Questions.pdf

PDF 114 KB Posted

Attached to
Modular Offices Federal contract opportunity
Solicitation number
FA940120QA052
Issued by
Department of the Air Force Materiel Command Nuclear Weapons Center

View the file

Other files for this federal contract opportunity

Other files attached to Modular Offices, newest first.
File Type Posted
Questions.pdf PDF
FLOOR PLAN.xlsx XLSX spreadsheet
Combined Synopsis Solicitation.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions

1) What type of wall that is required? Class A noncombustible (Industrial Standard)

2) What wall surface is required? Vinyl faced gypsum (drywall)

3) Do you want a single or double door unit? How many per building? Single Door Unit.

4) Do you want windows in any of the wall panels? Two windows located on front side of modular would be sufficient.

5) Do the ceilings require thermal insulation? 6" / R-19 fiberglass batts.

6) Will the roof just support the ceiling and lighting-YES Just ceiling and lighting

7) Modular buildings are typically erected on the warehouse floor with no interior finished flooring (tile, carpet, etc.). Is finished flooring required? Finished floor required-no carpet or tile.

8) Should the light fixtures be fluorescent or LED flat panels? LED flat panels.

9) Should the guard rail be 21" high single-rail or 42" high double-rail guard rail? 42” Double Rail.

10) Will you provide a NM Prevailing Wage Statement in the applicable County so that we can verify compliance? Quote should include NM Prevailing Wage in costs.

11) Typically materials are received and unloaded by the customer. Will work.

Our installed arrives after they are unloaded and staged.

- Is this acceptable? Yes, but need to clarify your meaning of staged.

12) Will we be allowed to us the customer's forklift for handling materials on-site? Or will we need to include local equipment rental in our price? If forklift needed for handling materials, include rental in price.

13) Will we be allowed to discard waste in the customer's trash and/or recycling dumpsters? Or will we need to rent one locally? Standard large dumpster provided. If dumpster needed for construction material that will over fill a large dumpster, then you’ll need to rent one.

14) Would be able to adjust the specifications on the Office Building - from 20' x 30' x 9'h to 20' x 32' x 9'6h? No, need to stay with 20’ x 30’ x 9’ or 9’6h

15) What the electrical requirements (A/C, outlets…) are for the units as well as the tonnage of the HVAC required? 5 Outlets are for 4 workstations and for one printer; A/C would have separate outlet for power.

Junction box inside each module to provide capacity for up to 10 - 20A circuits (2#12, 1#14 ground) to be installed in each module. Must be located in SE corner.

16) We are an enclosure manufacturer and the material we use is EXOACM which is an extruded aluminum exoskeleton composite that consists of 20 thousand aluminum on each side with a heat resistant core. Will this be an acceptable material? Yes.