Questions and Answers CAT Generator Amendment 3.pdf
PDF 413 KB Posted
- Attached to
- Caterpillar Generator for Arnold AFB Federal contract opportunity
- Solicitation number
- FA9101-21-Q-0073
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch 01 Caterpillar Generator Specifications Rev 2.pdf | ||
| FA9101-21-Q-0073 CAT Generator RFQ Amendment 3.pdf | ||
| Questions and Answers CAT Generator.pdf | ||
| Atch 01 Caterpillar Generator Specifications Rev 1.pdf | ||
| FA9101-21-Q-0073 CAT Generator RFQ Amendment 2.pdf | ||
| FA9101-21-Q-0073 CAT Generator RFQ Amendment 1.pdf | ||
| Atch 01 Caterpillar Generator Specifications.pdf | ||
| FA9101-21-Q-0073 CAT Generator RFQ.pdf | ||
| Atch 03 Brand Name Justifcation Redacted.pdf | ||
| Atch 02 FAR 52.204-24 Representation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ: FA9101-21-Q-0073
Title: CAT Generator
Questions Answers Will you need us to off-load? The Contractor shall off-load the generator.
Please see updated specifications.
As per the Mfg –
“You can not have both standby and prime configuration, you have to select one or the other.
Will this unit be the primary power supply? Or will it be a back up power supply? “ Please do let us know what you need Primary or Standby?
Emergency Standby Power (ESP). Please see updated specifications.
Will you consider accepting a quote on 500KW
Generac?
No, this generator must be the brand and model as per the speciifcation, brand name justification, and evaluation criteria in the
RFQ.
What’s is the desired run time on the fuel tank with engine running at 100% load?
3 hours. Please see updated specifications.
Is this an open unit, or enclosure? If weather enclosure or sound attenuated enclosure
(insulated version of weather enclosure)?
Open unit. Please see updated specifications.
Are you in a seismic zone? No
What size fuel tank? Shall be able to run 3 hours on 100% load.
Please see updated specifications.
Does it need an enclosure? Does it need weatherproof or sound attenuated enclosure?
No enclosure necessary, open unit
Do you want winding heaters? Winding heaters keep the generator dry from humidity.
No
Do you want battery chargers and block heaters? Yes, the generator shall include both. Please see updated specifications.
Is this a primary power unit or standby emergency power? If primary, it will need to have a different emisions rating.
Emergency Standby Power (ESP). Please see updated specifications.
If a 24 hr fuel tank is enough? There is a much cheaper CAT unit.
24 hour fuel tank not required. The model in the specifications will remain uncahnged.
Please see updated specifications for other information.
Once the generator is delivered, will the contract require a startup and commissioning?
Yes, the Government will require startup and commisioning by a Caterpillar Factor Tech.
Please see revised specs. Also, the
Government plans to remove the old unit and install the new unit.