIPE EXPANSION TANK PRESSURE RELIEF VALVE BACK TO GLYCOL FEED TANK.

PIPE TO SLOPE FROM RELIEF VALVE TO TANK.

10 NO NEW MECHANICAL PIPING SHALL USE VICTAULIC COUPLERS. ALL NEW PIPING

SHOULD BE WELDED STEEL. SEE SPECIFICATIONS.

11 VFD TO BE PROVIDED BY ELECTRICAL. SEE ELECTRICAL SHEETS. VFDS TO

CONTROL PUMP TO DIFFERENTIAL SETPOINT SEE DETAIL THAT INDICATES

GENERAL LOCATIONS OF THESE DIFFERENTIAL PRESSURE SENSORS. SEE DETAIL

6/M501

12 INSTALL DRIP PANS UNDER PIPING TO PROTECT VFDS

13 INSTALL NEW BMS INTEGRATED THERMOSTAT A MINIMUM OF 30" AWAY FROM

DOOR IN AN ACCESSIBLE LOCATION. THAT WILL CONTROL ALL 3 NEW UNIT

HEATERS SIMULTANEOUSLY. ENSURE THAT THE THERMOSTAT AND OTHER

CONTROL ACCESSORIES PROVIDED ARE COMPATIBLE WITH CONTROLLING THE

PROVIDED UNITS SIMULTANEOUSLY.

14 BEFORE WORK CAN BE DONE ON THE GLYCOL SYSTEM. THE GLYCOL MUST BE

DRAINED AND CONTAINED.

15 MODIFY EXISTING GAS SUPPLY AND VENT LINES AS NEEDED TO INSTALL NEW UNIT

HEATERS AND PRESSURE REGULATORS. SEE NATURAL GAS SPECIFICATION

SECTION.

16 MODIFY EXISTING GAS SUPPLY AND VENT LINES AS NEEDED TO INSTALL NEW UNIT

BOILERS ALONG WITH THEIR NEW GAS TRAIN INSTALL NEW SHUT OFF VALVE

REGULATOR, AND ANY OTHER SOLENOIDS OR ACCESSORIES PROVIDED WITH

BOILER TO MEET BOILER MANUFACTURE'S RECOMMENDATIONS AND CURRENT

CODE.. SEE NATURAL GAS SPECIFICATION SECTION.

17 EXISTING BOILER FLUE SHALL BE DEMOLISHED.

18 PROVIDE BOILER SHUT OFF BUTTON AT EACH EXIT. SEE ALSO CONTROLS

SPECIFICATION.

19 PROVIDE 100% NEW BOILER FLUE. PROVIDE TRANSITIONS AND ROUTING TO USE

EXISTING ROOF OPENING. TERMINATE FLUE 24" ABOVE THE ROOF WITH A CAP

THAT IS APPROVED MY THE BOILER MANUFACTURER.

1/4" = 1'-0"M401

2 BOILER RM FLOOR MECHANICAL PLAN

1/4" = 1'-0"M401

1 BOILER RM FLOOR MECHANICAL DEMO PLAN

0-150 PSI

0-150 PSI

0-150 PSI

PRESSURE GAUGE

UNION

CALIBRATED BALANCING VALVE

NON SLAM CHECK VALVE

SHUT OFF VALVE

FLEXIBLE CONNECTION

THERMOMETER

S U

C T

IO

N

D

IS

C H

A R

G E

STRAINER BLOWDOWN

FULL SIZE TO FLOOR

DRAIN WITH CAP

ISOLATOR PAD. SEE

SPECIFICATIONS (TYPICAL)

CONCRETE 4" BASE WITH #4 BARS 12"

O.C. BEBEL EACH WAY EDGE ALL

AROUND

ANCHOR BOLT WITH NUT

AND WASHER (TYPICAL)

REDUCER (TYPICAL)

1" BALL VALVE WITH PLUG

INSTALL AS CLOSE AS POSSIBLE

TO TOP OF CHECK VALVE.

2' M

IN

EXHAUST

TERMINAL

EXHAUST PIPE. SEE PLAN FOR SIZE

FLASHING

ROOF

EXHAUST

PIPE

FAN

GAS CONNECTION

SUPPORTS

INSTALL WITH PROPLER

CLEARANCES ON THE

INTAKE SIDE OF THE FAN.

NOTE:

TO DRAIN

HWS

TEMPERATURE AND

PRESSURE RELIEF

VALVE (45 PSI)

(TYPICAL)

BOILER

SHUT-OFF VALVE

LOW WATER CUTOFF.

INSTALL PER

MANUFACTURER'S

RECOMENDATIONS.

BURNER

G

GAS TRAIN INCLUDING PRESSURE

REGULATOR, SOLENOIDS, AND

VALVES PROVIDED WITH BOILER

INSTALLED BY MECHANICAL

CONTRACTOR.

GAS SHUT OFF VALVE

TO EXISTING PIPING

PRESSURE

GAUGE

DRAIN FOR TESTING LOW

WATER CUTOFF. PIPE TO

DRAIN

EXISTING CONCRETE

HOUSEKEEPING PAD

THERMOMETER

(TYPICAL)

FOR HEATING WATER PUMP INSTALLATION AND RELATED PIPING.

PT PLUG

REFER TO DRAWINGS

HWR

PT PLUG

3/4" DRAIN WITH VALVE

AND HOSE CONNECTION

(TYPICAL)

HEAT EXCHANGERHEAT EXCHANGER

RE-USE THE EXISTING CONTROL

VALVES. THE FLANGES MAY NEED TO

BE REPLACED IN THE SWITCH TO

WELDED PIPE. ATC TO WIRE ALL 3

VALVES PER BOILER INTO THE

EXISTING BMS.

(TYPICAL)

TO EXISTING PIPING

TO EXISTING PIPING

PIPE THE DRAINS WITH BALL VALVES TO THE

FLOOR DRAIN TERMINATE WITH AN AIR GAP AND

TURNDOWN. SIZE PIPE TO MATCH CONNECTION

SIZE. COMBINED PIPE TO BE 2"

STRAINER WITH BLOWDOWN

AND HOSE CONNECTION.

(TYPICAL)

CALIBRATED BALANCING VALVE.

(TYPICAL)

GLYCOL

FEED

TANK

STRAINER BLOWDOWN (TYPICAL)

CHECK VALVE (TYPICAL)

SHUT-OFF VALVE (TYPICAL)

SYSTEM PIPING

TO EXISTING EXPANSION

TANK PIPING.

3/4" DRAIN WITH VALVE

AND HOSE CONNECTION

BLADDER TYPE

EXPANSION TANK

SIZE PER

EXPANSION TANK CONNECTION

TAPPING

PRESSURE RELIEF VAVLE

SEE SCHEDULE FOR SETTING

0-100 PSI

PRESSURE

GAUGE

WITH COCK

WATER

AIR

PIPE TO GLYCOL FEED TANK FOR GLYCOL SYSTEM

BOILER ROOM

INSTALL NEW DIFFERENTIAL PRESSURE

SENSORS IN THE CHILLED AND HOT WATER

PIPING IN THE AIR HANDLER ROOM AT THIS

LOCATION.

A1

A2

B1

B2

C

D

E

F

L I C

E N

S E D

PROFESS IONA

L

E N

G I N

E E

R

No. 4775391-2202

S

T A

T E OF U

TA

H

SPENCER W.

HOWELL

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

THIS SQUARE APPEARS 1/2"x1/2"

ON FULL SIZE SHEETS

CLIENT:

SEAL

A u to d e s k D o c s /2

-F re m o n t H ig h S c h o o l B o ile r R e p la c e m e n t- M

E C

H v

/2

F re m o n t H ig h

S c h o o l B o ile r R e p la c e m e n t_

M E

C H v

.r v t

/3

/2

:4

:1

A

M

M501

Author

Checker

250122

MECHANICAL DETAILS

Fremont High School Boiler Equipment Package

1975 N 4700 W, Plain City, UT 84404

WEBER SCHOOL

DISTRICT

CONSTRUCTION

DOCUMENTS

4/30/2025

NOT TO SCALEM501

1 CLOSE COUPLED END SUCTION PUMP DETAIL

NOT TO SCALEM501

2 GAS FIRED UNIT HEATER THRU ROOF DETAIL

NOT TO SCALEM501

4 BOILER PIPING DIAGRAM

NOT TO SCALEM501

3 GLYCOL FEED UNIT DETAIL

NOT TO SCALEM501

5 FLOOR MOUNTED EXPANSION TANK -GLYCOL SYSTEM - DETAIL

NOT TO SCALEM501

6 DIFFERENTIAL PRESSURE SENSOR LOCATIONS FOR NEW PUMP VFD CONTROL

L I C

E N

S E D

PROFESS IONA

L

E N

G I N

E E

R

No. 4775391-2202

S

T A

T E OF U

TA

H

SPENCER W.

HOWELL

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

THIS SQUARE APPEARS 1/2"x1/2"

ON FULL SIZE SHEETS

CLIENT:

SEAL

A u to d e s k D o c s /2

-F re m o n t H ig h S c h o o l B o ile r R e p la c e m e n t- M

E C

H v

/2

F re m o n t H ig h

S c h o o l B o ile r R e p la c e m e n t_

M E

C H v

.r v t

/3

/2

:4

:1

A

M

M601

ML

250122

MECHANICAL

SCHEDULES

Fremont High School Boiler Equipment Package

1975 N 4700 W, Plain City, UT 84404

WEBER SCHOOL

DISTRICT

CONSTRUCTION

DOCUMENTS

4/30/2025

4. PUMP ON VFD BY DIVISION 26.

3. P-5 AND P-6 ARE PARALLEL PUMPS

2. P-3 AND P-4 ARE PARALLEL PUMPS

1. PUMP SHALL BE NON-OVERLOADING

P-20 TACO 4009 D BOILER ROOM CHILLER PRIMARY CLOSE COUPLED 560 30% P.G. 40 77 BRONZE FITTED 10 7.57 1760 460/3/60 1

P-6 TACO 2510C BOILER ROOM HEATING WATER CLOSE COUPLED 350 WATER 87 78 BRONZE FITTED 15 9.82 1760 460/3/60 1,3,4

P-5 TACO 2510C BOILER ROOM HEATING WATER CLOSE COUPLED 350 WATER 87 78 BRONZE FITTED 15 9.82 1760 460/3/60 1,3,4

P-4 TACO 3011D BOILER ROOM CHW - PREHEAT LOOP CLOSE COUPLED 500 30% P.G. 95 80 BRONZE FITTED 20 15.55 1760 460/3/60 1,2,4

P-3 TACO 3011D BOILER ROOM CHW - PREHEAT LOOP CLOSE COUPLED 500 30% P.G. 95 80 BRONZE FITTED 20 15.55 1760 460/3/60 1,2,4

P-2 TACO 4009 D BOILER ROOM CHILLER PRIMARY CLOSE COUPLED 560 30% P.G. 40 77 BRONZE FITTED 10 7.57 1760 460/3/60 1

P-1 TACO 2507D BOILER ROOM CHILLER PRIMARY CLOSE COUPLED 265 30% P.G. 40 76 BRONZE FITTED 5 3.63 1760 460/3/60 1

ID MODEL NUMBER LOCATION USE TYPE (GPM) FLUID (FT) (%) CONSTRUCTION (HP) (HP) (RPM) VOLT/PH/HZ NOTES

AND RATE WORKING LOSS EFFICIENCY SIZE BHP SPEED

MANUFACTURER FLOW HEAD MOTOR MOTOR MOTOR

FLUID PUMP ELECTRICAL

PUMP SCHEDULE

3. UNIT TO COME WITH PRESSURE REGULATOR. BUILDING LINE PRESSURE IS 4 OZ.

2. CONNECT TO NEW BMS INTEGRATED THERMOSTAT.

1. GAS HEATING INPUT AND OUTPUT AT SEA LEVEL.

UH-3C MODINE PDP 250 BOILER ROOM NATURAL GAS 6 3700 250,000 207,500 120/1/60 7.75 1,2,3

UH-3B MODINE PDP 250 BOILER ROOM NATURAL GAS 6 3700 250,000 207,500 120/1/60 7.75 1,2,3

UH-3A MODINE PDP 250 BOILER ROOM NATURAL GAS 6 3700 250,000 207,500 120/1/60 7.75 1,2,3

ID MODEL NUMBER LOCATION TYPE (IN) (CFM) (BTU/H) (BTU/H) VOLT/PH/HZ FLA NOTES

AND SIZE RATE LOAD LOAD

MANUFACTURER FLUE AIRFLOW HEATING HEATING

INPUT OUTPUT

ELECTRICAL

FUEL FIRED UNIT HEATER SCHEDULE

1. 65 GALLON GLYCOL CAPACITY.

PF-1 (SEE SPECIFICATION) MECH. ROOM POT FEEDER WATER -

GFU-1 (SEE SPECIFICATION) MECH. ROOM GLYCOL FEEDER 30% PROPYLENE GLYCOL 120/1/60 31 / 65 1

ID MODEL NUMBER LOCATION TYPE FLUID VOLT/PH/HZ (IN) NOTES

AND WORKING HEIGHT

MANUFACTURER DIAMETER/

FLUID ELECTRICAL PHYSICAL

CHEMICAL FEED SYSTEM SCHEDULE

9. CONTRACTOR TO INSTALL THIS EQUIPMENT AND ASSOCIATED ACCESSORIES. SEE ALSO BOILER SPEC FOR INSTALLATION AND STARTUP REQUIREMENTS.

8. BOILER TO COME WITH FUEL TRAIN. INCLUDING ALL NECESSARY NATURAL GAS REGULATORS, SOLENOIDS AND VALVES. LINE PRESSURE AT BOILER GAS LINE BRANCH IS 5 PSIG.

7. SINGLE POINT ELECTRICAL CONNECTION. ONBOARD TRANSFORMER INCLUDED FOR LOWER CONTROL VOLTAGE.

6. SIEMENS LMV5 CONTROLS OR APPROVED EQUIVALENT.

5. MINIMUM TURNDOWN OF 5:1

4. LOW EMISSIONS TO MEET UTAH CODE OF <9PPM NOx AND <400PPM CO.

3. PROVIDE WITH 2 INSERTION COILS FOR GLYCOL PREHEAT. 163 GPM EACH WITH <6 PSI PRESSURE DROP / 326 TOTAL GPM BETWEEN BOTH COILS, EWT=77, LWT=90. 30% PROPYLENE GLYCOL.

2. OUTPUT AT ALTITUDE OF 4300 FT. ELEVATION

1. ASME CERTIFIED

B-2 BRYAN RV700-W-WT-FDG-LX BOILER ROOM FORCED DRAFT WATER TUBE BOILER NAT GAS 7,000,000 5,880,000 350 160/180 WATER 4.8 1 10 460/3/60 17 20 176/50/90 1,2,3,4,5,6,7,8,9

B-1 BRYAN RV700-W-WT-FDG-LX BOILER ROOM FORCED DRAFT WATER TUBE BOILER NAT GAS 7,000,000 5,880,000 350 160/180 WATER 4.8 1 10 460/3/60 17 20 176/50/90 1,2,3,4,5,6,7,8,9

ID MODEL NUMBER LOCATION TYPE TYPE (BTU/H) (BTU/H) (GPM) (°F) FLUID (FT) QUAN. (HP) VOLT/PH/HZ FLA (IN) (IN) NOTES

AND FUEL LOAD LOAD RATE TEMP. WORKING LOSS MOTOR SIZE MOTOR DIAMETER HEIGHT

MANUFACTURER INPUT OUTPUT FLOW LEAVING HEAD MOTOR STACK WIDTH/

LEVEL ALTITUDE ENTERING/ BURNER LENGTH/

SEA SITE FLUID ELECTRICAL PHYSICAL

OWNER FURNISHED CONTRACTOR INSTALLED EQUPMENT

3. RELIEF VALVE TO BE PIPED OVER TO GLYCOL FEED TANK SO ANY BLOW-OFF IS AUTOMATICALLY CONTAINED.

2. NEW RELEIF VALVES TO BE INSTALLED WITH TANK.

1. ASME CERTIFIED 125 PSI

ET-3 CA1400-125 BOILER ROOM VERT BLADDER FULL WATER 370 370 13 45 36 / 103 1,2,3

ET-2 CA1400-125 BOILER ROOM VERT BLADDER FULL WATER 370 370 13 45 36 / 103 1,2,3

ET-1 CA450-125 BOILER ROOM VERT BLADDER FULL 30% PG 105 119 13 45 24 / 78 1,2,3

ID MODEL NUMBER LOCATION TYPE FLUID (GAL) (GAL) (PSIG) (PSIG) (IN) NOTES

AND WORKING ACCEPTANCE SIZE FILL PRESS. VALVE HEIGHT

MANUFACTURER MIN. TANK/ TANK INITAIL RELIEF DIA./

FLUID PHYSICAL

EXPANSION TANK SCHEDULE

(S) (S) SIMPLEX (D) DUPLEX (Q) QUADPLEX OR DOUBLE DUPLEX(D) (Q)

STANDARD CONVENIENCE OUTLET 18"

CONVENIENCE OUTLET, GFCI 18"

STANDARD CONVENIENCE OUTLET, HOSPITAL 18"

STANDARD CONVENIENCE OUTLET, SWITCHED 18"

STANDARD CONVENIENCE OUTLET, CUSTOM HEIGHT (6)

48"UNLESS

NOTED

CONVENIENCE OUTLET, GFCI, CUSTOM HEIGHT (6)

48"UNLESS

NOTED

CONVENIENCE OUTLET, ISOLATED GROUND 18"

CONVENIENCE OUTLET, FLOOR FLOOR

CONVENIENCE OUTLET, CEILING CEILING

2 CIRCUITS TO EACH DEVICE 18"

COMBINATION POWER AND COMMUNICATION FLOOR BOX FLOOR

SPECIAL PURPOSE OUTLET

DIRECT CONNECTION TO EQUIPMENT

CORD DROP OUTLET SUSPENDED

D

POWER/VOICE-DATA SERVICE POLE AS NOTED

DJU DISTRIBUTION JUNCTION UNIT

VFD VARIABLE FREQUENCY DRIVE

SPD SURGE PROTECTION DEVICE

J JUNCTION BOX AS NOTED (12)

J JUNCTION BOX, WALL AS NOTED (12)

J JUNCTION BOX, FLOOR FLOOR (12)

C CLOCK OUTLET (*)

M S

MANUAL MOTOR CONTROLLER SWITCH WITHOUT

TERMINAL OVERLOAD PROTECTION

P

S SWITCH WITH PILOT LIGHT

TH

S MANUAL SWITCH WITH THERMAL OVERLOAD

X

S SINGLE POLE DOOR SWITCH

PUSH BUTTON SWITCH, SINGLE AS NOTED

PUSH BUTTON SWITCH, DOUBLE AS NOTED

BUSH BUTTON SWITCH, TRIPLE AS NOTED

EMERGENCY POWER OFF (EPO) SWITCH

NON-FUSED DISCONNECT SWITCH (13) (14)

F FUSED DISCONNECT SWITCH (13) (14)

MAGNETIC STARTER (13) (14)

MAGNETIC STARTER WITH FUSED DISCONNECT (13) (14)

MAGNETIC STARTER WITH BREAKER DISCONNECT (13) (14)

R POWER RELAY (13) (14)

MOTOR OUTLET

MOTOR OUTLET, ROOF MOUNTED ROOF

LIGHTNING PROTECTION AIR TERMINAL ROOF

LIGHTNING PROTECTION BOND PLATE

LIGHTNING PROTECTION GROUND ROD GROUND

UTILITY POWER POLE SEE PLANS

M TRANSFORMER SEE PLANS

T TRANSFORMER SEE PLANS

G EMERGENCY GENERATOR SEE PLANS

CABLE TRAY

MAIN DISTRIBUTION POWER PANEL

PANEL BOARD, SURFACE 6'-6" TO TOP

PANEL BOARD, RECESSED 6'-6" TO TOP

ELECTRICAL SYMBOL SCHEDULE

SYMBOL DEVICE/FIXTURE DESCRIPTION COMMENTSMOUNTING

POKETHRU

CORD REEL OUTLET SUSPENDED

CR

GAP GENERATOR ANNUNCIATOR PANEL SEE PLANS

ATS AUTOMATIC TRANSFER SWITCH SEE PLANS

POKE THRU, POWER FLOOR

POKE THRU, POWER AND DATA FLOOR

J POKE THRU, POWER AND DATA W/AV FLOOR

DUPLEX OUTLET, POP-UP COUNTERTOP

CONVENIENCE OUTLET, GFCI, CUSTOM HEIGHT, HOSPITAL (6)

48"UNLESS

NOTED

ABBREVIATIONS

A AMPS

AFC AVAILABLE FAULT CURRENT

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AIC AMPS INTERRUPTING

CAPACITY

AWG AMERICAN WIRE GAUGE

B BATTERY

BC BARE COPPER

BFC BELOW FINISHED CEILING

BFG BELOW FINISHED GRADE

C CONDUIT

CO CARBON MONOXIDE

CT CURRENT TRANSDUCER

CU COPPER MATERIAL

DED DEDICATED

DFA DROP FROM ABOVE

EC ELECTRICAL CONTRACTOR

EF EXHAUST FAN

EM EMERGENCY/EGRESS

EMT ELECTRICAL METALLIC

TUBING

ENT ELECTRICAL NON-METALLIC

TUBING

ER EXISTING TO BE RELOCATED

EX EXISTING TO REMAIN

FMC FLEXIBLE METAL CONDUIT

GC GENERAL CONTRACTOR

GEC GROUND ELECTRICAL

CONDUCTOR AT SES

GFCI GROUND FAULT CIRCUIT

INTERRUPTER

GFEP GROUND FAULT EQUIPMENT

PROTECTOR

GND GROUND

IMC INTERMEDIATE METAL CONDUIT

IG ISOLATED GROUND

KCMIL 1000 CIRCULAR MILS (MCM)

LF LOW FREQUENCY, 520 HZ

LFMC LIQUID-TIGHT FLEXIBLE METAL

CONDUIT

LFNC LIQUID-TIGHT FLEXIBLE NON-

METAL CONDUIT

MC MECHANICAL CONTRACTOR

MCA MINIMUM CIRCUIT AMPS

N1 NEMA 1

N3R NEMA 3R

N NEW

NL NIGHT LIGHT, BYPASS LOCAL

SWITCHING

PC PLUMBING CONTRACTOR

POC POINT OF CONNECTION

POS POINT OF SALES

R RELOCATED

RX RECEIVER

RM ROOF MOUNTED

RMC RIGID METALLIC CONDUIT

RNC RIGID NON-METALLIC

CONDUIT

SBJ SYSTEM BONDING JUMPER

SCA SHORT CIRCUIT AMPERES

TX TRANSMITTER

TC TEMPERATURE CONTROL

CONTROLLER

TR TAMPERPROOF

UG UNDERGROUND

UNO UNLESS NOTED

OTHERWISE

VA VOLT/AMPS

VIF VERIFY IN FIELD

W WATTS

WP WEATHERPROOF/NEMA 3R

XP EXPLOSION PROOF

XR EXISTING TO BE REMOVED

1. THE ELECTRICAL SYSTEMS DEFINED BY THESE PLANS AND SPECIFICATIONS ARE TO BE

CONSTRUCTED AS COMPLETE AND OPERABLE SYSTEMS AND SHALL BE BID WITH THIS

INTENT. THE CONTRACTOR SHALL VISIT THE SITE, READ ALL THE RELEVANT

DOCUMENTS AND BECOME FAMILIAR WITH THE TYPE OF CONSTRUCTION AND WORK TO

BE ACCOMPLISHED. SHOULD ANY ERROR, OMISSION OR CONFLICT EXIST IN EITHER THE

PLANS OR SPECIFICATIONS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IN

WRITING BEFORE SUBMITTING HIS BID PRICE SO A CHANGE CAN BE ISSUED IN A PRE-BID

ADDENDUM. OTHERWISE, THE CONTRACTOR AND/OR EQUIPMENT SUPPLIER SHALL

SUPPLY THE PROPER MATERIALS AND LABOR TO INSTALL COMPLETE AND OPERABLE

SYSTEMS AT THEIR OWN EXPENSE. WHEN EACH ELECTRICAL SYSTEM IS COMPLETE,

THE CONTRACTOR SHALL TEST AND CONFIRM IT'S PROPER OPERATION. ANY

INCOMPLETE SYSTEM SHALL BE MADE COMPLETE AND OPERABLE.

2. THE ARCHITECTURAL AND MECHANICAL PLANS ARE CONSIDERED A PART OF THE

ELECTRICAL DOCUMENTS SO FAR AS ANY ELECTRICAL ITEMS THEY MAY CONTAIN. THE

ELECTRICAL CONTRACTOR SHALL REFER TO AND COORDINATE WITH THEM. NO EXTRA

COST SHALL BE ALLOWED FOR FAILURE TO COORDINATE THE CONTRACT DOCUMENTS

WITH OTHER TRADES AND/OR IF EQUIPMENT DIMENSIONS ARE GREATER THAN

SPECIFIED AND/OR DIMENSIONED ON THE PLANS.

3. NO ADDITIONS TO THE CONTRACTOR BID WILL BE ALLOWED FOR CHANGES MADE

NECESSARY BY INTERFERENCE WITH OTHER WORK.

4. THE ELECTRICAL CONTRACTOR SHALL PROVIDE EQUIPMENT, MATERIALS AND LABOR

FOR THE CONNECTIONS OF ALL EQUIPMENT SHOWN ON THE PLANS - ARCHITECTURAL,

MECHANICAL, ETC.

5. THIS PROJECT IS TO BE INSTALLED IN STRICT ACCORDANCE WITH LOCAL AND STATE

CODES AND THE NEC. IF AT ANY TIME DURING CONSTRUCTION, OR AFTER, SOMETHING

IS FOUND TO BE INSTALLED IN VIOLATION OF THE CODES LISTED ABOVE, IT SHALL BE

CORRECTED AT THE CONTRACTORS EXPENSE.

6. ALL EQUIPMENT PROVIDED BY THE ELECTRICAL CONTRACTOR SHALL BE LISTED AND

LABELED BY A NATIONALLY RECOGNIZED TESTING AGENCY, ACCEPTABLE TO THE

AUTHORITY HAVING JURISDICTION, AND BE PROPERLY INSTALLED FOR THE CONDITIONS

AND SPACE THAT EQUIPMENT IS BEING INSTALLED WITHIN.

7. THE ELECTRICAL CONTRACTOR SHALL COORDINATE AND CONFIRM THE EXACT

LOCATION OF THE POWER PANELS FROM WHICH NEW CIRCUITS ARE BEING FED FROM.

VERIFY EXISTING BRANCH CIRCUIT BREAKERS AND PROVIDE NEW BREAKERS AS

NECESSARY FOR A COMPLETE AND OPERABLE SYSTEM.

8. THE ELECTRICAL CONTRACTOR SHALL COORDINATE AND CONFIRM THE EXACT

LOCATION OF THE TELE/DATA ROOM FROM WHICH NEW TELE/DATA OUTLETS WILL BE

FED FROM. VERIFY EXISTING PATCH PANEL SPACES AND PROVIDE NEW PATCH PANELS

AS NECESSARY TO LAND ALL NEW TELE/DATA CABLING.

9. THE ELECTRICAL CONTRACTOR SHALL INSTALL A SEPARATE EQUIPMENT GROUNDING

CONDUCTOR IN EACH CONDUIT RUN. CONDUIT SHALL NOT BE USED AS AN EQUIPMENT

GROUNDING CONDUCTOR. THE ELECTRICAL CONTRACTOR SHALL GROUND THE

ELECTRICAL SYSTEM IN ACCORDANCE WITH LOCAL AND NATIONAL CODES.

10. THE ELECTRICAL CONTRACTOR SHALL CONFIRM MINIMUM CODE (NEC) WORKING

CLEARANCE BEFORE INSTALLING ANY ELECTRICAL PANELS OR CABINETS AND SHALL

MOVE THE PANELS AT HIS EXPENSE IF REJECTED BY AN INSPECTOR. IF CLEARANCE IS

NOT POSSIBLE, THE DESIGNER SHALL BE NOTIFIED IMMEDIATELY IN WRITING.

11. CONDUIT LAYOUTS SHOWN ON THE PLANS ARE DIAGRAMATIC, NOT INDICATING THE

ROUTING REQUIRED. THE EC SHALL ROUTE THE CONDUITS AS REQUIRED BY THE

CONDITIONS OF THE INSTALLATION AND SHALL COORDINATE WITH DUCTWORK, PIPING,

EQUIPMENT, BUILDING STRUCTURE AND OTHER POTENTIAL OBSTRUCTIONS.

12. THE CONTRACTOR SHALL ALLOW THE MOVEMENT, BEFORE ROUGH-IN, OF ANY

ELECTRICAL PANEL, DEVICE, LUMINAIRE, ETC. A DISTANCE OF 10 FEET WITHOUT

REQUIRING ADDITIONAL COST TO THE PROJECT.

13. THE ELECTRICAL CONTRACTOR SHALL SECURE ALL CONDUIT TO THE STRUCTURE AS IT

IS SET IN PLACE USING INDUSTRY STANDARD METHODS AND PRACTICES.

14. MINIMUM SIZE CONDUIT SHALL BE 3/4". ABOVE GROUND CONDUIT SHALL BE EMT WITH

STEEL SET SCREW FITTINGS. UNDERGROUND CONDUIT SHALL BE PVC (SCH40) WITH

GRC ELBOWS AND RISERS WRAPPED IN CORROSION RESISTANT MATERIALS WHERE IN

DIRECT CONTACT WITH THE SOIL.

15. FLEXIBLE CONDUIT SHALL BE LIMITED TO CONNECTIONS TO LIGHT FIXTURES AND FINAL

CONNECTIONS TO MOTORS OR OTHER EQUIPMENT SUBJECT TO VIBRATION. LENGTHS

OF FLEXIBLE OR SEALTITE CONDUIT SHALL NOT BE GREATER THAN 72" INCHES.

16. WIRING DEVICES SHALL MATCH EXISTING COLOR AND FACEPLATE TYPE.

17. TO ASSURE ALL DEVICES ARE RIGIDLY SET, THE ELECTRICAL CONTRACTOR SHALL

SECURE ALL DEVICE BOXES WITH BRACKETS, HANGERS, ETC. DESIGNED FOR THE

APPLICATION. ANY DEVICE BOXES NOT SECURED WILL BE MADE SECURE AT THE

CONTRACTORS EXPENSE.

18. THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL EMPTY CONDUITS WITH 200LB

RATED NYLON PULL CORD.

19. BEFORE ANY ELECTRICAL CONDUIT, BOXES, ETC. ARE COVERED (FLOOR, CEILINGS,

WALLS, ETC.), THEY SHALL BE APPROVED BY THE INSPECTING OFFICER (INSPECTOR).

THE UNCOVERING AND REPLACEMENT OF ELECTRICAL WORK FOR THE INSPECTION

PURPOSES WILL BE AT THE COST OF THE ELECTRICAL CONTRACTOR.

20. ALL BATTERY POWERED OR CONTINUOUS BURN LUMINAIRES SHOWN ON THE PLANS,

SUCH AS EXIT LIGHTS, NIGHT LIGHTS, OR EMERGENCY LIGHTS, SHALL BE CONNECTED

TO THE UN-SWITCHED LEG OF THE LIGHTING CIRCUIT FEEDING THAT AREA.

21. LUMINAIRES INSTALLED IN THE MECHANICAL ROOM SHALL BE PLACED SO THAT ALL

EQUIPMENT IS ADEQUATELY ILLUMINATED AFTER THE MECHANICAL EQUIPMENT IS IN

PLACE.

22. ALL LUMINAIRES SHALL BE SUPPORTED FROM THE BUILDING STRUCTURE AND NOT

SOLELY FROM THE CEILING GRID OR OTHER NONSTRUCTURAL MEMBER.

23. TO MAINTAIN CONSISTENT LIGHT QUALITY, FOR ANY ONE LAMP TYPE SUPPLIED, LAMPS

SHALL BE OF THE SAME MANUFACTURE, SURFACE TEMPERATURE, COLOR RENDERING

INDEX, LAMP EFFICACY, LUMEN OUTPUT AND STARTING CHARACTERISTICS FOR ALL

INSTALLED.

24. WHERE WIRE SIZE IS NOT SHOWN ON THE DRAWINGS FOR 20A, 120/277VAC BRANCH

CIRCUITS, THE CIRCUIT SHALL CONSIST OF 2#12(CU,THHN)+1#12(CU,THHN)GND IN 3/4"

EMT CONDUIT. THIS WIRE SIZE SHALL BE INCREASED TO #10(CU,THHN) FOR 120VAC

BRANCH CIRCUITS WITH OVERALL LENGTHS EXCEEDING 125' TO ACCOMMODATE FOR

VOLTAGE DROP. REFER TO EQUIPMENT SCHEDULES, FEEDER SCHEDULES AND NOTES

ON DRAWINGS FOR ALL OTHER BRANCH CIRCUIT AND FEEDER WIRE/CONDUIT SIZING.

25. CONDUCTORS SHALL BE COPPER, 600VAC RATED, TYPE THHN/THWN-2 UNLESS

OTHERWISE NOTED. CONDUCTORS SIZES UP TO #10AWG SHALL BE SOLID AND #8AWG

AND LARGER SHALL BE STRANDED.

26. ELECTRICAL CONTRACTOR SHALL COORDINATE WITH EQUIPMENT SUPPLIERS ON THE

EXACT LOCATIONS OF ALL EQUIPMENT AND ELECTRICAL CONNECTIONS, WIRES, AND

OVERCURRENT PROTECTION PRIOR TO ROUGH-IN. THE ELECTRICAL CONTRACTOR

SHALL MAKE THE FINAL CONNECTION TO ALL EQUIPMENT UNLESS OTHERWISE

DIRECTED BY THE EQUIPMENT SUPPLIER.

27. THE ELECTRICAL CONTRACTOR SHALL CLEAN THE ENTIRE ELECTRICAL SYSTEM AFTER

COMPLETION OF THE INSTALLATION. REMOVE ALL FINGER PRINTS, FOREIGN MATTER,

PAINT, DIRT, GREASE, UN-NEEDED LABELS OR STICKERS FROM FIXTURES AND

EQUIPMENT. REMOVE ALL RUBBISH AND DEBRIS ACCUMULATED DURING INSTALLATION

FROM THE PREMISES.

28. OBTAIN FROM SUPPLIERS ALL WIRING DIAGRAMS FOR EQUIPMENT PRIOR TO ANY

ROUGH-IN. TO ASSURE THAT PROPER CHARACTERISTICS ARE PROVIDED, ANY

INCORRECT WIRING OR DEVICES INSTALLED BY THE ELECTRICAL CONTRACTOR

WITHOUT THE WIRING DIAGRAM SHALL BE CORRECTED AT THE CONTRACTOR'S

EXPENSE. PROVIDE COPIES OF WIRING DIAGRAMS WITHIN EACH PIECE OF EQUIPMENT

AND ADDITIONAL COPIES WITH THE OPERATION AND MAINTENANCE MANUALS.

29. THE ELECTRICAL CONTRACTOR SHALL COORDINATE WITH THE MECHANICAL

CONTRACTOR TO PROVIDE CONDUIT AND DEVICE MOUNTING BOXES FOR

THERMOSTATS AND OTHER MECHANICAL CONTROLS.

30. IT IS THE INTENT OF THE CONSTRUCTION DOCUMENTS FOR ALL DEVICES TO BE FLUSH

MOUNTED AND CONDUIT/CABLING INSTALLED CONCEALED WITHIN WALLS/CEILINGS. IN

AREAS WHERE CONDUIT MUST BE INSTALLED EXPOSED IT SHALL BE COORDINATED

WITH THE ARCHITECT AND/OR ENGINEER. ALL EFFORTS SHALL BE MADE TO CONCEAL

WIRING METHODS.

31. PROVIDE AN UPDATED, TYPED PANEL CIRCUIT DIRECTORY FOR ALL PANELS WHERE

CIRCUITS HAVE BEEN MODIFIED, ADDED, OR REMOVED BY THE SCOPE OF THIS

PROJECT. CIRCUIT DESCRIPTIONS ON THE DIRECTORY SHALL BE UNIQUE AND INDICATE

THE ROOM AND EQUIPMENT/DEVICE IT IS FEEDING. DATE DIRECTORY WITH PROJECT

COMPLETION DATE. MODIFIED CIRCUITS TO BE IN BOLD.

32. SUBMIT A SCALED LAYOUT (1/4" = 1') OF ALL ELECTRICAL ROOMS BASED ON THE

ELECTRICAL GEAR AND EQUIPMENT SUBMITTALS.

33. PROVIDE A CLEAR, TYPED LABEL ON THE FACEPLATE OF ALL RECEPTACLES AND LIGHT

SWITCHES INDICATING THE CIRCUIT IT IS TIED TO. USE LABELING CONVENTION XX-xx, WHERE "XX" IS THE NAME OF THE PANEL AND "xx" IS THE BRANCH CIRCUIT NUMBER.

LABELS LENGTH SHALL NOT EXCEED 1/4" ON EITHER SIDE OF TEXT.

34. FUSED DISCONNECTS TO BE HEAVY DUTY.

35. ALL TELECOMMUNICATIONS WIRING SHALL BE INSTALLED WITHIN CONDUIT UNLESS

INSTALLED ABOVE ACCESSIBLE CEILINGS. MINIMUM CONDUIT SIZE FOR

TELECOMMUNICATIONS CABLING SHALL BE 1-1/4" EMT, UNLESS OTHERWISE NOTED.

36. PROVIDE A DEDICATED NEUTRAL FOR EACH BRANCH CIRCUIT. SHARED NEUTRALS ARE

NOT ALLOWED UNLESS NOTED OTHERWISE.

GENERAL NOTES

NOTES

(1) SEE LUMINAIRE SCHEDULE FOR FIXTURE TYPES AND DETAILS.

(2) SEE LUMINAIRE SCHEDULE FOR MOUNTING REQUIREMENTS.

(3) WIRE LIGHT FIXTURE FROM ADJACENT J-BOX.

(4) CONNECT NEAREST UN-SWITCHED HOT CONDUCTOR TO EMERGENCY BALLAST.

(5) DIRECTIONAL ARROWS INDICATE REQUIRED CHEVRONS.

(6) COORDINATE FINAL MOUNTING HEIGHT WITH ARCHITECTURAL INTERIOR ELEVATIONS AND

APPROVED MILLWORK SHOP DRAWINGS.

(7) USE WITH POWER PACK.

(8) "X" IN SYMBOL IS INCHES BETWEEN RECEPTACLE ALONG WIREWAY. SEE DRAWINGS.

(9) PROVIDE UL LISTED DEVICE COMPATIBLE WITH THE FIRE ALARM PANEL/SYSTEM.

(10) MATCH THE VOLTAGE OF THE RELAY WITH THAT OF THE CONTROLLING CIRCUIT.

(11) USE A 4" X 4" BOX WITH A MUD RING TO MATCH THE DEVICE AND INSTALLATION.

(12) PROVIDE MUD RING AND/OR BOX COVER APPROPRIATE FOR DEVICES/FIXTURE SERVED.

(13) USE HEAVY DUTY DEVICE FOR 480 VOLT.

(14) SIZE TO THE EQUIPMENT BEING CONTROLLED.

(15) FIRE ALARM PANELS: FACP: FIRE ALARM CONTROL PANEL, NAC: NOTIFICATION APPLIANCE

CIRCUIT PANEL, ANNUN: GRAPHIC ANNUNCIATOR PANEL, AND SES: SMOKE EVACUATION

SYSTEM PANEL.

(16) LIGHT FIXTURES ARE SCALED WITHIN THE DRAWINGS BASED ON ACTUAL DIMENSIONS.

FUSE

CIRCUIT BREAKER

GROUND/GROUND ROD

HOME RUN TO PANEL

X

XX.X DIAGRAM/DETAIL CALLOUT

X LUMINAIRE TYPE

X KITCHEN EQUIP. CALLOUT OR AS NOTED BY ARCH.

X-1 KITCHEN EQUIP. CALLOUT

XX

X MECHANICAL/PLUMBING EQUIPMENT CALLOUT

EQUIPMENT CONNECTION

CONDUIT STUB

CONDUIT STUB DOWN

CONDUIT STUB UP

CONDUIT BREAK/CONTINUATION

CONDUIT RUN CONCEALED IN WALL/CEILING

CONDUIT RUN CONCEALED IN GROUND/FLOORUG

SURFACE RACEWAY/WIREMOLD

LOW VOLTAGE CONDUIT RUN

DEMOLITION

EXISTING L

I

C E

N S

E D

P R

OFE SS I ONA

L

E N

G I N

E E

R

No. 9075170

S

T A

T E OF U

T

A H

LEWIS WONG

Project #: 250122

Contact: Sydnee Anderson

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

CONSTRUCTION

DOCUMENTS

THIS SQUARE APPEARS 1/2"x1/2"

ON FULL SIZE SHEETS

CLIENT:

SEAL

4/30/2025

A u to d e s k D o c s

/2

-F re m o n t H ig h

S c h o o l B o ile r R e p la c e m e n t- M

E C

H v

/2

F re m o n t H ig h

S c h o o l B o ile r R e p la c e m e n t_ E

L E

C v rv t.

rv t

/3

/2

:4

:3

P

M

E001

LA

LW

250122

ELECTRICAL TITLE

SHEET

Fremont High School Boiler Equipment Package

1975 N 4700 W, Plain City, UT 84404

WEBER SHCOOL

DISTRICT

ELECTRICAL SHEET INDEX

E001 ELECTRICAL TITLE SHEET

E601 ELECTRICAL SCHEDULES & DETAILS

E101 BOILER ROOM ELECTRICAL PLANS

VFD VFD

FRONT VIEW SIDE VIEW

TO EQUIPMENT

VFD POWER

C-CHANNEL SUPPORT

WITH CLAMPS. PER NEC

CONDUIT (QTY AND SIZE

AS REQUIRED)

BRACING AS REQUIRED

UNISTRUT SUPPORT

(P1000T OR BETTER)

ADJUSTABLE

BRACE

FITTINGS

CONCRETE INSERTS

EQUIPMENT

(TYP)

NOTE:

1. CONTRACTOR SHALL

PROVIDE AND INSTALL

UNISTRUT SUPPORT

SYSTEM DESIGNED FOR THE

SPECIFIC APPLICATION

PROVIDING ALL REQUIRED

NUTS, BOLTS, ANCHORS,

ETC. TO MEET ALL

REQUIRED SEISMIC LOADS.

TO EQUIPMENT

VFD POWER

STRUCTURE

STRUCTURE

STRUCTURE STRUCTURE

ALL THREAD (SIZE AS

REQUIRED) 3/8" MIN.

BEAM CLAMPS OR

HANGER CLAMPS (AS

REQUIRED BY WEIGHT

SUPPORTED)

RACEWAY. (3/4" - 6")

CONDUIT HANGER

BEAM CLAMPS OR

HANGER CLAMPS

(AS

REQUIRED BY

WEIGHT

SUPPORTED)

RACEWAY. (3/4" - 6")

NOTES:

1. WIRE SHALL NOT BE USED AS A

COMPONENT OF ANY RACEWAY

HANGER SYSTEM.

2. DO NOT NOT SUPPORT ANY

RACEWAY LARGER THAN 1" FROM

BOTTOM CHORD OF STEEL

TRUSSES.

CL

6"

LC

5 4

(TYP.)

EMT

(TYP.)

EMT

EMT

EMT

NOTES:

1. TYP. FOR WOOD AND METAL STUD ROUGH-IN.

2. PLASTER RINGS NOT SHOWN. COORDINATE RING DEPTH TO BE

FLUSH WITH FINISHED SURFACE, UNLESS NOTED OTHERWISE.

3. LOCATE ALL OUTLET BOXES IN ACCORDANCE WITH ARCH. AND

MECH. DRAWINGS, AND WITH ALL APPLICABLE SHOP DRAWINGS.

4. OUTLET BOXES ON OPPOSITE SIDES OF WALLS OR PARTITIONS IN

THE SAME STUD SPACEMUST BE SEPARATED BY A MIN. OF 6"

HORIZONTAL DISTANCE.

5. ELECTRICAL BOXES INSTALLED IN FIRE RESISTANT WALLS OR

PARTITIONS SHALL COMPLY WITH IBC 714.3.2.

6. INSULATED THROAT EMT CONNECTOR.

7. CADDY FASTENER, THROUGH STUD CABLE/CONDUIT SUPPORT

'FB12P'.

8. ADUSTABLE BAR HANGER.

9. TYPICAL DEVICE JUNCTION BOX.

REFER TO SECTION

FOR ATTACHMENT OF

ALL THREAD ROD TO

KINDORF CHANNEL

1 1/2"x1 1/2"-12GA. KINDORF

CHANNEL OR APPROVED

SUBSTITUTE

3/8" ALL THREAD,

MINIMUM. INCREASE

ROD SIZE IF WEIGHT

REQUIRES PER ROD

MANUFACTURERS

RECOMMENDATIONS.SUPPORT CONDUIT

WITH KINDORF STRAP

OR APPROVED

SUBSTITUTE.

BEAM CLAMPS OR

HANGER CLAMPS AS

REQUIRED BY WEIGHT

SUPPORTED

PROVIDE 25% SPACE CAPACITY

NUT

WASHER

WASHER

NUT

L I

C E

N S

E D

P R

OFE SS I ONA

L

E N

G I N

E E

R

No. 9075170

S

T A

T E OF U

T

A H

LEWIS WONG

Project #: 250122

Contact: Sydnee Anderson

DRAWN BY:

CHECKED BY:

PROJ. NO:

DRAWING NO:

DRAWING TITLE:

PROJECT NAME:

CONSTRUCTION

DOCUMENTS

THIS SQUARE APPEARS 1/2"x1/2"

ON FULL SIZE SHEETS

CLIENT:

SEAL

4/30/2025

A u to d e s k D o c s

/2

-F re m o n t H ig h

S c h o o l B o ile r R e p la c e m e n t- M

E C

H v

/2

F re m o n t H ig h

S c h o o l B o ile r R e p la c e m e n t_ E

L E

C v rv t.

rv t

/3

/2

:4

:3

P

M

E601

LA

Checker

250122

ELECTRICAL

SCHEDULES & DETAILS

Fremont High School Boiler Equipment Package

1975 N 4700 W, Plain City, UT 84404

WEBER SHCOOL

DISTRICT

EQUIPMENT SCHEDULE

TYPE DESCRIPTION

ELECTRICAL REMARKS CIRCUITING

VOLT PHASE HP FLA LOAD

WIRE

CONDUIT SIZE MOCP PANELSETS QTY SIZE GND

GFU-1 GLYCOL FEEDER 120 V 1 0.00 hp 2.0 A 240 VA 1 1 12 12 3/4" 20 4A DL1B

P-3 CHW PUMP 480 V 3 20.00 hp 27.0 A 22447 VA 1 3 8 10 3/4" 45 11A MCC-D1A

P-4 CHW PUMP 480 V 3 20.00 hp 27.0 A 22447 VA 1 3 8 10 3/4" 45 11A MCC-D1A

P-5 HEATING WATER PUMP 480 V 3 15.00 hp 21.0 A 17459 VA 1 3 10 10 3/4" 35 11A MCC-D1A

P-6 HEATING WATER PUMP 480 V 3 15.00 hp 21.0 A 17459 VA 1 3 10 10 3/4" 35 11A MCC-D1A

UH-3A UNIT HEATER 120 V 1 0.00 hp 7.8 A 930 VA 1 1 12 12 3/4" 20 4A DL1B

UH-3B UNIT HEATER 120 V 1 0.00 hp 7.8 A 930 VA 1 1 12 12 3/4" 20 4A DL1B

UH-3C UNIT HEATER 120 V 1 0.00 hp 7.8 A 930 VA 1 1 12 12 3/4" 20 4A DL1B

B. THE DIVISION 26 CONTRACTOR MAY INCREASE THE CONDUIT SIZE BY ONE INCREMENTAL SIZE TO FACILITATE INSTALLATION OR TO HELP WITH MATERIAL AVAILABILITY/COST.

ELECTRICAL ENGINEER OF RECORD IN WRITING PRIOR TO ROUGH-IN.

A. THE EC SHALL COORDINATE ALL REQUIREMENTS (IE: MOCP SIZE, UNIT THERMAL PROTECTION, ETC) WITH APPROVED MECHANICAL SHOP DRAWINGS/SUBMITTALS AND BRING UP ANY DISCREPANCIES WITH THE

GENERAL NOTES:

17. SPLIT SYSTEM. INDOOR UNIT FED FROM OUTDOOR UNIT.

16. LM-EB DISCONNECT W/CNTRL WIRING TO VFD

15. CONTROLLED WITH LIGHTS

TO TIE TO FIRE ALARM FOR AUTOMATIC SHUT OFF.

14. DUCT DETECTOR IN RETURN AIR DUCT. PROVIDE RELAY/CONTROL MODULE AND 120V POWER AS REQUIRED

13. DIRECT CONNECTION

12. RECEPTACLE/SPECIAL PURPOSE OUTLET/ETC.

11. VARIABLE FREQUENCY DRIVE

10. NEMA 3R NON-FUSED DISCONNECT SWITCH

9. NEMA 3R FUSED DISCONNECT SWITCH C2 = MAGNETIC ONLY CIRCUIT BREAKER

8. SOFT STARTER WITH FUSED DISCONNECT COMBINATION C1 = THERMAL MAGNETIC CIRCUIT BREAKER

7. MAGNETIC STR/NON-FUSED DISCONNECT COMBINATION OCPD TYPES:

6. MAGNETIC STARTER

5. MANUAL MOTOR CONTROLLER W/OUT THERMAL OVERLOAD E. FURNISHED AND INSTALLED UNDER DIV 26 REQUIRING CONNECTION UNDER ANOTHER DIVISION.

4. MANUAL STARTER WITH THERMAL OVERLOAD D. FURNISHED, INSTALLED AND CONNECTED UNDER ANOTHER DIVISION.

3. BREAKER IN ENCLOSURE C. FURNISHED UNDER ANOTHER DIVISION BUT INSTALLED AND CONNECTED UNDER DIV 26.

2. NEMA 1 NON-FUSED DISCONNECT SWITCH B. FURNISHED AND INSTALLED UNDER ANOTHER DIVISION REQUIRING CONNECTION UNDER DIV 26.

1. NEMA 1 FUSED DISCONNECT SWITCH A. FURNISHED, INSTALLED AND CONNECTED UNDER DIVISION 26.

REMARKS: REMARKS:

W = WATTS MCA = MINIMUM CIRCUIT AMPACITY PL = POLE

HP = HORSEPOWER FLA = FULL LOAD AMPERES STR = STARTER MOCP = MAXIMUM OCPD (LISTED BY THE MANUFACTURER)

V/PH = VOLTAGE/PHASE KVA = KILOVOLT AMPERES GND = GROUND COND = CONDUIT

KW = KILOWATTS VA = VOLT AMPERES DISC = DISCONNECT OCPD = OVERCURRENT PROTECTIVE DEVICE

ABBREVIATIONS:

Assembly Code

EQUIPMENT W/ DISCONNECT SCHEDULE

TYPE DESCRIPTION

ELECTRICAL OVERCURRENT PROTECTION REMARKS CIRCUITING

VOLT PHASE HP FLA LOAD

WIRE

CONDUIT SIZE MOCP

DISCONNECT

PANELSETS QTY SIZE GND SIZE POLES FUSE

B-1 BOILER 480 V 3 7.50 hp 17.0 A 14134 VA 1 3 10 10 3/4" 30 30 3 30.0 A 1A MCC-D1A

B-2 BOILER 480 V 3 7.50 hp 17.0 A 14134 VA 1 3 10 10 3/4" 30 30 3 30.0 A 1A MCC-D1A

P-1 CHILLER PUMP 480 V 3 5.00 hp 7.6 A 6319 VA 1 3 12 12 3/4" 20 30 3 20.0 A 8A MCC-D1A

P-2 CHILLER PUMP 480 V 3 10.00 hp 14.0 A 11639 VA 1 3 10 10 3/4" 25 30 3 25.0 A 8A MCC-D1A

P-20 CHILLER PUMP 480 V 3 10.00 hp 14.0 A 11639 VA 1 3 10 10 3/4" 25 30 3 25.0 A 8A MCC-D1A

NO SCALEE601

1 EQUIPMENT RACK MOUNTED ON CONCRETE DETAIL

NO SCALEE601

3 RACEWAY SUPPORT METHODS DIAGRAM

NO SCALEE601

4 ROUGH-IN DETAIL

NO SCALEE601

5 TRAPEZE SUPPORT DETAIL

THTH

TH

F F

TH

VFD VFD

VFDVFD

UH-3

B-1

UH-3UH-3

B-2

(E)ET-3

(E)ET-2

(E)ET-1

(E)P-5 (E)P-6

(E )P

-4

(E )P

-3

(E )P

-2

(E )P

-2

(E )P

-1

(E)GF

DST

WH-2

DSTDST

(E)AH-8

(E)AH-7

ATC

COMPRESSOR

(E)AS-XX

(E)AS-XX

P O

T F

E E

D E

R

MCC-D1A

D2 D2

D2

D2

D2 D2

D2

D2 D2 D2 D2 D2 D2

UH-3A UH-3B

B-1

B-2

DST DST

ET-3

ET-2

ET-1

DST

WH-2

(E)AH-8

(E)AH-7

GFU-1

ATC

COMPRESSOR

(E)AS-XX

MCC-D1A

MCC-D1A

P18

P15

DL1B

DL1B

DL1B

P16

P16

P16

DL1B

UH-3C

P -4

P -3

P -2

P -2

P -1

MCC-D1A

P19

P-5

P-6

P17

MCC-D1A

P19

P19

P14

MCC-D1A

A. EC SHALL COORDINATE WITH ALL OTHER TRADES DURING

DEMOLITION AND CONSTRUCTION TO FACILITATE TIMELY WORK.

B. ALL AREAS ARE TO BE KEPT CLEAN AND CLEAR OF DEBRIS AT ALL

TIMES.

C. CONTRACTOR SHALL PATCH AND REPAIR ALL WALLS, CEILINGS

ETC. TO MATCH EXISTING CONDITIONS.

D. ROUTE ALL CONDUIT IN A NEAT AND ORDERLY FASHION. ALL

CONDUIT IN FINISHED SPACES SHALL BE CONCEALED ABOVE

CEILINGS OR IN WALLS UNLESS OTHERWISE INDICATED ON THE

PLANS.

E. PROVIDE TAMPER-RESISTANT RECEPTACLES FOR SPACES

IDENTIFIED IN NEC 406.12.

F. BRANCH CIRCUITS SHALL NOT EXCEED 3% VOLTAGE DROP.

G. PROVIDE CLEAR, TYPED, P-TOUCH LABELS ON THE COVERPLATE

OF ALL RECEPTACLES INDICATING THE PANEL AND CIRCUIT

NUMBER IT IS TIED TO. LABEL SHALL BE 1/8” LONGER THAN TEXT

ON BOTH ENDS.

H. PROVIDE UPDATED TYPED CIRCUIT DIRECTORY WITH UNIQUE

CIRCUIT DESCRIPTIONS PER NEC 408.4 FOR PANELS AFFECTED BY

THIS PROJECT.

I. PROVIDE HOUSEKEEPING PADS FOR ALL FLOOR MOUNTED AND

GRADE MOUNTED ELECTRICAL EQUIPMENT. MINIMUM

REQUIREMENTS: 4" HIGH, 4% AIR ENTRAINED, POLYFIBER

REINFORCED CONCRETE, 4" WIDER AND 4" LONGER THAN

EQUIPMENT TO BE PLACED ON IT. REFER TO ELECTRICAL DETAIL

DRAWINGS FOR TRANSFORMER, GENERATOR, OR SWITCHGEAR

PADS THAT MAY EXCEED THESE REQUIREMENTS.

J. WIRE COUNTS FOR CIRCUIT CONDUCTORS ARE NOT SHOWN.

PROVIDE PROPER NUMBER OF CONDUCTORS TO ACHIEVE CIRCUIT

AND SWITCHING CONNECTIONS SHOWN.

K. CIRCUIT NUMBERS AT DEVICES CORRESPOND TO BREAKERS (SEE

PANELBOARD SCHEDULE). BRANCH CIRCUITS SHALL BE SIZED

ACCORDING TO THE CIRCUIT BREAKER RATING, UNLESS

INDICATED OTHERWISE ON THE ELECTRICAL EQUIPMENT

SCHEDULE.

L. DEVICES/EQUIPMENT SHOWN IN GRAY ARE EXISTING TO REMAIN.

PRESERVE AND PROTECT. MAINTAIN EXISTING CIRCUIT

INTEGRITY.

GENERAL POWER NOTES

A. EC SHALL COORDINATE WITH ALL OTHER TRADES

DURING DEMOLITION AND CONSTRUCTION TO

FACILITATE TIMELY WORK.

B. ALL AREAS ARE TO BE KEPT CLEAN AND CLEAR OF

DEBRIS AT ALL TIMES.

C. CONTRACTOR SHALL PATCH AND REPAIR ALL WALLS,

CEILINGS ETC. TO MATCH EXISTING CONDITIONS.

PENETRATIONS SHALL BE SEALED WITH FIRE RATED

CAULK.

D. ROUTE ALL CONDUIT IN A NEAT AND ORDERLY FASHION.

ALL CONDUIT SHALL BE CONCEALED ABOVE CEILINGS OR

IN WALLS OR FINISHED SPACES UNLESS OTHERWISE

INDICATED ON THE PLANS.

E. DEVICES SHOWN ON DEMOLITION SHEETS ARE

GATHERED FROM AS-BUILT DRAWINGS AND FIELD

INVESTIGATION. NOT ALL DEVICES ARE SHOWN. DEVICE

PLACEMENT IS SCHEMATIC AND NOT EXACT.

CONTRACTOR TO FIELD VERIFY FOR EXACT LOCATIONS

AND COORDINATE WORK WITH ALL OTHER DEVICES,

EQUIPMENT, CONDUIT, ETC. WHETHER OR NOT SHOWN

TO COMPLETE PROJECT.

F. CONTRACTOR TO COORDINATE WITH OWNER FOR ITEMS

TO BE SALVAGED PRIOR TO DEMOLITION. CONTRACTOR

RESPONSIBLE FOR DISPOSING OF ANY MATERIAL THAT

THE OWNER DOES NOT WANT TO KEEP.

G. CAP AND LABEL ALL EMPTY CONDUIT TO REMAIN.

H. DEVICES/EQUIPMENT SHOWN IN GRAY ARE EXISTING TO

REMAIN. PRESERVE AND PROTECT.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .