15-0302_Project_Manual.pdf

PDF 6 MB Posted

Attached to
Alter Suites H4-D and H4-C Federal contract opportunity
Solicitation number
FA8751-15-R-0026
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

Project Manual

View the file

Other files for this federal contract opportunity

Other files attached to Alter Suites H4-D and H4-C, newest first.
File Type Posted
15-0302_Final_Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Beardsley #14139 64 South Street

Auburn, New York 13021 Telephone: (315) 253-7301

Fax: (315) 253-7306 Email: bda@beardsley.com

PROJECT MANUAL

for

AIR FORCE RESEARCH LABORATORY

ROME, NEW YORK

ALTER SUITES H4-D & H4-C

ULDF #150302

April 29, 2015

Air Force Research Laboratory ULDF #150302 Alter Suites H4-D & H4-C

TABLE OF CONTENTS - 1

TABLE OF CONTENTS

DIVISION 01 – GENERAL REQUIREMENTS

01 00 15 LIST OF DRAWINGS

01 01 00 PROJECT PROVISIONS

01 10 00 SUMMARY

DIVISION 02 – EXISTING CONDITIONS

02 41 19 SELECTIVE STRUCTURE DEMOLITION

02 82 13 ASBESTOS ABATEMENT

02 83 04 HANDLING OF LEAD CONTAINING MATERIALS

DIVISION 08 – OPENINGS

08 14 16 FLUSH WOOD DOORS

08 71 00 DOOR HARDWARE

DIVISION 09 – FINISHES

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 69 00 ACCESS FLOORING

09 84 00 ACOUSTICAL ROOM COMPONENTS

DIVISION 26 – ELECTRICAL

26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

26 05 33 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS

26 27 26 WIRING DEVICES

26 51 00 INTERIOR LIGHTING

DIVISION 27 – COMMUNICATIONS

27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

ATTACHMENT:

APPENDIX A – LIMITED HAZARDOUS MATERIALS SURVEY REPORT

END OF TABLE OF CONTENTS

LIST OF DRAWING SHEETS 00 01 15 - 1

SECTION 01 00 15

LIST OF DRAWING SHEETS

CS-101 – Cover Sheet

A-101 – Floor Plan

A-102 – Furniture Plan & Details

F-001 – Symbols, Specifications and Demolition Plan

F-101 – First Floor Alteration Plan

M-101 – Mechanical Demolition Plans

M-102 – Mechanical Alteration Plans

E-001 – Symbols and Abbreviations

E-101 – Electrical Demolition Plan

E-102 – Power Alteration Plan

E-103 – Suite H4 Lighting Demolition Plan

E-104 – Suite H4 Lighting Alteration Plan

E-601 – Lighting Wiring Diagram

END OF SECTION

PROJECT PROVISIONS 01 01 00 - 1

SECTION 01 01 00

PROJECT PROVISIONS

1.1 SCOPE

A. The work covered under this Contract consists of furnishing all labor, equipment, devices, and materials and performing all work required to perform removal of existing shielded chamber and refurbish existing Suite in Building 3 at the Rome Research Site in accordance with these technical specifications and applicable drawings.

1.2 SUBMITTALS

A. The Contractor shall provide to the Government’s Representative at the end of the project a chemical inventory including products, quantities used, and material safety data sheets

(MSDS).

1.3 REFERENCED CODES AND STANDARDS

A. Codes and Standards referred to in this specification shall be the latest adopted issue at the Date of Bid, unless otherwise specifically indicated.

B. References herein to the “Rome Research Site” (RSS) refers to both locations as applicable.

1.4 LOCATION

A. The work area is designated as :

1) Building 3 on the Contract Drawings at the Air Force Research Laboratory, Research Site, within the City of Rome, New York.

1.5 PRINCIPAL FEATURES

A. The work to be performed includes the following principal features:

1. Removal of existing shielded chamber and refurbish existing Suite at Rome Research Site.

B. The above description of work is for the purpose of general information only and is not intended to include and describe every feature of work or to define the scope of the work.

1.6 UTILITIES

A. All reasonable quantities of electricity and water will be made available to the Contractor without cost to the Contractor. The Contractor will be responsible for all connections of utilities from the existing supply points. The Government will identify service tie-in points. The Government will not be held responsible for interruptions of utility service and will not be liable for Contractor delays, damages, or increased costs occasioned by any such interruption of service.

PROJECT PROVISIONS 01 01 00 - 2

1.7 SANITARY FACILITIES

A. There are no existing sanitary facilities available.

1.8 FIRE PROTECTION

A. The Contractor shall perform all work in a fire-safe manner in accordance with fire prevention standards of the Rome Research Site. The Contractor shall have an approved fire extinguisher at the site at all times during working operations. HALON AND C02 TYPE FIRE EXTINGUISHERS ARE NOT AUTHORIZED FOR USE. The Contractor will call the City of Rome Fire Department, 315-339-7784, before working with any flame or spark producing equipment such as tar buckets, grinders, or welders. The Contractor shall contact RIOC Contract Representative for approval of the contractor’s safety measures and to obtain a "Burn Permit" for this type of work.

1.9 POLLUTION CONTROL

A. The Contractor will perform all work consistent with the requirements of all Federal, State and Local laws, rules and regulations pertaining to pollution control.

1.10 WORK CONDITIONS

A. The Contractor is required to protect persons and property throughout the progress of the work. The work area will be kept clean of all debris at all times. All flammables and combustibles stored on-site must be kept in a designated storage area and an approved locker for flammables, both of which are approved by the Contracting Officer or his designated representative.

1.11 HAZARDOUS MATERIALS (HAZMAT) MANAGEMENT

A. In accordance with IAW Far Clause 52.223-3, each offeror must provide the Contracting Officer with a list of proposed HAZMAT that it plans to use on Rome Research Site during the performance of the Contract. In accordance with IAW AFFARS Clause 5352.223-9003, contractors must obtain Air Force authorization prior to using HAZMAT on an Air Force installation, and must report usage data to RIOCV.

B. Contractors must submit to the Contracting Officer a chemical inventory and MSDS’s necessary to obtain HAZMAT usage authorization. The Contracting Officer will transmit the Contractor submittal to RIOCV for processing.

C. For each Contractor-identified HAZMAT that RIOCV determines does not meet the Air Force definition of a HAZMAT, the requirements below do not apply. The HMMP team will notify the Contracting Officer that the Contractor has the authorization to bring and use that material on the installation without reporting usage.

D. For each Contractor-identified HAZMAT that meets the Air Force definition of a HAZMAT, RIOCV will require the Contractor to submit for authorization an AF Form 3952.

E. RIOCV ensures entry of the contractor supplied information into the standardized Air Force HAZMAT tracking system.

F. Contractor will report usage data on the HAZMAT used every 60 days. If the duration of the contract is less than 60 days, Contractor can report usage at the end of the contract.

PROJECT PROVISIONS 01 01 00 - 3

G. If the Contractor needs to bring a material on the installation that was not included in the original HAZMAT listing, the Contractor must first notify the Contracting Officer and then obtain prior authorization if RIOCV team determines the material to be a HAZMAT.

1.12 WORKMANSHIP

A. All work to be performed under this Contract shall be under the supervision of workmen skilled in the trades involved. Special qualifications for certain work are listed in the appropriate sections of this specification.

1.13 SUBMITTAL PROCEDURES

A. All items indicated in the Schedule of Material Submittals shall be submitted for approval:

1. Any other items required, per specifications, that cannot be visually verified shall be submitted for approval when requested by the Contracting Officer or the designated representative.

2. Submittals that may be required by this Contract, if submitted in printed matter, shall be made in four copies. One copy of the printed submittals will be returned to the Contractor.

3. The Contractor must submit for approval those items that deviate from the specifications.

Submission will be on an AF Form 3000.

B. At the pre-construction conference, the Contractor, Contracting Officer’s Technical

Representative, and the Contract Administrator will review the submittal requirements. The Contractor must be prepared to discuss the delivery dates for those submittals that are required, or for the items the Contractor plans to submit for approval. Once approved, the submission deadlines shall be incorporated into the Schedule of Materials submittals.

C. The Contractor is reminded that any item(s) installed prior to the Contracting Officer's approval is completed is at risk of not being accepted. If any item does not meet the Contract requirements as determined by the Contracting Officer, the Contractor will be required to remove these items at his/her own expense.

D. Equipment submittals, unless otherwise specified, shall conform with the following:

1. Submittals shall be complete with the manufacturer's product description literature.

SUBMITTALS WITH INSUFFICIENT LITERATURE WILL BE DISAPPROVED.

2. Submittals shall include a complete listing of all associated parameters contained in the Technical Specifications and Drawings (materials, finishes, capacities, temperatures, pressures, electrical characteristics, etc.). THE CONTRACTING OFFICER OR HIS/HER

TECHNICAL REPRESENTATIVE WILL NOT TRANSFER INFORMATION FROM THE TECHNICAL

SPECIFICATIONS AND DRAWINGS TO THE SUBMITTALS. INCOMPLETE SUBMITTALS WILL

BE DISAPPROVED.

3. Submittals shall be clearly marked to differentiate between the applicable and extraneous portions. THE CONTRACTING OFFICER OR HIS/HER TECHNICAL REPRESENTATIVE WILL

NOT MARK THE SUBMITTALS. UNMARKED SUBMITTALS WILL BE DISAPPROVED.

PROJECT PROVISIONS 01 01 00 - 4

1.14 INTERRUPTION OF UTILITIES

A. No utility services shall be interrupted to make connections, to relocate, or for any purpose, without approval of the Contracting Officer.

B. Services shall not be interrupted until receipt of approval of the proposed hours and date from the Contracting Officer.

1.15 FIELD MEASUREMENTS

A. The Contractor shall verify all measurements and be responsible for dimensions, fitting and proper trimming of items directly connected with all work described in this Contract.

B. The Contractor shall immediately notify the Contracting Officer of any discrepancy prior to starting the work.

1.16 SECURITY REQUIREMENTS

A. The work to be done on this project is located in and around area’s that are under the scrutiny of the Department of Defense Police assigned to the RRS Information Directorate. To gain access to the area(s) to examine the work to be done for job estimation purposes; arrangements must be made through the Contracting Office. Contractor personnel will be escorted into the area(s) for the purpose of project estimation.

B. When it has been determined which Contractor will accomplish the project a Visit Request from the company, preferably on Company letterhead, will be necessary prior to initial work commencement. The Visit Request letter needs to be signed by the Company President or Director of Human Resources. The Visit Request will also be used as the Entry Authority List. The Contractor will supply the Visit Request to Security (AFRL/RIOF) through the Contracting Office.

The Visit Request can be done via RRS Visit Request Form, AFMC Form 97 (found on the AFRL web page, https://rlweb.rl.af.mil/security/) or a simple Company Letterhead letter identifying all personnel who will be employed during the work. The request will contain a full name to include a middle initial (Frank A. Dude), date of birth (14 Dec 1953), state of driver’s license issuance and place of birth (Austin, Texas). This information will be used to do a Local Files Check. This check will provide Drivers License Info, Wants & Warrants and Protection Orders and will also provide information on Illegal Immigration and suspected terrorist affiliations. The Local Files Check will also be accomplished prior to work commencing. If the individual is not a US Citizen they will not be allowed within the complex or facilities. If, the individual is not a US Citizen but has a Green Card, Form I-551 or has the I-551 stamp on their passport, Security will need to see either one.

There will be no foreign national workers allowed on the Rome Research Site.

C. Provide the Company’s phone number and a Project Leaders or Supervisor/Foremen cell-phone number is necessary for the Law Enforcement Desk Sergeant.

PROJECT PROVISIONS 01 01 00 - 5

D. All facilities are entered using a magnetic media entry badge. Any personnel such as Supervisor/Foremen or Project Leaders who may need building access for meetings etc, during contract period, can acquire a Local Contractor Entry Badge through the Division/Branch with oversight of the work. This will be accomplished with the RRS Form 110 (Unescorted Visitor Badge). The Security Visitation Office is located in the lobby of Bldg 3, West Wing. This badge will be worn at all times within the facility. These badges will be returned to the Contracting Officer’s Technical Representative upon completion of the final inspection and Acceptance of Work. Any badges lost during the period of work will be reported to Security as soon as possible.

E. Access to the RRS Complex is controlled by a Main Gate on Brooks Rd, located just west of the

Otis & Brooks intersection. Identification for the contractor to enter with a vehicle will be an access list supported by the electronic badge issued. All commercial vehicles entering the gate will be searched. One-time deliveries can be escorted from the gate to delivery point by project personnel.

F. All commercial vehicles are searched prior to entry into the RRS Complex. Vehicle operators will be aware of the vehicle search pull-off area prior to approaching the Main Gate. A search of the vehicle will be conducted prior to its entry. All vehicles not needed for delivery of equipment or tools will be parked in the visitor parking area unless cleared through Security. There are No vehicles allowed within 25 meters (80 ft) of the RRS facilities.

G. All personnel should be aware that the Rome Research Site are Property of the United States Air

Force. All personnel will follow all posted signage.

H. Contractor personnel will be notified by RRS Police of any emergencies which would require an evacuation or work stoppage, such as an increase in the Force Protection Condition.

I. Building/Room Keys: If the contractor needs access to area(s) that are locked (i.e. mechanical rooms, janitor’s closet, etc.), a request for entry of at least 2 working days prior to the need for access will be submitted to AFRL/RIOC construction representative. The area(s) will be provided on a daily basis. The area(s) will be locked down at the end of the days work.

J. The 24 hour Desk Sgt. can be reached at (315) 330-2961.

1.17 DELIVERY AND STORAGE

A. Materials shall be delivered to the work area in undamaged condition, stored in fully covered, well-ventilated areas, and protected from extreme changes in humidity and temperature.

B. The Contractor is responsible for securing materials in the storage area to protect from pilferage and vandalism.

PROJECT PROVISIONS 01 01 00 - 6

1.18 SAFETY

A. The Contractor shall:

1. Comply with all safety and health requirements necessary for the protection of personnel, facilities and equipment including, but not limited to all applicable Occupational Safety and Health Administration (OSHA) standards, while performing this contract at the Air Force Research Laboratory (AFRL), Rome Research Site (RRS).

2. Maintain a written Safety Program, as required by OSHA and make said plan available for review by the government upon request by the contracting officer.

3. In the event of a mishap during the performance of this contract on AFRL RRS premise, notify the contracting officer in an expeditious manner. Notification shall include the following information:

a. Contract, Contract number, Name and Title of Person(s) Reporting

b. Date, Time and exact location of accident/incident

c. Brief Narrative of accident/incident (events leading to accident/incident)

d. Cause of accident/incident (if known)

e. Estimated cost of accident/incident (material and labor to replace/repair)

f. Nomenclature of equipment and personnel involved in accident/incident

g. Corrective Actions (taken or proposed)

h. Other pertinent information

1.19 PROPRIETARY EQUIPMENT

A. Reference to any equipment, material, article or patented process by trade name, mark or catalog number shall be regarded as establishing a standard of quality and shall not be construed as limiting competition. The Contractor may use any equipment, material article or process that is equal to that named as approved by the Contracting Officer.

1.20 PROTECTION

A. Protection of existing work:

1. The Contractor shall take all necessary precautions to insure against damage to the existing work to remain in place, to be reused, or to remain the property of the Government; i.e.

light fixtures, trees, sidewalks, etc.

B. Dust control:

1. The amount of dust resulting from demolition shall be controlled to avoid creation of a nuisance in the surrounding areas.

PROJECT PROVISIONS 01 01 00 - 7

C. Protection of personnel:

1. Where the safety of non-Contractor personnel is endangered in the area of removal work and new construction, barricades shall be used.

1.21 REMOVED MATERIALS AND EQUIPMENT

A. General:

1. All materials and equipment indicated to be removed as part of the work become the property of the Contractor for removal from the job site, unless otherwise shown on the drawings or specified.

B. Items re-used as part of the work:

1. Items indicated to be re-used on the “List of Salvageable Materials”, will be stored by the

Contractor until such time as they may be reinstalled.

1.22 DISPOSAL OF REMOVED MATERIALS

A. General:

1. Materials removed from the project which are designated as unusable by the Government shall be disposed of by the Contractor off the Griffiss Business and Technology Park and Stockbridge Site in accordance with applicable regulations.

2. All debris to be removed from the work site shall be transported in canvas covered trucks with the canvas tied down to prevent loss of materials while in route to the disposal areas.

3. The Contractor shall police the truck routes continuously and all debris, which has dropped, shall be picked up immediately.

B. Materials for Contractor salvage:

1. This material shall be removed from Government property before completion of the Contract.

2. Materials for salvage shall not be sold on the site.

1.23 CUTTING AND PATCHING

A. Patch existing construction damaged due to removals. Patching, unless otherwise indicated, will be limited to areas where removals occurred and will match existing in material, color and finish.

B. Cap or otherwise terminate existing utility services to removed equipment on all utilities that are to remain active.

PROJECT PROVISIONS 01 01 00 - 8

C. Protection: Protect in-place construction during cutting and patching to prevent damage.

Provide protection from adverse weather conditions during cutting and patching operations.

D. Cutting: Cut in place construction by sawing, drilling, breaking, chipping, grinding, and similar operations; including excavation, using methods least likely to damage elements retained.

E. Patching: Patch construction by filling, repairing, refinishing, closing up, and similar operations following performance of other work. Patch with durable seams that are as invisible as practicable. Provide materials and comply with installation requirements specified in other sections, where applicable.

1.24 SPECIAL CONDITIONS

A. Should any materials be encountered during construction which are suspected to contain hazardous materials and are not indicated as such on the drawings or Pre-Demolition Hazardous Materials Survey, immediately stop work in that area and report the encountered condition to the Contracting Officer’s Technical Representative.

B. The contractor will notify the Contracting Officer’s Technical Representative at least 10 working days prior to the completion of the demolition. This will allow for the work specified by others to be accomplished. The contractor will delay his work schedule as necessary for removal of all hazardous materials. The contractor may resume his work schedule after each of these tasks is completed.

1.25 SEQUENCING AND SCHEDULING

A. Provisions must be made to leave each entrance secured at the end of work each day.

B. Traffic control:

1. Routes of ingress and egress on the grounds and within existing buildings to the location of the work shall be over routes as directed by the Government.

2. Areas for parking vehicles belonging to the Contractor and his employees will be designated by the Contracting Officer’s Technical Representative. Maintain the parking areas free of debris and obstructions.

C. Existing Suite H4D Occupancy :

1. Existing Suite will remain occupied by Government during construction.

2. Coordinate all work with Contracting Officer’s Representative so as to not interfere with occupancy.

1.26 CONSTRUCTION SCHEDULING

A. The Contractor may be paid for materials on site, however, they must appear on the Contract Progress Schedule and be inventoried by the Contracting Officer’s Technical Representative prior to payment.

PROJECT PROVISIONS 01 01 00 - 9

1.27 WORK SCHEDULE

A. Working hours for the Contractor will normally be between the hours of 0700 and 1600 hours (7:00 a.m. and 4:00 p.m.), excluding Saturdays, Sundays and Federal holidays.

B. If the Contractor desires to work during periods other than above, additional government inspection forces may be required:

1. The Contractor must make his/her request to the Contracting Officer three (3) days in advance of his/her intention to work during other periods to allow assignment of additional inspection forces.

2. If such force is reasonably available, the Contracting Officer may authorize the Contractor to perform work during periods other than normal duty hours/days.

3. However, if inspectors are required to perform in excess of their normal duty hours/days solely for the benefit of the Contractor, the actual cost of inspection at overtime rates will be charged to the Contractor. These adjustments to the Contract Price may be made periodically as directed by the Contracting Officer.

1.28 REMOVAL OF TEMPORARY FACILITIES

A. Maintain all temporary facilities and controls as long as needed for the safe and proper completion of the work.

B. Remove all such temporary facilities and controls as rapidly as progress of the work will permit or as directed by the Contracting Officer.

1.29 CLEAN-UP

A. Debris and rubbish control:

1. Remove all debris and rubbish daily from the site.

2. Remove debris and rubbish into a dumpster; then transport in a manner that will prevent spillage on streets or adjacent areas.

3. The Contractor shall make his/her own arrangements for dumping off the Griffiss Business and Technology Park.

4. Burning of waste material on Griffiss Business and Technology Park is prohibited.

B. Regulations:

1. All disposal and hauling equipment and methods used shall comply with Federal, State, OSHA, and local regulations.

PROJECT PROVISIONS 01 01 00 - 10

C. If the Contractor utilizes a collector box, it must be provided with a cover.

D. The Contractor shall protect and restore lawn areas and plant materials, where required, during the course of this Contract. Lawn areas shall be protected and restored to a condition equal to that prior to the start of work of this Contract.

SUMMARY 01 10 00 - 1

SECTION 01 10 00

SUMMARY

PART 1 - GENERAL

1.1 PROJECT

A. Project Name: Alter Suites H4-D & H4-C.

B. Project Location: Air Force Research Laboratory, Rome Research Site, Rome, NY.

C. Owner's Name: Air Force Research Laboratory, Rome Research Site, Rome, NY.

D. Architect/Engineer: Beardsley Design Associates, Architecture, Engineering, Landscape Architecture, D.P.C., 64 South Street, Auburn, NY 13021

E. The Project generally consists of furnishing all labor, equipment, devices, and materials and performing all work required to perform removal of existing shielded chamber and refurbish existing Suite at Rome Site in accordance with these technical specifications and applicable drawings

1.2 CONTRACT DESCRIPTION

A. Contract Type: A single prime contract based on a Stipulated Price.

1.3 WORK BY GOVERNMENT

A. General: Cooperate fully with Air Force Research Laboratory so work may be carried out smoothly, without interfering with or delaying work under this contract or work by Government. Coordinate the work of this Contract with work performed by Government.

1.4 SPECIFICATION AND DRAWING CONVENTIONS

A. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.

These conventions are as follows:

1. Imperative mood and streamlined language are generally used in the Specifications.

The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

2. Specification requirements are to be performed by Contractor unless specifically stated otherwise.

3. The term “Provide” means furnish and install complete, in place and ready for operation and use.

4. The term “Furnish” means supply and deliver to the Project Site, ready for unloading, unpacking, assembly, installation, and similar operations.

5. The term “Install” means operations at the Project Site including the actual unloading, temporary storage, unpacking, assembly, erecting, placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning, and similar operations.

6. The term “Owner” means in Government, Rome Research Site.

7. The term “Architect” means in Government’s designated Technical Representative.

SUMMARY 01 10 00 - 2

B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work of all Sections in the Specifications.

C. Drawing Coordination: Requirements for materials and products identified on Drawings are described in detail in the Specifications. One or more of the following are used on Drawings to identify materials and products:

1. Terminology: Materials and products are identified by the typical generic terms used in the individual Specifications Sections.

2. Abbreviations: Materials and products are identified by abbreviations scheduled on Drawings or reasonably inferred.

3. Keynoting: Materials and products are identified by reference keynotes referencing Specification Section numbers found in this Project Manual.

PART 2 - PRODUCTS - NOT USED

PART 3 - EXECUTION - NOT USED

SELECTIVE STRUCTURE DEMOLITION 02 41 19 - 1

SECTION 02 41 19

SELECTIVE STRUCTURE DEMOLITION

PART 1 - GENERAL

1.1 DEFINITIONS

A. Remove: Detach items from existing construction and legally dispose of them off-site unless indicated to be removed and salvaged or removed and reinstalled.

B. Remove and Salvage: Carefully detach from existing construction, in a manner to prevent damage, and deliver to Owner.

C. Remove and Reinstall: Detach items from existing construction, prepare for reuse, and reinstall in the same location.

D. Remove and Relocate: Detach items from existing construction, prepare for reuse, and reinstall in a new location as indicated.

E. Existing to Remain: Existing items of construction that are not to be permanently removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.

F. Replace: Remove existing and provide new as indicated.

1.2 MATERIALS OWNERSHIP

A. Unless otherwise indicated, demolition waste becomes property of Contractor.

1.3 PREINSTALLATION MEETINGS

A. Predemolition Conference: Conduct conference at Project site.

1. Inspect and discuss condition of construction to be selectively demolished.

2. Review structural load limitations of existing structure.

3. Review and finalize selective demolition schedule and verify availability of materials, demolition personnel, equipment, and facilities needed to make progress and avoid delays.

4. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.

5. Review areas where existing construction is to remain and requires protection.

1.4 INFORMATIONAL SUBMITTALS

A. Qualification Data: For refrigerant recovery technician.

SELECTIVE STRUCTURE DEMOLITION 02 41 19 - 2

B. Proposed Protection Measures: Submit report, including drawings, that indicates the measures proposed for protecting individuals and property, for dust control. Indicate proposed locations and construction of barriers.

C. Schedule of Selective Demolition Activities: Indicate the following:

1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure Owner's building manager's on-site operations are uninterrupted.

2. Interruption of utility services. Indicate how long utility services will be interrupted.

3. Coordination for shutoff, capping, and continuation of utility services.

4. Use of elevator and stairs.

5. Coordination of Owner's continuing occupancy of portions of existing building and of

Owner's partial occupancy of completed Work.

D. Inventory: Submit a list of items to be removed and salvaged and deliver to Owner prior to start of demolition.

E. Predemolition Photographs or Video: Submit before Work begins.

F. Statement of Refrigerant Recovery: Signed by refrigerant recovery technician responsible for recovering refrigerant, stating that all refrigerant that was present was recovered and that recovery was performed according to EPA regulations. Include name and address of technician and date refrigerant was recovered.

G. Warranties: Documentation indicated that existing warranties are still in effect after completion of selective demolition.

1.5 CLOSEOUT SUBMITTALS

A. Inventory: Submit a list of items that have been removed and salvaged.

B. Landfill Records: Indicate receipt and acceptance of hazardous wastes by a landfill facility licensed to accept hazardous wastes.

1.6 QUALITY ASSURANCE

A. Refrigerant Recovery Technician Qualifications: Certified by an EPA-approved certification program.

1.7 FIELD CONDITIONS

A. Owner will occupy portions of building immediately adjacent to selective demolition area.

Conduct selective demolition so Owner's operations will not be disrupted.

B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.

SELECTIVE STRUCTURE DEMOLITION 02 41 19 - 3

C. Notify Architect of discrepancies between existing conditions and Drawings before proceeding with selective demolition.

D. Hazardous Materials: Hazardous materials are present in buildings and structures to be selectively demolished. A report on the presence of hazardous materials is on file for review and use. Examine report to become aware of locations where hazardous materials are present.

1. Hazardous material remediation is specified elsewhere in the Contract Documents.

2. Do not disturb hazardous materials or items suspected of containing hazardous materials except under procedures specified elsewhere in the Contract Documents.

3. Owner will provide material safety data sheets for suspected hazardous materials that are known to be present in buildings and structures to be selectively demolished because of building operations or processes performed there.

E. Storage or sale of removed items or materials on-site is not permitted.

F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.

1. Maintain fire-protection facilities in service during selective demolition operations.

1.8 WARRANTY

A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials so as not to void existing warranties. Notify warrantor before proceeding. Existing warranties include the following:

1. Roof.

B. Notify warrantor on completion of selective demolition, and obtain documentation verifying that existing system has been inspected and warranty remains in effect. Submit documentation at Project closeout.

PART 2 - PRODUCTS

2.1 PEFORMANCE REQUIREMENTS

A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ANSI/ASSE A10.6 and NFPA 241.

SELECTIVE STRUCTURE DEMOLITION 02 41 19 - 4

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that utilities have been disconnected and capped before starting selective demolition operations.

B. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.

C. When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict.

Promptly submit a written report to Architect.

D. Survey of Existing Conditions: Record existing conditions by use of preconstruction photographs.

3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS

A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.

1. Comply with requirements for existing services/systems interruptions specified in Section 011000 "Summary."

B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off indicated utility services and mechanical/electrical systems serving areas to be selectively demolished.

1. Building manager will arrange to shut off indicated services/systems when requested by Contractor.

2. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.

3. Disconnect, demolish, and remove fire-suppression systems, plumbing, and HVAC systems, equipment, and components indicated to be removed.

a. Piping to Be Removed: Remove portion of piping indicated to be removed and cap or plug remaining piping with same or compatible piping material.

b. Equipment to Be Removed: Disconnect and cap services and remove equipment.

c. Equipment to Be Removed and Reinstalled: Disconnect and cap services and remove, clean, and store equipment; when appropriate, reinstall, reconnect, and make equipment operational.

d. Equipment to Be Removed and Salvaged: Disconnect and cap services and remove equipment and deliver to Owner.

e. Ducts to Be Removed: Remove portion of ducts indicated to be removed and plug remaining ducts with same or compatible ductwork material.

SELECTIVE STRUCTURE DEMOLITION 02 41 19 - 5

C. Refrigerant: Remove refrigerant from mechanical equipment to be selectively demolished according to 40 CFR 82 and regulations of authorities having jurisdiction.

3.3 PREPARATION

A. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

B. Temporary Facilities: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

1. Provide protection to ensure safe passage of people around selective demolition area and to and from occupied portions of building.

2. Protect walls, ceilings, floors, and other existing finish work that are to remain or that are exposed during selective demolition operations.

3. Cover and protect furniture, furnishings, and equipment that have not been removed.

3.4 SELECTIVE DEMOLITION, GENERAL

A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:

1. Proceed with selective demolition systematically, from higher to lower level. Complete selective demolition operations above each floor or tier before disturbing supporting members on the next lower level.

2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.

Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping, to minimize disturbance of adjacent surfaces. Temporarily cover openings to remain.

3. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.

4. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain fire watch and portable fire-suppression devices during flame-cutting operations.

5. Maintain adequate ventilation when using cutting torches.

6. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.

7. Remove structural framing members and lower to ground by method suitable to avoid free fall and to prevent ground impact or dust generation.

8. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.

9. Dispose of demolished items and materials promptly.

SELECTIVE STRUCTURE DEMOLITION 02 41 19 - 6

B. Removed and Reinstalled Items:

1. Clean and repair items to functional condition adequate for intended reuse.

2. Pack or crate items after cleaning and repairing. Identify contents of containers.

3. Protect items from damage during transport and storage.

4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.

C. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Architect, items may be removed to a suitable, protected storage location during selective demolition and reinstalled in their original locations after selective demolition operations are complete.

3.5 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS

A. Resilient Floor Coverings: Remove floor coverings and adhesive according to recommendations in RFCI's "Recommended Work Practices for the Removal of Resilient Floor Coverings."

3.6 DISPOSAL OF DEMOLISHED MATERIALS

A. General: Except for items or materials indicated to be reused, salvaged, reinstalled, or otherwise indicated to remain Owner's property, remove demolished materials from Project site and legally dispose of them in an EPA-approved landfill.

1. Do not allow demolished materials to accumulate on-site.

2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

3. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.

B. Burning: Do not burn demolished materials.

C. Disposal: Transport demolished materials off Owner's property and legally dispose of them.

3.7 CLEANING

A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

ASBESTOS ABATEMENT 02 82 13 - 1

SECTION 02 82 13

ASBESTOS ABATEMENT

PART 1 - GENERAL

1.1 SCOPE OF WORK

A. This Section specifies removal and disposal of asbestos-containing materials (ACMs) as noted on the Drawings.

B. Type of Asbestos Abatement Project:

1. Large Asbestos Abatement Project: An asbestos project involving the removal, disturbance, repair or handling of more than 160 square feet of ACM or more than 260 linear feet.

1.2 INFORMATION AVAILABLE TO THE CONTRACTOR

A. A Limited Hazardous Material Survey Report prepared by Beardsley Architects + Engineers date January 7, 2014 is provided in Appendix A.

B. The subject Facility is classified as a Federally-owned/operated facility.

1.3 SUBMITTALS

A. Submit the following items for review by Government prior to commencing work involving asbestos materials:

1. An Asbestos Abatement Plan:

a. A detailed site specific plan of the work procedures to be used in the removal and handling of materials containing asbestos. This plan must be approved prior to the start of any asbestos work. The plan shall include:

1) Location of asbestos control areas.

2) Layout of decontamination chambers.

3) Plan for coordination between other trades.

4) Sequencing of asbestos related work.

5) Procedures for fire and medical emergencies (Fire Plan).

6) Negative air pressure filtration system plan.

a) Layout drawing indicating the method of providing air supply into the work areas.

b) Location of HEPA filtration system.

2. Disposal

a. Submit one copy of the transporter’s current waste transporter permit.

ASBESTOS ABATEMENT 02 82 13 - 2

b. Submit written evidence that the selected disposal facility is approved to receive asbestos-containing waste and is permitted by the applicable State agency and

EPA.

3. Submit required notifications and arrangements made with regulatory agencies having jurisdiction. The Government will provide the Contractor documentation stating the facility is Federally owned/operated per 12 NYCRR 56.

4. Certificates of Compliance

a. A valid and current copy of the Contractor’s New York State Asbestos Handler License.

b. A valid and current New York State Supervisor Certificate of the Project Supervisor assigned to the job.

B. Provide a statement that the Contractor and Air Monitoring/Air Sampling Consultant firm have no collusion.

C. Upon completion of the job as a condition of its acceptance or upon request of the Government, submit the following:

1. Asbestos Handler (Worker) Certificate and medical clearance documentation for each worker employed on the project.

2. Job log book containing:

a. Day-to-day record of personnel entering the work area.

b. Any significant events occurring during the abatement project.

c. Results of personnel air monitoring.

3. Original waste shipment and disposal site receipts showing that the ACM has been properly disposed. Completed waste shipment and disposal site receipts must be provided to the Government within 35 days of the waste leaving the site.

4. Submit air monitoring and clearance data.

5. Submit an Assessment Report prepared by the Contractor certifying that the work conforms to all standards set forth by all authorities having jurisdiction, mentioned in the references.

1.4 QUALITY ASSURANCE

A. Codes and Standards

1. Comply with applicable codes and standards including, but not necessarily limited to, the following. Where multiple requirements are specified, adhere to the more stringent requirements.

a. Code of Federal Regulations (CFR)

1) 29 CFR 1910.20, “Access to Employee Exposure and Medical Records”

(OHSA)

2) 29 CFR 1910.38, “Employee Emergency Plans and Fire Prevention Plans”

(OSHA)

3) 29 CFR 1910.134, “Respiratory Protection” (OSHA)

ASBESTOS ABATEMENT 02 82 13 - 3

4) 29 CFR 1910.145, “Specification for Accidental Prevention Signs and Tags”

(OSHA)

5) 29 CFR 1910.1200, “Hazard Communication Standard” “(OSHA)

6) 29 CFR 1926.62, “Construction Standard for Lead”

7) 29 CFR 1926.95-105, “Construction Standard for Personal Protection”

8) 29 CFR 1926.1101, “Asbestos” (OSHA)

9) 29 CFR 1926.150, “Fire Protection” (OSHA)

10) 40 CFR 61, Subpart A, “General Provisions” (EPA) (NESHAPS)

11) 40 CFR 61, Subpart M, “National Emission Standards for Hazardous Air

Pollutants (NESHAPS) Asbestos Regulations” (EPA)

12) 40 CFR Part 763, Subpart E, “Asbestos-Containing Materials in Schools”

(EPA, AHERA)

13) 40 CFR Part 763, Subpart G, (EPA, Asbestos Worker Protection Standards for Public Employee)

14) 49 CFR Part 173, Subpart J, “Asbestos Waste Management” (DOT)

b. American National Standard Institute (ANSI)

1) Z9.2-79, “Fundamentals Governing the Design and Operation of Local Exhaust Systems”

2) Z88.2-92, “Practices for Respiratory Protection”

c. Underwriters’ Laboratories, Incorporated (UL) Publication

1) 586-85, “High Efficiency, Particulate, Air Filter Units”

d. New York State Department of Labor

1) 12 NYCRR 56, Title 12, Part 56 of the New York State Official Compilation of Codes, Rules and Regulations

e. New York State Department of Environmental Conservation (DEC)

1) 6 NYCRR Part 360 – Solid Waste Management Facilities

2) 6 NYCRR Part 364 – Waste Transporter Permits

3) 6 NYCRR Part 370 – Hazardous Waste Management System

4) 6 NYCRR Part 371 – Identification and Listing of Hazardous Waste

5) 6 NYCRR Part 372 – Hazardous Waste Manifest System and Related

Standards for Generators, Transporters, and Facilities

6) 6 NYCRR Part 373 – Hazardous Waste Management Facilities

B. Notices and Permits

1. Comply with the codes and standards listed in this specification.

2. Emergency Procedures:

a. Consult with local Fire Department in the preparation of the Emergency Procedures Plan for fire and medical emergencies.

3. Post at the entrance to the abatement area the following documents:

a. Copy of the Site Specific Work Plan.

ASBESTOS ABATEMENT 02 82 13 - 4

b. Copy of the Limited Hazardous Material Survey Report.

c. Post a copy of each applicable regulation at each regulated area where workers will have daily access to the regulations.

1.5 SUBCONTRACTING

A. After Contract Award, no subcontracting of asbestos abatement work from one Contractor to another will be permitted.

1.6 PRE-ABATEMENT CONFERENCE

A. Prior to start of preparatory work under this Contract, the Contractor shall attend a pre-abatement conference and walk-through attended by the Government Representative(s) and Project Monitoring/ Air Sampling Consultant.

B. Agenda for this conference may include but not necessarily be limited to:

1. Contractor’s scope of work, work plan, and schedule.

2. Coordination with other trades.

3. Contractor’s work procedures including:

a. Methods of job site preparation and decontamination chamber set-up, wetting agents and procedures, removal methods, methods of handling removed material, and disposal procedures; clean-up procedures and equipment; signs and labels; fire exits and emergency procedures.

4. Contractor’s plan for 24 hour job security both for prevention of theft and for barring entry of curious but unprotected personnel into work areas.

5. Temporary utilities.

6. Handling of moveable objects, if applicable.

C. In conjunction with the conference the Contractor shall accompany the Government Representative(s) and the Project Monitoring/ Air Sampling Consultant on a preconstruction walk-through, documenting existing condition of finishes, reviewing overall work plan, location of fire exits, fire protection equipment, water supply and temporary electric tie-in.

1.7 DELIVERY AND STORAGE

A. Deliver all materials to the job site in original packages and containers bearing manufacturer’s name and label.

B. Store all materials at the job site in a suitable and designated area. Store materials subject to deterioration or damage away from wet or damp surfaces and under cover. Protect materials from unintended contamination.

C. Remove damaged or deteriorated materials and equipment from the job site. Materials and equipment contaminated with asbestos that cannot be cleaned shall be disposed of as asbestos debris as herein specified.

ASBESTOS ABATEMENT 02 82 13 - 5

1.8 JOB CONDITIONS

A. The Government is responsible to remove moveable furniture, equipment, and loose items from the work area before asbestos abatement work begins.

B. Contractor is responsible for keeping the work area in a clean and safe condition. Contractor shall ensure that uncertified personnel or unauthorized visitors do not enter the work area at any time.

1.9 PROJECT CONDITIONS

A. Shut-down of Air Handling System: Complete the Work of this Section within the time limitation allowed for shutdown of the air handling system serving the work area.

1. The air handling system will not be restarted until approval of the final clearance.

B. Cover and seal all diffusers, duplex outlets, speakers, etc. Use temporary plasticized partitions as required.

1. Prevent lead containing dust from entering hard to clean areas within the dust containment area.

2. Items judged to be too difficult to protect may be disconnected, removed, and replaced at contractor’s option.

1.10 TEMPORARY UTILITIES

A. Electric

1. Obtain electrical power from the facility’s existing power distribution system.

2. Provide temporary 120-208 volt, single phase, three wire, 20 amp electric service with ground fault circuit interrupters (GFCI) for all electric requirements within the asbestos work area containing 5-20 amp, 208 volt negative air machines and lighting.

3. Provide moisture barriers (three layers of taped 6 mil fire retardant poly) around all electrical conduits and junction boxes that must remain energized and that pass through work areas to provide safe electrical isolation for abatement workers.

4. Provide a back-up emergency generator for the duration of the Abatement Project to be used should failure of the normal power source occur.

5. Provide temporary wiring and “weatherproof” receptacles insufficient quantity and location to serve all HEPA vacuum equipment and tools.

6. Provide temporary lighting with “weatherproof” fixtures for all work areas including decontamination chambers. Provide adequate lighting intensity so Contractor and Air/Project Monitoring workers can perform duties efficiently and completely.

7. All temporary devices and wiring used in the work area shall be capable of decontamination procedures including HEPA vacuuming and wet-wiping.

B. Water

1. Provide temporary valved hot and cold water from the facility’s existing system.

2. Hot and cold water service shall be provided to decontamination chamber’s shower.

3. Provide 3/4” cold water hose connection at decontamination equipment room.

ASBESTOS ABATEMENT 02 82 13 - 6

4. In the event of hot water from the facility’s existing system is insufficient, the Contractor is to provide hot water to meet all regulation requirements.

1.10 ELECTRICAL CODES, STANDARDS, AND NOTIFICATIONS

A. Provide all products and perform all electrical installation and removal…

This is the start of the file's text. The full file is on GovTribe.