Specification Summary of Changes 12964-11-002A.pdf
PDF 22 KB Posted
- Attached to
- VA-1409 Compressor Rotor End Barrel Federal contract opportunity
- Solicitation number
- FA9101-11-R-0037
About this file
Specification Summary of Changes
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0001.pdf | ||
| Specification 12964-11-002A 25 October 2011.pdf | ||
| Specification Drawings Attachment 1.pdf | ||
| FA9101-11-R-0037.pdf | ||
| Subcontractor Consent Form Attachment 3.pdf | ||
| Past Performance Questionnaire Attachment 2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12964-11-002A 20 October 20111
Summary of Changes
1. Specification
• Corrected numbering to be consistent throughout spec.
• Table of Contents:
5. Changed to read “Preparation, Packaging, and Transportation”
• Paragraph 1.1:
Changed “delivery” to “transportation”; added “and associated Government furnished equipment” to end of first sentence.
• Paragraph 1.2.A:
Changed “5” to “4”
• Paragraph 1.2.B:
Changed “gauges” to “gauge”, “2” to “1”, and deleted “1 per taper hole size”.
• Added paragraphs 1.2.C and 1.2.D.
• Paragraph 2.1.1.A:
Changed “PU208618 Rev E” to “PU634696”
• Added Paragraph 2.1.1.D.
• Paragraph 3.1:
Changed “PU208618 Rev E” to “PU634696”
• Paragraph 3.4.1:
Changed “PU208618 Rev E” to “PU634696”
• Paragraph 4.3.A:
Changed “PU208618 Rev E” to “PU634696” Changed last sentence to read “Record all “as-built” dimensions in drawing PU208716QC sheet 4 and submit to the Contracting Officer.”
• Paragraph 5
Changed header to read “Preparation, Packaging, and Transportation”
• Paragraph 5.1 changed to read:
“The Contractor shall be responsible for the shipment of Government furnished equipment. Provide all preservation, packing, and packaging to ensure safe delivery of the finished machined rotor barrel discharge end and Government furnished equipment to AEDC, Arnold Air Force Base, Tennessee. Finished surfaces shall be adequately protected to prevent marring, scratching, rust, and contamination.”
• Paragraph5.2 changed to read:
“Packaging shall include rotor inlet barrel, rotor discharge end stub shaft, all rotor blades, and blade taper gauge provided by the Government for the Contactor’s use.”
• Paragraph 5.3 added:
“The Contractor shall assume liability for the Government furnished equipment from the time parts are loaded onto the transportation vehicle at AEDC until the time the Government furnished equipment and new rotor barrel discharge end are shipped to AEDC and unloaded from the transportation vehicle.”
File details come from the government source that posted it. Updated .