FA8604-19-R-8109_Amendment_2.pdf
PDF 2 MB Posted
- Attached to
- Material Handling System at Yokota AB, Japan Federal contract opportunity
- Solicitation number
- FA8604-19-R-8109
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Yakota_FA860419R8109_0003_RFP_Mod.pdf | ||
| Yakota_FA860419R8109_Questions_and_Answers.pdf | ||
| Amendment_1_Document.pdf | ||
| Proposal_Checklist.Pricing_Summary_Sheet.docx | DOCX document | |
| FA8604-19-R-8109_B&W.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
See Block #2
PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ.NO.
5. PROJECT NO. (If applicable)
6. ISSUED BY AFLCMC/PZIEB CODE FA8604 7. ADMINISTERED BY (If other than Item 6) CODE
USAF/AFMC/AFLCMC
AF LIFE CYCLE MANAGEMENT CENTER
2275 D STREET, BLDG 16, RM 128
WRIGHT-PATTERSON AFB OH 45433-7228
JUSTIN C. ORR 9376567488
JUSTIN.ORR.2@US.AF.MIL
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
FA860419R8109000
X
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers X is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X )
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: ( ) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. ITEM
10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor X is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
NON-ACAT Materials Handling System, Yokota Japan. Revised Appendix B, Revised Appendix F, and Updated Contractor Information Documents all dated 20 August 2019.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print).
16A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
16C. DATE SIGNED
(Signature of person authorized to sign)
BY________________________________________
(Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA ConWrite Version 7.2.1.9 FAR (48 CFR) 53.243 Created 21 Aug 2019 3:03 PM
CONTRACT DOCUMENTS, EXHIBITS AND ATTACHMENTS
FA860419R81090002 PAGE 2 OF 3
This Amendment is to include Revised Appendix B, Revised Appendix F, and Updated Contractor Information Documents all dated 20 August 2019.
All other terms and conditions remain the same.
SCHEDULE
FA860419R81090002
DOCUMENT PGS DATE TITLE
ATTACHMENT 3 9 01 MAY 2019 APPENDIX B--CALLAPSIBLE PALLET
CONTAINERS (REV 1)
ATTACHMENT 7 9 01 MAY 2019 APPENDIX F--REMOVAL OF EXISTING
EQUIPMENT (REV 1)
ATTACHMENT 14 3 01 MAY 2019 CONTRACTOR INFORMATION (REV 1)
APPENDIX B
FOR
COLLAPSIBLE PALLET CONTAINERS
AT
YOKOTA AIR BASE, JAPAN
374 LOGISTICS READINESS SQUADRON (LRS)
LRS WAREHOUSES
BUILDING 400 (IPE)
CSN: PYK706
DATE: 1 May 2019 REVISION 1: 20 August 2019
PREPARED BY:
Emmanuel A. Parel
EMMANUEL A. PAREL
PROJECT ENGINEER
AFLCMC/EZPAE
Megan Blackwell__
MEGAN BLACKWELL
REVIEWER
Yokota – LRS WHS, App B, Collapsible Pallet Containers - Page i
Table of Contents
1. SCOPE
2. APPLICABLE DOCUMENTS
3. REQUIREMENTS
3.1. SYSTEM DESCRIPTION
3.2. CHARACTERISTICS
3.2.1. DIMENSIONS
3.2.2. QUANTITY
3.2.3. CAPACITY
3.2.4. STACKING
3.2.5. PALLET BASE
3.2.5.1. DIMENSIONS
3.2.5.2. MATERIAL
3.2.5.3. FORKLIFT/PALLET JACK ACCESS
3.2.5.4. NESTING
3.2.5.5. COLOR
3.2.6. COLLAPSIBLE CENTER SLEEVE
3.2.6.1. DIMENSIONS
3.2.6.2. MATERIAL
3.2.6.3. COLLAPSIBLE
3.2.6.4. DROP DOWN OPENING
3.2.6.5. INTERFACE
3.2.7. TOP COVER
3.2.7.1. DIMENSIONS
3.2.7.2. MATERIAL
3.2.7.3. PALLET BASE INTERFACE
3.2.7.4. NESTING
3.2.7.5. COLOR
4. QUALITY ASSURANCE PROVISIONS
4.1. INSPECTIONS
4.2. TESTS
4.3 CERTIFICATIONS
R1
Yokota – LRS WHS, App B, Collapsible Pallet Containers – Page 1
1. SCOPE
This appendix establishes the minimum performance, design, fabrication, installation, and test requirements for collapsible pallet containers for the 374 Logistics Readiness Squadron (LRS), LRS Warehouse, in Building 400 (IPE), at Yokota Air Base (AB) Japan. The work shall be completed in accordance with this appendix, the Cover Purchase Description (PD), and Air Force Drawing PYK706-01. This appendix covers all equipment, materials, and labor necessary to complete installation of the system.
2. APPLICABLE DOCUMENTS
Applicable documents shall be in accordance with Section 2 of the Cover PD.
3. REQUIREMENTS
3.1. SYSTEM DESCRIPTION
A minimum of two hundred (200) collapsible pallet containers (commonly referred to as “Tri-Walls”) shall be provided to interface with the pallet racks specified in Appendix A to store small and medium sized AF mobility assets. The collapsible pallet containers shall consist of a solid pallet base, a collapsible plastic center sleeve, and solid top cover. The collapsible containers shall be Shuert Uni-Pak or equivalent as approved by the COTR.
3.2. CHARACTERISTICS
3.2.1. DIMENSIONS
The overall dimensions of the pallet container shall be 48-inches wide by 40-inches deep x 45-inches high.
3.2.2. QUANTITY
A minimum of 200 of each item (pallet base, sleeve, and top cover) shall be provided.
3.2.3. CAPACITY
Each pallet container shall have a minimum capacity of 2,000 pounds.
Yokota – LRS WHS, App B, Collapsible Pallet Containers – Page 2
3.2.4. STACKING
The pallet containers shall be capable of being safely stacked a minimum of four-high when fully loaded up to 2,000 pounds each.
3.2.5. PALLET BASE
The pallet base shall provide the bottom structure used to support loads and allow movements via forklifts and pallet jacks.
3.2.5.1. DIMENSIONS
The pallet base shall be 48-inches wide by 40-inches deep.
3.2.5.2. MATERIAL
The pallet base shall be made of high-density polyethylene (HDPE) with a minimum thickness of 0.300 gauge. Wood pallet bases are not acceptable.
3.2.5.3. FORKLIFT/PALLET JACK ACCESS
The pallet base shall be configured for four way forklift/pallet jack access. Each access pocket shall be a minimum of 9-inches wide by 3.5-inches high.
3.2.5.4. NESTING
The pallet bases shall be capable of nesting on top of other pallet bases when not in use.
3.2.5.5. COLOR
The pallet base shall black or blue.
3.2.6. COLLAPSIBLE CENTER SLEEVE
The collapsible center sleeve shall be a continuous sleeve that creates a four-sided enclosure between the pallet base specified in 3.2.5 and the top cover specified in 3.2.7.
3.2.6.1. DIMENSIONS
The sleeve shall create a storage space of a minimum of 37-inches of internal vertical clearance between the pallet base and the top cover.
Yokota – LRS WHS, App B, Collapsible Pallet Containers – Page 3
3.2.6.2. MATERIAL
The sleeve shall be constructed of a weather resistant plastic material. The sleeves shall have sealed edges.
3.2.6.3. COLLAPSIBLE
The sleeve shall be flexible on all four corners so that it can be collapsed and laid horizontally for storage when not in use.
3.2.6.4. DROP DOWN OPENING
A sealed-edge drop drown panel along one 48-inch side shall be provided. The panel shall 32-34 inches wide at the top, a minimum of 26-inches wide at the bottom and 20-24-inches high.
3.2.6.5. INTERFACE
The sleeve shall interface and lock into place with the pallet base specified in 3.2.5. and the top cover specified in 3.2.7.
No connectors (e.g. screws, ties, etc.) shall be used.
3.2.7. TOP COVER
The top cover shall provide a cover that locks the top of the sleeve into place as well as protects the contents within the container. It is also used to serve as a platform for stacking additional pallet containers.
3.2.7.1. DIMENSIONS
The top cover shall be 48-inches wide by 40-inches deep and be compatible with the sleeves specified in 3.2.6.
3.2.7.2. MATERIAL
The top cover shall be made of high-density polyethylene (HDPE) with a minimum thickness of 0.200 gauge.
3.2.7.3. PALLET BASE INTERFACE
The top cover shall have indentations to interface and lock in with the pallet bases specified in 3.2.6.
3.2.7.4. NESTING
Yokota – LRS WHS, App B, Collapsible Pallet Containers – Page 4
The top covers shall be capable of nesting on top of other top covers when not in use.
3.2.7.5. COLOR
The top cover shall be the same color as the pallet base specified in 3.2.5.5.
4. QUALITY ASSURANCE PROVISIONS
4.1. INSPECTIONS
The system shall be inspected to verify that it meets all the requirements of sections 1, 2, and 3 of this appendix and the Cover PD. These inspections shall be completed as part of the system checkout test and again as a part of the quality conformance test.
4.2. TESTS
The following tests shall be performed on the system as part of the system checkout test and again as a part of the quality conformance test.
No.
Paragraph Description
1. 3.1. The Government will provide test loads for the following test. The Contractor shall perform all testing. The COTR will randomly select a minimum of five pallet containers (five pallet base, five center sleeve and five pallet top) for testing. The contractor shall assemble the pallet containers and load each container with a uniformly distributed load. After the loads have remained in place for a period of 12 hours, the containers shall be inspected for any indications of failure or fatigue.
If noticeable component failure or fatigue is detected, the pallet containers shall fail the test.
Yokota – LRS WHS, App B, Collapsible Pallet Containers – Page 5
2. A minimum of five collapsible pallet containers shall be assembled. The Contractor shall place and remove the pallet containers from any storage locations on the pallet racks in Building 400 (IPE). If the loads cannot be placed and removed from any storage locations, the pallet containers fails the test.
4.3 CERTIFICATIONS
The Contractor shall provide certification that the following requirements have been met. All certifications shall be provided in accordance with paragraph 3.3.4. of the Cover Purchase Description.
No.
Paragraph Description
1. 3.2.2. Each collabsible pallet container have a minimum capacity of 2,000 pounds.
TECHNICAL PROPOSAL QUESTIONNAIRE
Yokota – LRS WHS, App B, Collapsible Pallet Containers TPQ -
COLLAPSIBLE PALLET CONTAIERS
Solicitation Number: FA8604- -R- Project Title: Materials Handling System Base: Yokota AB JA CSN: PYK706 Appendix B, Collapsible Pallet Containers, 1 May 2019
The Offeror shall complete this questionnaire. All entries to this questionnaire shall be typed. The questionnaire will be used to determine the Offeror's understanding of the requirements and acceptability of the proposed equipment.
Collapsible Pallet Container Manufacturer: ____________________ Model Numbers: ________________________________________________ Pallet Base: ________________________________________________ Center Sleeve: ______________________________________________ Top Cover: __________________________________________________
Paragraph Characteristics
3.1. Number of collapsible pallet containers provided:
3.2.1. Overall dimensions of pallet containers provided:
____________________________________________ inches
3.2.3. The minimum capacity of pallet containers provided:
____________________________________________ pounds
3.2.4. Are pallet containers capable of being safely
stacked a minimum of four-high when fully loaded up to 2,000 pounds each?
YES NO
3.2.6.4. Are sealed-edge drop down panels provided?
Overall dimensions of each drop down panel provided: __________________________________inches
Solicitation Number: FA8604-__________-R-__________
Yokota – LRS WHS, App B, Collapsible Pallet Containers TPQ -
EXCEPTIONS
Attach any exceptions taken to the Purchase Description Appendix. Please outline those concerns in detail. Your exceptions will be reviewed to determine acceptability.
Are exceptions taken? YES NO
Number of pages attached: ____________________________________
APPENDIX F
REMOVAL OF EXISTING EQUIPMENT
AT
YOKOTA AIR BASE, JAPAN
374 LOGISTICS READINESS SQUADRON (LRS)
LRS WAREHOUSES
BUILDINGS 400 & 950 (IPE), 90 (APS) AND 953 (HAZMAT)
CSN: PYK706
DATE: 1 May 2019 REVISION 1: 20 August 2019
PREPARED BY:
Emmanuel A. Parel
EMMANUEL A. PAREL
PROJECT ENGINEER
Megan Blackwell
MEGAN BLACKWELL
REVIEWER
Yokota – LRS WHS, App F, Existing Equipment - Page i
Table of Contents
1. SCOPE
2. APPLICABLE DOCUMENTS
3. REQUIREMENTS
3.1. SYSTEM DESCRIPTION
3.1.1. REMOVAL OF EXISTING EQUIPMENT – BUILDING 400
3.1.2. REMOVAL OF EXISTING EQUIPMENT – BUILDING 950
3.1.3. REMOVAL OF EXISTING EQUIPMENT – BUILDING 90
3.1.4. REMOVAL OF EXISTING EQUIPMENT – BUILDING 953
4. QUALITY ASSURANCE PROVISIONS
4.1. INSPECTIONS
Yokota – LRS WHS, App F, Existing Equipment- Page 1
1. SCOPE
This appendix establishes the minimum performance, installation and test requirements to remove, dispose of, and/or modify the existing equipment for the 374 Logistics Readiness Squadron (LRS), LRS Warehouses, in Building 400 & 950 (IPE), Building 90 (APS) and Building 953 (Hazmat), at Yokota Air Base (AB) Japan.
The work shall be completed in accordance with this appendix, the Cover Purchase Description (PD), and the AF Drawings specified in the Cover PD. This appendix covers all equipment, materials, and labor necessary to complete installation of the system.
2. APPLICABLE DOCUMENTS
Applicable documents shall be in accordance with Section 2 of the Cover PD.
3. REQUIREMENTS
3.1. SYSTEM DESCRIPTION
The new system shown on AF drawings specified in the Cover PD will be installed in a warehouse with existing equipment. The existing equipment shall be removed, disposed of, and/or modified as specified herein to complete the installation of the new system. Yokota AB warehouse functions will continue to operate in order to meet base missions. The Contractor must coordinate with the Base Project Officer (BPO) during installation so that operations are not restricted and the base mission can be accomplished. Any removed equipment shall be removed and hauled away. Anchor bolts from the existing equipment shall be removed and ground to floor level. Grout shall be used to fill in old anchor bolt holes if necessary.
All removed materials shall be hauled away off base and disposed of by the Contractor. The Contractor shall transport and dispose of all equipment and materials that are removed in accordance with all applicable Federal, Air Force, Air Base, Japanese, local, and municipal laws.
3.1.1. REMOVAL OF EXISTING EQUIPMENT – BUILDING 400
AF assets in Building 400 are currently stored using collapsible bulk storage bins or containers, ISU containers, and/or palletized-load on-floor storage areas. In coordination with the Contractor, Yokota AB personnel will clear the installation area of AF assets. The weapon rack/mobile storage installation area contains tie-downs (see Photo 1) as shown on AF Drawing
Yokota – LRS WHS, App F, Existing Equipment- Page 2
PYK706-01 that must be accounted for during the design and installation. Two covered drains (see Photo 2A and 2B) in the warehouse area shall be filled-in and raised level with the warehouse floor. One uncovered drain (see Photo 2C) in the warehouse area shall be raised level with the warehouse floor and shall maintain its current drainage function. The existing concrete floor surrounding the drains shall be prepared for a new slab, which shall be flush with the tops of the existing floor. Each new slab will be approximately 42 inches in diameter by 3 inches deep. The slab shall be installed such that it permanently bonds with the existing floor by etching, groove cutting, or similar method. The finished surface must provide a safe walking surface for personnel and support the operation the rider-reach forklifts specified in the Cover PD.
Photo 1 Tie-Downs
Yokota – LRS WHS, App F, Existing Equipment- Page 3
Photo 2A Covered Drain
Photo 2B Covered Drain
Photo 2C Uncovered Drain
Yokota – LRS WHS, App F, Existing Equipment- Page 4
3.1.2. REMOVAL OF EXISTING EQUIPMENT – BUILDING 950
AF assets in Building 950 are currently stored on palletized-load on-floor storage areas. In coordination with the Contractor, Yokota AB personnel will clear the installation area of AF assets before installation begins. The new medium-duty pallet racks for the vault will be installed in an area with existing cabinets (see Photo 3 and 4). The existing cabinets shall be removed and hauled away by the Contractor. The outside cabinet framing is made of steel and the interior is made of wood. Once removed, the walls where the cabinets were located shall be filled-in, finished smooth and painted to match the existing wall.
Photo 3 Existing Cabinets
Yokota – LRS WHS, App F, Existing Equipment- Page 5
Photo 4 Existing Cabinets
3.1.3. REMOVAL OF EXISTING EQUIPMENT – BUILDING 90
AF aircraft tires in Building 90 are currently stored in existing tire racks (see Photo 5A and 5B). In coordination with the Contractor, Yokota AB personnel will remove the aircraft tires stored in the existing tire racks. The existing tire racks shall be removed and hauled away by the Contractor.
Photo 5A Existing Tire Racks
Yokota – LRS WHS, App F, Existing Equipment- Page 6
Photo 5B
Existing Tire Racks
3.1.4. REMOVAL OF EXISTING EQUIPMENT – BUILDING 953
The existing shelving used to store Hazmat items Building 953 (see Photo 6) shall be removed and hauled away by the Contractor. In coordination with the Contractor, Yokota AB personnel will remove the hazmat assets stored in the existing shelving.
Yokota – LRS WHS, App F, Existing Equipment- Page 7
Photo 6 Existing Hazmat Shelving
4. QUALITY ASSURANCE PROVISIONS
4.1. INSPECTIONS
The system shall be inspected to verify that it meets all the requirements of sections 1, 2, and 3 of this appendix and the Cover PD. These inspections shall be completed as part of the system checkout test and again as a part of the quality conformance test.
Yokota – LRS WHS, App B, Existing Equipment TPQ
TECHNICAL PROPOSAL QUESTIONNAIRE
FOR
REMOVAL OF EXISTING EQUIPMENT
Solicitation Number: FA8604- -R- Project Title: Materials Handling System Base: Yokota AB Japan CSN: PYK706 Appendix F, Removal of Existing Equipment, 1 May 2019
The Offeror shall complete this questionnaire. All entries to this questionnaire shall be typed. The questionnaire will be used to determine the Offeror's understanding of the requirements and acceptability of the proposed equipment.
Please attach any exceptions to the Cover Purchase Description as detailed below.
Paragraph Characteristics
3. Will you remove and dispose of existing equipment as specified?
EXCEPTIONS
Attach any exceptions taken to the Purchase Description Appendix. Please outline those concerns in detail. Your exceptions will be reviewed to determine acceptability.
Are exceptions taken? YES NO
Number of pages attached: _____________________________________
Contractor Information - Yokota AB JA - PYK706 - Revision 1.docx Page 1 of 3
1 May 19 Rev 1 – 20 Aug 19
CONTRACTOR INFORMATION
1. SERVICES AVAILABLE TO THE CONTRACTOR
A. Work Schedule
Normal Working Hours Days Of The Week
1st Shift 0730 to 1630 M - F
2nd Shift to
3rd Shift to
The Contractor is not allowed to work U.S. and local (if overseas) holidays or other than the normal work schedule unless approved in advance by the base project officer.
B. Office space available? Yes No
(1) Number of desks:
(2) Number of square feet:
(3) Location:
C. Classroom space available?
(For number required to be trained)
Yes No
(1) Location:
(2) Chalkboard? Yes No
(3) Slide projector? Yes No
(4) Overhead projector? Yes No
(5) Video cassette player? Yes No
D. Staging space available? Yes No
(1) Under roof square feet: 2,500 sqft
Clear height: 27 ft
Location: Bldg 950, Bay 3
Contractor Information - Yokota AB JA - PYK706 - Revision 1.docx Page 2 of 3
Secured area? Yes No
(2) Outside square feet: 400 sqft
Location: Bldg 950
Secured area? Yes No
E. Rail siding available? Yes No
Location:
Distance from installation site:
Hours of operation:
F. Restrooms available? Yes No
Building number: Bldg 400 / 950
G. Telephone Service:
Pay phone available? Yes No
Location:
H. Utilities available:
(1) Electrical outlets available in area? Yes No
Voltage: 100/110 Hertz: 50 Phase: 1
(2) Water available? Yes No
Location:
(3) Special conditions:
2. SERVICES NOT AVAILABLE TO THE CONTRACTOR
A. Forklifts. Government forklifts are not available for the Contractor's use.
B. Tools. Government tools or equipment are not available for the Contractor's use.
C. Loading/unloading. Government personnel will not load or unload any Contractor equipment, tools, and system components shipped under this contract.
Contractor Information - Yokota AB JA - PYK706 - Revision 1.docx Page 3 of 3
3. JOINT OCCUPANCY
The Contractor will be installing the equipment in close proximity to normal Air Force operations. The Contractor must minimize interference with base personnel.
4. SITE VISIT
To acquaint bidders/offerers with this project, arrangements may be made to visit the site by contacting:
Name: MSgt Quintin Galus
Phone: Commercial: 011-81-3117-55-7754
| SCOPE |
| APPLICABLE DOCUMENTS |
| REQUIREMENTS |
| SYSTEM DESCRIPTION |
| CHARACTERISTICS |
| DIMENSIONS |
| QUANTITY |
| CAPACITY |
| STACKING |
| PALLET BASE |
| DIMENSIONS |
| MATERIAL |
| FORKLIFT/PALLET JACK ACCESS |
| NESTING |
| COLOR |
| COLLAPSIBLE CENTER SLEEVE |
| DIMENSIONS |
| MATERIAL |
| COLLAPSIBLE |
| DROP DOWN OPENING |
| INTERFACE |
| TOP COVER |
| DIMENSIONS |
| MATERIAL |
| PALLET BASE INTERFACE |
| NESTING |
| COLOR |
| QUALITY ASSURANCE PROVISIONS |
| 4.1. INSPECTIONS |
| 4.2. TESTS |
| 4.3 CERTIFICATIONS |
| SCOPE |
| APPLICABLE DOCUMENTS |
| REQUIREMENTS |
| System description |
| removAL of existing equipment – building 400 |
| removAL of existing equipment – building 950 |
| removAL of existing equipment – building 90 |
| removal of existing equipment – building 953 |
| QUALITY ASSURANCE PROVISIONS |
| Inspections |
File details come from the government source that posted it.