Pre-Award_RFIs_1-12.pdf
PDF 8 MB Posted
- Attached to
- Repair HVAC Solicitation Federal contract opportunity
- Solicitation number
- FA8601-18-B-0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pre-Award_RFIs_13-26.pdf | ||
| Amendment_1_Solicitation.pdf | ||
| Roof_Pictures.pdf | ||
| Site_Visit_Sign-In.pdf | ||
| Attachment_4_-_Addendum.pdf | ||
| FA860118B0003_IFB.pdf | ||
| Attachment_2_-_Specifications_150027.pdf | ||
| Attachment_3_-_Wage_Determination_150027.pdf | ||
| https://www.fbo.gov/index?s=procurement&mode=form&id=70f51a4f0f6965a52b9696c25cdd81c1&tab=ntype | HTML file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA8601-18-B-0003
Repair HVAC PMEL
Project #15-0027 Vendor RFIs and Government Responses 1
30 May 2018
1. While looking at the lighting plan (E300) A1 doesn’t appear. Also, A2 doesn’t match lighting schedule. Please advise.
Response: A1 is located exterior of Mech Rm’s 120, 127, 128 & 129, and Rm 221 (Rm “221” on the drawings is a typo, and should have been Rm “121”).
A2 symbol (all dark) on the lighting schedule on Sht. E405 has been changed to match the A2 symbol on Sht. E300. Revised E405 drawing is attached to this RFI.
Project #15-0027 Vendor RFIs and Government Responses 2-8
31 May 2018
2. Notes D04 & D05/AD101 call for removal existing mechanical louvers and vent and filling walls with new brick. Please identify locations of these items and/or provide opening sizes since none is shown on drawings.
Response: Sizes and locations of mechanical louvers/vents to be removed are shown on the mechanical drawings.
3. General Note D/A101 calls for partitions type S1.0. Please provide details for the type S1.0.
Response: Partion type is single layer of type “X” GWB each side of metal stud wall system. Overall width of new wall system to match adjacent wall.
4. Please provide details for door and frame types per Door Schedule on A101.
Response: Drawing A101 “PMEL Door Schedule” provides the necessary detail to what type of door/doorframe to be used. Three types of doors, most are full slabs, and fur with fire rated glass. All doorframes are to be welded hollow metal frames, and the hardware sets are listed in the specifications.
5. Please clarify a discrepancy for ceiling in Room 118A between drawings AD101 and A201. If we remove existing ceiling, would we need to install new ACT there or leave it opened to the deck per A201?
Response: The existing ceiling in Rm 118A (Light Room) is to remain.
6. Please clarify the extent of work for replacing existing board insulation and new semi-rigid insulation: do we need to cover the entire ceiling or just ~4’ along the perimeter walls? Do we need to remove existing ceiling insulation?
Response: If you are referring to the Reflected Ceiling Plan Legend notes on Sht. A201, the intent is to provide new semi-rigid R-10 insulation with foil faced vapor barrier on the exterior walls above the suspended ceiling up to the roof deck. The walls to receive this insulation are identified by the dashed line. In Room 118 and above Room 119 (Cold Room), the exterior wall already contains this insulation above the suspended ceiling, but some of it has been removed and/or has become detached from the wall. It is this insulation that is either to be repaired (restored to new condition) or replaced per the notes (Contractor’s discretion). A couple of pictures of this damaged/missing insulation, taken above the Cold Room ceiling, is included with this RFI response.
7. Please confirm that the Government is responsible for removing all equipment, furnishing and furniture from the work area.
Response: The Government is responsible for removing all equipment, furnishing and furniture from the work area, except for that identified in Specification Section 01 01 00 paragraph 1.05.C.
8. Will the Government permit to use the facility restrooms during the construction? Will the Government allow to use the facility premises for the field office?
Response: The facility restrooms will be under renovation in this project, to include new plumbing. The restrooms will be down during this portion of the construction.
The field office can be in the facility if can make this work. Note that virtually every room has some sort of construction going on. An office in Rooms 118A, 119, 125A, & 126 is prohibited.
Project #15-0027 Vendor RFIs and Government Responses 9-12
9. Will the Government accept other than Allerton fire alarm system?
Response: Yes. Must meet Spec Section 28 31 76.
10. Will the asbestos abatement contractor be stripping piping of the asbestos containing insulation, or entirely removing the pipe including the insulation?
Response: That is entirely up to the contractor. The only piping identified with asbestos containing insulation is shown on Sht’s PD101 and MD103, and that piping is shown to be removed.
11. For hand-carry bids who do we contact and are there different instructions for hand-carried bids?
Response: Contact Lt Evan Ewing and TSgt Kyle Wheat (listed in solicitation) for any questions regarding hand-carried bids. Instructions in the Solicitation are applicable to all bids whether mailed or hand-carried. Turning in bids the day of the opening must be done before time of opening which is 2:00 PM EDT 18 June 2018.
12. Specifications pages 439-443 call for signs as outlined, but there are none to be found on the Drawings. Is there signage on this project?
Response: Yes. New room # signs.
A4
LIGHT SYMBOL
4000 LUMENS
MANUFACTURER
WATTS
POWER RATING
120V, 1 PH
LITHONIA
A3 EATON
120V, 1 PH
A2
A5
LITHONIA
120V, 1 PH
LITHONIA
57.3
120V, 1 PH
NEW LIGHTING SCHEDULE
LIGHT SYMBOL
MARK
2ALL2 CTRF
ZL1N
GRAD LINEAR
4VT2
CATALOG NO.
CRI
A1
A2
A3
A4
A5
LUMEN OUTPUT
PER LIGHT
WARRANTYCOLOR
TEMPERATURE
LIGHT DESCRIPTION
LED, 2x2, CENTER FILL LED
4' INDUSTRIAL LED VAPORTITE
10 YEAR
10 YEAR
10 YEAR
10 YEAR
4000K
4000K
4000K
4000K
4' GRAD LINEAR , LED
LED STRIPLIGHT
6000 LUMENS
3200 LUMENS
5000 LUMENS
CRI >= 70
CRI >= 70
CRI >= 70
CRI >= 70
MOUNTING SIZE
(WXLXD)
RECESSED
SURFACE/RECESSED
CHAIN MOUNT.
CHAIN MOUNT.
24"X24"X4"
7"X49"X6"
8"X48"X2"
2.3"X48"X2.3"
A1
LITHONIA
120V, 1 PH
TWS LED
CRI >= 70
1476 LUMENS
LED WALL LUMINARIES
5000K
10 YEAR
WALL MOUNTED
7"X11"X6"
EATON
120V-277V, 1 PH
WKP6BLEDEDFC 10 YEAR
5000K
LED FULL CUT WALL MOUNT
3192 LUMENS
CRI >= 70 10"X17"X17"WALL MOUNTED
A6
A6
E
A2
LITHONIAA7
120V, 1 PH
GRAD LINEAR
10 YEAR
4000K
4' GRAD LINEAR , LED6000 LUMENS
CRI >= 70 CHAIN MOUNT.
8"X48"X2"A8 A8
LITHONIA
EXIT SIGN, STANDARD - RED LED - WHITE BACKGROUND. BUILT IN BATTERY BACKUP CEILING OR WALL MOUNTED.
SELF DIAGNOSTIC OPTION. 90 MINUTE BATTERY BACKUP. NI-CAD BATTERY.
120V, 1 PH
NOTES
PROVIDE BUILT IN SURGE PROTECTION FOR EXTERIOR LIGHTING
A8
LED EXIT SIGN EMERGENCY LIGHT COMBO. WALL OR CEILING MOUNTED. 90 MINUTE BATTERY BACKUP. NI-CAD BATTERY.A9
ELM2
1.5 NA
10 YEAR
WALL/CEILING MTD
LED THERMO EMERG LIGHT
NA
4.1"X10.2"X3.6"
RED EXIT WITH BATTERY
EXR LED EL M6 NA
120V, 1 PH
0.8LITHONIA
NA
WALL/CEILING MTD
7.5"X12"X2"
ECR LED HO M6
120V, 1 PH
10 YEAR
10 YEARNA
WALL/CEILING MTD 9"X20"X4.5"LED EXIT/UNIT COMBO3.8
LITHONIA
NA
NA
NA
NA
A2E LED, 2x2, CENTER FILL LED
10 YEAR
4000K
RECESSED 24"X24"X4"
BUILT IN 90 MINUTE BATTERY (1200 NOMINAL LUMEN IN CASE OF NORMAL POWER LOSS)
4000 LUMENS
120V, 1 PH
LITHONIA
2ALL2 CTRF
CRI >= 70
PROVIDE DIMMABLE FOR INDICATED ROOMS PER DRAWING NOTES.
COORDINATOR ENGINEERING CHIEF
DATE REVISION BY
NO.
DATE NO. REVISION BY
V
N
G
E
E
R
USAF
DESIGN CHIEF
ELECTRICAL LIGHTING SCHEDULE
15 Mar 18 001 Addendum Number 001 CJT
Cold Room Attch #1
Cold Room Attch #2
| RFI 01 response |
| RFIs 2-8 |
| RFIs 2-8 |
| Above Cold Room 1 |
| Above Cold Room 2 |
RFIs 9-12 response