16b4_Fire_Alarm_Questions_and_Answers.docx

DOCX document 12 KB Posted

Attached to
Phase 2 Repair Fire Alarm System Federal contract opportunity
Solicitation number
FA8751-16-R-0029
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

Q A

View the file

Other files for this federal contract opportunity

Other files attached to Phase 2 Repair Fire Alarm System, newest first.
File Type Posted
B101_Elevations.pdf PDF
16B0004_-_Attachment_4_Site_Visit_Form.pdf PDF
16B0004_-_Attachment_3_Wage_Determination.pdf PDF
FA8751-16-B-0004.pdf PDF
16B0004_-_Attachment_2_Drawings.pdf PDF
16B0004_-_Attachment_1_Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fire Alarm Phase II Request for Proposal Questions & Answers

FA8751-16-B-0004

Q1. Reference: Attachment 2, Sheet No. 5, BLDG 101. What is the approximate height from floor to the bottom of the steel at dock 4 area?

A1. Please see attached Elevation Drawing.

Q2. Reference: Attachment 2, Sheet No. 5, BLDG 101. Note above Line R states “Pendant Mount From Structure (Typical For Devices Located in Dock #4) Is there a length for these, as roof height varies in this area?

A2. The Fire Alarm/Mass Notification Speakers shall be located approximately 40’ A.F.F. with exact height determined upon installation with coordination of the Contracting Officer’s technical representative. Pendant lengths shall be as appropriate to install speakers at this height.

Q3. Reference: Attachment 2, Sheet No. 8. Riser calls for cat 6 from 1480 to 1477, however, 1480 is not on the location plan, is this an error?

A3. The location plan that depicts the buildings at Stockbridge is incorrect. The building labeled as BLDG. 1600 should read BLDG. 1480. There are existing fiber optic cables between the two buildings at Stockbridge (1477 & 1480) that can be utilized for Fire Alarm communication and no new conductors need to be run between the buildings.

Q4. Reference: Attachment 2, Sheet No. 9. Sheet is labeled Newport site, but location plan shows BLDG. 1600 at Stockbridge site. Is this an error?

A4. The location plan for Stockbridge is incorrect. BLDG. 1600 is on Tanner Hill in Newport.

File details come from the government source that posted it. Updated .