Final Specifications.pdf

PDF 4 MB Posted

Attached to
PRESERVATION AND STABILIZATION OF ENGINEERING OFFI Federal contract opportunity
Solicitation number
140P5420R0029
Issued by
Department of the Interior National Park Service Southeast Region

About this file

This federal solicitation seeks preservation and stabilization services at Dry Tortugas National Park. The selected contractor will preserve and stabilize the Engineering Officers' Quarters and the Front 4 Curtain Magazine. Services include repairing, repointing, and stabilizing historic masonry to prevent deterioration. The period of performance is from award through November 1, 2023. The solicitation was issued by the Department of the Interior National Park Service Southeast Region. The response due date is not provided in the document. Pricing will be fixed firm-fixed-price. There are no socioeconomic set-asides or provisions for incumbent contractors mentioned.

View the file

Other files for this federal contract opportunity

Other files attached to PRESERVATION AND STABILIZATION OF ENGINEERING OFFI, newest first.
File Type Posted
EOQ FRONT 4 CURTAIN MAG NPS RESPONSES 8-03-2020_0003.pdf PDF
EVER DRTO Hurricane Plan 2020_0003.pdf PDF
Sol_140P5420R0029_Amd_0003.pdf PDF
GEN_EQ-CM_0003.pdf PDF
Site Visit_0002.pdf PDF
Sol_140P5420R0029_Amd_0002.pdf PDF
Sol_140P5420R0029_Amd_0001.pdf PDF
Engineers Officers Quarters Final Report.pdf PDF
Sol_140P5420R0029.pdf PDF
Curtain Magazines Final Report.pdf PDF
Curtain Magazine Final Drawings.pdf PDF
Statement of Work.pdf PDF
Engineers Quarters Final Drawings.pdf PDF
Wage Determination.pdf PDF
Past Performance Questionnaire.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRY TORTUGAS NATIONAL PARK

MONROE COUNTY, FLORIDA

PROJECT SOLICITATION NO. XXXXXXXXXXXXXX

PRESERVATION OF CIVIL WAR ERA STRUCTURES

AT FORT JEFFERSON

PMIS NO. DRTO TBD

PROJECT SPECIFICATIONS

Construction Documents

NATIONAL PARK SERVICE

DENVER SERVICE CENTER

August 31, 2017

[This page intentionally left blank]

DRTO 149152 TOC-1

TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 27 00 Definition of Contract Line Items 01 31 00 Project Management & Coordination 01 32 16 Construction Schedule 01 32 33 Photographic Documentation for Historic Preservation Projects 01 33 23 Submittal Procedures 01 35 13.22 Archeological Protection 01 35 23 Safety Requirements 01 35 91 Historic Preservation Treatment Procedures 01 40 00 Quality Requirements 01 42 00 References 01 50 00 Temporary Facilities and Controls 01 57 10 Moat Protection 01 57 19.12 Noise & Acoustics Management 01 57 23 Under-An-Acre Pollution Prevention 01 67 00 Product Requirements 01 73 40 Execution 01 74 19 Construction Waste Management and Disposal 01 77 00 Closeout Procedures

DIVISION 02 – 34 TECHNICAL REQUIREMENTS

DIVISION 02 – EXISTING CONDITIONS

02 15 00 Bracing and Shoring 02 41 19 Selective Demolition

DIVISION 03 – CONCRETE

03 30 50 Coral Concrete

DIVISION 04 – MASONRY

04 01 20 Masonry Repointing and Repair 04 21 00 Clay Masonry Units 04 72 00 Concrete Fabrications

DIVISION 05 – METALS

055501 Bronze Strike Plate

DIVISION 06 – 49

Not Used

DRTO 149152 TOC-2

APPENDICES

Everglades & Dry Tortugas Hurricane Plan (Version 2014) Scarp Wall Sections for Embrasures 53-54 and 58-63 (Sections are not available for other Embrasures)

DRTO - 168910 01 11 00 - 1

091015 SUMMARY OF WORK

SECTION 01 11 00 - SUMMARY OF WORK

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Work covered by the Contract Documents.

2. Work phases.

3. Work under other contracts.

4. Government Furnished Materials.

5. Contractor use of premises.

6. Public use of site.

7. Occupancy requirements for buildings.

8. Work Restrictions.

9. Special Construction Requirements.

10. Soils Investigation Report.

11. Additional Reports.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Location: The project is located at Fort Jefferson, Dry Tortugas National Park, Garden Key, in Monroe County, Florida. Garden Key is located in the Gulf of Mexico approximately 68 miles west of Key West. Garden Key is only accessible by boat or seaplane. The logistics of transporting personnel, supplies, materials and equipment to the Dry Tortugas and maintaining a productive construction site far from the mainland will require careful planning and coordination by the Contractor.

B. The Work consists of the following:

1. The Work of this project consists of preserving and stabilizing multiple historic resources at Fort Jefferson including; the Large Detached Magazine, the Small Detached Magazine, the Engineers’ Quarters ruin, the Soldiers’ Barracks ruin, the Officers’ Quarters ruin, a bastion and curtain magazine and the Bakery. The work will focus on the repair, repointing and stabilization of historic masonry to prevent further deterioration and potential loss of historic fabric. Some restorative efforts at the Bastion and Curtain magazines are included in the scope of work to enhance their interpretive value.

Fort Jefferson is listed on the National Register of Historic Places (NR) and managed as a cultural resource asset. Historical significance extends to the entire site including all associated buildings, landscapes, engineering features and marine construction. This significance also extends to subterranean items including undiscovered or unexcavated archaeological resources. During construction care must be taken to protect all cultural and natural resources.

DRTO - 168910 01 11 00 - 2

The site’s historical and environmental significance must be considered when planning and executing construction means and methods. All proposed work and modifications to historic features shall be in accordance with the Secretary of the Interior’s “Standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring and Reconstructing Historic Buildings.” Contractor shall proceed with care and attention to preservation concerns. Conservative and cautious approaches when working on or around this resource will be given precedence over radical and unproven methods.

Repair and retention of existing historic fabric is a priority. If potential exists for irreversible damage or loss of fabric, Contractor will cease work and seek guidance and approval from Contracting Officer (CO) before resuming work. Actions deemed detrimental to the resource or actions that place the resource at risk of damage or loss to its historic integrity, regardless of cause, will not be undertaken without prior review and approval by the Contracting Officer.

2. Project is designed to comply with a Certification Level according to the U.S. Green Building Council's Leadership in Energy & Environmental Design (LEED) Rating System, as specified in Division 01 Section "Sustainable Design Requirements."

C. Project may be constructed under multiple contracts.

1.3 WORK PHASES

A. The Work may be conducted in multiple phases.

1. Phasing will be determined based on the priorities and needs of the National Park Service.

1.4 CONTRACTOR USE OF SITE

A. General: Contractor shall have limited use of the site for construction operations during the construction period. Limit use of site to only those areas agreed to in advance with the CMR. Do not disturb portions of the project site beyond areas in which the Work is indicated.

1. Limits: Confine staging and operations to Contractor work area on the North Coaling Dock and other areas indicated on drawings or agreed to in advance with the Contracting Officer.

2. While the Contractor Work Area shown on the drawings will be closed to the public during construction, the sally port entrance to the fort needs to remain open to NPS personnel and the visiting public. If closure of the sally port is necessary for limited periods of time, the Contractor shall coordinate the details of this closure with the Contracting Officer. Use of the sally port will be restricted/limited by NPS from 10:30 am to 3:00 pm.

3. Contractor Mooring Area: Contractor Mooring Area shown on drawings will be available to Contractor vessels on a limited and temporary basis for loading and unloading of materials and equipment. The mooring area will not be available to the Contractor when the tour boat, NPS Ft. Jefferson or other official vessels (such as Coast Guard vessels) are scheduled to use the main dock. Contractor vessels using the mooring area will need to be relocated immediately following completion of their tasks. In order to provide temporary controls and limit public access to the area, the Contractor shall coordinate use of the

DRTO - 168910 01 11 00 - 3

mooring location with the Contracting Office. Contractor shall provide a minimum of 48hrs notice of any Contractor vessel arriving at DRTO.

4. Limits on Number of Contractor Personnel: An environmental assessment for the project was performed resulting in a finding of no significant impact (FONSI). This FONSI was based on a limitation being placed on the number of Contractor personnel that can be housed at the site to perform the work of the project. The Contractor’s crew (including subcontractor personnel) shall not exceed ten (10) individuals staying overnight on Garden Key and using water and sewage utilities during a 24-hour period.

5. Contractor Housing: There is one dormitory facility referred to as “The Crew’s Quarters” with bunk beds (10 beds total) that the Contractor may use to accommodate its staff. The cost of these accommodations is $30.00 per person/per night. If the Contractor proposes to use these dormitory facilities to accommodate its staff, the Contractor shall include in its technical proposal the number of beds by days that it intends to use. Further, during contract performance, the Contractor is responsible for tracking the number of beds used each month and making payment to Dry Tortugas National Park on a fixed payment schedule (every 3 months). The Contractor shall submit a report to the Government indicating the actual number of beds used by date with each payment. Facilities and supplies available in the Crew’s Quarters includes two toilets, two showers, one lavatory, one satellite television, three refrigerator/freezers, one freezer, one ice-maker, one microwave, range/oven, two coffee makers, pots, pans and tableware. The Contractor agrees that its staff shall not damage these accommodations and shall use reasonable amounts of electricity, water, and waste disposal. This requirement for conservation of electricity, water and waste disposal is required due to the remote location of the site and the Park’s schedule for waste and water management. No cleaning or other services are provided by the Government.

6. Provisions: The Contractor and or Contractor’s personnel shall provide their own food/condiments/drinks/toiletries and any other personal items for the length of their stay.

Recreation items desired such as fishing/snorkeling gear, beach accessories, or flashlights must likewise be brought to the site by the Contractor and/or its personnel.

7. Use of Contractor Housing:

a. All food and drink containers such as plastic (all types), glass, tin and aluminum is recycled. All recycled containers that have been brought to the island must be carried back to the mainland at the Contractor’s expense. Contractor is responsible for all recyclable material.

b. Recyclable material and domestic waste must be removed from the island at regular intervals of no more than every three weeks.

c. All food must be removed upon departure.

d. Water shall be conserved by taking quick showers and consolidating dirty dishes to be washed only once a day.

e. Housing units must be thoroughly cleaned daily and upon departure.

f. Quiet hours are from 10:00 PM to 7:00 AM.

g. Contractor employees are restricted from using the NPS staff Recreation Room.

h. Contractor is restricted from using the Park’s laundry facilities. The Contractor must arrange to have laundry processed off-site at Contractor’s expense.

i. Contractor is restricted from using NPS boats without prior approval.

DRTO - 168910 01 11 00 - 4

8. Construction Camp: Establishment of a camp within the park will not be permitted. The Contractor may propose to house its staff or subcontractors on boats in the harbor as long as the boats are self-contained and the contractor does not use the park’s facilities to dispose of sewage/gray water. If the Contractor proposes to house staff or subcontractors on boats in the harbor, the Contractor shall be responsible for storing and hauling out of the park, and surrounding waterways, the sewage/gray water to an appropriate treatment facility. Contractor shall also be responsible for securing and maintaining any required Special Use Permits from NPS.

9. Telephone/Internet Communications Systems: There is no hard line on site for telephone/internet communications. Contractor shall be responsible for their own telephone and internet communications systems. Close coordination with Park personnel will be necessary to establish where equipment components can or cannot be located.

Contractor shall receive approval from the Contracting Officer before installing any communications equipment.

10. Conduct:

a. All Park regulations must be followed. Park regulations can be found at the following website http://www.nps.gov/drto/planyourvisit/upload/Park-Regs-updated-2010-2.pdf and http://www.nps.gov/drto/learn/management/compendiumregulations.htm

b. Do not litter.

c. All natural, archaeological, and historical features and artifacts are protected.

Do not take or collect anything without a permit.

d. Avoid interaction or interfering with protected, endangered species. Do not kill, harm or interact with any wildlife. Do not feed or approach any wildlife.

e. Do not enter posted closed areas.

f. Do not stand on any sea grass or coral.

g. Fishing is only allowed with a current Florida State saltwater fishing license.

h. Smoking will not be permitted inside the Fort walls.

11. Transportation to the Project Site:

a. The Contractor shall be responsible for all transportation of personnel.

b. The Contractor shall be responsible for procuring, shipping and handling all construction materials.

The Contractor shall be responsible for packaging, transporting and disposal of all construction debris and personal trash. Due to limited space on site, debris and trash shall be removed from the island at regular intervals throughout the contract period

– See 1.5.A.7.c.

c. Only USCG-approved vessels shall be used for transport of equipment, material and personnel. Contractor shall provide written verification that vessels used in the completion of this contract are USCG-approved.

d. Commercial Modes of Travel: The following schedules may be affected by weather conditions and are subject to cancellation or change.

1) Yankee Freedom III Ferry/Tour Boat Daily Schedule: Boat departs Key West at 8:00 AM with a 7:15 check in time. If any gear or provisions are being transported they must be loaded on the boat by 6:30 am (Gear/provisions

DRTO - 168910 01 11 00 - 5

should not exceed 60lbs dry weight – Excess gear/provisions will be charged at a rate of $0.75/lb). The amount of personal supplies/gear that can be carried on the vessel is limited. Equipment and supplies for construction should be transported via the National Park Service’s tender, M/V Fort Jefferson.

Transportation of supplies/equipment other than personal gear aboard the Yankee Freedom requires prior approval of the Captain and is subject to availability of space and freight charges. Ferry departs Fort Jefferson at 3:00 PM – check in at 2:45 PM. Approximately 2 ½ hours of travel time (each-way).

a) As of October 1, 2013, the rate for Contractors is $99.00 each way.

Breakfast and lunch is included on outbound trips. Lunch can be purchased separately for $7.00.

b) Contact Information: By phone at 305-294-7009 or 1-800-634-0939 or visit www.drytortugas.com.

2) Key West Seaplane Adventures Daily Schedule: Flight times are subject to availability. Flights leave Key West Airport at 8:00 AM, 10:00 AM, 12:00 PM and 2:00 PM. Flights leave the Fort at 11:00 AM, 1:00 PM, 3:00 PM and 5:00 PM. Approximately 45 min. flight time each way.

a) As of December 25, 2013, Contractor rates for traveling on the seaplane are $236 per person each way or the same price for a 4 hour round trip. A full day (8 hour round trip) will cost $412 and a 10 hour day trip (first flight out, last flight back) will cost $472.

b) Contact Key West Seaplane Adventures for weight limitations and lists of items that can and cannot be transported by air.

c) Contact Information: By phone: 1-305-293-9300, by email:

info@keywestseaplanecharters.com

e. National Park Service Crew Boat (Motor Vessel Fort Jefferson): The Government has a crew boat that may be available for the Contractor to arrange transportation for its construction personnel to the site rather than relying only on commercial modes of transportation. While the Contractor may make arrangements for its personnel to be transported to the construction site based on the Government crew boat’s availability and schedule, the Government crew boat’s schedule and availability is uncertain and subject to weather conditions and other operational requirements such as staff availability, boat repairs, etc. Since this alternative method of transportation might be available but is not being provided as Government-furnished property/services, the Contractor shall be responsible for determining what method to use to transport its personnel to the construction site. If the Contractor chooses to use the Government crew boat and the crew boat is unable to make a trip, the Contractor shall bear all responsibility and expense for transporting its crew to the site; and this shall not be recognized as a Government delay of work or be an acceptable reason for the Contractor to make a request for equitable adjustment or additional time under the contract. The Contractor shall be responsible for making arrangements for the Government crew boat with the park personnel.

DRTO - 168910 01 11 00 - 6

Information and restrictions that apply to passengers on the Government crew boat include the following:

1) All food items must be placed in cardboard boxes or coolers labeled with the owner’s name.

2) All other cargo must be labeled and easily identifiable as to the owner of the property.

3) Prior Park (and USCG) approval must be obtained in order to gain access to the docking facilities at the West Trumbo Point Naval Annex.

4) The trip is approximately 5-1/2 hours of travel time from Key West to Dry Tortugas. The Government crew boat typically departs at 9:00 am from Key West Trumbo Point Naval Annex every other Tuesday. Return trips to Key West are generally the following Thursday, departing at 7:00 am from Dry Tortugas. There would be no charge for use of the Government crew boat when used with the normal operational schedule and solely for the transportation of Contractor personnel, groceries and personal items.

Scheduled trips are generally every other week. The Government crew boat is unavailable when the crew have scheduled leave, training, scheduled maintenance at a ship yard or have chartered trips supporting research. On an annual average basis, the Government crew boat will make approximately 18 resupply trips to Dry Tortugas.

5) Arrangements for use of the Government crew boat shall be made at least two weeks in advance of travel.

6) All Contractor personnel cargo must be loaded, secured and unloaded by the Contractor or its personnel. The Government is not responsible for lost or damaged goods.

7) The Contractor and Contractor’s personnel or subcontractors’ personnel must present proper identification at the naval base gate and be escorted to the boat.

The Government will not be responsible for personnel unable to access the boat prior to departure.

8) Private vehicles may not be parked overnight on the base. A small parking area is located directly outside the main gate and can be used to park privately owned vehicles. The Government shall not be liable for vehicle damage or theft if the Contractor’s or subcontractor’s personnel park their vehicle at this site.

9) Entry to the naval base may be denied anytime the national security level is elevated to orange or red or the naval base determines the individual(s) may not enter.

10) The Contractor shall be responsible for completing liability waivers for each person traveling on the Government crew boat. These waivers must be presented to the captain prior to the Government crew boat getting underway.

DRTO - 168910 01 11 00 - 7

12. Hurricane Plan: A copy of the most recent version of the Everglades/Dry Tortugas Hurricane Plan is attached to the solicitation and made a part hereof (See Appendix).

B. Storage of Materials: Contractor shall work with Contracting Officer to identify areas appropriate for material storage at each of the project locations.

C. Preservation of Natural Features:

1. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.

2. Provide temporary barriers to protect existing trees and plants and root zones.

3. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with

Contracting Officer and remove agreed-on roots and branches that interfere with construction.

4. Do not fasten ropes, cables, or guys to existing trees.

5. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.

D. Walkways, Pathways and Entrances: Keep walkways, pathways, and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times.

Do not use these areas for parking or storage of materials.

1. Schedule deliveries to minimize use of pathways and entrances during peak visitation times.

2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

E. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials. Load restrictions on park roads are identical to the state load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment.

1.5 PUBLIC USE OF SITE

A. Contractor shall at all times conduct his operations to ensure the least inconvenience to the public.

If necessary, counterscarp closures will be permitted before 10:00 am and after 3:00 pm, upon specific approval of Contracting Officer (See 1.4.A.2).

1.6 OCCUPANCY REQUIRMENTS FOR BUILIDINGS

A. Existing Buildings

1. Full Government Occupancy: Government will occupy buildings that will be under construction during the entire contract period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the Work so as not to interfere with Government's day-to-day operations. Maintain existing exits, unless otherwise indicated.

DRTO - 168910 01 11 00 - 8

a. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from the CO.

b. Maintain existing building in a weather tight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.

1.7 CONDUCT OF OPERATIONS

A. At all times the contractor shall conduct his operations in conformance with the rules and regulations promulgated by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent.

B. Work on Saturdays, Sundays, Federal holidays or at night may not be performed without prior consent from the Contracting Officer. Submit requests no less than 48 in advance of the work to the Contracting Officer for approval.

C. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.

1.8 WORK RESTRICTIONS

A. On-Site Work Hours: Work shall be generally performed during normal business working hours of 7:00 a.m. to 6:00 p.m., seven days a week, except when otherwise indicated.

1. Hours for noisy activity shall be limited to the period between 8:00 am and 5:00 pm.

B. Existing Utilities

1. Existing Utilities: Notify Contracting Officer and utility companies of proposed locations and times for excavation.

2. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.

3. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the contract.

C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Government or others unless permitted under the following conditions and then only after arranging to provide temporary utility services according to requirements indicated:

1. Do not proceed with utility interruptions without Contracting Officer’s written permission.

D. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet of entrances, operable windows, or outdoor air intakes. Smoking is not permitted within the Fort’s walls.

1.9 SPECIAL CONSTRUCTION REQUIREMENTS

DRTO - 168910 01 11 00 - 9

A. Seasonal Shutdown: Due to the active tropical hurricane season Atlantic Ocean and Gulf of Mexico, a seasonal shutdown of the work in progress will be required from June 1st through November 1st.

Contractor will be required to demobilize during this period. Any extensions or exceptions to this work restriction shall be approved by the Park Site Manager and Contracting Officer.

If project work spans multiple work seasons, temporary on-site storage may be available at the Park.

Contractor shall work with the Contracting Officer and Park personnel to identify approved storage areas.

Contractors will be responsible for installing temporary barriers to make a solid enclosure to store their materials and equipment. Barriers must be solid walls painted to blend with the surrounding masonry and minimize their visual impact.

All walls/barriers must be constructed in a manner so that they do not cause damage to the historic fabric or permanently fasten to the existing masonry walls, ceilings or floors. Contractor must operate with care so as not to damage historic fabric during loading and unloading operations. Contractor will be responsible, at no cost to the Government, for repairing any damage to historic fabric in the storage area including the brick pathway leading to the storage area.

Contractor is solely responsible for all contents stored on site and the temporary barriers which shall be designed to withstand extreme weather events such as tropical storms and hurricanes. Barriers shall be maintained in good condition at all times.

B. Project Website: A project website administered by the NPS will be used for purposes of managing communication and documents during the construction stage.

1. See Section 01 31 00 “Project Management and Coordination” for requirements on using the Project Website.

1.10 ADDITIONAL REPORTS

A. Individual treatment reports, including some materials analysis data have been prepared.

B. Copies of these reports are available to all plan holders with this package.

C. If conflicts occur between the report and drawings or specifications, the drawings and specifications govern.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 11 00

DRTO - 168910 01 26 01 - 1

031414 CONTRACT MODIFICATION PROCEDURES

SECTION 01 26 01 – CONTRACT MODIFICATION PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. The work of this section consists of administrative and procedural requirements for contract modifications.

1.2 DEFINITIONS AND ALLOWANCES

A. Home Office Overhead: Those costs incurred in support of all of a contractor’s projects and not attributable to a specific job. The cost for home office overhead is only allowed as a percentage of all direct work excluding profit. The following items represent allowable home office overhead costs identified in Part 31 of the Federal Acquisition Regulation (FAR):

1. Rent

2. Utilities

3. Furnishings

4. Office equipment

5. Executive and management staff not exclusively assigned to the project

6. Support, accounting, and administrative staff

7. Preparation of cost proposals, estimating, and schedule analyses connected with

Modifications

8. Estimating and preconstruction services

9. Mortgage costs

10. Real estate and corporate taxes

11. Automobile maintenance and travel costs for home office personnel

12. Home office insurances i.e. structure, automotive, umbrella, flood, etc.

13. Depreciation of equipment and other assets

14. Home office supplies (paper, staples, etc.)

15. Legal services

16. Accounting and data processing

17. Professional fees/registration

B. General Conditions (Field Office Overhead): Management and administrative costs incurred on site for the designated project. Costs associated with the preparation of modifications will not be allowed. The costs for these items are to be included only in the general conditions of the modification estimate. Only in the case of a contract time extension are additional general conditions included in modifications. The following items, if applicable, are considered allowable costs for calculating General Conditions:

1. Project Manager, Assistant Project Manager

2. Superintendent, Assistant Superintendent

3. Quality Control, Safety Officer, Environmental Manager, etc.

4. Engineers

5. Travel, lodging, and per diem (as established by Federal Travel Regulations)

DRTO - 168910 01 26 01 - 2

6. Scheduling

7. Field Office Trailers and associated temporary utilities

8. Field office supplies

a. Mailing and couriers

b. Reproduction costs

c. Storage

d. Phones

e. Computers

f. Copiers

9. Personal vehicles i.e. Superintendent Pickup trucks

C. General Requirements: These are costs directly associated with the project and are necessary to perform the actual work of the modification. These costs shall be shown as direct costs in the estimate. The following items, if applicable, are considered allowable costs for calculating General Requirements:

1. Hoisting

2. Material handling

3. Temporary fencing

4. Port-a-lets

5. Trash removal, dumpsters

6. Barricades

7. Small tools

8. Safety supplies

9. Scaffolding

10. Daily cleaning

11. Traffic control

12. Temporary signage

13. Temporary heating and power

D. Personnel Costs: Costs included in the modification must only be for General Conditions staff and workers actually present and working on the project site. Modification costs for salaried workers are only allowed within the structure of a 40 hour week and no overtime or holiday pay will be allowed.

1. Worker Hourly Rates are costs directly associated with the individual worker and consist of the following:

a. Base Rate: This is the hourly rate paid directly to the worker

b. Labor Burden: Employer payments of all applicable burdens, this includes insurance and taxes that the business must pay on behalf of the worker to government entities and educational forums , such as:

1) Social Security

2) Medicare

3) Workers Compensation– Policy and company calculation to be made available.

4) FUTA– Cap Rate and percentage to be proportionally allocated over one year.

5) SUTA– Cap Rate and percentage to be proportionally allocated over one year.

DRTO - 168910 01 26 01 - 3

6) Union agreement costs – Other costs required under an enforceable collective bargaining agreement.

c. Fringe Benefits: Various non-wage compensations provided to employees such as:

1) Health Care Insurance Premiums

2) Cell Phone

3) Clothing

4) 401K and Pensions

5) Vehicle allowances

6) Gas allowance

7) Life insurance premiums

8) Disability insurance

9) Other Fringe Benefits required under an enforceable collective bargaining agreement

E. Bonuses or Deferred Compensation: No Bonus or Deferred Compensation will be allowed within any components of pricing including Home Office Overhead, General Conditions, General Requirements, Hourly Worker Rates, or the direct costs of work.

F. General Liability Insurance: An insurance policy that protects the contractor from claims resulting from bodily injury or property damage to a third party. Include this as a separate line item within all modification proposals and provide a current insurance quote upon request.

G. Performance and Payment Bonds: A performance bond is a surety bond issued by an insurance company or bank to guarantee satisfactory completion of a project. The Payment Bond guarantees that the contractor will pay the labor and material costs they have incurred. Banks and Insurance companies charge a premium for each individual project based on a sliding scale which relates to the size of the project. Include this as a separate line item in modification proposals and provide current company bonding rates upon request.

H. Builder’s Risk Insurance: This covers the contractor’s loss due to fire, high winds, or other natural forces. This is not reimbursed by the National Park Service (NPS) and shall not be included in modification proposals.

1.3 MODIFICATION PROPOSAL PRICING REQUIREMENTS

A. General:

1. Your proposal must be received in the format and within the time frame specified in the Request for Proposal letter. Costs or delays resulting from failure of contractor to submit within the time frame specified will not be compensable.

2. The proposal must be detailed with itemized lists of equipment, materials, labor, production rates, overhead, profit, and bond markup for each item. Labor costs must be itemized by craft and hourly rate, including Fringe Benefits and Labor Burden. If the costs of Fringe Benefits and Labor Burden are not itemized, it is assumed that that they are included in the hourly rate shown, or contractor is not requesting reimbursement.

Contractor may utilize the government provided Contractor Estimate Form, or their

DRTO - 168910 01 26 01 - 4

own form, provided that it contains the same information and level of detail as the Gov’t provided form.

3. Requests for extensions of contract time as a result of this change must be justified with a Time Impact Analysis (TIA). Refer to Division 01 Specification, “Construction Schedule”, for time impact analysis requirements. TIA and associated costs must be received with the proposal by the date shown within the Request for Proposal letter.

Contractor’s failure to submit within the specified time frame will be construed as the Contractor waiving the right for additional time and no time extension will be allowed.

4. All supporting documentation used to justify the proposed modification will be made available to the Contracting Officer upon request.

5. Contractor must review and approve all subcontractor/supplier pricing in detail for proper format, scope, production rates, and pricing prior to submission to the NPS. All delay costs associated with not reviewing and approving subcontractor/supplier pricing will be borne by the Contractor.

6. All pricing and production rates within the estimate must be based on fair and reasonable pricing and cannot include built-in contingency.

B. Labor:

1. Contractor shall estimate the cost of labor by itemizing each craft involved, indicating worker hourly rate (base rate + labor burden + fringe benefits) for each and itemizing the hours required for each craft that will be directly engaged in modification work.

Any work proposed that will require overtime work or premium pay shall be itemized separately. All rates shall be in accordance with the Davis-Bacon Act as incorporated herein. Labor Burden may include payroll taxes, Social Security, unemployment insurances, workers compensation insurance, FICA, FUTA, and other direct costs resulting from Federal, State or local laws.

2. Itemize labor costs for equipment operators separate from equipment costs.

3. The labor cost for foremen shall only be costs for related work required for the modification.

C. Materials:

1. The estimated cost for materials shall include quotes from multiple sources. Material prices must include all applicable fees and credits, including but not limited to, sales tax, freight and delivery charges, and tax rebates.

2. No markup shall be applied to any material provided by the NPS.

D. Equipment:

1. Equipment used for the project must be appropriately sized for the work being performed.

2. Do not include costs for “miscellaneous tools and equipment”, in your proposal for a replacement value of $500 or less. Costs shown in excess of $500 must be broken out separately.

3. Regardless of ownership, the rates to be used in determining equipment rental costs shall be the lowest cost from one of the following sources:

a. U.S. Army Corps of Engineers , Ownership and Operating Expense Schedule (use latest edition and applicable region)

b. Construction Blue Book

DRTO - 168910 01 26 01 - 5

c. Local equipment rental rates, documented by actual invoice charges, or itemized vendor quotes.

4. The estimated equipment rates shall include the operating costs of all fuel, oil, lubrication, supplies, small tools, necessary attachments, ground engaging components, tires & tracks, routine repairs and maintenance (cost of major repair and overhaul is not allowed per FAR 31.105(d)(2)), depreciation, storage, insurance, and all incidentals.

Mobilization, if applicable, may be included for equipment solely used on the modification work but must be listed separately.

5. Estimate the full rate for equipment only for the duration that the equipment will be utilized to accomplish the work of the modification.

6. Standby unit rates used are to be in accordance with paragraph 1.3, D, 2, above. If the US Army Corp of Engineers is utilized then their standby rates prevail. If Bluebook or local equipment pricing is accepted, then ½ of the equipment costs minus any operating costs, major repair and overhaul will be accepted.

7. If equipment is in standby mode due solely to a documented NPS delay, the established standby rate shall apply from the first day of the delay.

8. Equipment that is not used and on the jobsite for up to five consecutive days may be classified at standby rates, provided that the equipment is or has been used solely to perform work on the modification and will be necessary to complete additional modification work. Equipment that is still on the jobsite but not in use after five consecutive days will not be considered in the modification pricing.

9. Requests for compensation for equipment stand by time must be justified, documented and itemized separately.

10. The estimated timeframe (daily, weekly, monthly) for use of the equipment must reflect the lowest cost to the Government.

E. Establishment and Application of Overhead and Profit Percentages:

1. Home Office Overhead and Profit (OH&P) shall be applied to direct costs only. Profit shall not be applied to overhead amounts; and overhead shall not be applied to profit.

Home office overhead shall contain only allowable, allocable, and reasonable costs per the contract documents and FAR Part 31. Profit percentages are based on risk factors found in FAR Part 31which have been applied to the specific type of work included in this project. Negotiated rates shall not exceed the following percentages for OH&P for contractor self-performed work:

Overhead………………10% Profit………………5.5%

2. Total aggregate limit of markup (OH&P) for contractor and subcontractors on modification work shall not exceed 25%. The NPS will not be responsible for allocation of percentages between contractor and subcontractors at any tier.

3. If contractors form a partnership, than the partnership may only receive home office overhead and profit in the same amount as an individual contractor (refer to par 1.3,E,1 above). It is the responsibility of the partners to decide on the division of revenue.

4. Combined Increases and Decreases: On proposals involving both increases and decreases in the Contract Price, the overhead and profit mark-ups are required on the net increases and deducted on net decreases.

5. At no time can profit be calculated on Overhead or itself, it must be calculated on direct costs of work only.

DRTO - 168910 01 26 01 - 6

PART 2 - PRODUCTS

PART 3 - EXECUTION

END OF SECTION 012601

DRTO - 168910 01 27 00 - 1

082714 DEFINITION OF CONTRACT LINE ITEMS

SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS

PART 1 - GENERAL

1.1 SUMMARY

A. The intent of this section is to explain, in general, what is and what is not included in a contract line item, and the limits or cut-off points where one item ends and another begins.

B. If no contract line item exists for a portion of the work, include the costs in a related item.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 LIST OF CONTRACT LINE ITEMS

A. Contract Line Item No. 0001 Officers’ Quarters and Kitchens Ruins Repairs.

1. This item consists of stabilizing and repairing the Officers’ Quarters and kitchens ruins.

2. Measurement for payment will be per lump sum.

3. Payment will be made at the contract lump sum price.

B. Contract Line Item No. 002 Soldiers’ Barracks Repairs.

1. This item consists of stabilizing and repairing Soldiers’ Barracks ruin.

2. Measurement for payment will be per lump sum.

3. Payment will be made at the contract lump sum price.

C. Contract Line Item No. 0003 Engineers’ Quarters Repairs.

1. This item consists of stabilizing and repairing the Engineers’ Quarters ruin.

2. Measurement for payment will be per lump sum.

D. Contract Line Item No. 0004 Large Detached Magazine Repairs.

1. This item consists of stabilizing and repairing the Large Powder Magazine ruin.

E. Contract Line Item No. 0005 Small Detached Magazine Repairs.

1. This item consists of stabilizing and repairing the Small Powder Magazine ruin.

DRTO - 168910 01 27 00 - 2

082714 DEFINITION OF CONTRACT LINE ITEMS

F. Contract Line Item No. 0006 Bakery Repairs.

1. This item consists of stabilizing and repairing the Bakery.

G. Contract Line Item No. 0007 Front 4 Curtain Magazine Repairs.

1. This item consists of stabilizing and repairing the Front Four Curtain Magazine.

3. Payment will be made at the contract lump sum price.

H. Contract Line Item No. 0008 Bastion 6 Powder Magazine Repairs.

a. This item consists of stabilizing and repairing the Bastion 6 Powder Magazine.

b. Measurement for payment will be per lump sum.

c. Payment will be made at the contract lump sum price.

END OF SECTION 01 27 00

DRTO - 168910 01 31 00 - 1

091015 PROJECT MANAGEMENT AND COORDINATION

SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

1. Definitions

2. Construction Coordination.

3. Submittals

4. Coordination Drawings.

5. Requests for Information (RFIs).

6. NPS/DSC SharePoint Project Website.

7. Project meetings.

8. Environmental Coordination.

9. Permits

B. Related Requirements:

1. Section 01 32 16 “Construction Schedule” for preparing and submitting Contractor’s construction schedule.

2. Section 01 73 40 “Execution” for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.

3. Section 01 77 00 “Closeout Procedures” for coordinating closeout of the Contract.

4. Section 01 91 14 “Total Building Commissioning” for coordinating the work with Owner’s

Commissioning Authority.

1.2 DEFINITIONS

A. Authority Having Jurisdiction (AHJ): An AHJ is an agency that has been granted legal authority over a location, action or resource. This authority includes the ability to issue a permit or other legal permission document.

B. Construction Permits: Are those permits obtained by the contractor based on means and methods used to execute the work. Construction Permits are issued to the Contractor and not to the National Park Service (NPS).

C. Government Furnished Permits: Are those permits that are obtained by NPS during the design process and provided to the Contractor for compliance with the provisions through construction.

These permits may address impacts to natural resources, construction stormwater, etc.

1.3 CONSTRUCTION COORDINATION

A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate

DRTO - 168910 01 31 00 - 2

construction operations, included in different Sections, which depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

2. Coordinate installation of different components with other Contractors to ensure maximum accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

4. Where availability of space is limited, coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of all components, including mechanical and electrical.

5. Properly plan construction operations to include permit requirements. Allow enough time to execute permit provisions to maintain work schedule, site visits, inspections, and reporting deadlines.

B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.

C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's Construction Schedule.

2. Preparation of the Schedule of Values.

3. Installation and removal of temporary facilities and controls.

4. Delivery and processing of submittals.

5. Progress meetings.

6. Permit requirements.

7. Pre-installation conferences.

8. Project closeout activities.

1.4 SUBMITTALS

A. Division 01 documents: The following items shall be submitted a minimum of one week prior to the Preconstruction Conference. Contracting Officer will notify Contractor of tentative date for the Pre-Construction Conference.

1. Letter designating Project Superintendent.

2. Construction Schedule.

3. A comprehensive breakdown of the Schedule of Values.

4. Accident Prevention Plan.

5. A list of Subcontractors for this project.

6. Written statements from subcontractors certifying compliance with applicable labor standard clauses.

7. Satisfactory evidence of liability insurance coverage and workman’s compensation for the

Contactor and all subcontractors.

8. Waste Management Plan.

DRTO - 168910 01 31 00 - 3

9. Quality Control Plan.

10. Temporary Storm Water Pollution Prevention Plan (SWPP or UPPP).

11. Historic Preservation Treatment Plan.

12. List of Required Construction Permits. Include the following information for each permit:

a. Name of Permit.

b. The Agency(ies) with Jurisdiction issuing the permit.

c. Information required from the Government to complete the permit application.

13. Emergency Contact Forms for any personnel that will stay overnight on Garden Key or within the Park boundary as part of this contract.

B. All items listed must be provided to the Contracting Officer before the Pre-Construction Conference is held. If all of these documents have not been received one week prior to the scheduled Pre-Construction Conference date, the conference will be cancelled, Notice to Proceed will not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued.

1.5 REQUESTS FOR INFORMATION (RFIs)

A. General: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI utilizing the form created on the NPS/DSC SharePoint Project website.

1. CO will not respond to RFIs submitted by other entities controlled by Contractor.

2. Coordinate and submit RFIs in a prompt manner to avoid delays in the work.

B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:

1. RFI number, numbered sequentially.

2. Date.

3. RFI subject.

4. Specification Section number and title and related paragraphs, as appropriate.

5. Drawing number and detail references, as appropriate.

6. Field dimensions and conditions, as appropriate.

7. Contractor's suggested resolution. If Contractor's suggested resolution impacts the

Contract Time or the Contract Sum, Contractor shall state impact in the RFI.

8. Contractor's signature.

9. Requested date for response.

10. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop

Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

a. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.

C. RFI Form: Complete the RFI Form on the NPS/DSC SharePoint website as follows:

1. Enter the general information at the top of the form.

DRTO - 168910 01 31 00 - 4

2. Under the “Action” section at the bottom of the form, select “Question” then select “CMR” in the drop-down of the “Send to” box.

3. Enter the details of the question and attach related documents.

4. Select “Submit Form” at the bottom of the page.

D. Contracting Officer’s Action: CO will review each RFI, determine action required, and respond.

CO will determine the critical nature of each RFI and issue a response accordingly.

1. The following are not considered to be RFIs and will receive no action:

a. Requests for approval of submittals.

b. Requests for approval of substitutions.

c. Requests for approval of Contractor's means and methods.

d. Requests for coordination information already indicated in the Contract Documents.

e. Requests for adjustments in the Contract Time or the Contract Sum.

f. Requests for interpretation of Architect's actions on submittals.

g. Incomplete RFIs or inaccurately prepared RFIs.

2. CO's action may include a request for additional information, in which case time for response will date from time of receipt of additional information.

3. CO's action on RFIs may result in the need for a change to the Contract Time or the Contract Sum. All contract changes will be processed following the terms and conditions of the contract.

1.6 PROJECT WEB SITE

A. Use the NPS/DSC SharePoint Project website for communication throughout the contract period.

The NPS/DSC SharePoint Project website will be used for the following functions:

1. Project directory.

2. Project correspondence.

3. Meeting agendas and minutes.

4. Contract modifications forms and logs.

5. RFI form and processing.

6. Task and issue management.

7. Photo documentation.

8. Baseline schedule, schedule updates and calendar management.

9. Submittal form and processing.

10. Payment coordination documentation.

11. Drawing and specification document hosting, viewing, and updating.

12. Online document collaboration.

13. Reminder and tracking functions.

14. Archiving functions.

15. Notification of submittal and RFI statuses and current…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .