Amendment_0001.pdf

PDF 762 KB Posted

Attached to
Materials Handling System at Holloman AFB NM Federal contract opportunity
Solicitation number
FA8604-18-R-8103
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

Amendment 0001 to the Cover PD

View the file

Other files for this federal contract opportunity

Other files attached to Materials Handling System at Holloman AFB NM, newest first.
File Type Posted
running_QA_3.pdf PDF
running_QA_2.pdf PDF
Amendment_0002.pdf PDF
Amendment_0003.pdf PDF
running_QA_1.pdf PDF
running_QA_1.pdf PDF
running_QA.pdf PDF
Q.A._set_1.pdf PDF
Proposal_Checklist-Pricing_Summary_Sheet_(R1).pdf PDF
RFP_for_release.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

See Block #2

PAGE OF PAGES

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

4. REQUISITION/PURCHASE REQ.NO.

5. PROJECT NO. (If applicable)

6. ISSUED BY AFLCMC/PZIEB CODE FA8604 7. ADMINISTERED BY (If other than Item 6) CODE

USAF/AFMC/AFLCMC

AF LIFE CYCLE MANAGEMENT CENTER

2275 D STREET, BLDG 16, RM 128

WRIGHT-PATTERSON AFB OH 45433-7228

DIANE M. CHONG (937)255-0952

diane.chong.1@us.af.mil

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

FA8604-18-R-8103

X

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers X is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X )

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: ( ) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. ITEM

10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Non-ACAT, Mechanized Material Handling Systems, Holloman AFB

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print).

16A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

16C. DATE SIGNED

(Signature of person authorized to sign)

BY________________________________________

(Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA ConWrite Version 6.15.4 FAR (48 CFR) 53.243 Created 12 Feb 2018 10:03 AM

SCHEDULE

FA8604-18-R-8103 0001

The attached Cover PD replaces that which was attached to the basic RFP.

CONTRACT DOCUMENTS, EXHIBITS AND ATTACHMENTS

FA8604-18-R-8103 0001

DOCUMENT PGS DATE TITLE

ATTACHMENT 1 28 08 FEB 2018 COVER PURCHASE DESCRIPTION

COVER PURCHASE DESCRIPTION

FOR

MATERIALS HANDLING SYSTEM

AT

HOLLOMAN AIR FORCE BASE

BUILDINGS 292, 297, & 304

CSN: AHL705

DATE: 7 JANUARY 2018

REVISION 1: 8 FEBRUARY 2018

PREPARED BY:

James F. Rowland James F. Rowland

PROJECT ENGINEER

AFLCMC/EZPAE

Brad Thompson Brad Thompson

REVIEWER

AFLCMC/EZPAE

FA8604-18-R-8103/0001 Attachment 1 Page 1 of 28

THIS PAGE LEFT BLANK INTENTIONALLY

FA8604-18-R-8103/0001 Attachment 1 Page 2 of 28

Table of Contents

1. SCOPE

1.1. GENERAL SCOPE

1.2. DEFINITIONS

2. APPLICABLE DOCUMENTS

2.1. GOVERNMENT DOCUMENTS

2.2. NON-GOVERNMENT DOCUMENTS

3. REQUIREMENTS

3.1. SYSTEM DESCRIPTION

3.1.1. WIDE SPAN SHEVLING

3.1.2. MODULAR WORKSTATIONS

3.1.3. MODULAR CABINETS

3.1.4. ARMAMANET SHELVING

3.1.5. TWO TON ROLLING HOIST

3.1.6. REMOVAL AND DISPOSAL OF EXISTING EQUIPMENT

3.2. CHARACTERISTICS

3.2.1. NOISE LEVELS

3.2.2. ELECTRICAL CHARACTERISTIC REV1

3.2.2.1. POWER SOURCE

3.2.2.1.1. POWER DISTRIBUTION PANELS

3.2.2.2. INSTALLATION CODE

3.2.2.3. CONDUIT

3.2.2.4. GROUNDING

3.2.2.5. WIRING

3.2.2.6. OVERCURRENT PROTECTION

3.2.2.7. ENVIRONMENTAL PROTECTION

3.2.2.8. PROTECTION FROM MECHANICAL DAMAGE

3.3. DESIGN AND FABRICATION

3.3.1. DESIGN CRITERIA

3.3.1.1. MAINTAINABILITY

3.3.1.2. ENVIRONMENTAL CONDITIONS

3.3.1.3. STANDARD, COMMERCIAL COMPONENTS

3.3.1.4. STANDARDIZATION

3.3.1.5. SPECIAL TOOLS

3.3.1.6. ACCESSIBILITY

3.3.1.7. STRUCTURAL REQUIREMENTS

3.3.1.8. VERIFICATION OF DIMENSIONS

3.3.1.9. OZONE DEPLETING SUBSTANCES (ODS)

3.3.1.10. SAFETY

3.3.1.10.1. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

3.3.1.10.2. PROTECTION AGAINST MOVING PARTS

3.3.1.10.3. PLACARDS

3.3.1.10.4. FAIL-SAFE CONTROLS

3.3.1.10.5. CLEAN-UP

3.3.1.10.6. RACK CAPACITY LEVELS

FA8604-18-R-8103/0001 Attachment 1 Page 3 of 28

3.3.1.11. HUMAN ENGINEERING

3.3.2. MATERIALS

3.3.2.1. STEEL

3.3.2.2. MECHANICAL FASTENING DEVICES

3.3.2.3. ANCHORS

3.3.3. PROTECTIVE COATINGS

3.3.3.1. PAINTING

3.3.3.2. PLATING

3.3.3.3. GALVANIZING

3.3.3.4. DISSIMILAR METALS

3.3.4. WELDING

3.3.4.1. WELDING PROCEDURE QUALIFICATION

3.3.4.2. WELDER PERFORMANCE QUALIFICATION

3.3.4.3. FIRE PROTECTION

3.3.5. CUTTING

3.3.6. COORDINATION

3.3.7. NAMEPLATES

3.3.8. PRECEDENCE

3.4. DOCUMENTATION

3.4.1. MANAGEMENT REPORTS

3.4.2. SHOP DRAWINGS

3.4.3. EQUIPMENT MANUALS

3.4.4. CERTIFICATIONS

3.4.5. AS-BUILT DRAWINGS

3.5. ORIENTATION

3.5.1. SYSTEM OPERATOR ORIENTATION

3.5.1.1. SYSTEM OPERATOR CLASSROOM INSTRUCTIONS

3.5.1.2. SYSTEM OPERATOR HANDS-ON INSTRUCTIONS

3.5.2. MAINTENANCE ORIENTATION

3.5.2.1. MAINTENANCE CLASSROOM INSTRUCTION

3.5.2.2. MAINTENANCE HANDS-ON INSTRUCTION

4. QUALITY ASSURANCE PROVISIONS

4.1. GENERAL

4.2. ACCEPTANCE TESTS

4.2.1. SYSTEM CHECKOUT TEST

4.2.2. QUALITY CONFORMANCE TEST

4.2.3. RELIABILITY DEMONSTRATION TEST

4.3. INSPECTIONS, TESTS, AND CERTIFICATIONS

4.3.1. INSPECTIONS

4.3.2. TESTS

4.3.3. CERTIFICATIONS

FA8604-18-R-8103/0001 Attachment 1 Page 4 of 28

Holloman AFB, Cover PD - Page 1

1. SCOPE

1.1. GENERAL SCOPE

This purchase description (PD) establishes the minimum performance, design, fabrication, installation, orientation, and test requirements for a Materials Handling System for the 49th LRS in Buildings 292, 297, and 304 at Holloman Air Force Base, New Mexico. The work shall be completed in accordance with this PD, the appendices, and Air Force (AF) Drawings AHL705-01 through -03. This PD covers all equipment, materials, and labor necessary to complete installation of the system. It also includes performing tests and making adjustments to the system as well as providing classroom and on-the-job instructions to Government personnel.

1.2. DEFINITIONS

PD - Purchase Description AF - Air Force AFB - Air Force Base COTR - Contracting Officer's Technical Representative

2. APPLICABLE DOCUMENTS

The following documents form a part of this PD to the extent specified herein. The issue in effect on the date the solicitation is issued shall apply.

2.1. GOVERNMENT DOCUMENTS

AIR FORCE INSTRUCTION (AFI)

AFI 48-127

Occupational Noise and Hearing Conservation Program

AFI 91-203

Air Force Consolidated Occupational Safety Instruction.

FA8604-18-R-8103/0001 Attachment 1 Page 5 of 28

Holloman AFB, Cover PD - Page 2

AIR FORCE DRAWINGS

AHL705-01 Holloman AFB, New Mexico

Building 292 Layout 1 Nov 17

AHL705-02 Holloman AFB, New Mexico Building 297 Layout

AHL705-03 Holloman AFB, New Mexico Building 304 Layout

2.2. NON-GOVERNMENT DOCUMENTS

AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

AISC 360-05 Manual of Steel Construction -

Allowable Stress Design, Ninth Edition

(Applications for copies shall be addressed to the American Institute of Steel Construction, Inc, 1 East Wacker Drive, Chicago IL 60601)

AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)

ANSI B15.1-00 Safety Standard for Mechanical Power

Transmission Apparatus

ANSI Z49.1-99 Safety in Welding and Cutting

National Standards Institute, 1430 Broadway, New York, NY 10018)

OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS

29 CFR 1910 Occupational Safety and Health

Standards, (General Industry)

29 CFR 1926 Safety and Health Regulations for Construction

US ARMY CORPS OF ENGINEERS INSTRUCTION

TI 809-04 Seismic Design for Buildings

FA8604-18-R-8103/0001 Attachment 1 Page 6 of 28

Holloman AFB, Cover PD - Page 3

AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)

ASTM A123/

A123M-02

Standard Specification for Zinc (Hot Dip Galvanized) Coatings on Iron and Steel Products

ASTM A153/

A153M-03

ASTM A307-03

Standard Specification for Zinc Coating(Hot-Dip) on Iron and Steel Hardware

Standard Specification for Carbon Steel Bolts and Studs, 60,000 psi Tensile Strength

ASTM A325-04 Standard Specification for Structural Bolts, Steel, Heat Treated, 120/105 ksi Minimum Tensile Strength

ASTM B633-98 Standard Specification for Electrodeposited Coatings of Zinc on Iron and Steel

Society for Testing and Materials, 1916 Race Street, Philadelphia PA 19103)

AMERICAN WELDING SOCIETY (AWS)

AWS B2.1-00 Welding Procedure and Performance

Qualification

AWS D1.1-04 Structural Welding Code – Steel

AWS D14.1-97 Welding of Industrial and Mill Cranes and Other Material Handling Equipment, Spec for

Welding Society, Inc, 550 NW Lejeune Road, P.O.Box 35140, Miami

FL 33135)

NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION (NEMA)

NEMA ICS 6-01 Enclosures for Industrial Controls and

Systems

FA8604-18-R-8103/0001 Attachment 1 Page 7 of 28

Holloman AFB, Cover PD - Page 4

(Applications for copies shall be addressed to the National Electrical Manufacturers Association, 2101 L Street, NW, Washington DC 20037)

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 51B-14 Standard for Fire Prevention During

Welding, Cutting and Other Hotwork

NFPA 70-14 National Electrical Code

NFPA 13-13 Installation of Sprinkler Systems

(Applications for copies shall be addressed to the National Fire Protection Association, One Batterymarch Park, P.O. Box 9101, Quincy MA 02269-9101)

SOCIETY OF AUTOMOTIVE ENGINEERS, INC (SAE)

SAE J429-99 Mechanical and Material Requirements for Externally Threaded Fasteners, Standard

(Applications for copies shall be addressed to the Society of Automotive Engineers, Inc, 400 Commonwealth Drive, Warrendale PA 15906)

INTERNATIONAL BUILDING CODE (IBC)

IBC 2012 International Building Code (IBC) developed by the International Code Council (ICC)

(Applications for copies can be obtained at http://www.iccsafe.org/Pages/default.aspx

3. REQUIREMENTS

3.1. SYSTEM DESCRIPTION

The following major components shall be integrated to form the complete Materials Handling System:

FA8604-18-R-8103/0001 Attachment 1 Page 8 of 28 http://www.iccsafe.org/Pages/default.aspx

Holloman AFB, Cover PD - Page 5

3.1.1. WIDE SPAN SHEVLING

The wide span racks shall be installed as specified in Appendix A and this Cover PD.

3.1.2. MODULAR WORKSTATIONS

The modular workstations shall be installed as specified in Appendix B and this Cover PD.

3.1.3. MODULAR CABINETS

The modular cabinets shall be installed as specified in Appendix C and this Cover PD.

3.1.4. ARMAMANET SHELVING

The armament shelving shall be installed as specified in Appendix D and this Cover PD.

3.1.5. TWO TON ROLLING HOIST

A two-ton A-Frame rolling hoist shall be provided in Building

292. The hoist shall be a nominal 11’H x 14’L x 7’W and capable of lifting a minimum of two-tons.

3.1.6. REMOVAL AND DISPOSAL OF EXISTING EQUIPMENT

There is no existing equipment that needs to be removed as part of this contract.

3.2. CHARACTERISTICS

3.2.1. NOISE LEVELS

The Contractor shall consider noise levels in the design of the equipment. Hazardous noise shall not exceed 85 decibels A-weighted sound pressure level (dB(A)) for 8 hours in any 24-hour period or equivalent in accordance with AFI 48-127. Noise level measurements will be taken at a three-foot distance from the equipment producing the noise and at a level of five feet above the ground/floor in all locations in which personnel may be present during normal operations. If noise levels of installed equipment exceed this requirement, then noise shall be reduced

FA8604-18-R-8103/0001 Attachment 1 Page 9 of 28

Holloman AFB, Cover PD - Page 6 through engineering controls; i.e., insulation, dampening, and isolation.

3.2.2. ELECTRICAL CHARACTERISTICS REV1

3.2.2.1. POWER SOURCE

The Contractor shall run electrical power from the electrical supplies located on AF Drawings AHL705-01 thru -03. The Contractor shall furnish and install all necessary wiring and equipment for power distribution to the system and for control of the system.

3.2.2.1.1. POWER DISTRIBUTION PANELS

Power distribution panels (panelboards) with circuit breakers shall be furnished and installed by the Contractor. Panelboards shall not exceed 78 inches in height and shall be mounted so that the height of the top operating handle shall not exceed 60 inches from the floor. Each panelboard door shall be provided with a lock and keyed alike. The Contractor shall supply two keys per lock set. Directories shall be typed to indicate load served by each circuit and shall be mounted in a holder behind a translucent protective covering on the inside of the panel door.

The function of the panel shall be clearly labeled on the outside of the panel. All panelboards shall be in compliance with Article 384, NFPA 70.

3.2.2.2. INSTALLATION CODE

The installation shall, at a minimum, conform to applicable rules of NFPA 70 (National Electrical Code).

3.2.2.3. CONDUIT

All wiring shall be encased in rigid metal conduit conforming to Article 346 of NFPA 70; electrical metallic tubing conforming to Article 348 of NFPA 70; or flexible metallic tubing conforming to Article 349 of NFPA 70. If conduit/cables are dropped from overhead, they shall be enclosed in a power pole. No conduit/cable shall run on top of the floor/ground. Exposed conduit shall be installed parallel or perpendicular to walls, structural members, or intersections of vertical planes and ceilings. Exposed conduit and fasteners shall match the color of the walls and/or existing conduit color. Changes in direction of conduit shall be made with symmetrical bends or cast metal fittings. Field made bends shall be made with the proper hickey or conduit-bending machine. Crushed or deformed

FA8604-18-R-8103/0001 Attachment 1 Page 10 of 28

Holloman AFB, Cover PD - Page 7 conduit shall not be accepted. Conduit shall be rigidly fastened in place at intervals of not more than 10 feet.

3.2.2.4. GROUNDING

Each component of the system shall be properly grounded to ensure safe working conditions. This shall include adequate ground against static charges that may be generated. Grounding shall conform to Article 250 of NFPA 70.

3.2.2.5. WIRING

Conductors shall be copper. Wire connectors of insulating material or solderless pressure connectors properly taped shall be utilized for all splices where possible. Soldered mechanical joints shall not be accepted. All wiring shall be color-coded, uniquely tagged, or uniquely numbered for identification.

Marking shall be applied in such a manner so as to facilitate tracing of wires (circuits) during repairs and/or maintenance.

Wiring and wiring installation shall conform to Article 300 of

NFPA 70.

3.2.2.6. OVERCURRENT PROTECTION

The power distribution panel shall be equipped with circuit breakers and fuses in compliance with Article 240 of NFPA 70.

Motors shall be equipped with disconnect switches and thermal overload devices.

3.2.2.7. ENVIRONMENTAL PROTECTION

All indoor enclosures and controls shall be in accordance with NEMA ICS 6, Type 12. All outdoor enclosures and controls shall be in accordance with NEMA ICS 6, Type 3S.

3.2.2.8. PROTECTION FROM MECHANICAL DAMAGE

No pushbuttons, control panel, conduit, shielded cable, wire, or electrical device shall be installed so as to expose it to mechanical damage during normal use. If an electrical device, which includes photoeyes, is exposed to damage by material or personnel, then it shall be guarded.

3.3. DESIGN AND FABRICATION

3.3.1. DESIGN CRITERIA

3.3.1.1. MAINTAINABILITY

FA8604-18-R-8103/0001 Attachment 1 Page 11 of 28

Holloman AFB, Cover PD - Page 8

The system shall be designed, fabricated, and installed to facilitate maintainability and ensure a minimum service life of 15 years. The design shall provide for modular assembly of components and subassemblies where feasible to permit repair or replacement of parts in a minimum of time. This shall include plug-in electrical connections for major electrical subassemblies.

3.3.1.2. ENVIRONMENTAL CONDITIONS

The system shall operate in a temperature range of 5 to 110 degrees Fahrenheit with up to 95 percent relative humidity. The system shall be constructed to operate in an open warehouse environment. For components located outdoors, the component shall be constructed for year-round outdoor use, operating in sun, rain, snow, and wind.

3.3.1.3. STANDARD, COMMERCIAL COMPONENTS

Standard, commercial components which have been for sale and available for purchase to the general public or government agencies for at least one year shall be used to the maximum extent possible. If requested by the COTR (Contracting Officer's Technical Representative), the Contractor shall furnish evidence that equipment of approximately the same design as that proposed to be installed has been tested and successfully operated. Where two or more units of the same type of equipment are required, these units shall be products of the same manufacturer. All equipment and materials shall be new.

3.3.1.4. STANDARDIZATION

Mechanical and electrical interchangeability shall exist between like assemblies, subassemblies, and replaceable parts regardless of the manufacturer's supplier. Interchangeability does not necessarily mean complete identity, but requires that a substitution of such like-assemblies and replacement parts be easily effected without physical or electrical modifications, including cabling, wiring, and mounting.

3.3.1.5. SPECIAL TOOLS

Use of special tools shall be minimized and, where required for operational adjustments, shall be securely mounted within the equipment in a readily accessible location. Standard tools, fittings, lubricants, and fluids shall be used to the maximum practicable extent.

FA8604-18-R-8103/0001 Attachment 1 Page 12 of 28

Holloman AFB, Cover PD - Page 9

3.3.1.6. ACCESSIBILITY

Structural members shall not prevent access to or removal of components for repair or replacement. Equipment shall be designed for rapid and easy removal as well as replacement or repair of malfunctioning units, by one individual where feasible. Mechanical components shall be designed to permit lubrication of components without disassembly.

3.3.1.7. STRUCTURAL REQUIREMENTS

The system shall be designed and constructed in accordance with design codes at Holloman AFB, NM. The system shall also be designed to withstand seismic forces as specified in TI 809-04.

3.3.1.8. VERIFICATION OF DIMENSIONS

The contractor shall become familiar with all details of the work, verify all dimensions in the field, and shall advise the Contracting Officer of any discrepancy before performing the work.

3.3.1.9. OZONE DEPLETING SUBSTANCES (ODS)

The Contractor shall not use or prescribe to the greatest extent possible any ODS in the installation and maintenance of the system. ODS includes, but is not limited to aerosol cans, certain cleaning solvents, and certain lubricants. If there is a question pertaining to the applicability of a substance, submit the name of the substance to the Contracting Officer for verification.

3.3.1.10. SAFETY

The Contractor shall consider the safety of personnel and equipment when designing and installing the system. Safety provisions shall be incorporated to the maximum extent possible.

When possible, hazards shall be eliminated through design. When this is not possible, safety devices such as guards, interlocks, and barriers shall be installed. If this does not eliminate the hazard, warning devices such as warning signs, indicator lights, and audio devices shall be installed. Safety requirements shall include, but are not limited to, the following.

3.3.1.10.1. OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

FA8604-18-R-8103/0001 Attachment 1 Page 13 of 28

Holloman AFB, Cover PD - Page 10

The system installation practices and completed system shall meet all applicable requirements of OSHA 29 CFR 1910 and OSHA 29

CFR 1926.

3.3.1.10.2. PROTECTION AGAINST MOVING PARTS

Moving parts shall be provided with guards to protect personnel from possible injury. Guards shall be in accordance with ANSI B15.1.

3.3.1.10.3. PLACARDS

Conspicuous placards shall be mounted adjacent to areas where hazards may exist (i.e., high voltage, pinch points, and tripping hazards). Placards shall also be used to identify operating limits (i.e., capacity, speed, and incline) in a conspicuous location for operators' use.

3.3.1.10.4. FAIL-SAFE CONTROLS

No controls shall cause false operation or endanger personnel if a part should fail. No damage or destruction of any component shall result from reduced voltage or complete loss of power.

3.3.1.10.5. CLEAN-UP

The Contractor shall, at all times, keep the work area, including storage areas, free from the accumulation of waste materials and dust which would cause a hazard or nuisance to others. The approved methods of stabilization for dust control are sprinkling, chemical treatment (non-ODS) or a similar method approved by the COTR. If there is a cutting process, the solution shall be vacuumed up during the process to prevent dust pollution and water damage. Before leaving the site, the Contractor shall remove all rubbish, tools, equipment, and materials that are not the property of the Government. At the completion of the installation/test, the Contractor shall leave the site in a clean, neat and orderly condition satisfactory to the COTR. Waste will be removed daily from the site and shall not be allowed to accumulate to the extent that it becomes a safety or fire hazard. It shall be the Contractor's responsibility to dispose of waste in accordance with all applicable Federal, State, County and Municipal codes.

3.3.1.10.6. RACK CAPACITY LEVELS

All racking (including wide-span etc.) shall have labels applied to all shelves/arms detailing their weight capacities. The

FA8604-18-R-8103/0001 Attachment 1 Page 14 of 28

Holloman AFB, Cover PD - Page 11 labels shall be approximately 2" x 4". Inscribed metal plates or paper stickers containing this information shall be acceptable.

3.3.1.11. HUMAN ENGINEERING

The system design and layout shall incorporate ergonomic design criteria so the optimal interface between operator and equipment is attained.

3.3.2. MATERIALS

3.3.2.1. STEEL

The structural steel components shall meet all design property requirements of AISC 360-05.

3.3.2.2. MECHANICAL FASTENING DEVICES

Unless otherwise specified, all threaded connectors of diameter greater than 7/16 inch shall be either A325 bolts conforming to ASTM A325 or SAE Grade 5 bolts conforming to SAE J429. All structural joints shall be in accordance with AISC 360-05. Bolt hole diameters shall not exceed nominal bolt diameters by more than 1/16 inch. All bolt holes shall be free of burrs, pins, or slivers. Bolts shall extend a minimum of two threads beyond the nuts. All nuts, bolts, and other threaded fasteners shall be plated or galvanized to prevent corrosion. All threaded fasteners shall utilize plated flat and lock washers as required.

3.3.2.3. ANCHORS

Anchors shall, at a minimum, meet the requirements of ASTM A307.

Anchors shall be either the drop-in expansion type or wedge type. All anchors shall be sufficient in size to withstand the calculated pullout and shear forces experienced by the equipment. Minimum anchor sizes shall be 3/8 inch in diameter or, if applicable, as specified in the appendices. Anchor lengths shall be long enough to assure that the manufacturer's minimum embedment in concrete is maintained and shall be installed properly to maintain the required minimum concrete embedment. Anchors shall be spaced so that the manufacturer's recommended minimum allowable spacing between anchors is maintained and the recommended minimum allowable edge distance is maintained. All anchors shall be torqued to the manufacturer's recommended installation torque. When required, adhesive anchors may be used; subject to approval by the COTR.

FA8604-18-R-8103/0001 Attachment 1 Page 15 of 28

Holloman AFB, Cover PD - Page 12

3.3.3. PROTECTIVE COATINGS

All system component surfaces shall be protected from corrosion by painting, plating, or galvanizing.

3.3.3.1. PAINTING

Metal surfaces, which are not galvanized or plated, shall be cleaned, treated, and painted to protect against rust, corrosion, and deterioration. The first coat of paint or primer shall be applied to a dry clean surface as soon as practicable after cleaning and treating the metal. The primer shall not interfere with the application and adhesion of subsequent coats.

Paint shall last the service life of the equipment. Paint shall be lead and chromate free and meet air pollution requirements for solvent emissions. When several standard colors are available, a color selection chart shall be submitted to the COTR with the shop drawings for selection. The finish coat shall be a smooth, even surface, free from runs, sags, and defects when dry. Welded surfaces shall be cleaned and painted after the welding process is complete. Prepainted accessories, as well as surfaces not requiring paint, shall be protected from overspray.

3.3.3.2. PLATING

All surfaces to be plated shall be thoroughly cleaned to provide a surface free of mill scale, oil, grease, dirt, rust, and any other foreign material prior to being plated. Plating at a minimum shall comply with ASTM B633, Service Condition 1, Type I unless otherwise specified.

3.3.3.3. GALVANIZING

All metal surfaces to be galvanized shall be thoroughly cleaned to provide smooth surfaces and shall comply with ASTM A153 and

ASTM A123.

3.3.3.4. DISSIMILAR METALS

Materials used and their locations shall not promote galvanic corrosion. No combination of materials shall be used that form an electrolytic couple of such nature that corrosion is accelerated.

3.3.4. WELDING

FA8604-18-R-8103/0001 Attachment 1 Page 16 of 28

Holloman AFB, Cover PD - Page 13

Dimensional tolerances for welded construction, details of welds, and quality of welds shall be in accordance with the applicable requirements of AWS B2.1, AWS D1.1, and AWS D14.1.

The Government reserves the right to perform supplemental nondestructive and destructive tests to determine compliance.

Safety precautions during welding shall conform to ANSI Z49.1.

3.3.4.1. WELDING PROCEDURE QUALIFICATION

Qualification of welding procedures shall conform to the applicable requirements of AWS B2.1, AWS D1.1, and AWS D14.1.

The Government reserves the right to request copies of Welding Procedure Specifications for any welding procedure followed in the fabrication of this system.

3.3.4.2. WELDER PERFORMANCE QUALIFICATION

Each welder, welding operator, and tack welder assigned to work on this system shall be qualified in accordance with the applicable requirements of AWS B2.1, AWS D1.1, and AWS D14.1.

The Government reserves the right to request certification (Performance Qualification Test Record) that each welder, welding operator, or tack welder is qualified as specified.

3.3.4.3. FIRE PROTECTION

All welding, cutting, brazing, and burning operations shall be accomplished in strict compliance with the requirements outlined in AFI 91-203 and NFPA Standard 51B. Prior to starting any welding, cutting, brazing, or burning operations, the Contractor shall obtain a permit (USAF Welding, Cutting, and Brazing AF Form 592). This permit can be obtained by contacting the Holloman Fire Department at least 24 hours in advance. A copy of each permit will be retained at the work site until the work has been completed. Operations that produce flying, dropping slag, metal or embers shall have sufficient non-combustible materials and fire blankets on site to protect against fire damage or personal injury. In addition, the contractor shall provide a minimum of 2 portable fire extinguishers at the work site until the work has been completed. Extinguishers shall meet a rating of 4A-40BC and the requirements outlined in AFOSH 91-501, Chapter 6. At the close of their operation, the contractor shall make a thorough inspection of each building in which he/she has performed work. This inspection shall ensure that all necessary safeguards relative to potential fire hazards are in effect and operational. The contractor shall familiarize themselves and their personnel on the location of all telephones needed for fire reporting. The contractor shall maintain good

FA8604-18-R-8103/0001 Attachment 1 Page 17 of 28

Holloman AFB, Cover PD - Page 14 housekeeping practices to reduce the risk of fire, damage, and/or personal injury. All scrap materials, rubbish, and refuse shall be removed daily from in and around the building and shall not be permitted to be strewn on adjacent property.

Flammable and combustible materials used inside the building shall be kept to a minimum and removed from the building during unused periods. Storage of flammable/combustible materials shall not be permitted inside the building.

3.3.5. CUTTING

All edges produced by oxygen-flame cutting or any cutting operation shall be finished by grinding (or other method approved by the COTR) to a surface finish equivalent to that of adjacent surfaces. Sharp edges shall not be acceptable.

3.3.6. COORDINATION

The Contractor shall obtain approval from the local base civil engineering, fire, safety, and bioenvironmental offices before making any modifications to the existing structure to accommodate the new system. The modifications shall match existing work and shall be of comparable quality. The COTR shall also approve all modifications before they are made.

3.3.7. NAMEPLATES

The Contractor shall provide and install one corrosion resistant metal nameplate for each component. A nameplate for each row of shelving/rack shall be provided such that if one row is dismantled, the nameplates will exist elsewhere. For conveyors, a nameplate shall be provided for each kind of conveyor in the system (i.e. takeaway, gravity, curves, incline/decline, etc).Nameplates shall be located in a visible and safe location.

Nameplates shall last the life of the equipment and shall be capable of withstanding local environmental conditions.

Nameplates shall be stamped, engraved, or etched in a print type not less than 1/8-inch tall. No nameplate or product marking shall be installed until all touch-up painting has been completed. The nameplate or product marking shall clearly display the following headings and corresponding information.

Type of equipment Name of manufacturer Model Number Contract Number Serial Number Capacity

FA8604-18-R-8103/0001 Attachment 1 Page 18 of 28

Holloman AFB, Cover PD - Page 15

Weight Manufacture Date, Month/Year "Property of US Government"

The following information shall be listed on the nameplate for each vehicle/truck:

Type of equipment Name of manufacturer Model Number Contract Number Serial Number Capacity - pounds at 24 inch load centers Service Weight - pounds (with battery) Weight of Battery - pounds Manufacture Date, Month/Year "Property of US Government"

3.3.8. PRECEDENCE

Where local codes and standards conflict with the contents of this PD, the more stringent requirement shall prevail.

3.4. DOCUMENTATION

The Contractor shall provide documentation (data) as described below and in accordance with Table 1 below. Where possible, the Contractor shall print on recycled paper. Also, the Contractor shall not require the use of any Class I ozone depleting substance in any submittal.

3.4.1. MANAGEMENT REPORTS

The Contractor shall provide a monthly status report complete with schedule. The report shall be either Microsoft word document or a PDF file. The monthly status report shall be submitted in accordance with Table 1. Contractor format is acceptable as long as it provides the following information as a minimum;

A) A front cover sheet which includes the title of report, the contractor’s name and address, the base name, the contract number, and the date.

B) A schedule showing progress against schedule to date of report submission and future schedule to contract completion. Schedule as a minimum shall provide the following milestones; submission of data items, if applicable the post award conference, fabrication, shipping, installation, and testing.

FA8604-18-R-8103/0001 Attachment 1 Page 19 of 28

Holloman AFB, Cover PD - Page 16

C) The body of the report shall provide a summary of the progress to date. It shall identify any problem areas, any changes in schedule or contract equipment, any engineering change proposals, all significant trips, emails, or telephone calls affecting the performance or scope of the contract.

3.4.2. SHOP DRAWINGS

The Contractor shall provide shop drawings, which includes at a minimum; all drawings and instructions required for installation of the system. The shop drawing package shall be submitted in as required by Table 1.

3.4.3. EQUIPMENT MANUALS

Operation and maintenance manuals and illustrated parts breakdowns shall be required for every system component with moving parts, electrical/electronic parts and especially components requiring maintenance. Manuals shall incorporate maintenance, testing, inspection, and operator qualification requirements of AFOSH 127-46. Warranties shall be included in the manuals or provided as a separate data item. Manuals shall be submitted in accordance with Table 1.

3.4.4. CERTIFICATIONS

After installation of all equipment the contractor shall certify the system meets or exceeds the requirements listed in sections

4.3.3 of this Cover Purchase Description and all appendices. A general statement that the delivered system meets or exceeds all system requirements is not acceptable i.e. the contractor shall certify each requirement one-by-one. With these certifications the contractor shall also certify the tests in paragraph 4.3.2 of this Cover Purchase Description and of all appendices have been performed and the system is ready for Government inspection.

3.4.5. AS-BUILT DRAWINGS

The Contractor shall provide as-built drawings of all drawing submitted as part of the shop drawing package. As-built drawings shall be submitted in accordance with Table 1.

Table 1 – Data Requirements

SUBMITTAL DUE DATE DISTRIBUTION LIST

FA8604-18-R-8103/0001 Attachment 1 Page 20 of 28

Holloman AFB, Cover PD - Page 17

James Rowland james.rowland .5@us.af.mil

Buyer identified at time of award

SMSgt Eric Campbell

Management Reports (3.4.1)

1st business day of each month starting after the month the contract is awarded email with attachment of report email with attachment of report email with attachment of report

Shop Drawings (3.4.2)

Due date is same as

CLIN 0001

Email with attachment of drawings (AutoCAD and PDF) (and one set of hard copies (D Size))

Email with attachment of drawings

(PDF)

Email with attachment of drawings (AutoCAD and PDF) and one set of hard copies (D size)

Manuals (3.4.3)

With delivery of equipment

Email with attachment of manuals (PDF)

Email indicating delivery of manuals completed

Email with attachment of manuals (PDF) and 2 sets of hard copies

Certifications (3.4.4)

Within 2 business days of system installatio n completion

Email with attachment of certification s (Word Document or

PDF)

Email with attachment of certificat ions (Word Document or PDF)

Email with attachment of certificatio ns (Word Document or

PDF)

As-built Drawings (3.4.5)

30 days after Government acceptance of system

Email with attachment of drawings (AutoCAD and PDF) (and one set of hard copies (D Size))

Email with attachment of drawings

(PDF)

Email with attachment of drawings (AutoCAD and PDF) and one set of hard copies (D size)

3.5. ORIENTATION

The Contractor shall provide technical services and materials to orient Government personnel. Fully qualified Contractor personnel who are knowledgeable of the system shall accomplish

FA8604-18-R-8103/0001 Attachment 1 Page 21 of 28 mailto:.5@us.af.mil

Holloman AFB, Cover PD - Page 18 all orientation. Courses shall be combined in accordance with the Contractor's standard commercial training courses, where applicable, provided all aspects of training are included.

Orientation shall be provided at Holloman AFB. The Contractor shall provide each attendee with a certificate indicating successful completion of the orientation. All orientation shall be completed prior to the start of the quality conformance test.

3.5.1. SYSTEM OPERATOR ORIENTATION

This orientation shall provide instructions in the overall operational functions that are performed by the system operators. Instructions shall include the operation of all the system components. Upon completion of this course, the operators shall be able to operate all components of the system.

Operators shall be able to perform these functions using only the reference manuals provided with the system relative to operations. An estimated 6 students with possibly no experience will attend.

3.5.1.1. SYSTEM OPERATOR CLASSROOM INSTRUCTIONS

The classroom phase shall include instructions in the operational requirements of the installed system. Classroom instructions shall include a briefing and orientation on the use of the operation manuals supplied by the Contractor. Classroom instructions shall be developed so that it can be placed on videotape. Classroom instructions shall be a minimum of 1 hour.

3.5.1.2. SYSTEM OPERATOR HANDS-ON INSTRUCTIONS

The hands on phase shall include actual operation of the system under the supervision and instruction of the Contractor. Hands-on instruction shall be a minimum of 1 hour.

3.5.2. MAINTENANCE ORIENTATION

This orientation shall provide instructions in corrective and preventive maintenance of the system delivered. Instruction shall include installation and adjustment of all system components. Upon completion of this orientation, students shall be able to install, adjust, and maintain equipment stated using only the maintenance reference manual delivered. An estimated 6 students with possibly no experience will attend.

3.5.2.1. MAINTENANCE CLASSROOM INSTRUCTION

FA8604-18-R-8103/0001 Attachment 1 Page 22 of 28

Holloman AFB, Cover PD - Page 19

The classroom phase shall include instruction in the maintenance requirements of the installed system. Classroom instruction shall include a briefing and orientation on the use of the maintenance manuals supplied by the Contractor. Classroom instruction shall be developed so that it can be placed on videotape. Classroom instruction shall be a minimum of 1 hour.

3.5.2.2. MAINTENANCE HANDS-ON INSTRUCTION

The hands-on phase shall include actual field instruction in the maintenance requirements of the installed system. Hands-on instructions shall be a minimum of 1 hour.

4. QUALITY ASSURANCE PROVISIONS

4.1. GENERAL

The COTR shall monitor the installation of the system. The system delivery dates shall not be extended because of work stoppages caused by unacceptable practices and/or test failures.

For all inspections and tests, the Contractor shall provide all test apparatus (i.e., tape measures, levels, calipers, micrometers, stop watches). All test apparatus will be returned to Contractor upon completion of all tests. The Government will provide all test loads.The Contractor shall be responsible for loading and unloading all test loads and performing all inspections and tests. The Contractor shall provide a knowledgeable and authoritative representative on site during the entire acceptance tests.

4.2. ACCEPTANCE TESTS

Three tests must be successfully completed prior to the Government accepting the system. These tests are the system checkout test, the quality conformance test, and the reliability demonstration test.

4.2.1. SYSTEM CHECKOUT TEST

Upon completion of installation, the Contractor using loads of the type specified herein and in the appendices shall check out the system. The Contractor shall inspect the system to assure that the system meets all the requirements of 4.3.1. The Contractor shall also test the system in accordance with the test defined in 4.3.2. All inspections and tests shall be repeated until all modifications and/or adjustments are complete and the system passes all inspections and tests. The Contractor shall submit to the Contracting Officer written certification

FA8604-18-R-8103/0001 Attachment 1 Page 23 of 28

Holloman AFB, Cover PD - Page 20 that the system has passed the requirements of this paragraph.

The COTR will schedule the quality conformance test to start within 10 days following the receipt of the written certification from the Contractor.

4.2.2. QUALITY CONFORMANCE TEST

As part of the quality conformance test, the Contractor shall provide written certification that the requirements listed in

4.3.3. have been met. This certification is required on or before the start of the quality conformance test. The Contractor, in the presence of the COTR, shall inspect the system to confirm that the system meets all the requirements of

4.3.1. The Contractor, in the presence of the COTR, shall also test the system in accordance with the test defined in 4.3.2.

Upon successful completion of all tests and inspections and the receipt of all certifications, the reliability demonstration shall start.

4.2.3. RELIABILITY DEMONSTRATION TEST

After successful completion of the quality conformance test, each component of the system shall demonstrate a reliability and availability greater than that listed in the reliability/availability table in 3.3.1.1. In addition, all static components shall demonstrate compliance with the requirements of the purchase description (PD). The test period shall be the 30 calendar days immediately following the successful completion of the quality conformance test. If the system does not demonstrate the required reliability and availability or compliance with the PD, the test will be restarted from the beginning after the Contractor has taken corrective action. The Contractor shall be allowed to restart the reliability demonstration test a maximum of 2 times. If the system fails to pass the reliability demonstration within 3 attempts, then the system shall be rejected.

4.3. INSPECTIONS, TESTS, AND CERTIFICATIONS

This section defines all inspections and tests that must be completed as part of the system checkout test and repeated at the quality conformance test. This section also includes a list of all certifications that must be received from the Contractor on or before the start of the quality conformance test. The Contractor may add to this list, or question any requirement, by sending a letter to the Contracting Officer prior to the

FA8604-18-R-8103/0001 Attachment 1 Page 24 of 28

Holloman AFB, Cover PD - Page 21 acceptance tests. The COTR will classify all deficiencies encountered into one of the defect classification listed below.

Any critical or major defect found shall be cause for rejection of the system. Any combination of two or more minor defects shall leave the rejection of the system at the discretion of the

COTR.

Critical Defect - A defect that judgment and experience indicate is likely to result in hazardous or unsafe conditions for individuals using, maintaining, working near, or depending upon the equipment.

Major Defect - A defect other than critical that is likely to result in failure, or reduce materially the system for its intended purpose.

Minor Defect - A defect that is not likely to reduce materially the usability of the system for its intended purpose, or is a departure from established standards having little bearing on the effective use or operation of the system.

4.3.1. INSPECTIONS

The system shall be inspected to verify that it meets all the requirements of sections 1, 2, and 3 of the cover purchase description (and associate appendices, if applicable). These inspections shall be completed as part of the system checkout test and again as a part of the quality conformance test.

4.3.2. TESTS

The tests in associated appendices shall be performed on the system as part of the system checkout test and again as a part of the quality conformance test.

4.3.3. CERTIFICATIONS

The Contractor shall provide certification that the following requirements (and the certification requirements of associated appendices) have been met in accordance with the Contract Data Requirements List.

No. Paragraph Certifications

1. 3.2.2.2. The installation conforms to applicable rules of NFPA 70.

FA8604-18-R-8103/0001 Attachment 1 Page 25 of 28

Holloman AFB, Cover PD - Page 22

2. 3.3.1.2. The system was designed, fabricated, and installed to facilitate maintainability and ensure a minimum service life of 15 years.

3. 3.3.1.8. The system was designed to withstand seismic zone 1 conditions.

4. 3.3.1.11.1. The system installation practices and completed system meet all applicable requirements of OSHA 29 CFR 1910 and OSHA 29 CFR 1926.

5. 3.3.1.11.2. Guards are in accordance with ANSI B15.1.

6. 3.3.2.1. The structural steel components meet all design property requirements of AISC 325.

7. 3.3.2.2. All structural joints are in accordance with

AISC 325.

8. 3.3.2.3. Anchors meet the requirements of ASTM A307.

9. 3.3.3.2. Plating complies with ASTM B633, Service Condition 1, Type I.

10. 3.3.3.3. All metal surfaces to be galvanized were thoroughly cleaned to provide smooth surfaces and comply with ASTM A153 and ASTM A123.

11. 3.3.4. Dimensional tolerances for welded construction, details of welds, and quality of welds are in accordance with the applicable requirements of AWS B2.1, AWS D1.1 and AWS D14.1.

12. 3.3.4.2. Each welder, welding operator, and tack welder assigned to work on this system was qualified in accordance with the applicable requirements of AWS B2.1, AWS D1.1, and AWS D14.1.

FA8604-18-R-8103/0001 Attachment 1 Page 26 of 28

Holloman AFB, Cover PD, TPQ – Page 1 of 2

TECHNICAL PROPOSAL QUESTIONNAIRE

FOR

COVER PURCHASE DESCRIPTION

Solicitation Number: FA8604- -R- Project Title: Storage Aid System Base: Holloman AFB, New Mexico CSN: AHL705 Cover Purchase Description, 8 February 2018

The Offeror shall complete this questionnaire. All entries to this questionnaire shall be typed. The questionnaire will be used to determine the Offeror's understanding of the requirements and acceptability of the proposed equipment.

Please attach any exceptions to the Cover Purchase Description as detailed below.

Paragraph Characteristics

3. Are all the requirements specified in the Cover Purchase Description complied with except for any exceptions taken as indicated on the attached exception sheet?

YES NO

FA8604-18-R-8103/0001 Attachment 1 Page 27 of 28

TECHNICAL PROPOSAL QUESTIONNAIRE

FOR THE COVER PURCHASE DESCRIPTION

Holloman AFB, Cover PD, TPQ - Page 2 of 2

EXCEPTIONS

Attach any exceptions taken to the Purchase Description Appendix. Please outline those concerns in detail. Your exceptions will be reviewed to determine acceptability.

Are exceptions taken? YES NO

Number of pages attached: ____________________________________

FA8604-18-R-8103/0001 Attachment 1 Page 28 of 28

SCOPE
General Scope
Definitions
APPLICABLE DOCUMENTS
Government documents
Non-Government documents
REQUIREMENTS
System description
Wide span shevling
modular workstations
modular cabinets
armamanet shelving
Two Ton rolling hoist
Removal and Disposal of EXisting Equipment
Characteristics
Noise levels
Electrical characteristics REV1
Power source
POWER DISTRIBUTION PANELS
Installation code
Conduit
Grounding
Wiring
Overcurrent protection
Environmental protection
Protection fROM mechanical damage
Design and fabrication
Design criteria
Maintainability
Environmental conditions
Standard, commercial components
Standardization
Special tools
Accessibility
Structural requirements
Verification of dimensions
OZONE DEPLETING SUBSTANCES (ods)
Safety
Occupational Safety and Health Administration
Protection against moving parts
Placards
Fail-safe controls
CLEAN-UP
RACK CAPACITY LEVELS

Human engineering

MaterialS
Steel
Mechanical fastening devices
Anchors
Protective coatings
Painting
Plating
Galvanizing
Dissimilar metals
Welding
Welding procedure qualification
Welder performance qualification
fire protection
Cutting
Coordination
Nameplates
Precedence
Documentation
Management Reports
Shop Drawings
Equipment Manuals
Certifications
As-Built Drawings
Orientation
System operator orientation
System operator classroom instructions
System operator hands-on instructions
Maintenance orientation
Maintenance classroom instruction
Maintenance hands-on instruction
QUALITY ASSURANCE PROVISIONS
General
Acceptance Tests
System checkout test
Quality conformance test
Reliability demonstration test
Inspections, tests, and certifications
Inspections
Tests
Certifications