This document is a Q&A for solicitation FA9101-24-Q-B074 for a 40 Ton Chiller. The key details are:

The solicitation is for commercial supplies and is being conducted as a Request for Quote (RFQ) under FAR Subpart 12.6 and FAR Part 13. Vendors asked questions about the requirements, including whether new thermostats, gauges, and flex connections are needed, and whether the water lines need to be bled. The government answered that new thermostats, gauges, and bleedingare not required, but some insulation replacement may be needed. The government also confirmed that a bond is not required. The existing chiller unit is a Carrier model.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vendor Questions and Government Answers for FA9101-24-Q-B074

1. Vendors Question: Are new thermostats are required on the lines outside the building?

Governments Answer: If you are referring to temperature transmitters (TT), no they are not required to be changed out

2. Vendors Question: Are new gauges are required on the lines outside the building?

Governments Answer: No, pressure and temperature gauges are not required to be replaced.

3. Vendors Question: Are new flex connections required when connecting to the water lines?

Governments Answer: Are you referring to insulation and cladding on the inlet/outlet piping from the chiller? You may have to replace some of the insulation where it is required. Cladding may be re-used.

4. Vendors Question: Please confirm there is no requirement to bleed the water lines in the building.

Governments Answer: No, bleeding the water lines will not be required. If required, it will be done in-house.

5. Vendors Question: Is a bond required?

Government Answer: Bond is not required.

6. Vendors Question: Who is the controls contractor for the existing unit?

Government Answer: The existing unit is a Carrier.