Attachment 1b SOW Suite B6 UPDATED 110719.pdf

PDF 90 KB Posted

Attached to
Furniture Reconfiguration - Suite B6 Federal contract opportunity
Solicitation number
FA875119Q0550
Issued by
Department of the Air Force Materiel Command Research Laboratory

View the file

Other files for this federal contract opportunity

Other files attached to Furniture Reconfiguration - Suite B6, newest first.
File Type Posted
Attachment 1a Suite B6 DWG.pdf PDF
Attachment 2 Brand Name Justification.pdf PDF
Attachment 4 Site Visit RRS Form 31.pdf PDF
Attachment 3 Reps and Certs.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

PROVIDE ALLSTEEL TERRACE SYSTEMS FURNITURE

FOR SUITE B6, RIE, B/3

AT

AIR FORCE RESEARCH LABORATORY

ROME, NY

11 July 2019

(UPDATED 7 NOV 2019)

1.01 SCOPE

A. The scope of this effort consists of furnishing all design services, delivery and labor, equipment, devices, and materials, and to perform all work required to PROVIDE SYSTEMS FURNITURE FOR SUITE B6, B/3, located at Air Force Research Laboratory, Rome, NY at the Air Force Research Laboratory (AFRL). This procurement will consist of reconfiguring existing furniture as well as supplemental new parts and pieces.

1.02 PRINCIPAL FEATURES

A. The work to be performed involves the following principal features:

1. Develop estimates with part numbers and descriptions for all pieces listed on attached parts list. All parts must be new. Allsteel Terrace System brand parts are proprietary and will be the only accepted product line, as our existing parts are from the Allsteel Terrace line.

2. All product to be quoted in the following finishes:

Metal: Parchment

Panel Fabric: Appoint Turmeric/Appoint Chai

Electrical Components: Muslin

Laminate: Natural Maple

Edge: Muslin

3. After AFRL/RIOC approval, order and deliver all furniture and materials to work area site. Transport existing unused inventory from installation site to on-site warehouse adjacent to Bldg. 3.

4. Install all furniture, including all accessories. Remove all packing material and boxes from the work site.

5. The work site is located in a single story building equipped with a loading dock.

-- End of SOW--