Exhibit_A_ORS-5_Launch_Vehicle_CDRLs-1423_23_Oct_14.pdf

PDF 323 KB Posted

Attached to
ORS-5 Launch Services Federal contract opportunity
Solicitation number
FA8818-15-R-0003
Issued by
Department of the Air Force Space Command Space and Missile Systems Center

About this file

Exhibit A- CDRLs

View the file

Other files for this federal contract opportunity

Other files attached to ORS-5 Launch Services, newest first.
File Type Posted
141120_ORS-5_Launch_Services_BFI_V4.pdf PDF
A5_Small_Business_Sub-Contracting_Plan.pdf PDF
A6_Security_Requirements_DD254.pdf PDF
A3_Milestones_23OCT14.pdf PDF
FA8818-15-R-0003_Draft_RFP_ORS-5v2.pdf PDF
A7_Sec_L_Instructions_to_Offerors_5_Nov_V6.pdf PDF
A2_TRD_4Nov14.pdf PDF
A1_ORS-5_LV_PWS_4_Nov14.pdf PDF
A8_Sec_M_Evaluation_of_Commercial_Items_3_Nov_V5.pdf PDF
A4_Price_Adjustment_for_GFP_and_Services.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT A

TO

FA8818-15-R-0003

Operationally Responsive Space – 5 (ORS-5)

CONTRACT DOCUMENTATION REQUIREMENTS LIST (CDRLS)

23 Oct 2014

CDRL List

Number DID Title

- A001 N/A Meeting/Review Documentation

- A002 N/A Countdown Documentation

- A003 N/A SV to LV Interface Control Document (ICD)

- A004 N/A ICD Requirements Verification Report (RVR)

- A005 N/A Final Flight Report

- A006 N/A SV – LV Integration Procedures

- A007 N/A Technical Report – Launch Vehicle and GSE Telemetry Formats

- A008 N/A Integrated Master Schedule

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP X TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

ORS-5

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A001 Technical Report - Meeting / Review Documentation

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MISC-80508A

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

ASREQ b. COPIES

8. APP CODE C 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE Draft

Final

A N/A Reg

Repro

16. REMARKS:

Applies to:

Presentation and handout material, minutes, and accompanying action item lists from each formal review.

Blk 4: The DID is tailored as follows:

1) Delete 1 (a) through 1 (d) and replace with: “Contractor format is acceptable for all documents in this CDRL.”

2) The following shall be added to the DID under 2. Content.:

(A) Presentation packages and hand-out materials provided at the review for attendees

(i) Reviews as documented in Attachment XY

(B) Minutes from each formal review

(C) List of attendees

(D) An action item list maintained and updated by the Contractor. The list shall include:

(i) Due Date

(ii) Subject

(iii) Assigned tracking number for each action item

(iv) Person or organization responsible for completing the action

(v) Status of action (i.e., open, closed, or deleted)

(vi) Closure rationale

Block 14:

The draft and preliminaries shall be submitted in Microsoft Office. The finals shall be submitted in Adobe Acrobat.

SMC/SY

SMC/ORS

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 13

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP X TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

ORS-5

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A002 Technical Report - Countdown

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MISC-80508A

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

ASREQ L-1 WEEK b. COPIES

a. ADDRESSEE Draft

Final

A N/A AS CHANGED

The documents necessary to launch the vehicle and assist ORS-5 management during the countdown process. Contractor developed documentation, as required and approved by the launch Range, is sufficient to meet this CDRL if Data Requirements as defined in A

– C below are included.

1) Delete 1 (a) through 1 (d) and replace with: “Contractor format is acceptable for all documents in this CDRL.”

Appendices for the documents listed below shall be provided when necessary to present supplemental or incidental information, detailed tabulations or deviations, or graphic representations.

(A) Countdown The Countdown document shall provide:

(i) All necessary steps and built-in holds required to successfully launch the vehicle and its payload during the launch window

(ii) Procedures required to safe the vehicle after a launch attempt

(iii) Procedures required to recycle the countdown for another launch attempt

The necessary steps shall be listed as a sequence of events with each entry including a T-time. T-time is defined as the time before launch, not including planned holds, and with T-0 being the time of launch vehicle lift-off from the launch pad.

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 2 of 13

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP X TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

ORS-5

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A002 Technical Report - Countdown

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MISC-80508A

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

ASREQ L-1 WEEK b. COPIES

a. ADDRESSEE Draft

Final

T+ time is any event after T-0. Each member of the launch team shall be identified by call sign and communication channel. All mission constraints to launch shall also be identified.

(B) Mission Constraints Document This document is a summary of all the launch vehicle, payload and range mission constraints to launch. The launch vehicle constraints shall include, but not be limited to:

(i) Weather

(ii) Communication

(iii) Range requirements

(iv) Collision avoidance (COLA)

(v) Tracking and telemetry

The document shall also identify critical measurements during the launch countdown. Not to exceed values shall be identified for all critical measurements.

(C) Redline Document A document that identifies monitored measurements, applicable in test and countdown, used to verify that the Launch Vehicle and ground systems are operating within normal limits. This document shall include Operational and Redline limits which, if specified parameters minimum or maximum values are exceeded, indicate: a condition that may be hazardous to personnel, vehicle, or site; a condition which may compromise the successful completion of the vehicle mission or; a condition that is outside of the expected range based on previous experience or analysis.

Block 14:

The draft and preliminaries shall be submitted in Microsoft Office.

The finals shall be submitted in Adobe Acrobat.

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 3 of 13

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP X TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

ORS-5

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A003 SV to LV Interface Control Document

(ICD)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-CMAN-81248

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

ASREQ @PDR b. COPIES

a. ADDRESSEE Draft

Final

The ICD identifies and defines the functional, structural/physical, electrical, thermal and environmental interfaces, and performance requirements of the payload, and payload GSE with the launch vehicle and associated payload/launch processing facilities, as well as the payload success criteria.

Preliminary ICD is the first CDRL release of the ICD and is expected to have several TBD’s. Baseline ICD is the next release of the CDRL and is expected to have very few TBD’s.

1) No changes to DID

The number of interface requirement changes incorporated in each new revision and subsequent release of the ICD shall not exceed ten (10) approved requirements changes.

Where there is not a direct match between the specified ICD data requirements identified below and the Contractor’s standard ICD, the Contractor’s standard ICD will be acceptable provided it addresses equivalent content as appropriate to meet payload requirements. The outline below is meant to assure all potential requirements are addressed regardless of payload complexity or risk posture; however any deemed unnecessary requirements based upon manifested payload requirements (upon mutual Government/ Contractor agreement) may be listed as not applicable (NA) in the approved ICD:

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 4 of 13

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP X TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

ORS-5

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A003 SV to LV Interface Control Document

(ICD)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-CMAN-81248

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

ASREQ @PDR b. COPIES

a. ADDRESSEE Draft

Final

1.0 INTRODUCTION

1.1 Purpose

1.2 Scope

1.3 Definitions

1.4 Interface Change Control

1.5 Requirement Traceability

1.6 Requirements Status

2.0 APPLICABLE DOCUMENTS

2.1 Government Documents

2.2 Contractor Documents

2.3 Other Documents

3.0 INTERFACE REQUIREMENTS

3.1 Structural /Mechanical/Thermal Interfaces

3.2 Electrical Interfaces

3.3 Environmental Interfaces

3.4 Flight Design

3.5 Ground Operations

3.6 Safety Requirements

4.0 PAYLOAD SUCCESS CRITERIA

The Contractor’s proposed criteria to be used to determine the success of the mission. These criteria shall be based on applicable flight related ICD requirements.

The Contractor’s proposed methods, including required vehicle telemetry measurements, ground observation, and analysis/reconstruction techniques, for verifying that each proposed payload success criterion is satisfied. Allowances for sensor measurement accuracy shall be explicitly identified and justified.

The finals shall be submitted in Adobe Acrobat.

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 5 of 13

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP X TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

ORS-5

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A004 Technical Report – ICD Requirements Verification Report (RVR)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MISC-80508A

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

ASREQ ICD + 3 MTHS b. COPIES

a. ADDRESSEE Draft

Final

A verification matrix will document and track all ICD requirements and methods by which they will be verified and responsible organization. The verification matrix shall list the final documentation of the verification approved by the cognizant Contractor engineer.

The verification matrix shall be released no later than three (3) months after the Preliminary ICD CDRL approval and shall be updated upon release of each ICD revision.

Where there is not a direct match between the specified ICD Verification Matrix data requirements identified below and the Contractor’s standard ICD Verification Matrix, the Contractor’s standard ICD Verification Matrix will be acceptable provided it addresses equivalent content:

• ICD requirement language • Verification Plan

• ICD requirement paragraph number • Verification Source

• Verification Method (Test, Inspection, Analysis, Demo)

• Responsible Organization • Notes/Comments

• Status Block 14:

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 6 of 13

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP X TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

ORS-5

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A005 Technical Report – Final Flight Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MISC-80508A

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

ASREQ L+30 DAYS b. COPIES

a. ADDRESSEE Draft

Final

After each launch, a final post-flight report shall be provided. This report will support the ORS-5 Contracting Officer’s payload success determination.

(A) This report shall include, in its entirety, the Contractor’s internal post-flight report produced for the mission.

This report shall also include:

(i) Orbit elements determined from vehicle guidance data

(ii) Vehicle data indicating payload separation

(iii) Pre-flight prediction of expected flight environments (i.e., acoustic/vibration, quasi-static acceleration, thermal, and pressure).

Generic vehicle environmental data may be submitted unless specific environmental requirements are identified in the ID

(iv) Post flight determination of actual flight environments

(v) Explanation of significant differences between the predicted and actual flight environments

(vi) Vehicle sequence and attitudes data (if available)

(B) This report shall also specifically address each ICD orbital parameter and environmental condition using flight data, ground observations, or other data sources in accordance with the determination methods proposed by the Contractor under CDRL

ORS5-3

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 7 of 13

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP X TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

ORS-5

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A005 Technical Report – Final Flight Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MISC-80508A

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

ASREQ L+30 DAYS b. COPIES

a. ADDRESSEE Draft

Final

(C) This report shall include all vehicle telemetry data in the Contractor provided format in accordance with ORS5-8

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 8 of 13

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP X TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

ORS-5

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A006 SV - LV Integration Procedures

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MISC-80508A

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

ASREQ SV–LV INT -60D b. COPIES

a. ADDRESSEE Draft

Final

Site procedures for various operations that involve the payload and/or the launch vehicle / payload interfaces.

Provide as a minimum, the following integrated procedures (If applicable):

(A) Payload/ launch vehicle electrical interface verification test

(B) Payload integration

(C) Payload/launch vehicle mate (includes payload adapter and vehicle mates, if separate)

(D) Launch vehicle electrical readiness/flight simulation

(E) Fairing installation

(F) Combined system test/final readiness test

Also provide a list of all Contractor-specific procedures used for integrated processing with a brief description of their purpose.

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 9 of 13

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP X TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

ORS-5

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A007 Technical Report – Launch Vehicle and GSE Telemetry Formats

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MISC-80508A

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

ASREQ FRR b. COPIES

a. ADDRESSEE Draft

Final

R N/A AS CHANGED

To provide all telemetry (RF and hardwire) formats for vehicle systems, GSE and sub-systems testing, including detailed description of formats that will allow ORS-5 to process, display and verify all launch vehicle and GSE telemetry (RF and hardwire).

The environmental spacecraft data shall include the raw vehicle and GSE telemetry (RF and hardwire) formats if any and shall include as a minimum:

(A) PCM Data Stream Description: this file will describe the format of the Pulse Code Modulation (PCM) telemetry data stream. A new file must be delivered if the formatting of the PCM data stream is modified. It must include:

(i) Bit rate in bits per second

(ii) Location and description of sync word

(iii) Number of minor frames in major frame

(iv) Size of minor frame

(v) Number of bits per word or syllable

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 10 of 13

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP X TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

ORS-5

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MISC-80508A

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

a. ADDRESSEE Draft

Final

(B) Measurement Description File: this file must be standard ASCII text or another format easily read with a personal computer using commercially available software. A new file must be delivered if any measurement or calibration changes are made to the launch vehicle and/or GSE telemetry stream. It must include:

(i) Measurement ID

(ii) Measurement description

(iii) Engineering units of measurement

(iv) Location of measurement in minor frame

(v) Word step rate of measurement if supercommutated

(vi) Size of measurement in bits or bytes

(vii) Type of measurement

(viii) Initial minor frame number where measurement is found

(ix) Type of measurement

(x) Initial minor frame number where measurement is found

(xi) Frame step rate of measurement if found in more than 1 minor frame

(xii) Special conversion algorithm from raw to engineering units if not standard polynomial

(xiii) Calibration coefficients for conversion from raw to engineering units

(xiv) Bit number in word if measurement is a discrete

(xv) List of guidance modes that measurement is valid

(xvi) Method of determining guidance modes

(xvii) Measurement mask if required

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 11 of 13

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP X TM OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

ORS-5

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MISC-80508A

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

a. ADDRESSEE Draft

Final

(C) Description of rules used to format measurement description file including:

(i) Description of each field in file

(ii) Description of all codes or abbreviations

(iii) Method of determining revision level or revision date

(D) Non-PCM Data Stream Description: This file will describe the format of the data stream location and description of all measurements, and the calibration data required to convert from raw to engineering units.

(E) A list of flight events which will occur for each mission and the nominal time for event occurrence. If event can occur at variable times, this must include a description for determining event time during flight.

(F) A list of predicted position and velocity state vectors for significant events during flight. This list must include, at a minimum, the end of all powered flight phases and payload separation. A description of the coordinate system used to provide the state vectors must also be included. This list must be delivered for every mission.

(G) A list of vehicle attitude measurements and description of format used. All files must be delivered using an electronic medium.

Block 14:

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 12 of 13

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER X

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

ORS-5

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A008 Integrated Master Schedule (IMS)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MGMT-81650 SOW SMC/ORS

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

MONTHLY ATP + 30D b. COPIES

a. ADDRESSEE Draft

Final

A MTH END 15TH OF EA. MTH

ORS-5 LV Integrated Master Schedule.

1. Level of effort tasks are not required in the IMS

2. Hard constraints, if used must be supported with an explanation in the Notes field. Deadlines are recommended to be used in lieu of hard constraints.

3. Baseline changes must be explained in the monthly status report.

4. A calendar with holidays and plant closures shall be used to ensure non-work days are not planned in the baseline. Execution may require customization to accommodate critical work-arounds if the delivery date is in jeopardy.

The IMS shall be submitted in Microsoft Project 2007 or 2010, Primavera P6, Open Plan or other professional project scheduling tool but must be able to provide XML file if not MS Project.

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 13 of 13

File details come from the government source that posted it. Updated .