R0003.DOC

DOC document 264 KB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
Solicitation number
FA9101-09-R-0003
Issued by
Department of the Air Force Materiel Command Test Center

About this file

Request for Proposal

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements (SABER), newest first.
File Type Posted
SABERdol.pdf PDF
AEDC SABER Vol I SOW Jan 2009.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

FA9101-09-R-0003

2. TYPE OF SOLICITATION

FORMCHECKBOX

SEALED BID (IFB)

FORMCHECKBOX

NEGOTIATED (RFP)

3. DATE ISSUED

02 MAR 2009

PAGE OF PAGES

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

5. REQUESTION/PURCHASE REQUEST NO.

SEE SCHEDULE

6. PROJECT NO.

7. ISSUED BY AEDC PKE
CODE FA9101
8. ADDRESS OFFER TO

AEDC/PKE

100 KINDEL DRIVE, SUITE A-332

ARNOLD AFB, TN 37389-1332

alan.fudge@arnold.af.mil

SEE BLOCK 7

DO: DO-C2 NAIC:

9. FOR INFORMATION

CALL:

A. NAME

ALAN C. FUDGE

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

931-454-4406 X

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder”.

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no, date):

This is a Simplified Acquisition of Base Engineering Requirements (SABER) solicitation. The resulting contract will be an Indefinite Delivery Indefinite Quantity (IDIQ) contract for construction projects.

The period of performance will be a One (1) year Base Period and Four (4) one year Option Periods.

Projects under the resulting contract will be issued in the form of Delivery Orders.

Magnitude of this contract is estimated between $5,000,000 and $10,000,000.

Maximum dollar amount over the life of the contract is $10,000,000. The guaranteed minimum amount over the life of the contract will be $200,000.

An offer guarantee for twenty percent (20%) of the guaranteed $200,000 is required.

11. The Contractor shall begin performance within _ __ calendar days and complete it within __ __ calendar days after receiving

FORMCHECKBOX

award, FORMCHECKBOX notice to proceed. This performance period is FORMCHECKBOX mandatory, FORMCHECKBOX negotiable. (See _ _.)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES”, indicate within how many calendar days after award in Item 12B.)

FORMCHECKBOX

YES FORMCHECKBOX

NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and 1 copy to perform the work required are due at the place specified in Item 8 by 2:00 P.M. (hour) local time 02APR09..

B. An offer guarantee [ X ] is, [ ] is not required. 20% ($40,000) bid bond or other acceptable surety.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212

ConWrite Version 6.10.8 Created 02 Mar 2009 10:37 AM 1442-101

STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
17.

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within __ __ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation – give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

20B. SIGNATURE
20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED

22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA

See Section G

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

FORMCHECKBOX

10 U.S.C. 2304(c) ( ) FORMCHECKBOX 41 U.S.C. 253(c) ( )

26. ADMINISTERED BY CODE

27. PAYMENT WILL BE MADE BY

EFT:T

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

FORMCHECKBOX

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return _______ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration slated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.

FORMCHECKBOX

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation, is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN

(Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE
30C. DATE
31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

STANDARD FORM 1442 PAGE 2 (REV. 4-85)

Qty Unit Price

ITEM

SUPPLIES OR SERVICES

Purch Unit Total Item Amount

SABER

Lump Sum

Noun:

BASE YEAR - STANDARD HOURS COEFFICIENT

NSN:

N - Not Applicable

Contract type:

J - FIRM FIXED PRICE

Inspection:

DESTINATION

Acceptance:

FOB:

Descriptive Data:

Furnish all labor, materials, plant, tools, transportation, and equipment necessary to provide: Maintenance, repair and construction work at Arnold AFB, TN, Main Base, Housing Area, and Famcamp

BASE YEAR - NON-STANDARD HOURS COEFFICIENT

Furnish all labor, materials, plant, tools, transportation, and equipment necessary to provide: Maintenance, repair and construction work at Arnold AFB, TN, Main Base, Housing Area, and Famcamp

OPTION 1 - STANDARD HOURS COEFFICIENT

Furnish all labor, materials, plant, tools, transportation, and equipment necessary to provide: Maintenance, repair and construction work at Arnold AFB, TN, Main Base, Housing Area, and Famcamp

ITEM

SUPPLIES OR SERVICES

Purch Unit Total Item Amount

OPTION 1 - NON-STANDARD HOURS COEFFICIENT

Furnish all labor, materials, plant, tools, transportation, and equipment necessary to provide: Maintenance, repair and construction work at Arnold AFB, TN, Main Base, Housing Area, and Famcamp

OPTION 2 - STANDARD HOURS COEFFICIENT

Furnish all labor, materials, plant, tools, transportation, and equipment necessary to provide: Maintenance, repair and construction work at Arnold AFB, TN, Main Base, Housing Area, and Famcamp

OPTION 2 - NON-STANDARD HOURS COEFFICIENT

Furnish all labor, materials, plant, tools, transportation, and equipment necessary to provide: Maintenance, repair and construction work at Arnold AFB, TN, Main Base, Housing Area, and Famcamp

ITEM

SUPPLIES OR SERVICES

Purch Unit Total Item Amount

OPTION 3 - STANDARD HOURS COEFFICIENT

Furnish all labor, materials, plant, tools, transportation, and equipment necessary to provide: Maintenance, repair and construction work at Arnold AFB, TN, Main Base, Housing Area, and Famcamp

OPTION 3 - NON-STANDARD HOURS COEFFICIENT

Furnish all labor, materials, plant, tools, transportation, and equipment necessary to provide: Maintenance, repair and construction work at Arnold AFB, TN, Main Base, Housing Area, and Famcamp

OPTION 4 - STANDARD HOURS COEFFICIENT

Furnish all labor, materials, plant, tools, transportation, and equipment necessary to provide: Maintenance, repair and construction work at Arnold AFB, TN, Main Base, Housing Area, and Famcamp

ITEM

SUPPLIES OR SERVICES

Purch Unit Total Item Amount

OPTION 4 - NON-STANDARD HOURS COEFFICIENT

Furnish all labor, materials, plant, tools, transportation, and equipment necessary to provide: Maintenance, repair and construction work at Arnold AFB, TN, Main Base, Housing Area, and Famcamp

1. OFFERS:

The offeror must submit ten (10) percentage factors (coefficients) for this solicitation in order to be considered acceptable. Five coefficients are to be applied to work anticipated to be accomplished during standard working hours at Arnold AFB, TN for the base year and four option years (CLINs 0001, 0003, 0005, 0007, and 0009). Five coefficients are to be applied to work anticipated to be accomplished on a non-standard basis at Arnold AFB, TN for the base year and four option years (CLINs 0002, 0004, 0006, 0008, and 0010). It is estimated that 5% of the work-hours of this contract will be accomplished on a non-standard basis. These percentage factors shall be submitted on the Schedule B, CLINs 0001-0010.

(a) The offer shall be "net (e.g. 1.00) or a percentage "decrease from" (e.g. .95), or "increase to" (e.g. 1.20) to the unit prices listed in the Unit Price Book (UPB). Offerors who submit separate percentage factors for individual tasks shall be considered unacceptable and the offer will be rejected.

(b) Any change in applicable wage rates or in the material costs during the contract period shall not affect the unit prices, to be paid by the Government for work performed under the contract. Coefficients will remain constant for the Base Period and each subsequent Option Year of the contract. Non-priced Items once negotiated and used in a Delivery Order will be added to the Special Item Supplement to the UPB. Uses of items previously added to the supplement in subsequent Delivery Orders shall be considered pre-priced items in those subsequent Delivery Orders.

2. COEFFICIENTS:

(a) Proposal Schedule, CLINS 0001, 0003, 0005, 0007, 0009 - STANDARD HOURS: Offeror shall perform any or all functions described in Volume II, Technical Specifications, Attachment 2, during standard working hours in accordance with the scope specified in individual Delivery Orders against this contract for the unit price sum specified in the Unit Price Book/Project Estimating software and the current version of "R.S. Means Facilities Construction Cost" database, multiplied by the coefficient.

(b) Proposal Schedule, CLINS 0002, 0004, 0006, 0008, 0010 - NON-STANDARD HOURS: Offeror shall perform any or all functions described in Volume II, Technical Specifications, Attachment 2, during standard working hours in accordance with the scope specified in individual Delivery Orders against this contract for the unit price sum specified in the Unit Price Book/Project Estimating software and the current version of "R.S. Means Facilities Construction Cost" database, multiplied by the coefficient.

(c) The percentage factor for non-standard working hours will be paid to the contractor ONLY if the contractor is directed to work non-standard hours by the Contracting Officer.

(d) A project may be split, at the Contracting Officer's discretion, into a combination of standard and non-standard working hours. In this case, both percentage factors may be used on a single Delivery Order.

(e) The coefficients submitted shall be multiplied by the Project Estimating software and the current version of "R.S. Means Facilities Construction Cost" database. The product shall reflect contractor's total costs.

(f) The contractor's total costs shall include, but not limited to all plant, labor, equipment, materials, subcontracting, transportation, services, supervision, and incidentals necessary to perform any and all work detailed in the specifications, and in the Project Estimating software and the current version of "R.S. Means Facilities Construction Cost" database. No allowance will be made later for any other purpose. All costs are final.

(g) The contractor's coefficient shall contain all costs other than the pre-priced unit prices contained in Project Estimating software and the current version of "R.S. Means Facilities Construction Cost" database. The coefficient is a numerical factor that represents the contractor cists (indirect and direct costs, sales tax, etc.) and profit not considered included in the Project Estimating software and the current version of "R.S. Means Facilities Construction Cost" database cost data. The contractor's coefficient must contain all contractor's costs inclusive of profit, all overhead (to include home office and field overhead), labor burden, bond premiums, insurance, inaccuracies in the Project Estimating software and the current version of "R.S. Means Facilities Construction Cost" database cost data, general and administrative expenses, subcontractor markup, contingencies (such as changes in wage rates, geographical location of work), mobilization.demobilization, and all other costs including but not limited to , compliance and documentation required by law or these specifications, tax laws, protection and/or moving of Government property and complete engineering services. The coefficient shall also include costs described as costs to provide submittals, interface with Government Representatives, coordination with occupants and other contractors. The coefficient shall also include costs for:

- Mobilization and close out for the total contract and each Delivery Order

- Clean up

- Surveying

- Tarpaulins and other temporary controls

- Safety (e.g. safety rails, safety nets, tethers, face and clothing protection, etc.)

- Traffic and work site signs, barriers, and flag persons

- Project management and supervision

- Quality control

- Office management and equipment (to include specialized hardware/software)

- Depreciation of mobile office(s)

- Subcontractor profit

- Required drawings, submittals, permits, licenses and other risk to doing business

- Site security

- Complete design/engineering services to include CADD development

- Computer and software requirements listed herein

- Keeping the worksite, staging area, and storage areas clean to match adjacent areas

- Costs as described elsewhere in these specifications as being included in the coefficient

(h) Contingencies such as change to construction costs, wage rates, and inflation shall not be included in the coefficient. These contingencies will be adjusted by the implementation of new Project Estimating software and the current version of "R.S. Means Facilities Construction Cost" database with the exercise of each option year. The offeror's price percentage factor must contain all contractor costs including, but not limited to, mobilization, demobilization, overhead, G&A, profit, bond premiums, insurance, design costs, subcontractor costs, and all contingencies in connection with the contract. No allowance whatsoever will be made later for any other purpose. Coefficients will not be adjusted for the life of the contract.

3. STANDARD WORKING HOURS: Offerors shall perform all functions called out in any Delivery Order during standard working hours for the unit price sum specified in the UPB, multiplied by the coefficient. Standard hours will be 7:00 A.M. - 5:00 P.M. local time (0700 - 1700 hours) Monday through Friday.

4. NON-STANDARD WORKING HOURS: Offerors shall perform all functions called out in any Delivery Order during other than standard working hours for the unit price sum specified in the UPB, multiplied by the coefficient.

5. MODIFICATIONS: Modifications to Delivery Orders shall use the Project Estimating" software and the current version of "R.S. Means Facilities Construction Cost" database in effect at the time the modification is negotiated.

NOTICE: The following contract clauses pertinent to this section are hereby incorporated by reference:

FEDERAL ACQUISITION REGULATION CONTRACT CLAUSES

1. GENERAL INFORMATION

Specifications that are applicable are listed below and are attached at the end of the solicitation/contract as specified below:

(a) SABER Statement of Work, Attachment 1

NOTICE: The following contract clauses pertinent to this section are hereby incorporated by reference:

FEDERAL ACQUISITION REGULATION CONTRACT CLAUSES

NO CLAUSES OR PROVISIONS IN THIS SECTION

INSPECTION AND ACCEPTANCE TERMS

Supplies/Services will be inspected/accepted at and by as follows:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

0002 Destination Government Destination Government

0003 Destination Government Destination Government

0004 Destination Government Destination Government

0005 Destination Government Destination Government

0006 Destination Government Destination Government

0007 Destination Government Destination Government

0008 Destination Government Destination Government

0009 Destination Government Destination Government

0010 Destination Government Destination Government

INSPECTION AND ACCEPTANCE: AEDC/SDF is designated as the office responsible for inspecting the work while the Contracting Officer is responsible for final acceptance of the work.

NOTICE OF COMPLETION OF DELIVERY ORDERS/FINAL INSPECTION:

(a) Pre-Final and Final Inspection: The contractor is responsible for performing a quality control check prior to requesting a final inspection from the Government. Any discrepancies noted shall be corrected prior to any final inspection. A final inspection will be required on all Delivery Orders and the procedures identified below shall be followed:

(1) A contractor may request a pre-final inspection for the purpose of having the Government assist in identifying discrepancies or punch-list items prior to final inspection.

(2) When a contractor is ready for final inspection, he shall request final inspection in writing to the Contracting Officer 48 hours prior to the desired date or as otherwise negotiated with the Contracting Officer.

(3) The final inspection shall be performed with the contractor by AEDC/SDF personnel

(b) Any discrepancies noted shall be corrected by the contractor within five (5) working days or as specified by the Contracting Officer, prior to final payment. The Contracting Officer reserves the right to both decline the contractor request for a final inspection or suspend a final inspection, when it is evident that the contractor is not ready. At the discretion of the Contracting Officer, ten percent (10%) of the total value of each Delivery Order will be retained until all discrepancies are corrected.

DESIGNATION OF GOVERNMENT INSPECTOR:

The Base Civil Engineer or his authorized representative is designated at the representative of the Contracting Officer for the purpose of technical surveillance or workmanship and inspection of materials for work being performed under this contract. The designation in no way authorizes anyone other than the Contracting Officer to commit the Government to changes in the terms of the contract or changes to individual Delivery Orders.

NOTICE: The following contract clauses pertinent to this section are hereby incorporated by reference:

FEDERAL ACQUISITION REGULATION CONTRACT CLAUSES

52.246-12

INSPECTION OF CONSTRUCTION (AUG 1996)

52.246-13

INSPECTION -- DISMANTLING, DEMOLITION, OR REMOVAL OF IMPROVEMENTS (AUG 1996)

SHIP

MARK

TRANS

ITEM

SUPPLIES SCHEDULE DATA

QTY

TO

FOR

PRI

DATE

FA9101

FA9101

ASREQ

BASE YEAR - STANDARD HOURS COEFFICIENT

All items shall be delivered to:

USAF Procurement Branch

100 Kindel Drive, Suite A332

Arnold AFB TN 37389-1332

FA9101

BASE YEAR - NON-STANDARD HOURS COEFFICIENT

USAF Procurement Branch

100 Kindel Drive, Suite A332

Arnold AFB TN 37389-1332

FA9101

OPTION 1 - STANDARD HOURS COEFFICIENT

All Items shall be delivered to:

USAF Procurement Branch

100 Kindel Drive, Suite A332

Arnold AFB TN 37389-1332

FA9101

OPTION 1 - NON-STANDARD HOURS COEFFICIENT

USAF Procurement Branch

100 Kindel Drive, Suite A332

Arnold AFB TN 37389-1332

TRANS

ITEM

SUPPLIES SCHEDULE DATA

QTY

TO

FOR

PRI

DATE

FA9101

OPTION 2 - STANDARD HOURS COEFFICIENT

USAF Procurement Branch

100 Kindel Drive, Suite A332

Arnold AFB TN 37389-1332

FA9101

OPTION 2 - NON-STANDARD HOURS COEFFICIENT

USAF Procurement Branch

100 Kindel Drive, Suite A332

Arnold AFB TN 37389-1332

FA9101

OPTION 3 - STANDARD HOURS COEFFICIENT

USAF Procurement Branch

100 Kindel Drive, Suite A332

Arnold AFB TN 37389-1332

FA9101

OPTION 3 - NON-STANDARD HOURS COEFFICIENT

USAF Procurement Branch

100 Kindel Drive, Suite A332

Arnold AFB TN 37389-1332

TRANS

ITEM

SUPPLIES SCHEDULE DATA

QTY

TO

FOR

PRI

DATE

FA9101

OPTION 4 - STANDARD HOURS COEFFICIENT

USAF Procurement Branch

100 Kindel Drive, Suite A332

Arnold AFB TN 37389-1332

FA9101

OPTION 4 - NON-STANDARD HOURS COEFFICIENT

USAF Procurement Branch

100 Kindel Drive, Suite A332

Arnold AFB TN 37389-1332

PERIOD OF PERFORMANCE

(a) This is a Firm-Fixed-Price, Indefinite Delivery, Indefinite Quantity (IDIQ) contract for the maintenance, repair and construction work in accordance with the Statement of Work and Technical Specifications. The contract will be effective from Date of Award for a twelve (12) month basic period and four (4), twelve (12) month option periods, unless sooner terminated under the terms of the contract.

(b) Delivery or Performance requirements shall be specified in each individual Delivery Order issued under the terms of this contract. Individual Delivery Order performance periods will be negotiated and/or specified on each Delivery Order.

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) compete the entire work ready for use not later than the date specified on individual Delivery Orders. The time stated for completion shall include final cleanup of the premises.

52.211-12 LIQUIDATED DAMAGES - CONSTRUCTION (SEP 2000)

(a) If the contractor fails to complete the work within the time specified in the contract, the contractor shall pay liquidated damages to the Government in the dollar amount determined on a case by case basis for each Delivery Order for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

I. NOTICE: The following contract clauses pertinent to this section are hereby incorporated by reference:

FEDERAL ACQUISITION REGULATION CONTRACT CLAUSES

52.211-12

LIQUIDATED DAMAGES -- CONSTRUCTION (SEP 2000)

Para (a), Amount of liquidated damages. '$170.00. This amount applies only to delivery orders designated as having liquidated damages, typically only orders in excess of $550,000.'

52.211-13

TIME EXTENSIONS (SEP 2000)

II. NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:

OTHER CONTRACT CLAUSES IN FULL TEXT

F001 OPTION CLIN PERFORMANCE PERIOD(S) (FEB 1998) (TAILORED)

The respective performance periods for the options identified in Section B are as follows:

OPTION

PERFORMANCE PERIOD

OPTION CLINS

1 12 Consecutive Months

0003 and 0004

12 Consecutive Months

0005 and 0006

0007 and 0008

0009 and 0010

ACCOUNTING AND APPROPRIATION DATA

Accounting and appropriation data will be specified on individual Delivery Orders.

IDENTIFICATION OF CORRESPONDENCE

All correspondence and data submitted by the contractor under this contract shall reference the Contract number, Delivery Order number, project title, and project number.

CONTRACT ADMINISTRATION

Administration of this contract and the Delivery Orders will be performed by USAF Enterprise Acquisition Division, 100 Kindel Drive, Suite A332, Arnold AFB TN 37389-1332.

SUBMISSION OF INVOICES

(a) The contractor will be paid monthly on the submission of a proper invoice for the work performed during the preceeding month. The contractor shall submit the invoice in accordance with FAR Clause 52.232-27, Prompt Payment for Construction Contracts and FAR Clause 52.232-5, Payment Under Fixed Price Construction Contracts. The invoice shall be submitted into Wide Area Work Flow. The web address is https://wawf.eb.mil.

(b) A properly executed Certificate of Payment must accompany each invoice in accordance with FAR Clause 52.232-5.

((c) All payments under this contract shall be made in accordance with DFARS Clause 252.232-7003, Electronic Submission of Payment Requests.

I. NOTICE: The following contract clauses pertinent to this section are hereby incorporated by reference:

FEDERAL ACQUISITION REGULATION CONTRACT CLAUSES

II. NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:

OTHER CONTRACT CLAUSES IN FULL TEXT

G018 CONTRACT HOLIDAYS (FEB 2003) (TAILORED)

(a) The prices/costs in Section B of the contract include holiday observances; accordingly, the Government will not be billed for such holidays, except when services are required by the Government and are actually performed on a holiday. Holidays in addition to those reflected in this contract, which are designated by the Government, will be billable provided the assigned Contractor employee was available for performance and was precluded from such performance.

(b) The following days are contract holidays:

New Year's Day

1 January

Martin Luther King's Birthday

Third Monday in January

President's Day

Third Monday in February

Memorial Day

Last Monday in May

Independence Day

4 July

Labor Day

First Monday in September

Columbus Day

Second Monday in October

Veteran's Day

11 November

Thanksgiving Day

Fourth Thursday in November

Christmas Day

25 December

NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:

OTHER CONTRACT CLAUSES IN FULL TEXT

AEDC-H001 DISPOSAL AREAS (FEB 2009)

An approved disposal area is located about 2 miles from the construction site. This area is approved for surplus earth, stone, broken concrete, and building materials waste. Building materials waste also includes containers, dunnage, and other related items.

AEDC-H002 EXISTING UNDERGROUND UTILITIES (FEB 2009)

The location of existing underground utilities as shown on the contract drawings has been taken from as?built drawings. There may be underground utilities which are not shown on the contract drawings and these utilities may be dangerous if ruptured. If the Contractor unearths or strikes any underground utility not shown, the excavation work shall cease and the Contracting Officer shall be notified immediately. The Contractor shall determine with caution the exact location of such utilities and will not proceed with further excavation unless otherwise advised by the Contracting Officer.

AEDC-H003 PROGRESS SCHEDULE (FEB 2009)

(a) In accordance with FAR Clause 52.236-15, which is incorporated by reference in the Contract Clauses section of this solicitation, the Contractor shall submit three copies of a progress schedule (Air Force Form 3064) for review and approval by the Contracting Officer no later than five days after beginning work on the project site. The Contractor shall comply with the procedures for completing the form on the reverse of the Air Force Form 3064.

(b) When requesting payment for materials stored on site, the Contractor shall include stored materials as a separate work element on the progress schedule and submit paid invoices to support the request for payment.

AEDC-H004 REQUIRED INSURANCE (FEB 2009)

Pursuant to FAR clause 52.228-5, Insurance - Work on a Government Installation (JAN 1997) (Deviation) the contractor shall maintain the following minimum amounts of insurance:

TYPE

AMOUNT

Workers' Compensation & Employer's Liability $100,000

Insurance

General Liability Insurance (Bodily Injury)

$500,000 per occurrence

Automobile Liability

$200,000 per person

$500,000 per occurrence for bodily injury

$20,000 per occurrence for property damage

AEDC-H005 SAFETY (FEB 2009)

The Contractor will obtain AEDC/SE coordination to assure adequate safety coverage. The Contractor shall take or cause to be taken such additional measures as the Contracting Officer may determine to be reasonably necessary for the protection of life and health of employees and other persons and for prevention of damage to property, materials, supplies, and equipment. The Contractor shall comply with safety rules (tags and work clearances) of the AEDC Support Contractor at interface points of new construction and modifications to existing systems and with AEDC Base Safety Standards.

AEDC-H006 SANITATION (FEB 2009)

The Contractor shall provide toilet facilities in a ratio of not fewer than one for each 30 persons or fraction thereof. Connections to existing sanitary sewer manholes may be made. The Contractor shall supply drinking water from conections to the existing potable water system. The Contractor shall take proper precautions to protect the water system from damage and contamination. Any temporary connections made for drinking water or toilet facilities shall be removed by the Contractor in a manner satisfactory to the Contracting Officer before final acceptance of the work.

AEDC-H007 SECURITY RULES AND REGULATIONS (FEB 2009)

Paragraph

1. General Security Requirements

2. Employee Listing and Badges

3. Citizenship

4. Vehicle Use

5. Traffic Laws

6. Private Cameras

7. Cellular Phone

8. Visitors

9. Labor Protests

10. Rooftop Access

11. Firearms

12. Security of Private Property & Vehicles Inspections:

13. Sponsoring Visitors

14. Reporting Requirements

15. Escort Requirements for Foreign Nationals Performing On Construction Projects

16. Operations Security (OPSEC) Requirements

17. Physical Security

18. Security Reviews/Exercises

19. References

20. Prescribed Forms

21. Abbreviations and Acronyms

1. GENERAL SECURITY REQUIREMENTS: The contractor shall comply with all security regulations and directives as identified herein and other security requirements shown elsewhere in this contract. These requirements apply to all contractors working on Arnold AFB that DO NOT have access to classified information in the performance of their contract. Arnold Engineering Development Center (AEDC) is a closed military installation, therefore the below requirements and procedures are prerequisites to the issuance of any government identification. Contractor requests for exceptions to the below requirements and procedures shall be addressed to the Contracting Officer/designee who will obtain an approval or disapproval from the installation commander who has the final authority on access issues.

2. EMPLOYEE LISITING AND BADGES: The contractor (company representative also known as the site superintendent) shall provide an updated GC Form 698, Contractor Employee Notice, listing each employee that will require access to prior to contract start. Badges and passes are issued at Visitor Control located adjacent to the main gate. Your contract monitor will provide Visitor Control a GC Form 700, Contract Clearance Request, which will identify the company representative. The company representative will provide a list of employees via the GC Form 698 to Visitor Control in person and will attach to the GC Form 698 copies of the birth certificate, Social Security Number, and state driver's license (if assigned). Visitor Control will not issue badges without this documentation or a current GC Form 700 on file. The badges are government property and must be retrieved and turned in upon completion of the contract. These badges must be presented at the gate for entry and displayed on the front of an outer garment and above the waist with the photograph visible at all times within the fenced area. The badge may be worn on a necklace/chain provided the badge remains visible outside the outer garment, above the waist, and the picture is shown outward.

NOTE: If displaying the badge on the outer garment in the immediate work area will create a safety hazard, then the badges can be removed and placed in the pocket of the individual. Upon departure of the immediate area, the badge will be displayed.

NOTE: Returning ID badges (if applicable) and Passes. Upon contract completion (to include employment termination), and before final payment can be made, the contractor shall ensure all ID badges (if applicable) have been turned in to the issuer and vehicle passes/decals have been returned to Visitor Control . Contractor employees terminating employment for any reason shall return all ID badges (if applicable) and vehicle passes/decals prior to departing the base.

3.

CITIZENSHIP: All employees performing on this contract must be a US citizen or

Registered Alien and show proof of citizenship. The AEDC host shall require that all Registered Aliens have in their possession their Permanent Resident Cards. A minimum lead-time of 14 business days is required to facilitate timely Permanent Resident Card validation. The visiting Lawful Permanent Resident (LPR) must provide color copies (front & back) of their Permanent Resident Card and their internal passport information (photo/documentation). Visiting LPRs having business with Aerospace Testing Alliance (ATA) must submit this documentation to the host and contractor security office. The contractor security office will coordinate directly with the AEDC Foreign Disclosure Office to complete the validation process and render a recommendation to authorize or deny access. All other visiting LPRs must submit their documentation directly to the Foreign Disclosure Office via mail. (Address: Foreign Disclosure Office, MS-2305, 251 Von Karman Road, Arnold AFB, TN 37389-2305) The Foreign Disclosure Office will provide a list of authorized LPR personnel to Visitor Control, allowing entry into the applicable areas. Registered Aliens not on an approved list will not be permitted entry into any part of Arnold AFB. If Registered Aliens failed to produce the proper Immigration and Naturalization Service (INS) credentials, they will be denied access to all portions of Arnold AFB. You will be held responsible for complying with federal statutes, which prohibit the hiring of illegal aliens and foreign nationals who are not authorized to work in the United States. Non-US citizens must be identified and present their resident alien cards to Pass and Identification to show proof that they have been legally admitted to the United States. Failure to show proof will result in entry being denied. Employment of Foreign Nationals by Contractors at Arnold Air Force Base: The use of Foreign Nationals in the performance of contracts on AEDC will require prior notification to the Contracting Officer. In accordance with U.S. Immigration and Naturalization Service Directive 210, all foreign nationals performing on contract in support of any Federal Government activity will provide to that activity, identification and authorization for the performance of work within the U.S., for each individual. Information shall consist of the following and copies attached to the GC Form 698 for Pass and Identification. (Visitor Control will not issue badges without this documentation or a current GC Form 700 on file.)

Name

Nationality

Place of birth (Birth Certificate)(Copy maintained at Visitor Control )

Date of birth

Social Security Number (Copy maintained at Visitor Control )

State driver license number (if assigned) (Copy maintained at Visitor Control )

Passport/Visa/Alien Registration Number(s) (Copy maintained at Visitor Control) Naturalization documents (Copy maintained at Visitor Control )

A foreign national is defined as any individual that is not a U.S. Citizen, regardless of any status or documentation promulgating the intent to become a U.S. Citizen. Any overt or negligent act in the lack of prior reporting of any employee deemed to be a non-U.S. Citizen shall be determined to be a violation of contract. The violation shall be formally reported to all government activities or agencies deemed necessary.

4. VEHICLE USE: If a personal vehicle will be operated on the base the operator must possess a valid state driver's license, ID card (if applicable), proof of ownership (title, state registration, bill of sale or lease agreement) and proof of insurance are required to be available at all times. The employee shall be responsible for maintaining insurance that meets or exceeds the minimum requirements of state law.

5.

TRAFFIC LAWS: The contractor and its employees shall comply with base traffic regulations and installation entry/exit security measures. Vehicle operators are subject to random vehicle inspections.

6. PRIVATE CAMERAS: Use of private cameras inside the mission area is not allowed in areas marked as "No Photography." If you need photographs of your job site, you should contact your contract monitor. Professional quality photo support can be provided by the base photo lab. Use of cameras in administrative areas is generally permitted.

7.

CELLULAR PHONE: Cellular Telephones (private and government owned) are authorized for use on Arnold AFB except at facilities and/or areas where Facility. Managers or Safety Office has posted a policy prohibiting their use. A hands-free device must be utilized if a cell phone is used when driving.

8.

VISITORS: To expedite entry into the mission area, during normal duty hours, call

Visitor Control at Ext. . #5453. During non-duty hours, call the Security Forces Control Center (SFCC) at Ext. #5662. Only the company representative can authorize visitors (US citizens) in conjunction with the specific contract.

9.

LABOR PROTESTS: If your company becomes a target of a labor protest while you are working on the installation, you will be assigned a gate to enter and exit the mission area, other than the main gate. All your employees will be directed to utilize this strike gate.

10.

ROOFTOP ACCESS: You and your contract monitor are reminded that you must have permission from the building manager before you can access the roof of any building.

11. FIREARMS: Are prohibited within the fenced mission area. Concealed carry permits are not valid on any part of Arnold AFB.

12.

SECURITY OF PRIVATE PROPERTY & VEHICLES INSPECTIONS: Secure your private property. Be prepared for vehicle inspections any time you are on Arnold AFB property.

13.

SPONSORING VISITORS: Contractors that sponsor another contractor's visit shall receive an endorsement from the prime contractor or Department of Defense (DoD) Representative and comply with specified requirements.

14. REPORTING REQUIREMENTS: Contractor personnel shall report to an appropriate authority, any information or circumstances of which they are aware may pose a threat to the security of DoD personnel, contractor personnel, resources, and classified or unclassified defense information. Reports may be made to the Security Police at 454- 5662, the 704th Mission Support Group/Security Forces (704 MSG/SF), at 454-3424/7610 or the Air Force Office of Special Investigations at 931-454-7820.

15. ESCORT REQUIREMENTS FOR FOREIGN NATIONALS PERFORMING ON CONSTRUCTION PROJECTS

The following rules apply to your responsibilities associated with escorting and monitoring your workers who are foreign nationals:

a.

All foreign national employees must have permission of the government prior to working on any contract.

b.

Non-US citizens will be issued a purple badge with the citizen's name and

Citizenship on the badge. The badge must be worn at all times within the fenced in portion of AEDC.

c.

You must appoint an escort who is a US citizen to escort non-US Citizens; Continuous monitoring is required, to include rest breaks, lunch, etc.

d.

You must insure that access is limited to only authorized work areas. The only

EXCEPTION is the main cafeteria.

e.

The escort must retrieve the non-citizen's badge and vehicle pass, at the end of each work shift and hold it until the next day. Non-US citizens are not permitted to retain possession of their badges and vehicle passes overnight.

f.

The non-citizen will not be allowed to enter or exit the fenced mission area without an escort. A representative of your company who is a US citizen must accompany the non-citizen at all times.

g.

The non-citizen's badges and vehicle pass will be retrieved at the end of the project and returned to Visitor Control.

h.

The contract monitor is responsible for notifying Facility Managers and custodians any time non-citizens are working within buildings.

i.

All foreign national employees will process through Visitor Control upon arrival at AEDC on a daily basis for obtaining the appropriate badge.

16. OPERATIONS SECURITY (OPSEC) REQUIREMENTS: The contractor will comply with the AEDC OPSEC Program and will protect critical or sensitive information per AFI 10-701, Operations Security (OPSEC), and the OPSEC Protection information provided below. Contractor organizations requiring access to unclassified technical data disclosing militarily critical technology with military or space application must be certified with the Defense Logistics Information Service (DLIS) Joint Certification Program (JCP). OPSEC critical information can be released to government and AEDC contractor personnel with a valid need-to-know. Contact the ATA OPSEC Support Representative, Ext. 3131 or the AEDC OPSEC Program Manager at Ext. 7610 for clarification.

DLIS Certification:

Certification by the DLIS JCP is required for all U.S. or Canadian contractors who wish to obtain access to unclassified technical data disclosing militarily critical technology with military or space application that is under the control of, or in the possession of the DoD or the Canadian Department of National Defense. Certification under the JCP establishes the eligibility of a U.S. or Canadian contractor to receive technical data governed, in the U.S., by DoD Directive 5230.25. To request DLIS Certification contractors must submit a DD Form 2345, Military Critical Technical Data Agreement, to DLIS along with a copy of the company's State Business License, Incorporation Certificate, Sales Tax Identification Form or other documentation, which verifies the legitimacy of the company.

Types of sensitive information:

Distribution Limited Controlled Technology (has a distribution statement other than "A")

Export Controlled information (has a warning notice that it is export controlled)

For Official Use Only (FOUO - requires official government business need to know)

Proprietary - belongs to a commercial entity

Competition Sensitive - government is competing between multiple contractors - temporary designation

Company Restricted - belongs to an organization

Privacy Act Information - requires protection from unauthorized access (includes social security numbers, phone telephone numbers, specific salary data, etc.)

Designated OPSEC Critical Information

OPSEC GUIDANCE: Applies to the access, handling, and protection of all sensitive information

Destruction:

When no longer required, sensitive information must be destroyed by any means that will prevent reconstruction of the material, preferably by shredding (if shredded, use equipment that produces no more than ½-inch residue and crosscuts the text so a legible line of text is not produced.) or initializing, degaussing, or shredding magnetic media.

Recycling:

Place only public domain materials such as textbooks, vendor catalogs and instruction booklets, magazines, newspapers, blank papers and forms, specification books and catalogs, BellSouth telephone books, etc. in Recycle bins

Reproduction:

Reproduce sensitive information on standard office equipment, but ensure all waste, overruns, originals, etc. are properly retrieved and stored or destroyed

Storage/Protection and Access:

When unattended, ensure locked protection of sensitive information from unauthorized access

Need-to-know must be verified before granting access to sensitive information - includes phone inquiries and unsolicited emails

Release of Information:

Need-to-Know must be verified prior to granting access to the information

Do not discuss sensitive information over open, unsecured communication devices, such as telephones (includes cellular telephones), two-way radios, Blackberry devices, etc.

Do not telefax sensitive information over an unsecure (unencrypted) telefax machine

Sensitive information must be encrypted prior to transmission over computer lines (email, Internet, etc.)

Do not place sensitive information or material on an external web site or web page that is accessible to unauthorized personnel (sensitive information is not approved for release to the public)

Limit cafeteria and other "public use area" discussions to that which is approved as public domain or unofficial business.

17. PHYSICAL SECURITY: Areas controlled by contractor employees shall comply with base Operations Plans/Instructions for Force Protection Conditions procedures, Random Antiterrorism Measures and local search/identification requirements. The contractor shall safeguard all government property, including controlled forms, provided for contractor use. At the close of each work period, government training equipment, ground aerospace vehicles, facilities, support equipment, and other valuable materials shall be secured.

18. SECURITY REVIEWS/EXERCISES: The contractor may be subject to various security program reviews and participate in exercises in conjunction with the Air Force activity assigned.

19. REFERENCES

U.S. Immigration and Naturalization Service Directive 210

DoD Directive 5230.25, DoD Regulation 5400.7/Air Force Supplement, DoD Freedom of Information Act Program

AFI 10-701, Operations Security (OPSEC)

AEDC ISI 31-101, Installation Security Instruction

20. PRESCRIBED FORMS

GC Form 698, Contractor Employee Notice

GC Form 700, Contract Clearance Request

Standard Form 85P, Questionnaire for Public Trust Positions

DD Form 2345, Military Critical Technical Data Agreement

21. ABBREVIATIONS AND ACRONYMS

ATA

Aerospace Testing Alliance

AEDC

Arnold Engineering Development Center

DLIS

Defense Logistics Information Service

DoD Department of Defense

FOUO

For Official Use Only

FOIA

Freedom Of Information Act Program

INS

Immigration and Naturalization Service

JCP

Joint Certification Program

LPR

Lawful Permanent Resident

NAC

National Agency Check

OPSEC

Operations Security

SFCC

Security Forces Control Center

704 CS

704th Communications Squadron

704 MSG/SF

704th Mission Support Group/Security Forces

AEDC-H008 UTILITIES AVAILABLE (FEB 2009)

(a) Water: All reasonable required amounts of potable and raw water will be made available without cost to the Contractor from existing systems, outlets, and supplies near the vicinity of the work. All water shall be carefully conserved. All temporary connections and piping installed by the Contractor shall be removed in a manner satisfactory to the Contracting Officer prior to final acceptance of the work.

(b) Electricity: All reasonably required amounts of 60 HZ electric power at 110V and 480V will be made available without cost to the Contractor from existing electrical systems near the vicinity of the of the work. The Contractor shall install and maintain at no cost to the Government any necessary supply connections and facilities in a manner satisfactory to the Contracting Officer. All electrical service shall be removed in a manner satisfactory to the Contracting Officer.

AEDC-H009 PRINCIPAL PROJECT MANAGER AND KEY STAFF (FEB 2009)

The Contractor shall provide written notification to the Contracting Officer before any change in the assignment of a Project Manager or any Key Staff. The notification shall include the specific reasons for the change, an assessment of the impact on the contract, and the Contractor's recommendation to effectively complete the contract. The Government's comment on the impact of such change will be considered before a final decision is made by the Contractor.

AEDC-H010 SUPERVISION OF EMPLOYEES (FEB 2009)

The Government shall not exercise any supervision or control over the Contractor employees or subcontractor employees performing services under this contract. The Contractor's employees shall be accountable not to the Government but solely to the Contractor, who in turn is responsible to the Government.

AEDC-H011 SUBCONTRACTORS (FEB 2009)

Within seven (7) days after the award of any subcontract either by himself or a subcontractor, the contractor shall deliver to the Contracting Officer a completed SF 1413, STATEMENT OF ACKNOWLEDGEMENT. The form shall include the subcontractor's acknowledgement of the inclusion in his subcontract of the clauses of this contract entitled Davis-Bacon Act, Contract Work Hours and Safety Standards Act-Overtime Compensation, Apprentices and Trainees, Payrolls and Basic Records, Compliance with Copeland Act Requirements, Witholding of Funds, Subcontracts, Contract Termination-Debarment, Disputes Concerning Labor Standards, Compliance with the Davis-Bacon and Related Act Regulations, and Certification of Eligibility. Nothing contained in this contract shall create any contractual relation between the subcontractor and the Government.

AEDC-H012 MATERIAL APPROVAL SUBMITTAL FORM (AF FORM 3000) (FEB 2009)

Within 10 calendar days after commencement of work on individual Delivery Orders or as otherwise established by the Contracting Officer, all material and articles requiring approval shall be submitted by the contractor using AF Form 3000. The contractor will install, catalog and maintain his submittals, as approved, to avoid repetitive duplication in subsequent Delivery Orders. All wall covering, carpet and other fabric type submittals will be 12" X 12" minimum. All submittals shall be grouped in color boards and installed, i.e. carpet, paneling, chair-rail, wall covering, and ceiling tile. Contractor is responsible for identifying and locating required materials for submittals to include matching any existing materials. Once a submittal is approved, future submittals for the same type item can be referenced by the use of a numbering system, which the contractor develops.

AEDC-H013 ORDERING PROCEDURES (FEB 2009)

A. As the need exists for performance under the terms of this contract, the CO or his/her authorized representative will notify the Contractor of an existing performance requirement and request a price from the Contractor for a “one job, lump sum” Task Order. The Government will provide to the Contractor a Request for Proposal (RFP) with a Statement of Work (SOW) describing the work to be performed, which may include special instructions and conditions, a material submittal register (AF Form 66), and if applicable a NOT MORE…