Statement_of_Work_-_FIJI_FAME_Cartridges.pdf

PDF 19 KB Posted

Attached to
FIJI FAME Cartidges Federal contract opportunity
Solicitation number
FA8601-19-Q-A154
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

Statement of Work for FIJI FAME Cartridges

View the file

Other files for this federal contract opportunity

Other files attached to FIJI FAME Cartidges, newest first.
File Type Posted
SoleSource_FAME_Cartridges_-_Final_Redacted.pdf PDF
Notice_of_Intent-Solicitation_-_FA860119QA154.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Seta FIJI FAME Cartridges

PR# F3ST9239A001

September 2019

The following is a list of requirements for purchase of a Seta FIJI FAME Cartridges. These cartridges will be used to test for Fatty Acid Methyl Esters (FAME) Content in Aviation Turbine Fuel at the Air Force Petroleum Agency’s Aerospace Fuels Laboratories.

1. This cartridges must fully comply with ASTM D7797-12 test methodology for the determination of FAME content in Aviation Turbine Fuel.

a. Page 2, Paragraph 2 of T.O. 42B-1-1 (Quality Control of Fuels and Lubricants), provides direction for use of MIL-STD-3004D (Quality Assurance/Surveillance for Fuels, Lubricants and Related Products) for testing requirements. MIL-STD- 3004D, Page 14, Para 1.1 states ‘Requirements for procurement needs may be derived from this document’ and Para 2 references the list of testing methods required. This requirement is found in ASTM D1655 (Standard Specification for Aviation Turbine Fuels) states ASTM D7797-12 test methodology must be used to test this product.

2. The cartridge must consist of a cap, 20µm upper frit, a 6mL polypropylene cartridge housing with a 2.85g +/- 5% sorbent, a 20µm lower frit, the input seal housing and an exit Luer fitting.

3. The cartridge must also fit into the Fiji FAME instrument, Model SA5000-2.

4. Estimated delivery is 10 weeks from receipt of Award.

Note: A copy of ASTM D7797-12 may be obtained by writing; ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959; by telephone at 610-832- 9255; by e-mail at service@astm.org; or through the ASTM website at www.astm.org

DELIVERY PROCEDURES COMMERCIAL VEHICLES

All vehicles larger than a large pick-up truck are required to be inspected by the Wright-Patterson Air Force Base Commercial Vehicle Delivery Gate (CVDG) prior to entering the installation.

Vehicles to be inspected include, but are not limited to, the following:

1. Step van/panel truck

2. Tractor/trailer, box and flatbed containing cargo

3. Tanker trucks

4. Box trucks mailto:service@astm.org http://www.astm.org/

5. Tour buses

6. Garbage/recycled waste trucks

7. Concrete trucks/mixers, dump trucks

8. Cranes, recreational vehicles, petroleum tanker

This inspection will be conducted at Gate 16A located off State Route 444.

The following are exemptions to vehicles utilizing the CVDG:

1. If the vehicle has the product inside (concrete and asphalt trucks) and timely delivery is necessary due to product deterioration it does not need to enter the CVDG. To bypass the CVDG, the contractor shall submit a list containing drivers’ names, social security numbers and the state in which the driver's license is held for those drivers who will be entering the base. This shall be accomplished 24 hours prior to requested entry time. If entry is requested on Monday, this list must be submitted by Friday at 1630 hours. All lists shall be submitted to the 88th ABW/CE Directorate contract inspector. The only gates that may be used under this exemption shall be 15A, 26A, 38A, and gate 1B. If the driver's name is not on the list, he/she will not be allowed access to the installation through these gates and the base will not assume liability for denied access.

2. If a delivery vehicle must exit, and then re-enter the base to complete its route, the vehicle shall be resealed upon exiting the base. After initially passing through the commercial vehicle delivery gate, trucks shall be resealed at Gates 15A, 38A and 22B. The resealing of the trucks will allow them to continue to any other area of the installation (Areas A, B, or Kittyhawk) without reprocessing through the CVDG. To receive resealing assistance, the drivers shall physically stop at one of the three authorized gates and request the installation entry controller to reseal their truck and provide the next location of their delivery. The controller will reseal the truck and give the delivery driver a pre-clearance form. The driver shall present the pre-clearance form to the entry controller at the next point of installation entry. This reentry can be through any base gate.

Vehicles may be subject to an inspection at any of installation entry control points during a directed random antiterrorism measure (RAM.) Any commercial vehicle, regardless of size, can be directed to the CVDG at the discretion of the installation entry controller.

(End of Statement)

File details come from the government source that posted it.