Final Copy of 48-2025 bid tab.xlsx

XLSX spreadsheet 27 KB Posted

Attached to
Crocker Ditch Measurement & Splitter Structure Replacement State and local contract opportunity
Solicitation number
48-2025
Issued by
Colorado

About this file

This document is a bid proposal (Bid No. 48-2025) from the City of Boulder Open Space and Mountain Parks (OSMP) for the Crocker Ditch Measurement & Splitter Structure Replacement project. The project involves replacing an existing concrete diversion structure, installing Parshall flumes, and improving earthen ditch grades. The bid tabulation sheet outlines multiple construction items including mobilization, demolition, excavation, cast-in-place flume structure, embeds, subgrade preparation, backfill, channel reshaping, and channel armoring. The bid requires contractors to provide unit pricing for each listed item, with some components like tree removal and steel Parshall flume to be provided directly by OSMP.

The bid proposal allows for competitive pricing across various construction elements, with contractors required to complete all bid schedules. The total construction cost will be calculated by multiplying the quantity of each item by its respective unit cost. The City of Boulder reserves the right to accept the lowest responsible and best bid while maintaining the flexibility to reject any or all bids. The project appears to be focused on infrastructure improvement for an irrigation ditch system, with specific attention to measurement and diversion structure functionality in the Colorado state jurisdiction.

View the file

Other files for this state and local contract opportunity

Other files attached to Crocker Ditch Measurement & Splitter Structure Replacement, newest first.
File Type Posted
RFB 48-2025 Crocker Ditch final.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

BID PROPOSAL - BID NO. 48-2025
CITY OF BOULDER OSMP - Crocker Ditch Measurement & Splitter Structure Replacement
CONTRACTOR:
(enter contractor name here)
All proposals shall be submitted on this form. The lowest responsible and best bid will be accepted; provided, however that the City shall have the right to reject any and all bids and to waive any informalities or irregularities contained in said bid. The following quantities are an estimate only and may be altered to meet actual City of Boulder requirements.
CONTRACTORS SHALL USE THIS FORM TO SUBMIT THEIR BID
Submit firm unit prices for the type of construction listed below. Overhead shall not be priced and bid separately, but shall be included in each bid item as required. All prices are for furnishing and installing the described item unless noted otherwise. Bidders must provide pricing for all bid schedules.

ONLY THOSE CELLS HIGHLIGHTED IN YELLOW SHALL BE FILLED IN. ALL OTHER CELLS SHALL NOT BE ALTERED.

Item No.Construction ItemQuantityUnitUnit CostExtension
Preparation
1Mobilization1LS$ -
2Demolition (Remove Existing Structure)1LS$ -
3Tree Removal and Grubbing (provided by OSMP)1LS--
Flume
4Excavation1LS$ -
5Cast in Place Flume Structure23CY$ -
6Embeds10LF$ -
7Steel Parshall Flume (provided by OSMP)2EA--
8Subgrade Preparation3CY$ -
9Backfill32CY$ -
Channel Grading
12Reshaping220LF$ -
13Revegetation (Provided by OSMP)1LS-
Channel Armoring
14Rip Rap (outlets only)18CY$ -

Total Construction Items $ - 0