Contractor Questions and Government Answers (Round 3)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_2.pdf | ||
| RFP_Questions_and_Government_Answers_(Round_2).docx | DOCX document | |
| Amendment_1.pdf | ||
| Proposal_Checklist-Pricing_Summary_Sheet_(R1).docx | DOCX document | |
| RFP.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP Contractor Questions and Government Answers Bradley ANGB, Connecticut
22 Feb 2018 (Round 3) FA8604-18-R-8105, Amendment 2
1. Cover PD, paragraph 3.1.6 – mentions pallet jack interfacing with conveyor in Appendix D. I have no appendix D, nor do I see any mention of conveyor in other appendices.
Government Answer: Appendix D was deleted from the requirement. Reference was therefore deleted in the updated Attachment 1, “Cover PD (Revision 1)” dated 21 February.
2. Appendix B, paragraph 3.2.4.6 – lighting- mentions only motion sensor fixtures. Is there not a requirement for a switch to operate the area?
Government Answer: Although a light switch can be provided, a light switch is not required.
3. Appendix C – may I assume that the display shelving is the “B” & “C” units on Drawing 01 – “upper level of admin office area”?
Government Answer: Yes, you may assume the display shelving is the “B” & “C” units on Attachment XX “Drawing 01 – “upper level of the admin office area. Please not there are also two (2) “B” units located on the floor.
20 Feb 2018 (Round 2) FA8604-18-R-8105 (No Amendment Required)
1. Is there an incumbent? If so who are they and what was the winning bid, contract number and scope?
Government Answer: Each project is a separate project. Therefore, this solicitation is for an individual project not a follow-on or continuation of previous work.
2. When is the submission date extended to? I can’t seem to find that detail in the 12 Feb Amendment.
Government Answer: The submission has not been changed. It remains 06 March 2018 at 1400 EST
3. Is there a past performance requirement?
Government Answer: Please see the solicitation provisions on document pages 172 through 175.
4. I understand there’s a Proposal Checklist, but is there a corresponding section L/M?
Government Answer: There are solicitation provisions in the very back of the solicitation, document pages 164 through 181.
12 Feb 2018 (Round 1) FA8604-18-R-8105, Amendment 1
1. There seem to be missing Attachments. Will there be an amendment to include these missing attachments?
Government Answer: The Solicitation was amended to include all of the attachments, including those that were missing.