Questions and Responses Set 2.pdf
PDF 705 KB Posted
- Attached to
- FA8604 Storage Aid System Eglin AFB, FL MMHS Federal contract opportunity
- Solicitation number
- FA8604-21-R-B010
About this file
This document contains questions and responses regarding a solicitation for a storage aids system project at Eglin Air Force Base, Florida. The solicitation seeks the design, fabrication, installation, orientation, and testing of storage aid systems for Building 1412. Responses confirm specifications for mezzanine structures are acceptable and provide details on joist, beam, and column connections as well as bracing, base plates, and panel box locations. Fire suppression system plans and specifications for the existing system are unknown, though connection points are assumed to be above or near the mezzanine area. The document clarifies there are no standard docks for the building.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Responses Set 3.pdf | ||
| New Proposal Checklist and Pricing Summary Sheet.docx | DOCX document | |
| Questions and Responses Set 1.pdf | ||
| Storage Aids Systems Eglin AFB FL.zip | ZIP file | |
| Solicitation - FA860421RB010.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA8604‐21‐R‐B010
Eglin AFB, FL Questions/Answers Set 2 20 April 2021
Questions/Responses (In Red):
In reviewing the above RFP we have the following questions:
Appendix A ;3.2.1.7.1 and 3.2.1.7.2.
Please confirm that the following specifications comply with the above sections and are acceptable.
CONFIRMED. SPECIFICATIONS ARE ACCEPTABLE. PER PARA 3.2.1.7.4, IF CROSSS BRACING IS USED IT
SHALL NOT BE LOCATED ALONG FRONT WIDTH OF MEZZANINE.
2.2 JOIST-TO-BEAM CONNECTIONS Joists are framing channels, up to 24-feet in length, used to support the mezzanine deck. Joists transfer shear loads to the main mezzanine beams through a bolted, L-shaped, shear connector. 2.3 BEAM-TO-COLUMN CONNECTIONS Beams are structural elements that transfer loads from joists to columns. Beams shall transfer shear loads to the column through a shear connector that is factory-welded to the column on its center axis. Bolt holes on the beams are pre-punched and positioned to maximize the strength and stability of the connection. 2.4 COLUMNS Columns support gravity loads transferred by the beams. In addition, columns support the lateral load resisting system that provides stability to the structure. Columns are square hollow structural sections with shop welded base plates. 2.5 BRACES A lateral force resisting system is required for lateral stability. The most effective and economical system is comprised of cross braces. The use of knee braces is acceptable, but less favorable anchoring conditions typically result from the use of knee braces (often requiring one or several of the following: larger base plates, thicker base plates, larger or longer anchor bolts, chemical anchors, footings). 2.6 BASE PLATE AND CONNECTIONS Base plates transfer column loads to the anchoring slab. Base plates shall be a minimum thickness of ½-inch. The column shall be centered on the base plate and welded around its entire perimeter. Centered base plates permit an even transfer of loads to the slab and help reduce the effects of sway on the mezzanine. In limited cases, off-centered base plates are acceptable, but unfavorable anchoring conditions typically result from the use of off-centered plates (often requiring one or several of the following attributes: larger base plates, thicker base plates, larger or longer anchor bolts, chemical anchors, footings).
Appendix A 3.2.1.8.2 and Appendix D 3.2.9 Can we provide Sealed ResinDEK in lieu of to the HDPE specified.
YES
Appendix A 3.2.13 Fire Suppression System
Please provide system plans and specifications for existing system including connection points for system to be added.
EXACT SPECIFICATIONS ARE UNKNOWN. AS PER APP A, PARA 3.2.1.13. “The Contractor shall perform a test on the existing system to determine flow and pressure characteristics and design a system compatible with the existing system.” ASSUME CONNECTION POINT ABOVE/GENERAL AREA OF
MEZZANINE.
Please indicate location of the panel box in Room 492
LOCATION/CHARACTERISTICS OF PANEL BOX SHOWN ON ATTACHED PDF.
Please indicate if there are standard docks for Bldg 1412 and location on the overall Project Plan.
THERE ARE NO STANDARD DOCKS IN BLDG 1412. EVERYTHING IS GROUND LEVEL.