FA875118B0003_a15_Attach_2_SPECIFICATION_Vol_1of2_20180808.pdf

PDF 7 MB Posted

Attached to
Construct Research Antenna Measurement Facility Federal contract opportunity
Solicitation number
FA875118B0003
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

Attachment 2 - Specifications (1 of 2)

View the file

Other files for this federal contract opportunity

Other files attached to Construct Research Antenna Measurement Facility, newest first.
File Type Posted
027000_-_CHAIN_LINK_FENCES_AND_GATES.pdf PDF
Tanner_Hill_68_Wall_Sections.PDF PDF
Tanner_Hill_63_Floor_Plans_1982.PDF PDF
Tanner_Hill_67_Bldg_Sections.PDF PDF
Appendix_A_-_Geotech_Report.pdf PDF
AD_S-505.pdf PDF
Tanner_Hill_70_Foundation_plans.PDF PDF
18b3_RFI_no_1.docx DOCX document
FA875118B00030003.pdf PDF
FA875118B00030002.pdf PDF
FA875118B00030001.pdf PDF
FA875118B0003_a15_Attach_2_SPECIFICATION_Vol_2of2_20180808.pdf PDF
FA875118B0003.pdf PDF
FA875118B0003_a15_Attach_5_Supplemental_Reqmts.pdf PDF
Attachment_4_Wage_Decision__NY20180031.pdf PDF
FA875118B0003_a15_Attach_3_DRAWINGS_20180808.pdf PDF
FA875118B0003_a15_Attach_6_-_RRS_Form_31_Request_for_Visit_Authorization.pdf PDF
FA875118B0003_a15_Attach_1_Bid_Schedule.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SENSITIVE BUT UNCLASSIFIED (SBU)

PROPERTY OF THE UNITED STATES GOVERNMENT

COPYING, DISSEMINATION, OR DISTRIBUTION OF THIS DOCUMENT

TO UNAUTHORIZED RECIPIENTS IS PROHIBITED

Do not remove this notice Properly destroy or return documents when no longer needed.

PROJECT MANUAL

CONSTRUCT NEWPORT RESEARCH ANTENNA

MEASUREMENT FACILITY TANNER HILL PHASE 2

TANNER HILL, PHASE

OWNER: SUBMISSION:

FINAL CONSTRUCTION DOCUMENTS

VOLUME ONE OF TWO:

SPECIFICATION DIVISIONS 00-14

ISSUE DATE:

July 28, 2017

(REVISED 08/08/2018)

ARCHITECT: PROJECT LOCATION:

AIR FORCE RESEARCH LABORATORY

ROME RESEARCH SITE

ROME, NY 13441

CONSULTANTS: PROJECT INFORMATION:

MEPFP ENGINEERING CONSULTANT:

ENVIRONMENTAL ENGINEERS:

COLDEN CORP.

A/E CONTRACT #.

OWNER PROJECT #:

NKB PROJECT #:

FA8751-16-D-0002

ULDF 16-0303AE2

16340.05

PROJECT CERTIFICATION:

To the best of my knowledge, belief and professional judgment, the drawings and specifications which comprise the Construction Documents for the project are in compliance with applicable codes, including the latest editions of the International Building Code and NFPA 101.

AFRL – ROME NY FINAL CONSTRUCTION DOCUMENTS

CONSTRUCT NEWPORT RESEARCH ANTENNA MEASUREMENT FACILITY 7/28/2017

TANNER HILL, PHASE 2 - ULDF 16-0303AE2 (REVISED 08/08/18)

TABLE OF CONTENTS 000100 - 1

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed

VOLUME ONE OF TWO:

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

000100 TABLE OF CONTENTS

000115 LIST OF DRAWING SHEETS

DIVISION 1 – GENERAL REQUIREMENTS

010000 GENERAL REQUIREMENTS

011100 SUMMARY OF WORK

011100.1 SUMMARY OF WORK - SUPPLEMENTAL

011101 ABBREVIATIONS AND SYMBOLS

013529 SAFETY, FIRE PROTECTION AND HEALTH

014000 QUALITY REQUIREMENTS

015001 ENVIRONMENTAL PROTECTION

015613 TEMPORARY BARRIERS AND ENCLOSURES

DIVISION 2 - EXISTING CONDITIONS

024116 STRUCTURE DEMOLITION

028200 ASBESTOS ABATEMENT with SAMPLING REPORT

DIVISION 3 – CONCRETE

031210 FORMLINERS FOR ARCHITECTURAL CONCRETE

033000 CAST-IN-PLACE CONCRETE

DIVISION 5 – METALS

051200 STRUCTURAL STEEL FRAMING

051213 ARCHITECTURALLY EXPOSED STRUCTURAL STEEL FRAMING

052100 STEEL JOIST FRAMING

053100 STEEL DECKING

054000 COLD-FORMED METAL FRAMING

055119 METAL GRATING STAIRS

055213 PIPE AND TUBE RAILINGS

055313 BAR GRATINGS

DIVISION 6 – WOOD, PLASTICS AND COMPOSITES

061053 MISCELLANEOUS ROUGH CARPENTRY

061600 SHEATHING

064113 WOOD-VENEER-FACED ARCHITECTURAL CABINETS

DIVISION 7 – THERMAL AND MOISTURE PROTECTION

071326 SELF-ADHERING SHEET WATERPROOFING

072100 THERMAL INSULATION

072500 WEATHER BARRIERS

074113.16 STANDING-SEAM METAL ROOF PANELS

074243 COMPOSITE WALL PANELS

075323 ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING

076200 SHEET METAL FLASHING AND TRIM

077100 ROOF SPECIALTIES

077253 SNOW GUARDS

078413 PENETRATION FIRESTOPPING

079200 JOINT SEALANTS

DIVISION 8 – OPENINGS

081113 HOLLOW METAL DOORS AND FRAMES

TABLE OF CONTENTS 000100 - 2

081416 FLUSH WOOD DOORS

083323 OVERHEAD COILING DOORS

084113 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

085113 ALUMINUM WINDOWS

087100 DOOR HARDWARE

088000 GLAZING

DIVISION 9 – FINISHES

092216 NON-STRUCTURAL METAL FRAMING

092900 GYPSUM BOARD

093013 CERAMIC TILING

095123 ACOUSTICAL TILE CEILINGS

096340 STONE FLOORING

096513 RESILIENT BASE AND ACCESSORIES

096519 RESILIENT TILE FLOORING

096813 TILE CARPETING

099123 PAINTING

DIVISIONS 10 – SPECIALTIES

102800 TOILET, BATH, AND LAUNDRY ACCESSORIES

104423 PANEL SIGNAGE

104416 FIRE EXTINGUISHERS

DIVISION 11 – EQUIPMENT

113100 RESIDENTIAL APPLIANCES

DIVISION 12 – FURNISHINGS

123661 SIMULATED STONE COUNTERTOPS

DIVISION 13 – SPECIAL CONSTRUCTION

NOT USED

DIVISION 14 – CONVEYING EQUIPMENT

146000 BRIDGE CRANE & HOIST SYSTEM

VOLUME TWO OF TWO:

DIVISION 21 – FIRE SUPPRESSION

211313 FIRE SUPPRESSION SPRINKLER SYSTEMS

213100 FIRE PUMP ENCLOSURE

213116 DIESEL-DRIVE, CENTRIFUGAL FIRE PUMPS

213400 PRESSURE-MAINTENANCE PUMPS

213900 CONTROLLERS FOR FIRE PUMP DRIVERS

214400 STORAGE TANKS FOR FIRE SUPPRESSION WATER

TABLE OF CONTENTS 000100 - 3

DIVISION 22 – PLUMBING

220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

220553 220719

IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

PLUMBING PIPING INSULATION

223000 PLUMBING – GENERAL

224000 PLUMBING FIXTURES

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING

230513 230514

COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

ELECTRIC WIRING FOR HVAC EQUIPMENT

230517 230518

SLEEVES AND SLEEVE SEALS FOR HVAC PIPING

ESCUTCHEONS FOR HVAC PIPING

230519 METERS AND GAGES FOR HVAC PIPING

230523 GENERAL DUTY VALVES FOR HVAC PIPING

230529 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

230553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC

230713 DUCT INSULATION

230719 HVAC PIPING INSULATION

230900 231116

INSTRUMENTATION AND CONTROL FOR HVAC

FACILITY LIQUIFIED PETROLEUM GAS PIPING

232113 HYDRONIC PIPING

232116 HYDRONIC PIPING SPECIALITIES

232123 232300

HYDRONIC PUMPS

REFRIGERANT PIPING

233113 METAL DUCTS

233300 AIR DUCT ACCESSORIES

233423 233713 235123

HVAC POWER VENTILATORS

DIFFUSERS, REGISTERS AND GRILLES

GAS VENTS

235216 235523

CONDENSING BOILERS

LOW INTENSITY GAS FIRED INFRARED HEATERS

236200 PACKAGED CONDENSING UNIT

237313 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNIT

238233 CONVECTORS

238236 FINNED-TUBE RADIATION HEATERS

238239 239119

PROPELLER UNIT HEATERS

FIXED LOUVERS

DIVISION 26 – ELECTRICAL

260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

260523 CONTROL-VOLTAGE ELECTRICAL POWER CABLES

260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

260533 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

260543 UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS

260544 SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING

TABLE OF CONTENTS 000100 - 4

260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS

260572 OVERCURRENT PROTECTION DEVICE SHORT-CIRCUIT STUDY

260573 OVERCURRENT PROTECTION DEVICE COORDINATION STUDY

260574 OVERCURRENT PROTECTION DEVICE ARC-FLASH STUDY

260923 LIGHTING CONTROL DEVICES

262413 SWITCHBOARDS

262416 PANELBOARDS

262500 ENCLOSED BUS ASSEMBLIES

262726 WIRING DEVICES

262816 ENCLOSED SWITCHES AND CIRCUIT BREAKERS

264113 LIGHTNING PROTECTION FOR STRUCTURES

265119 LED INTERIOR LIGHTING

265219 EMERGENCY AND EXIT LIGHTING

265619 LED EXTERIOR LIGHTING

DIVISION 27 – COMMUNICATIONS

270526 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS

271100 COMMUNICATIONS EQUIPMENT ROOM FITTINGS

271500 HORIZONTAL CABLING

271700

TESTING AND IDENTIFICATION

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

281600 INTRUSION DETECTION

282300 VIDEO SURVEILLANCE

283111 DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

DIVISION 31 - EARTHWORK

310000 EARTHWORK

310140 SHEETING AND SHORING

310519 CONSTRUCTION FABRICS

311000 SITE CLEARING

312000 ENVIRONMENTAL PROTECTION

312000 EARTH MOVING

312319 DEWATERING

312513 EROSION AND SEDIMENT CONTROL

313233 TRENCHING BACKFILLING AND COMPACTION

315000 EXCAVATION SUPPORT AND PROTECTION

316329 DRILLED CONCRETE PIERS AND SHAFTS

312513 EROSION AND SEDIMENT CONTROL

313233 TRENCHING, BACKFILLING, AND COMPACTING

DIVISION 32 – EXTERIOR IMPROVEMENTS

321000 ROADWAY AND MISCELLANEOUS SURFACE SUBBASE

321200 ASPHALT CONCRETE PAVING AND SURFACING

329213 HYDROSEEDING

DIVISION 33 – UTILITIES

331100 WATER UTILITY DISTRIBUTION PIPING

332000 WATER WELLS

333000 SANITARY SEWERS

TANNER HILL, PHASE 2 - ULDF 16-0303AE2

LIST OF DRAWING SHEETS 000115 - 1

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed

SECTION 000115 - LIST OF DRAWING SHEETS

A. Drawings: Drawings consist of the Contract Drawings and other drawings listed on the Table of Contents page of the separately bound drawing set titled IRISH HILL B1624 ALTERATION & REPAIR, dated 4/28/2017, and as modified by subsequent Addenda and Contract modifications.

A. List of Drawings: Drawings consist of the following Contract Drawings and other drawings of type indicated:

SHEET NUMBER SHEET NAME

GENERAL

G-001 COVER SHEET

CIVIL

C-001 SITE SURVEY PLAN

C-002 DEMOLITION PLAN

C-003 SITE PLAN

C-004 GRADING PLAN

C-005 ONSITE WASTEWATER TREATMENT PLAN

C-006 CONSTRUCTION DETAILS

C-007 CONSTRUCTION DETAILS

C-008 FIRE PUMP SITE WORK

STRUCTURAL

S-001 STRUCTURAL NOTES

S-100 STRUCTURAL FOUNDATION PLAN

S-101 LOWER ROOF AND MEZZANINE FRAMING PLAN

S-102 UPPER MEZZANINE FLOOR FRAMING PLAN

S-103 UPPER ROOF FRAMING PLAN

S-201 CONCRETE WALL ELEVATIONS

S-202 CONCRETE WALL ELEVATIONS

S-203 CONCRETE WALL ELEVATIONS

S-204 CONCRETE WALL ELEVATIONS

S-205 STRUCTURAL STEEL ELEVATIONS

S-501 TYPICAL FOUNDATION DETAILS & SCHEDULES

S-502 FOUNDATION SECTION & DETAILS

S-503 CONCRETE WALL SECTIONS & DETAILS

S-504 TYPICAL STRUCTURAL STEEL DETAILS & COLUMN SCHEDULE

S-505 STAIR TOWER SECTIONS & DETAILS

S-506 STRUCTURAL STEEL SECTIONS & DETAILS

S-507 STRUCTURAL STEEL SECTIONS & DETAILS

S-508 STRUCTURAL STEEL BAR JOIST DETAILS

S-509 TYPICAL COLD FORMED STEEL DETAILS

S-600 STORAGE TANK FOUNDATION PLAN & DETAIL

S-900 TOWER ELEVATIONS AND SECTIONS

S-901 STAND ALONE ANTENNA FOUNDATION

S-902 TOWER ELEVATION SECTIONS

LIST OF DRAWING SHEETS 000115 - 2

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed

S-903 TOWER SECTION AND DETAILS

S-904 TOWER SECTION AND DETAILS

S-905 TOWER SECTION AND DETAILS

ARCHITECTURAL

A-001 GENERAL NOTES, SYMBOLS & ANNOTATIONS

A-002 PARTITION TYPES

A-003 CODE REVIEW

A-004 CODE REVIEW

AD101 DEMOLITION PLAN

AE101 FIRST FLOOR PLANS

AE102 FIRST FLOOR REFLECTED CEILING PLAN

AE103 LOWER MEZZANINE PLAN

AE104 UPPER MEZZANINE PLAN

AE105 MEZZANINE REFLECTED CEILING PLANS

AE106 LOWER ROOF PLAN

AE107 UPPER ROOF PLAN

AE201 EXTERIOR ELEVATIONS

AE202 EXTERIOR ELEVATIONS

AE203 EXTERIOR ELEVATIONS

AE204 EXTERIOR ELEVATIONS

AE301 BUILDING SECTION

AE302 BUILDING SECTION

AE303 BUILDING SECTION

AE304 WALL SECTIONS

AE305 WALL SECTIONS

AE400 ENGLARGED PLANS & ELEVATIONS

AE401 ENLARGED STAIR PLANS

AE402 ENLARGED STAIR PLANS & DETAILS

AE403 INTERIOR ELEVATIONS

AE404 INTERIOR ELEVATIONS

AE405 INTERIOR ELEVATIONS

AE406 INTERIOR ELEVATIONS

AE501 DETAILS

AE502 DETAILS

AE503 DETAILS

AE504 ROOF DETAILS

AE505 DETAILS

AE601 ROOM FINISH SCHEDULE

AE602 DOOR AND HARDWARE SCHEDULES & DETAILS

AE603 WINDOW AND GLAZING SCHEDULES & DETAILS

AE900 EXTERIOR VIEWS

AI101 FURNITURE PLAN (N.I.C)

AI102 FINISH PLAN

PLUMBING

P-001 SYMBOLS, ABBREVIATIONS, DETAILS, SCHEDULES AND NOTES

PD101 DEMOLITION PLANS

LIST OF DRAWING SHEETS 000115 - 3

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed

P-101 UNDERSLAB PIPING PLAN

P-102 FIRST FLOOR PLAN

P-103 LOWER AND UPPER MEZZANINE PLANS

FIRE SUPRESSION

FP001 NOTES, SYMBOLS AND ABBREVIATIONS

FP002 DETAILS

FP101 FIRST FLOOR PLAN

FP102 LOWER MEZZANINE PLAN

FP103 UPPER MEZZANINE PLAN

MECHANICAL

M-001 NOTES, SYMBOLS AND ABBREVIATIONS

MD101 DEMOLITION PLANS

M-101 FIRST FLOOR PLAN

M-102 LOWER MEZZANINE PLAN

M-103 UPPER MEZZANINE PLAN

M-401 LOWER MEZZANINE SECTIONS

M-501 DETAILS

M-502 DETAILS

M-601 SCHEDULES

ELECTRICAL

E-001 SYMBOLS, ABBREVIATIONS AND NOTES

ED101 FIRST FLOOR DEMOLITION PLAN

ED102 SECOND FLOOR AND ROOF DEMOLITION PLANS

E-101 SITE PLAN

E-102 FIRST FLOOR POWER PLAN

E-103 FIRST FLOOR LIGHTING PLAN

E-104 LOWER MEZZANINE POWER AND LIGHTING PLAN

E-105 UPPER MEZZANINE POWER AND LIGHTING PLAN

E-106 FIRST FLOOR FIRE ALARM AND SECURITY PLAN

E-107 LOWER AND UPPER MEZZANINE FIRE ALARM AND SECURITY FLOOR PLANS

E-501 DETAILS

E-502 DETAILS

E-503 DETAILS

E-601 ONE-LINE DIAGRAMS AND PANEL SCHEDULES

E-602 SCHEDULES

Grand total: 108

END OF SECTION 000115

LIST OF DRAWING SHEETS 000115 - 4

THIS PAGE INTENTIONALLY LEFT BLANK

CONSTRUCT NEWPORT RESEARCH ANTENNA MEASUREMENT FACILITY 07/28/2017

GENERAL REQUIREMENTS 010000 - 1

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed

SECTION 010000 – GENERAL REQUIREMENTS

1.0 n/a – THIS SECTION IS SPECFIC TO EACH PROJECT

2.0 WORKING HOURS

A. The regular hours of work at the Information Directorate are 0700 to 1600 hours, Monday through Friday, excluding Federal holidays. The Government may restrict access to work sites to these hours and days. The Contractor shall consider all other hours as non- regular time and use the appropriate unit prices for tasks performed during those hours. In the technical/cost proposal submitted for each delivery order, the contractor shall clearly identify those items of work scheduled for accomplishment during non-standard time and include justification for the request. The contractor shall notify the Contracting Officer (CO) at least 48 hours in advance of any work performed during non-regular hours that requires inspection during accomplishment or that prevents inspection of previous work after accomplishment.

2.1. LEGAL HOLIDAYS

The Rome Research Site recognizes the following legal holidays:

New Year’s Day 1 January Martin Luther King’s Birthday Third Monday in January President’s Day Third Monday in February Memorial Day Last Monday in May Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veteran’s Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December

3.0 SECURITY REQUIREMENTS

A. The work to be done on this project is located in and around areas that are under the scrutiny of the Department of Defense Police assigned to the RRS Information Directorate. To gain access to the area(s) to examine the work to be done for job estimation purposes, arrangements must be made through the Contracting Office. Contractor personnel will be escorted into the area(s) for the purpose of project estimation.

B. When it has been determined which Contractor will accomplish the project, a Request for Visit Authorization Form (RRS Form 31) from the company, will be necessary prior to initial work commencement. The form needs to be signed by the Company President or Director of Human Resources. The form will also be used as the Entry Authority List. The Contractor will supply the form to Security (AFRL/RIOF) as instructed on the form. This information will be used to do a Local Files Check. This check will provide Drivers License Info, Wants & Warrants and Protection Orders and will also provide information on Illegal Immigration and suspected terrorist affiliations.

The Local Files Check will also be accomplished prior to work commencing. If the individual is not a US Citizen they will not be allowed within the complex or facilities. There will be no foreign national workers allowed on the Information Directore site. For work at DFAS (adjacent to RI), an additional Form SF 85 must be submitted for each contractor working in the facility.

Additional information regarding access to Air Force facilities and Government information tech-nology networks:

GENERAL REQUIREMENTS 010000 - 2

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed

(a) Contractor employees requiring access to U.S. Air Force bases, AFRL facilities, and/or ac-cess to U.S. Government Information Technology (IT) networks in connection with the work on this contract/order must be U.S. citizens. For the purpose of base and network access, posses-sion of a permanent resident card (“Green Card”) does not equate to U.S. citizenship. This re-quirement does not apply to foreign nationals approved by the U.S. Department of Defense or U.S. State Department under international personnel exchange agreements with foreign govern-ments. Any waivers to this requirement must be granted in writing by the Contracting Officer prior to providing access. The above requirements are in addition to any other contract requirements related to obtaining a Common Access Card (CAC). .

(b) If an IT network/system does not require AFRL to endorse a Contractor’s application to said network/system in order to gain access, the organization operating the IT network/system is re-sponsible for controlling access to its system. If an IT network/system requires a U.S. Govern-ment sponsor to endorse the application in order to gain access to the IT network/system, AFRL will only endorse the following types of applications, consistent with the requirements above: (1) Contractor employees who are U.S. citizens performing work under this contract/order; or (2) Contractor employees who are non-U.S. citizens and who have been granted a waiver. Any addi-tional access restrictions established by the IT network/system owner apply.

C. Provide the Company’s phone number and a Project Leaders or Supervisor/Foremen cell-phone number is necessary for the Law Enforcement Desk Sergeant.

D. All facilities are entered using a magnetic media entry badge. Any personnel such as Supervisor/Foreman or Project Leader who may need building access for meetings etc. during the contract period can acquire a Local Contractor Entry Badge through the Division/Branch with oversight of the work. This will be accomplished with the RRS Form 110 (Unescorted Visitor Badge). The Security Visitation Office is located in the lobby of Bldg 3, West Wing. This badge will be worn at all times within the facility. These badges will be returned to the Contracting Officer’s Representative (COR) upon completion of the final inspection and Acceptance of Work.

Any badges lost during the period of work will be reported to Security as soon as possible.

E. Access to the Information Directorate complex is controlled by a Main Gate on Brooks Rd, located just west of the Otis & Brooks intersection. Identification for the contractor to enter with a vehicle will be an access list supported by the electronic badge issued. All commercial vehicles entering the gate will be searched. One-time deliveries can be escorted from the gate to delivery point by project personnel.

F. All commercial vehicles are searched prior to entry into the Information Directorate complex. Vehi-cle operators will be aware of the vehicle search pull-off area prior to approaching the Main Gate. A search of the vehicle will be conducted prior to its entry. All vehicles not needed for delivery of equipment or tools will be parked in the visitor parking area unless cleared through Security. There are no vehicles allowed within 25 meters (80 ft.) of the Information Directorate facilities.

G. All personnel should be aware that the Information Directorate site is property of the United States

Air Force. All personnel will follow all posted signage.

H. Contractor personnel will be notified by Information Directorate Police of any emergencies which would require an evacuation or work stoppage, such as an increase in the Force Protection Condi-tion.

I. Building/Room Keys: If the contractor needs access to area(s) that are locked (i.e. mechanical rooms, janitor’s closet, etc.), a request for entry of at least 2 working days prior to the need for ac-cess will be submitted to AFRL/RIOC construction representative. The area(s) will be provided on a daily basis. The area(s) will be locked down at the end of the day’s work.

GENERAL REQUIREMENTS 010000 - 3

J. Dumpsters: Per UFC 04-010-02, all construction dumpsters shall be located no less than 25 meters

(80 feet) from any facility, unless otherwise approved by Information Directorate Security. All dump-ster locations will be reviewed and evaluated on a case by case basis.

K. The 24 hour Desk Sgt can be reached at 315-330-2961.

4.0 SAFETY

A. The Contractor is responsible for compliance with all Federal, Air Force, and State safety and health regulations and is subject to Air Force safety, OSHA inspections, and conformance to Section 01 35 29 of this SOW, Safety, Fire Protection and Health while working at the Information Directorate Site

5.0 EXCAVATION PERMITS

A. The Contractor shall obtain excavation permits (Air Force form 103) prior to any excavation. The CO or COR shall assist the Contractor in obtaining the excavation permits. The Contractor shall provide drawings and details showing exact location and description of the type of excavation to be accomplished. Should any one of the coordination points indicate an additional underground utility or structure over and above those shown on the contract drawing either by sketch on the Contractor's drawing by field pointing or by flagging, the Contractor shall be responsible for protection of each of the items indicated. Should damage occur to any of the items indicated by the Contractor, contract drawings or coordinating agency to the permit, the Contractor shall be responsible for prompt repair of the damage to return the item to its original workable condition.

6.0 UTILITIES AND INTERRUPTION OF UTILITIES OR BUILDING SYSTEMS

A. Available water and electrical services may be used in this work at no cost to the Contractor.

The Contractor shall make arrangements for such services with the CO or COR. The Government will identify service tie-in points. Connections to these tie-in points shall be the responsibility of the Contractor.

B. The Government may not be held responsible for interruptions of utility service and will not be liable for Contractor delays, damages, or increased costs occasioned by any such interruption of service.

C. No utility services or building systems shall be interrupted to make connections, to relocate, or for any purpose without approval of the CO. Request for permission to shut down services or building systems shall be submitted in writing to the COR fourteen (14) days prior to date of proposed interruption. The request shall give the following information:

1. Location of shut-off.

2. Services affected.

3. Hour, date, and duration of shut-off.

D. Services shall not be interrupted until receipt of approval of the proposed hours and date from the CO. If utility services or building systems are damaged by the Contractor, the Contractor shall restore them within 24-hours.

GENERAL REQUIREMENTS 010000 - 4

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed

7.0 EXISTING FACILITIES

A. The existing dimensions and locations shown on the applicable drawings are for approximation purposes only. Failure to verify the dimensions and locations will be at the Contractor’s risk and shall not relieve the Contractor from accomplishing the work required by the contract at the price awarded by the government.

8.0 SUBMITTALS

A. Submittals will be required on materials used under each proposal. Each submittal shall include information as described in the technical specifications or as shown on the drawings.

Submittals will accompany the contractor’s proposal on each project. All submittals shall include a Material Approval Submittal AF3000 cover sheet. Once an item of material or equipment has been approved, the Contractor will not be required to resubmit with the following exception: If, at any time during the duration of this contract, the Contractor desires to change materials from those originally approved, the new materials shall be resubmitted to and approved by the CO prior to incorporation into the project.

9.0 SCHEDULING WORK

A. Before any of the work is initiated the Contractor shall confer with the CO or COR and agree on a sequence of procedures; means of access to premises and buildings; space for storage of materials and equipment; delivery of materials and use of approaches; use of corridors, stairways, elevators, and similar means of communications; the location of partitions.

B. Delivery of materials and equipment shall be made with a minimal interference to Government op-erations and personnel.

C. The work shall, so far as practicable, be done in definite sections or divisions and confined to limited areas which shall be completed before work in other sections or divisions is begun.

a. Refer to section 0011100.1” Summary of Work Supplemental” for further work restrictions.

10.0 CONTRACTOR STORAGE

A. If agreed, a suitable outside storage area may be provided to the Contractor by the CO. Security shall be the responsibility of the Contractor. The Contractor shall keep the storage area neat, order-ly and clear of all debris. The Contractor shall not allow trash or other debris to be scattered from this area by wind or other means.

11.0 INSPECTION

A. Inspection of work by the Government will normally be accomplished along with the work as it pro-gresses. At the discretion of the CO, inspection may be directed at the completion of various phas-es of the work prior to initiation of any further work. The Contractor shall notify the COR that a phase will be complete at least 3 days in advance of the completion of each phase to be inspected.

END OF SECTION - GENERAL REQUIREMENTS

TANNER HILL, PHASE 2 - ULDF 16-0303AE2

SUMMARY OF WORK 011100 - 1

SENSITIVE BUT UNCLASSIFIED (SBU)

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed

SECTION 011100 SUMMARY OF WORK

PART 1 - GENERAL

1.1 LOCATION

A. The work to be accomplished under this project is at the Information Directorate Site, including satellite locations at Newport and Stockbridge. The specific construction site is on Tower Road, Newport, NY.

1.2 DESCRIPTION

A. The project consists of furnishing all labor, materials and equipment required for a broad range of demolition and construction work on various real property facilities at any or all of the above mentioned sites.

1. Demolition of existing building B1600 to the extent as indicated on the Contract Drawing.

a. Building requires abatement activities prior to demolition.

b. Existing site restoration following building demolition.

2. Site development for the construction of new work, including road ways, storm drainage, well water and septic systems.

3. Construction of new antenna research facility, including main building and stand-alone silo tower structure.

B. Refer also to Section 011100.01 “Summary of Work Supplemental” for more detailed descriptions regarding the project.

PART 2 - PRODUCTS

2.1 SUBMITTAL REQUIREMENTS

A. Submittal Requirements: Reproducible Shop drawings, manufacturer’s data, dated certifications and test reports, and samples constitute the project submittals. All submittals shall have an AF Form 3000 attached.

a. Refer to individual specifications for specific submittal requirements.

PART 3 - EXECUTION

A. Safety Requirements: It shall be the responsibility of the Contractor to initiate and maintain such programs as to comply with the provisions of the Air Force Occupational Safety and Health Standards. These programs shall include the education and training of employees and subcontractor personnel in the recognition, avoidance and prevention of unsafe conditions. See Section 01 35 29 for further instructions.

B. Disposal of Materials: Unless designated as salvageable, all waste materials generated by any work under this contract shall be handled, transported, stored and disposed of off Government property by the Contractor at the end of each day’s work. Such materials shall be disposed of in accordance with applicable federal, state or local laws, ordinance or regulations. Spoils from

TANNER HILL, PHASE 2 - ULDF 16-0303AE2

SUMMARY OF WORK 011100 - 2

SENSITIVE BUT UNCLASSIFIED (SBU)

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed excavation for marker bases may be spread evenly around the work area, but at no time will piles of soil be allowed in the work area. Special considerations must be made for any light bulbs and ballasts removed during the project. RIOCV will provide boxes and protective material (i.e. bubble wrap), for the Contractor to place the old light bulbs in. The contractor shall not dispose of these light bulbs; RIOCV must dispose of them in accordance with "Universal Waste" regulations.

a. In addition, the Contractor shall not dispose of any light ballasts removed during this project. The Contractor should stage the ballasts for processing and disposal by RIOCV.

b. RIOCV must be notified/consulted if the Contractor encounters or generates any hazardous or potentially hazardous waste (i.e. broken light bulbs, mercury containing thermostats).

The Contractor shall never assume that generated wastes are hazardous. The Contractor shall not dispose of any hazardous wastes, or sign hazardous waste manifests, on behalf of the government

C. Lead: The Contractor is responsible for ensuring surfaces coated with lead paint are properly remediated and disposed of in accordance with Environmental Protection Agency (EPA) protocols.

C. Fire Protection: The Contractor shall be responsible for furnishing adequate and proper fire protection for all phases of the contract work.

D. Reference Standards and Publications: The standards and publications listed in each section of these specifications form part of these specifications to the extent referenced. The Contractor shall conform to the provision of the dated issue of the listed standard or publication.

E. Clean-up: The Contractor shall keep the construction area, including storage areas used by him, free from accumulation of waste materials or rubbish at all times. Prior to completion of the work each day, remove from the construction site all waste materials or rubbish. Upon completion of the construction, the contractor shall leave the work premises in a clean, neat condition.

F. Pollution Control/Hazardous Substances: The contractor shall take every reasonable precaution to prevent the spillage of oil or other hazardous substances and report any spill of oil or hazardous material to RIOCV immediately. The Contractor will perform all work consistent with the requirements of all Federal, State and Local laws, rules and regulations pertaining to pollution control. Additionally, Contractors using HAZMAT on this installation must comply with the procedures outlined in the RRS Hazardous Materials Management Plan (HMMP), section 2.4.4 (see the following excerpt). Any clarification of these procedures can be provided by RIOCV.

{Excerpt from Rome Research Site Hazardous Materials Management Plan Section 2.4.4}

Pertaining to Contractor Usage

For the purposes of this contract, the “HMMP Team” and the “HAZMART” are the EOH Office.

2.4.4 HAZMAT Determination and Authorization Procedures for Contractors

2.4.4.1 Contractors using HAZMAT on Air Force installations must comply with the authorization procedures below.

2.4.4.1.1 If a contract is expected to require a contractor to bring or to use HAZMAT on an installation, the Contracting Office shall include both Federal Acquisition Regulation (FAR) Clause 52.223-3, Hazardous Material Identification and Material Safety Data, current edition, AFFARS Clause 5352.223-9003, and installation-specific contract requirements.

TANNER HILL, PHASE 2 - ULDF 16-0303AE2

SUMMARY OF WORK 011100 - 3

SENSITIVE BUT UNCLASSIFIED (SBU)

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed

2.4.4.1.2 HMMP team representatives will provide the contracting office with installation-specific contract requirements (for inclusion in the contract) regarding how contractors must request AF Form 3952 authorization and report the required HAZMAT usage data to the HAZMART.

2.4.4.1.3 IAW FAR Clause 52.223-3, each offeror must provide the Contracting Office with a list of proposed HAZMAT that it plans to use on the installation during the performance of the contract.

Contractors must obtain Air Force authorization prior to using HAZMAT on an Air Force installation, and must report usage data to the HAZMART.

2.4.4.1.4 Contractors must submit to the Contracting Office the information and supporting documentation (including MSDS) necessary to obtain HAZMAT usage authorization. The Contracting Office will transmit the contractor submittal to the HAZMART for processing. No Class I ODS’s can be used.

2.4.4.1.5 For each contractor-identified HAZMAT that the HMMP team determines does not meet the Air Force definition of a HAZMAT, the RRS HMP requirements do not apply. The HMMP team will notify the Contracting Office that the contractor has authorization to bring and use that material on the installation without reporting usage.

2.4.4.1.6 For each contractor-identified HAZMAT that the HMMP team determines does meet the Air Force definition of a HAZMAT, the Air Force will require CE authorization and SE review of the AF Form 3952 information. The CE authorization is for environmental, fire protection concerns, and emergency response purposes. The SE review is “for information purposes only” (see AF Form 3952), and does not involve evaluation and approval of the contractor’s safety and health programs. The purpose of the SE review is to identify potential risks to government personnel and resources and advise CE and the Contracting Office on how to mitigate identified hazards from planned contractor HAZMAT usage.

2.4.4.1.7 The HAZMART ensures entry of the contractor supplied information into HMMS. This action includes the addition of the contractor to the AUL.

2.4.4.1.8 Report data on the HAZMAT used during the performance of the contract at intervals and in the format specified by the HMMP team. For the purposes of this contract, total gallons of each HAZMAT used must be reported.

2.4.4.1.9 If the contractor needs to bring a material on the installation that was not included in the original HAZMAT listing, the contractor must first notify the Contracting Office and then obtain prior authorization, if the HMMP team determines the material to be a HAZMAT.

END OF SECTION 011100

TANNER HILL, PHASE 2 - ULDF 16-0303AE2

SUMMARY OF WORK 011100 - 4

SENSITIVE BUT UNCLASSIFIED (SBU)

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

TANNER HILL, PHASE 2 - ULDF 16-0303AE2

SUMMARY OF WORK - SUPPLEMENTAL 011100.1 - 1

SENSITIVE BUT UNCLASSIFIED (SBU)

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed

SECTION 011100.1 – SUMMARY OF WORK SUPPLEMENTAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including all other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section Includes:

1. Project information.

2. Work covered by Contract Documents.

3. Phased construction.

4. Work by Owner.

5. Work under separate contracts.

6. Future work.

7. Purchase contracts.

8. Owner-furnished products.

9. Contractor-furnished, Owner-installed products.

10. Access to site.

11. Coordination with occupants.

12. Work restrictions.

13. Specification and drawing conventions.

14. Miscellaneous provisions.

B. Related Requirements:

1. Section 010000 “General Requirements” for limitations and procedures, including but not limited to, governing temporary use of Owner's facilities.

1.3 PROJECT INFORMATION

A. Project Identification: AFRL - ROME NY NEWPORT RESEARCH ANTENNA MEASUREMENT

FACILITY, TANNER HILL, PHASE 2 - ULDF 16-0303AE2

B. Project Location: Tanner Hill Research Site, Newport, NY.

C. Owner: Rome AF Research Lab.

1. Owner's Representative: TBD.

D. Architect: N.K Bhandari, Architecture & Engineering, P.C.

1.4 WORK COVERED BY CONTRACT DOCUMENTS

A. The Work of Project is defined by the Contract Documents and consists, but not necessarily be limited to, the following:

1. Demolition of existing building B1600 to the extent as indicated on the Contract Drawing.

2. Building requires abatement activities prior to demolition.

TANNER HILL, PHASE 2 - ULDF 16-0303AE2

SUMMARY OF WORK - SUPPLEMENTAL 011100.1 - 2

SENSITIVE BUT UNCLASSIFIED (SBU)

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed

3. Existing site restoration following building demolition.

4. Site development for the construction of new work, including road ways, storm drainage, well water and septic systems.

5. Construction of new antenna research facility, including main building and stand-alone silo tower foundation structure only.

B. Type of Contract:

1. Project will be constructed under a single prime contract.

1.5 PHASED CONSTRUCTION

A. Unless noted otherwise, the Work shall be conducted in one phase.

B. Bid Options exist and some phasing of the Work may be impacted based on the final selections made by the Owner.

1. Bid Option #1: The anticipated scheduled construction for Bid Option #1 work for Existing Building Demolition will only take place following the completion of the new building construction and occupancy.

2. Bid Option #2: The anticipated scheduled construction for Bid Option #2 work for Silo Tower Foundation only may occur concurrently with the new building construction.

3. Not In Contract (NIC) Work: The Stand Alone Silo Tower steel superstructure is work that will be procured by the Owner separately. This work will need to be coordinated with the contractor for Bid Option #2 work activities. (see Work By Owner Section 1.6)

C. Before commencing the Work, submit an updated copy of Contractor's construction schedule showing the sequence, commencement and completion dates - including all Bid Option work and N.I.C. work – as well as move-out and -in dates of Owner's personnel for the Work.

1.6 WORK BY OWNER

A. General: Cooperate fully with Owner so work may be carried out smoothly, without interfering with or delaying work under this Contract or work by Owner. Coordinate the Work of this Contract with work performed by Owner.

B. Subsequent Work: Owner will perform the following additional work at site after Substantial Completion of Bid Option #2. Completion of that work will depend on successful completion of preparatory work under this Contract.

1. Stand Alone Silo Tower steel superstructure.

1.7 OWNER-FURNISHED PRODUCTS

A. Owner will furnish products indicated. The Work includes receiving, unloading, handling, storing, protecting, and installing Owner-furnished products and making building services connections.

B. Owner-Furnished Products: Furniture and miscellaneous Electrical equipment, soap and paper towel dispensers in toilet rooms.

TANNER HILL, PHASE 2 - ULDF 16-0303AE2

SUMMARY OF WORK - SUPPLEMENTAL 011100.1 - 3

SENSITIVE BUT UNCLASSIFIED (SBU)

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed

1.8 ACCESS TO SITE

A. General: Contractor shall have full use of Project site for construction operations during construction period. Contractor's use of Project site is limited only by Owner's right to perform work or to retain other contractors on portions of Project.

B. General: Contractor shall have limited use of Project site for construction operations as indicated on Drawings by the Contract limits, as prescribed by the Owner, and as indicated by requirements of this Section.

C. Use of Site: Limit use of Project site to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.

1. Limits: Confine construction operations to areas where work is permitted.

2. Driveways, Walkways and Entrances: Keep driveways and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times.

Do not use these areas for parking or storage of materials.

a. Schedule deliveries to minimize use of driveways and entrances by construction operations.

b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

D. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weathertight condition throughout construction period. Repair damage caused by construction operations.

1.9 COORDINATION WITH OCCUPANTS

A. Full Owner Occupancy: Owner will occupy site and adjacent building (TBD) during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's day-to-day operations. Maintain all existing exits unless otherwise indicated.

1. Maintain access to existing roadways, walkways, and other adjacent occupied or used facilities. Do not close or obstruct roadways, walkways, or other occupied or used facilities without written permission from Owner and approval of authorities having jurisdiction.

2. Notify Owner not less than fourteen (14) days in advance of activities that will affect Owner's operations.

1.10 WORK RESTRICTIONS

A. Work Restrictions, General: Comply with restrictions on construction operations.

1. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction.

B. On-Site Work Hours: Limit work in the existing building to normal business working hours of 7:00 a.m. to 4:00 p.m. (0700-1600), Monday through Friday, unless otherwise indicated.

1. If the Contractor desires to work during periods other than above, additional government

TANNER HILL, PHASE 2 - ULDF 16-0303AE2

SUMMARY OF WORK - SUPPLEMENTAL 011100.1 - 4

SENSITIVE BUT UNCLASSIFIED (SBU)

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed inspection forces may be required:

2. The Contractor must make his/her request to the Contracting Officer three (3) days in advance of his/her intention to work during other periods to allow assignment of additional inspection forces.

3. If such force is reasonably available, the Contracting Officer may authorize the Contractor to perform work during periods other than normal duty hours/days.

4. However, if inspectors are required to perform in excess of their normal duty hours/days solely for the benefit of the Contractor, the actual cost of inspection at overtime rates will be charged to the Contractor. These adjustments to the Contract Price may be made periodically as directed by the Contracting Officer.

C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied by Owner or others unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:

1. Notify Owner not less than fourteen (14) days in advance of proposed utility interruptions.

2. Obtain Owner's written permission before proceeding with utility interruptions.

D. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and vibration, odors, or other disruption to Owner occupancy with Owner.

1. Notify Owner not less than fourteen (14) days in advance of proposed disruptive operations.

2. Obtain Owner's written permission before proceeding with disruptive operations.

E. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet of entrances, operable windows, or outdoor-air intakes.

F. Controlled Substances: Use of tobacco products and other controlled substances on Project site is not permitted.

G. Employee Identification: Owner will provide identification tags for Contractor personnel working on Project site. Require personnel to use identification tags at all times.

H. Employee Screening: Comply with Owner's requirements for drug and background screening of Contractor personnel working on Project site. Maintain list of approved screened personnel with Owner's representative.

1.11 SPECIFICATION AND DRAWING CONVENTIONS

A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.

These conventions are as follows:

1. Imperative mood and streamlined language are generally used in the Specifications. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

2. Specification requirements are to be performed by Contractor unless specifically stated otherwise.

B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.

TANNER HILL, PHASE 2 - ULDF 16-0303AE2

SUMMARY OF WORK - SUPPLEMENTAL 011100.1 - 5

SENSITIVE BUT UNCLASSIFIED (SBU)

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed

C. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products:

1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections. However, specific Basis of Design (B.O.D.) items are listed on the drawings to provide contractors with proper direction and guidance for selection of products and systems as requested by the Owner to meet the desired intent.

2. Abbreviations: Materials and products are identified by abbreviations published as part of the U.S. National CAD Standard, as listed in the Specifications and as scheduled on Drawings.

3. Keynoting: Materials and products may be identified by reference keynotes referencing Specification Section numbers found in this Project Manual.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 011100.1

TANNER HILL, PHASE 2 - ULDF 16-0303AE2

SUMMARY OF WORK - SUPPLEMENTAL 011100.1 - 6

SENSITIVE BUT UNCLASSIFIED (SBU)

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

TANNER HILL, PHASE 2 - ULDF 16-0303AE2

ABBREVIATIONS AND SYMBOLS 011101 - 1

SENSITIVE BUT UNCLASSIFIED (SBU)

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed

SECTION 011101 – ABBREVIATIONS AND SYMBOLS

MEASURE DESCRIPTION

1.0 DISTANCE

MM Millimeter IN Inch CM Centimeter FT Foot M Meter LF Linear Foot VLF Vertical Linear Feet YD Yard CLF 100 Linear Feet MLF 1000 Linear Feet MI Mile (Statute)

2.0 AREA

CM2 Square Centimeter SI Square Inch M2 Square Meter SF Square Foot HEC Hectare SY Square Yard KM2 Square Kilometer CSF 100 Square Feet CSY 100 Square Yards ACR Acre MI2 Square Mile

3.0 VOLUME

CC Cubic Centimeter CI Cubic Inch M3 Cubic Meters CF Cubic Feet CY Cubic Yard BF Board Feet MBF 1000 Board Feet

4.0 FLOW

CCS Cubic Centimeter/Sec CFM Cubic Ft/Minute CMM Cubic Meter/Minute MCF 1000 Cubic Ft/Minute

TANNER HILL, PHASE 2 - ULDF 16-0303AE2

ABBREVIATIONS AND SYMBOLS 011101 - 2

SENSITIVE BUT UNCLASSIFIED (SBU)

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed

5.0 LIQUID

MEASURE DESCRIPTION

LIT Liter GAL Gallon (US)

6.0 WEIGHT

G Gram

OZ Ounce KG Kilogram LB Pound MT Metric Ton TON Ton (Short)

7.0 MISCELLANEOUS

BBL Barrel EA Each FLR Floor LAN Lane LS Lump Sum OPN Opening PCT Percent PR Pair RSR Riser SEA Seat SET Set SQ Square (Roofing) LD Load

END OF SECTION 011101

TANNER HILL, PHASE 2 - ULDF 16-0303AE2

SAFETY, FIRE PROTECTION AND HEALTH 013529 - 1

SENSITIVE BUT UNCLASSIFIED (SBU)

PROPERTY OF THE UNITED STATES GOVERNMENT FOR OFFICIAL USE ONLY

Do not remove this notice properly destroy or return documents when no longer needed

SECTION 013529 – SAFETY, FIRE PROTECTION AND HEALTH SPECIFICATION

PART 1 - GENERAL

1.1 SAFETY REQUIREMENTS

A. The contractor shall develop and implement a comprehensive written Safety and Occupational Health Program. The contractor will submit a safety plan within ten (10) calendar days after award of the contract that will implement a safety program that ensures protection of Government personnel and property. The contractor shall comply with U.S. Occupational Safety and Health Administration (OSHA) standards, program elements, explosive standards, and other safety and health requirements necessary for the protection of personnel, facilities, and equipment.

Acceptance of the contractor’s Safety and Occupational Health Plan only signifies that the plan generally conforms to the requirements of the contract. It does not relieve the contractor of the responsibility for providing employees with a safe and healthful work environment. The program will consist of, as a minimum:

1. Mishap reporting, as defined in paragraph B below.

2. A Safety Plan that addresses, as a minimum, the subjects listed in Section II -Safety Plan

Elements, and will be used during the performance of the work described in the contract.

The Safety Plan will be approved by the procuring safety office prior to commencement of any work described in this contract.

3. Routine and recurring surveillance of the procedures listed in the Safety Plan.

4. Competent personnel to provide surveillance of the Safety Plan.

5. Identification of segregated work site locations for operations that cannot be co-mingled with general industrial operations and the process for Contracting Officer approval of operations and changes at these specific sites.

6. Process for ensuring subcontractors comply with the safety provisions of this contract, as applicable.

1.2 MISHAP NOTIFICATION

A. The Contractor shall notify the contracting Safety Office and the CO within one (1) hour of all mishaps or incidents at or exceeding $2,000 (material + labor) in damage to DOD property entrusted by this contract. This notification requirement shall also include physiological mishaps/incidents. A written or email copy of this mishap/incident notification shall be sent within three calendar days to the CO, who will forward it to the Safety Office. For information not available at the time of initial notification, the Contractor shall provide the remaining information no later than 20 calendar days after the mishap, unless extended by the Contracting Officer.

Mishap notifications shall contain, as a minimum, the following information:

(a) Contract, Contract Number, Name and Title of Person(s) Reporting

(b) Date, Time and exact location of accident/incident

(c) Brief Narrative of accident/incident (events leading to accident/incident)

(d) Cause of accident/incident, if known

(e) Estimated cost of accident/incident (material and labor…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.