View the file

Other files for this federal contract opportunity

Other files attached to High Density Storage System for Joint Base Pearl Harbor-Hickam AFB, Hawaii, newest first.
File Type Posted
amendment_03.pdf PDF
Running_QA_3.pdf PDF
Running_QA_2.pdf PDF
amendment_02.pdf PDF
amendment_01.pdf PDF
Running_QA.pdf PDF
Proposal_Checklist-Pricing_Summary_Sheet_(R1).pdf PDF
FA8604-18-R-8108_RFP.pdf PDF
PCH606-02.dwg DWG drawing
PCH606-01.dwg DWG drawing

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question: In the Cover PD paragraph 3.1 Description it mentions a mini mezzanine being converted into a maxi mezzanine, however there is nothing in the Cover PD that goes into detail, or a drawing that depicts where the maxi-mezzanine is to be placed. Was this a typo or is there information missing?

Answer: The reference for a maxi-mezzanine was removed from the project. I will remove this reference. An amendment to the RFP will be posted with this updated information.

Question: Is there an existing electric panel for VLM or will it requiring wiring and conduit from an electric room? If so, how far away is the electric room from the location of the VLM? Also, what is the voltage required for the VLM (what does the building have)?

Answer: There is not an existing electric panel for the VLM. There is a minimum of 208/220 power available and it is located within 100 feet of the VLM installation site.