This Contract Data Requirements List outlines testing requirements for a chiller to be provided under Solicitation Number SPRHA223R0059. The chiller, known as the MMIII MAF Chiller, must undergo First Article Testing no later than 30 days after testing concludes. The contractor must submit the test report to the requiring organizations, which are the 414th Supply Chain Management Squadron and the 6031st Logistics Readiness Squadron at Hill Air Force Base. The final test report is due 15 days after the contractor receives government comments on the initial submission. Testing must be performed in accordance with DI-NDTI-80809B and include dimensions, tolerances, materials, and processing details. The solicitation is restricted to HDT Global as the approved source under CAGE code 92878.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MQR.pdf | ||
| EDL.pdf | ||
| SPRHA223R0059.pdf | ||
| Pkg_SOW.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
0001AA AA NDTI
Chiller, MAF/NIIN:015475215 FD20202300060
A001 Test/Inspection Report Test/Inspection Report
DI-NDTI-80809B 414 SCMS/GUEA
DD
N/A D
SEE BLK 16
SEE BLK 16
SEE BLK 16
SEE BLK 16
414 SCMS 1 1
6031 Gum Lane
Bldg 1227 Hill AFB, UT
84056 ATTN: Mike Loveless
414 SCMS 1 1
6031 Gum Lane
Bldg 1227
Hill AFB, UT 84056
ATTN:
Chelsey Helleksen
2 2 0
Note: , “NO FAT REQUIRED IF SUPPLIER HAS ALREADY PRODUCED AN ACCEPTABLE EAS80202-104 “Chiller, MAF” TO THE AIR FORCE WITHIN THE
PAST 3 YEARS”.
Otherwise: FAT is required as as indicated below;
Block 4: Paragraph 10.2 of DI-NDTI-80809B clarified as follows:
a. All dimensions and tolerances specified on the manufacturing data shall be listed in one column, with the actual corresponding reading obtained from the inspection of the part listed in another column.
b. Materials used in the manufacture of the "First Article" shall be identified and certified along with a copy of material purchase requirements as conforming to applicable data requirements.
c. Material processing, including finish requirements (plating, heat treatment, welding, anodizing, painting, etc.) utilized in the manufacture of "First Article" item shall be identified and certified as conforming to applicable requirements. A copy of the purchase order certifying the process accomplished at other than contractor facility shall be included.
BLOCKS 10, 11, 12, & 13: CONTRACTOR SHALL SUBMIT FIRST ARTICLE TEST
REPORT NO LATER THAN (NLT) 30 CALENDAR DAYS AFTER THE
CONCLUSION OF THE FIRST ARTICLE TEST. GOVERNMENT SHALL HAVE 15
CALENDAR DAYS TO PROVIDE COMMENTS. FINAL FIRST ARTICLE TEST
REPORT SUBMITTAL SHALL BE DELIVERED NLT 15 CALENDAR DAYS
FOLLOWING RECEIPT OF GOVERNMENT COMMENTS.
BLOCK 14: Contractor shall submit Test/Inspection Report to ORGs electronically.
Electronic submissions authorized to:
Michael.loveless.5@us.af.mil chelsey.helleksen@us.af.mil
NSP
0.00
LOVELESS.MICHAEL.ALAN.151
9342827
Digitally signed by
LOVELESS.MICHAEL.ALAN.1519342827
Date: 2022.11.10 10:50:03 -07'00'
11/10/2022 HELLEKSEN.CHELSEY.S.1
138722402
Digitally signed by
HELLEKSEN.CHELSEY.S.1138722402
Date: 2022.11.15 08:18:44 -07'00'
11/15/22
1 1 Adobe Professional 8.0
File details come from the government source that posted it. Updated .