Addendum_01.pdf
PDF 390 KB Posted
- Attached to
- Project 140016 Repair HVAC and CER Federal contract opportunity
- Solicitation number
- FA8601-17-B-0004
About this file
Addendum 01 including added specification/drawing(s).
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI_002_003_Response.pdf | ||
| FA8601-17-B-0004-A0001.pdf | ||
| Wage_Determination_OH102_(16_Jun_17).pdf | ||
| Response_to_RFI_001.pdf | ||
| Proj_140016_-_Pre-Award_Site_Visit.pdf | ||
| Drawings.pdf | ||
| Specifications.pdf | ||
| Wage_Determination_OH102_(2_Jun_17).pdf | ||
| FA8601-17-B-0004.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Template Version 19 Aug 2011
ADDENDUM NUMBER 01
TO
DRAWINGS AND SPECIFICATIONS
FOR
Repair HVAC and CER
FACILITY 20620
WRIGHT-PATTERSON AIR FORCE BASE, OHIO
PROJECT NUMBER: ZHTV 140016
1. The contract Drawings and Specifications are hereby amended in part as follows:
A. Add the attached specification section 09 90 00 titled “PAINTS AND
COATINGS”.
B. Add the attached specification section 27 10 00 titled “Telecommunications Cabling System”.
C. Add the following text to Plan Note 5 on E303: “ALL CABLING TO NEW
DATA OUTLETS ARE FROM THIS LOCATION.”
D. Add the following text to Plan Note 2 on sheet E303: “ALL CABLING TO
NEW DATA OUTLETS ARE FROM THE SECOND RACK FROM THE
END NEAR THE SYMBOL FOR NOTE 2 JUST INSIDE ROOM 1CP115”.
E. Add the following text to Plan Note 1 on FA201: “THIS EXISTING FIRE
ALARM/MASS NOTIFICATION CONTROL PANEL IS A SIMPLEX
MODEL 4100U”.
F. Add the following text to Plan Note 4 on E300: “ALL CIRCUITS/CABLING
SHALL BE RUN TO THE BOTTOM LEFT RACK JUST BELOW THE
SYMBOL FOR NOTE 4. THE CIRCUITS/CABLING SHALL EXTEDN
FROM THE LADDER RACK TO THE FLOOR. CABLES SHALL BE OF
SO TYPE WITH STRAIN RELIEF FITTINGS. THE 30 AMP
CIRCUITS/CABLES SHALL BE L6-30 TYPE. THE 50 AMP
CIRCUITS/CABLES SHALL BE PIN AND SLEVE 460C9W TYPE.”
G. Add the following text to Plan Note 2 on H201: “THE TEMPORARY
COOLING REQUIREMENT IS 42,000 BTU PER HOUR”.
H. Replace drawing sheet E303 with the attached new drawing sheet E302 annotated as REVISION NO. 1, ADDENDUM 01, dated 17 JUL 17.
2. This Addendum Number 01 hereby forms and is made a part of the above named project drawings and specifications.
17 Jul 17
DSN 140016 REPAIR HVAC AND CER IN FACILITY 20620
20e 30, 2017
SECTION 09 90 00
PAINTS AND COATINGS
05/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH)
ACGIH 0100 (2015; Suppl 2002-2016) Documentation of the Threshold Limit Values and Biological Exposure Indices
ASTM INTERNATIONAL (ASTM)
ASTM D235 (2002; R 2012) Mineral Spirits (Petroleum Spirits) (Hydrocarbon Dry Cleaning Solvent)
ASTM D4214 (2007; R 2015) Standard Test Method for Evaluating the Degree of Chalking of Exterior Paint Films
ASTM D4263 (1983; R 2012) Indicating Moisture in Concrete by the Plastic Sheet Method
ASTM D4444 (2013) Use and Calibration of Hand-Held Moisture Meters
ASTM D523 (2014) Standard Test Method for Specular Gloss
ASTM D6386 (2016) Standard Practice for Preparation of Zinc (Hot-Dip Galvanized) Coated Iron and Steel Product and Hardware Surfaces for Painting
ASTM F1869 (2016) Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride
MASTER PAINTERS INSTITUTE (MPI)
MPI 101 (Oct 2009) Epoxy Anti-Corrosive Metal Primer
MPI 107 (Oct 2009) Rust Inhibitive Primer (Water-Based)
MPI 108 (Oct 2009) High Build Epoxy Coating, Low Gloss
MPI 119 (Oct 2009) Exterior Latex, Gloss
SECTION 09 90 00 Page 1
DSN 140016 REPAIR HVAC AND CER IN FACILITY 20620 201606012
11 July 2017
Repair to Relocate Canteen ZHTV 150047 Facility 20620 June 30, 2017
MPI 134 (Oct 2009) Galvanized Primer (Waterbased)
MPI 147 (May 2016) Institutional Low Odor / VOC Interior Latex, Semi-Gloss, MPI Gloss Level 5
MPI 153 (Oct 2009) Interior W.B. Light Industrial Coating, Semi-Gloss, MPI Gloss Level 5
MPI 163 (Oct 2009) Exterior W.B. Light Industrial Coating, Semi-Gloss, MPI Gloss Level 5
MPI 164 (Oct 2009) Exterior W.B. Light Industrial Coating, Gloss, MPI Gloss Level 6
MPI 23 (Oct 2009) Surface Tolerant Metal Primer
MPI 4 (Oct 2009) Interior/Exterior Latex Block Filler
MPI 42 (Oct 2009) Latex Stucco and Masonry Textured Coating
MPI 44 (Oct 2009) Interior Latex, MPI Gloss Level
MPI 48 (Oct 2009) Interior Alkyd, Gloss, MPI Gloss Level 6
MPI 50 (Oct 2009) Interior Latex Primer Sealer
MPI 54 (Oct 2009) Interior Latex, Semi-Gloss, MPI Gloss Level 5
MPI 79 (Oct 2009) Alkyd Anti-Corrosive Metal Primer
MPI 9 (Oct 2009) Exterior Alkyd, Gloss, MPI Gloss Level 6
MPI 95 (Oct 2009) Quick Drying Primer for Aluminum
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SCS Global Services (SCS)Indoor Advantage
SCS SP-01 (2000) Environmentally Preferable Product Specification for Architectural and Anti-Corrosive Paints
SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC 7/NACE No.4 (2007; E 2004) Brush-Off Blast Cleaning
SSPC Guide 6 (2015) Guide for Containing Surface Preparation Debris Generated During Paint Removal Operations
SECTION 09 90 00 Page 2
SSPC Guide 7 (2004; E 2004) Guide to the Disposal of Lead-Contaminated Surface Preparation Debris
SSPC PA 1 (2000; E 2004) Shop, Field, and Maintenance Painting of Steel
SSPC PA Guide 3 (1982; E 1995) A Guide to Safety in Paint Application
SSPC QP 1 (2012; E 2012) Standard Procedure for Evaluating Painting Contractors (Field Application to Complex Industrial Structures)
SSPC SP 1 (2015) Solvent Cleaning
SSPC SP 10/NACE No. 2 (2007) Near-White Blast Cleaning
SSPC SP 12/NACE No.5 (2002) Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating
SSPC SP 2 (1982; E 2000; E 2004) Hand Tool Cleaning
SSPC SP 3 (1982; E 2004) Power Tool Cleaning
SSPC SP 6/NACE No.3 (2007) Commercial Blast Cleaning
SSPC VIS 1 (2002; E 2004) Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning
SSPC VIS 3 (2004) Guide and Reference Photographs for Steel Surfaces Prepared by Hand and Power Tool Cleaning
SSPC VIS 4/NACE VIS 7 (1998; E 2000; E 2004) Guide and Reference Photographs for Steel Surfaces Prepared by Waterjetting
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. DEPARTMENT OF DEFENSE (DOD)
MIL-STD-101 (2014; Rev C) Color Code for Pipelines and for Compressed Gas Cylinders
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
FED-STD-313 (2014; Rev E) Material Safety Data, Transportation Data and Disposal Data for Hazardous Materials Furnished to Government Activities
SECTION 09 90 00 Page 3
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.1000 Air Contaminants
29 CFR 1910.1025 Lead
29 CFR 1926.62 Lead
UL ENVIRONMENT (ULE)
ULE Greenguard UL Greenguard Certification Program
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
The current MPI, "Approved Product List" which lists paint by brand, label, product name and product code as of the date of contract award, will be used to determine compliance with the submittal requirements of this specification. The Contractor may choose to use a subsequent MPI "Approved Product List", however, only one list may be used for the entire contract and each coating system is to be from a single manufacturer. All coats on a particular substrate must be from a single manufacturer. No variation from the MPI Approved Products List is acceptable.
Samples of specified materials may be taken and tested for compliance with specification requirements.
In keeping with the intent of Executive Order 13101, "Greening the Government through Waste Prevention, Recycling, and Federal Acquisition", products certified by SCS as meeting SCS SP-01 shall be given preferential consideration over registered products. Products that are registered shall be given preferential consideration over products not carrying any EPP designation.
SD-02 Shop Drawings
Piping identification ; G
Submit color stencil codes ; G
SD-03 Product Data
Certification ; G
Coating ; G
Manufacturer's Technical Data Sheets
Indicate VOC content.
SD-04 Samples
Color ; G
SECTION 09 90 00 Page 4
Submit manufacturer's samples of paint colors. Cross reference color samples to color scheme as indicated.
Textured Wall Coating System ; G
Sample Textured Wall Coating System Mock-Up ; G
SD-07 Certificates
Applicator's qualifications ; G
Qualification Testing laboratory for coatings; G
SD-08 Manufacturer's Instructions
Application instructions ; G
Manufacturer's Material Safety Data Sheets
Submit manufacturer's Material Safety Data Sheets for coatings, solvents, and other potentially hazardous materials, as defined in
FED-STD-313 .
SD-10 Operation and Maintenance Data
Coatings ; G
Preprinted cleaning and maintenance instructions for all coating systems shall be provided.
1.3 APPLICATOR'S QUALIFICATIONS
1.3.1 SSPC QP 1 Certification
All contractors and subcontractors that perform surface preparation or coating application shall be certified by the Society for Protective Coatings (formerly Steel Structures Painting Council) (SSPC) to the requirements of SSPC QP 1 prior to contract award, and shall remain certified while accomplishing any surface preparation or coating application. The painting contractors and painting subcontractors must remain so certified for the duration of the project. If a contractor's or subcontractor's certification expires, the firm will not be allowed to perform any work until the certification is reissued. Requests for extension of time for any delay to the completion of the project due to an inactive certification will not be considered and liquidated damages will apply. Notify the Contracting Officer of any change in contractor certification status.
1.4 QUALITY ASSURANCE
1.4.1 Field Samples and Tests
The Contracting Officer may choose up to two coatings that have been delivered to the site to be tested at no cost to the Government. Take samples of each chosen product as specified in the paragraph "Sampling Procedures." Test each chosen product as specified in the paragraph "Testing Procedure." Products which do not conform, shall be removed from the job site and replaced with new products that conform to the referenced
SECTION 09 90 00 Page 5 specification. Testing of replacement products that failed initial testing shall be at no cost to the Government.
1.4.2 Textured Wall Coating System
Three complete samples of each indicated type, pattern, and color of textured wall coating system applied to a panel of the same material as that on which the coating system will be applied in the work. Samples of wall coating systems shall be minimum 5 by 7 inches and of sufficient size to show pattern repeat and texture.
1.4.3 Sample Textured Wall Coating System Mock-Up
After coating samples are approved, and prior to starting installation, a minimum 8 foot by 8 foot mock-up shall be provided for each substrate and for each color and type of textured wall coating, using the actual substrate materials. Once approved the mock-up samples shall be used as a standard of workmanship for installation within the facility. At least 48 hours prior to mock-up installation, the Contractor shall submit written notification to the Contracting Officer's Representative.
1.4.4 Sustainable Design Certification
Product shall be third party certified in accordance with ULE Greenguard , SCS Scientific Certification Systems Indoor Advantage or equal.
Certification shall be performed annually and shall be current.
1.5 REGULATORY REQUIREMENTS
1.5.1 Environmental Protection
In addition to requirements specified elsewhere for environmental protection, provide coating materials that conform to the restrictions of the local Air Pollution Control District and regional jurisdiction.
Notify Contracting Officer of any paint specified herein which fails to conform.
1.5.2 Lead Content
Do not use coatings having a lead content over 0.06 percent by weight of nonvolatile content.
1.5.3 Chromate Content
Do not use coatings containing zinc-chromate or strontium-chromate.
1.5.4 Asbestos Content
Materials shall not contain asbestos.
1.5.5 Mercury Content
Materials shall not contain mercury or mercury compounds.
1.5.6 Silica
Abrasive blast media shall not contain free crystalline silica.
SECTION 09 90 00 Page 6
1.5.7 Human Carcinogens
Materials shall not contain ACGIH 0100 confirmed human carcinogens (A1) or suspected human carcinogens (A2).
1.6 PACKAGING, LABELING, AND STORAGE
Paints shall be in sealed containers that legibly show the contract specification number, designation name, formula or specification number, batch number, color, quantity, date of manufacture, manufacturer's formulation number, manufacturer's directions including any warnings and special precautions, and name and address of manufacturer. Pigmented paints shall be furnished in containers not larger than 5 gallons . Paints and thinners shall be stored in accordance with the manufacturer's written directions, and as a minimum, stored off the ground, under cover, with sufficient ventilation to prevent the buildup of flammable vapors, and at temperatures between 40 to 95 degrees F . Do not store paint, polyurethane, varnish, or wood stain products with materials that have a high capacity to adsorb VOC emissions. Do not store paint, polyurethane, varnish, or wood stain products in occupied spaces.
1.7 SAFETY AND HEALTH
Apply coating materials using safety methods and equipment in accordance with the following:
Work shall comply with applicable Federal, State, and local laws and regulations, and with the ACCIDENT PREVENTION PLAN, including the Activity Hazard Analysis as specified in Section 01 35 26 GOVERNMENT SAFETY REQUIREMENTS and in Appendix A of EM 385-1-1 . The Activity Hazard Analysis shall include analyses of the potential impact of painting operations on painting personnel and on others involved in and adjacent to the work zone.
1.7.1 Safety Methods Used During Coating Application
Comply with the requirements of SSPC PA Guide 3 .
1.7.2 Toxic Materials
To protect personnel from overexposure to toxic materials, conform to the most stringent guidance of:
a. The applicable manufacturer's Material Safety Data Sheets (MSDS) or local regulation.
b. 29 CFR 1910.1000 .
c. ACGIH 0100 , threshold limit values.
d. The appropriate OSHA standard in 29 CFR 1910.1025 and 29 CFR 1926.62 for surface preparation on painted surfaces containing lead. Removal and disposal of coatings which contain lead is specified in Section
02 82 33.13 20 REMOVAL/CONTROL AND DISPOSAL OF PAINT WITH LEAD."
Additional guidance is given in SSPC Guide 6 and SSPC Guide 7 . Refer to drawings for list of hazardous materials located on this project.
Contractor to coordinate paint preparation activities with this specification section.
SECTION 09 90 00 Page 7
1.8 ENVIRONMENTAL CONDITIONS
Comply, at minimum, with manufacturer recommendations for space ventilation during and after installation.
1.8.1 Coatings
Do not apply coating when air or substrate conditions are:
a. Less than 5 degrees F above dew point;
b. Below 50 degrees F or over 95 degrees F , unless specifically pre-approved by the Contracting Officer and the product manufacturer.
Under no circumstances shall application conditions exceed manufacturer recommendations.
1.8.2 Post-Application
Vacate space for as long as possible after application. Wait a minimum of 48 hours before occupying freshly painted rooms. Maintain one of the following ventilation conditions during the curing period, or for 72 hours after application:
a. Supply 100 percent outside air 24 hours a day.
b. Supply airflow at a rate of 6 air changes per hour, when outside temperatures are between 55 degrees F and 85 degrees F and humidity is between 30 percent and 60 percent.
c. Supply airflow at a rate of 1.5 air changes per hour, when outside air conditions are not within the range stipulated above.
1.9 SUSTAINABLE DESIGN REQUIREMENTS
1.10 SCHEDULING
Allow paint, polyurethane, varnish, and wood stain installations to cure prior to the installation of materials that adsorb VOCs.
1.11 COLOR SELECTION
Colors of finish coats shall be as indicated or specified. Where not indicated or specified, colors shall be selected by the Contracting Officer. Manufacturers' names and color identification are used for the purpose of color identification only. Named products are acceptable for use only if they conform to specified requirements. Products of other manufacturers are acceptable if the colors approximate colors indicated and the product conforms to specified requirements.
Tint each coat progressively darker to enable confirmation of the number of coats.
Color, texture, and pattern of wall coating systems shall be as indicated.
1.12 LOCATION AND SURFACE TYPE TO BE PAINTED
1.12.1 Painting Included
Where a space or surface is indicated to be painted, include the following unless indicated otherwise.
SECTION 09 90 00 Page 8
a. Surfaces behind portable objects and surface mounted articles readily detachable by removal of fasteners, such as screws and bolts.
b. New factory finished surfaces that require identification or color coding and factory finished surfaces that are damaged during performance of the work.
c. Existing coated surfaces that are damaged during performance of the work.
1.12.1.1 Exterior Painting
Includes new surfaces of the building and appurtenances. Also included are existing coated surfaces made bare by cleaning operations.
1.12.1.2 Interior Painting
Includes new surfaces and existing coated surfaces of the building and appurtenances as indicated and existing coated surfaces made bare by cleaning operations. Where a space or surface is indicated to be painted, include the following items, unless indicated otherwise.
a. Exposed columns, girders, beams, joists, and metal deck; and
b. Other contiguous surfaces.
1.12.2 Painting Excluded
Do not paint the following unless indicated otherwise.
a. Surfaces concealed and made inaccessible by panelboards, fixed ductwork, machinery, and equipment fixed in place.
b. Surfaces in concealed spaces. Concealed spaces are defined as enclosed spaces above suspended ceilings, furred spaces, attic spaces, crawl spaces, elevator shafts and chases.
c. Steel to be embedded in concrete.
d. Copper, stainless steel, aluminum, brass, and lead except existing coated surfaces.
e. Hardware, fittings, and other factory finished items.
1.12.3 Mechanical and Electrical Painting
Includes field coating of interior new and existing surfaces.
a. Where a space or surface is indicated to be painted, include the following items unless indicated otherwise.
(1) Exposed piping, conduit, and ductwork;
(2) Supports, hangers, air grilles, and registers;
(3) Miscellaneous metalwork and insulation coverings.
b. Do not paint the following, unless indicated otherwise:
SECTION 09 90 00 Page 9
(1) New zinc-coated, aluminum, and copper surfaces under insulation
(2) New aluminum jacket on piping
(3) New interior ferrous piping under insulation.
1.12.3.1 Fire Extinguishing Sprinkler Systems
Clean, pretreat, prime, and paint new fire extinguishing sprinkler systems including valves, piping, conduit, hangers, supports, miscellaneous metalwork, and accessories. Apply coatings to clean, dry surfaces, using clean brushes. Clean the surfaces to remove dust, dirt, rust, and loose mill scale. Immediately after cleaning, provide the metal surfaces with one coat primer per schedules. Shield sprinkler heads with protective covering while painting is in progress. Upon completion of painting, remove protective covering from sprinkler heads. Remove sprinkler heads which have been painted and replace with new sprinkler heads. Provide primed surfaces with the following:
a. Piping in Unfinished Areas: Provide primed surfaces with one coat of red alkyd gloss enamel applied to a minimum dry film thickness of 1.0 mil in attic spaces, spaces above suspended ceilings, crawl spaces, pipe chases, mechanical equipment room, and spaces where walls or ceiling are not painted or not constructed of a prefinished material.
b. Piping in Finished Areas: Provide primed surfaces with two coats of paint to match adjacent surfaces, except provide valves and operating accessories with one coat of red alkyd gloss enamel applied to a minimum dry film thickness of 1.0 mil . Provide piping with 2 inch wide red enamel bands or self-adhering red plastic bands spaced at maximum of 20 foot intervals throughout the piping systems.
1.12.4 Definitions and Abbreviations
1.12.4.1 Qualification Testing
Qualification testing is the performance of all test requirements listed in the product specification. This testing is accomplished by MPI to qualify each product for the MPI Approved Product List, and may also be accomplished by Contractor's third party testing lab if an alternative to Batch Quality Conformance Testing by MPI is desired.
1.12.4.2 Batch Quality Conformance Testing
Batch quality conformance testing determines that the product provided is the same as the product qualified to the appropriate product specification. This testing shall only be accomplished by MPI testing lab.
1.12.4.3 Coating
A film or thin layer applied to a base material called a substrate. A coating may be a metal, alloy, paint, or solid/liquid suspensions on various substrates (metals, plastics, wood, paper, leather, cloth, etc.).
They may be applied by electrolysis, vapor deposition, vacuum, or mechanical means such as brushing, spraying, calendaring, and roller coating. A coating may be applied for aesthetic or protective purposes or both. The term "coating" as used herein includes emulsions, enamels, stains, varnishes, sealers, epoxies, and other coatings, whether used as
SECTION 09 90 00 Page 10 primer, intermediate, or finish coat. The terms paint and coating are used interchangeably.
1.12.4.4 DFT or dft
Dry film thickness, the film thickness of the fully cured, dry paint or coating.
1.12.4.5 DSD
Degree of Surface Degradation, the MPI system of defining degree of surface degradation. Five (5) levels are generically defined under the Assessment sections in the MPI Maintenance Repainting Manual.
1.12.4.6 EPP
Environmentally Preferred Products, a standard for determining environmental preferability in support of Executive Order 13101.
1.12.4.7 EXT
MPI short term designation for an exterior coating system.
1.12.4.8 INT
MPI short term designation for an interior coating system.
1.12.4.9 micron / microns
The metric measurement for 0.001 mm or one/one-thousandth of a millimeter.
1.12.4.10 mil / mils
The English measurement for 0.001 in or one/one-thousandth of an inch, equal to 25.4 microns or 0.0254 mm.
1.12.4.11 mm
The metric measurement for millimeter, 0.001 meter or one/one-thousandth of a meter.
1.12.4.12 MPI Gloss Levels
MPI system of defining gloss. Seven (7) gloss levels (G1 to G7) are generically defined under the Evaluation sections of the MPI Manuals.
Traditionally, Flat refers to G1/G2, Eggshell refers to G3, Semigloss refers to G5, and Gloss refers to G6.
Gloss levels are defined by MPI as follows:
Gloss Description Units Units Level at 60 degrees at 85 degrees
G1 Matte or Flat 0 to 5 10 max G2 Velvet 0 to 10 10 to 35 G3 Eggshell 10 to 25 10 to 35 G4 Satin 20 to 35 35 min G5 Semi-Gloss 35 to 70 G6 Gloss 70 to 85
SECTION 09 90 00 Page 11
Gloss Description Units Units Level at 60 degrees at 85 degrees G7 High Gloss
Gloss is tested in accordance with ASTM D523. Historically, the Government has used Flat (G1 / G2), Eggshell (G3), Semi-Gloss (G5), and Gloss (G6).
1.12.4.13 MPI System Number
The MPI coating system number in each Division found in either the MPI Architectural Painting Specification Manual or the Maintenance Repainting Manual and defined as an exterior (EXT/REX) or interior system (INT/RIN).
The Division number follows the CSI Master Format.
1.12.4.14 Paint
See Coating definition.
1.12.4.15 REX
MPI short term designation for an exterior coating system used in repainting projects or over existing coating systems.
1.12.4.16 RIN
MPI short term designation for an interior coating system used in repainting projects or over existing coating systems.
PART 2 PRODUCTS
2.1 MATERIALS
Conform to the coating specifications and standards referenced in PART 3.
Submit manufacturer's technical data sheets for specified coatings and solvents. Comply with applicable regulations regarding toxic and hazardous materials.
PART 3 EXECUTION
3.1 PROTECTION OF AREAS AND SPACES NOT TO BE PAINTED
Prior to surface preparation and coating applications, remove, mask, or otherwise protect, hardware, hardware accessories, machined surfaces, radiator covers, plates, lighting fixtures, public and private property, and other such items not to be coated that are in contact with surfaces to be coated. Following completion of painting, workmen skilled in the trades involved shall reinstall removed items. Restore surfaces contaminated by coating materials, to original condition and repair damaged items.
3.2 SURFACE PREPARATION
Remove dirt, splinters, loose particles, grease, oil, disintegrated coatings, and other foreign matter and substances deleterious to coating performance as specified for each substrate before application of paint or surface treatments. Oil and grease shall be removed prior to mechanical cleaning. Cleaning shall be programmed so that dust and other contaminants will not fall on wet, newly painted surfaces. Exposed
SECTION 09 90 00 Page 12 ferrous metals such as nail heads on or in contact with surfaces to be painted with water-thinned paints, shall be spot-primed with a suitable corrosion-inhibitive primer capable of preventing flash rusting and compatible with the coating specified for the adjacent areas.
3.2.1 Additional Requirements for Preparation of Surfaces With Existing Coatings
Before application of coatings, perform the following on surfaces covered by soundly-adhered coatings, defined as those which cannot be removed with a putty knife:
a. Test existing finishes for lead before sanding, scraping, or removing. If lead is present, refer to paragraph Toxic Materials.
b. Wipe previously painted surfaces to receive solvent-based coatings, except stucco and similarly rough surfaces clean with a clean, dry cloth saturated with mineral spirits, ASTM D235. Allow surface to dry. Wiping shall immediately precede the application of the first coat of any coating, unless specified otherwise.
c. Sand existing glossy surfaces to be painted to reduce gloss. Brush, and wipe clean with a damp cloth to remove dust.
d. The requirements specified are minimum. Comply also with the application instructions of the paint manufacturer.
e. Previously painted surfaces specified to be repainted shall be thoroughly cleaned of all grease, dirt, dust or other foreign matter.
f. Blistering, cracking, flaking and peeling or other deteriorated coatings shall be removed.
g. Chalk shall be removed so that when tested in accordance with ASTM D4214, the chalk resistance rating is no less than 8.
h. Slick surfaces shall be roughened. Damaged areas such as, but not limited to, nail holes, cracks, chips, and spalls shall be repaired with suitable material to match adjacent undamaged areas.
i. Edges of chipped paint shall be feather edged and sanded smooth.
j. Rusty metal surfaces shall be cleaned as per SSPC requirements.
Solvent, mechanical, or chemical cleaning methods shall be used to provide surfaces suitable for painting.
k. New, proposed coatings shall be compatible with existing coatings.
3.2.2 Existing Coated Surfaces with Minor Defects
Sand, spackle, and treat minor defects to render them smooth. Minor defects are defined as scratches, nicks, cracks, gouges, spalls, alligatoring, chalking, and irregularities due to partial peeling of previous coatings. Remove chalking by sanding so that when tested in accordance with ASTM D4214, the chalk rating is not less than 8.
3.2.3 Removal of Existing Coatings
Remove existing coatings from the following surfaces:
SECTION 09 90 00 Page 13
a. Surfaces containing large areas of minor defects;
b. Surfaces containing more than 20 percent peeling area; and
c. Surfaces designated by the Contracting Officer, such as surfaces where rust shows through existing coatings.
3.2.4 Substrate Repair
a. Repair substrate surface damaged during coating removal;
b. Sand edges of adjacent soundly-adhered existing coatings so they are tapered as smooth as practical to areas involved with coating removal;
and
c. Clean and prime the substrate as specified.
3.3 PREPARATION OF METAL SURFACES
3.3.1 Existing and New Ferrous Surfaces
a. Ferrous Surfaces including Shop-coated Surfaces and Small Areas That Contain Rust, Mill Scale and Other Foreign Substances: Solvent clean or detergent wash in accordance with SSPC SP 1 to remove oil and grease. Where shop coat is missing or damaged, clean according to SSPC SP 2 , or SSPC SP 10/NACE No. 2 . Shop-coated ferrous surfaces shall be protected from corrosion by treating and touching up corroded areas immediately upon detection.
b. Surfaces With More Than 20 Percent Rust, Mill Scale, and Other Foreign Substances: Clean entire surface in accordance with SSPC SP 6/NACE No.3 / SSPC SP 12/NACE No.5 WJ-3.
3.3.2 Final Ferrous Surface Condition:
For tool cleaned surfaces, the requirements are stated in SSPC SP 2 and SSPC SP 3 . As a visual reference, cleaned surfaces shall be similar to photographs in SSPC VIS 3 .
For abrasive blast cleaned surfaces, the requirements are stated in SSPC 7/NACE No.4 , SSPC SP 6/NACE No.3 , and SSPC SP 10/NACE No. 2 . As a visual reference, cleaned surfaces shall be similar to photographs in
SSPC VIS 1 .
For waterjet cleaned surfaces, the requirements are stated in SSPC SP 12/NACE No.5 . As a visual reference, cleaned surfaces shall be similar to photographs in SSPC VIS 4/NACE VIS 7 .
3.3.3 Galvanized Surfaces
a. New or Existing Galvanized Surfaces With Only Dirt and Zinc Oxidation Products: Clean with non-alkaline detergent solution in accordance with SSPC SP 1 . If the galvanized metal has been passivated or stabilized, the coating shall be completely removed by brush-off abrasive blast. New galvanized steel to be coated shall not be "passivated" or "stabilized" If the absence of hexavalent stain inhibitors is not documented, test as described in ASTM D6386, Appendix X2, and remove by one of the methods described therein.
SECTION 09 90 00 Page 14
b. Galvanized with Slight Coating Deterioration or with Little or No Rusting: Water jetting to SSPC SP 12/NACE No.5 WJ3 to remove loose coating from surfaces with less than 20 percent coating deterioration and no blistering, peeling, or cracking. Use inhibitor as recommended by the coating manufacturer to prevent rusting.
c. Galvanized With Severe Deteriorated Coating or Severe Rusting: Spot abrasive blast rusted areas as described for steel in SSPC SP 6/NACE No.3 , and waterjet to SSPC SP 12/NACE No.5 , WJ3 to remove existing coating.
3.3.4 Non-Ferrous Metallic Surfaces
Aluminum and aluminum-alloy, lead, copper, and other nonferrous metal surfaces.
Surface Cleaning: Solvent clean in accordance with SSPC SP 1 and wash with mild non-alkaline detergent to remove dirt and water soluble contaminants.
3.3.5 Terne-Coated Metal Surfaces
Solvent clean surfaces with mineral spirits, ASTM D235. Wipe dry with clean, dry cloths.
3.3.6 Existing Surfaces with a Bituminous or Mastic-Type Coating
Remove chalk, mildew, and other loose material by washing with a solution of 1/2 cup trisodium phosphate, 1/4 cup household detergent, one quart 5 percent sodium hypochlorite solution and 3 quarts of warm water.
3.4 PREPARATION OF CONCRETE AND CEMENTITIOUS SURFACE
3.4.1 Concrete and Masonry
a. Curing: Concrete, stucco and masonry surfaces shall be allowed to cure at least 30 days before painting, except concrete slab on grade, which shall be allowed to cure 90 days before painting.
b. Surface Cleaning: Remove the following deleterious substances.
(1) Dirt, Chalking, Grease, and Oil: Wash new surfaces with a solution composed of 1/2 cup trisodium phosphate, 1/4 cup household detergent, and 4 quarts of warm water. Then rinse thoroughly with fresh water. For large areas, water blasting may be used.
(2) Fungus and Mold: Wash existing coated, and existing uncoated surfaces with a solution composed of 1/2 cup trisodium phosphate, 1/4 cup household detergent, 1 quart 5 percent sodium hypochlorite solution and 3 quarts of warm water. Rinse thoroughly with fresh water.
(3) Paint and Loose Particles: Remove by wire brushing.
(4) Efflorescence: Remove by scraping or wire brushing followed by washing with a 5 to 10 percent by weight aqueous solution of hydrochloric (muriatic) acid. Do not allow acid to remain on the surface for more than five minutes before rinsing with fresh
SECTION 09 90 00 Page 15 water. Do not acid clean more than 4 square feet of surface, per workman, at one time.
(5) Removal of Existing Coatings: For surfaces to receive textured coating MPI 42 , remove existing coatings including soundly adhered coatings if recommended by textured coating manufacturer.
c. Cosmetic Repair of Minor Defects: Repair or fill mortar joints and minor defects, including but not limited to spalls, in accordance with manufacturer's recommendations and prior to coating application.
d. Allowable Moisture Content: Latex coatings may be applied to damp surfaces, but not to surfaces with droplets of water. Do not apply epoxies to damp vertical surfaces as determined by ASTM D4263 or horizontal surfaces that exceed 3 lbs of moisture per 1000 square feet in 24 hours as determined by ASTM F1869. In all cases follow manufacturers recommendations. Allow surfaces to cure a minimum of 30 days before painting.
3.4.2 Gypsum Board, Plaster, and Stucco
a. Surface Cleaning: Plaster and stucco shall be clean and free from loose matter; gypsum board shall be dry. Remove loose dirt and dust by brushing with a soft brush, rubbing with a dry cloth, or vacuum-cleaning prior to application of the first coat material. A damp cloth or sponge may be used if paint will be water-based.
b. Repair of Minor Defects: Prior to painting, repair joints, cracks, holes, surface irregularities, and other minor defects with patching plaster or spackling compound and sand smooth.
c. Allowable Moisture Content: Latex coatings may be applied to damp surfaces, but not surfaces with droplets of water. Do not apply epoxies to damp surfaces as determined by ASTM D4263. New plaster to be coated shall have a maximum moisture content of 8 percent, when measured in accordance with ASTM D4444, Method A, unless otherwise authorized. In addition to moisture content requirements, allow new plaster to age a minimum of 30 days before preparation for painting.
3.5 PREPARATION OF WOOD AND PLYWOOD SURFACES
3.5.1 New and Existing Uncoated, Plywood and Wood Surfaces, Except Floors:
a. Wood surfaces shall be cleaned of foreign matter.
Surface Cleaning: Surfaces shall be free from dust and other deleterious substances and in a condition approved by the Contracting Officer prior to receiving paint or other finish. Do not use water to clean uncoated wood.
b. Removal of Fungus and Mold: Wash existing coated surfaces with a solution composed of 3 ounces (2/3 cup) trisodium phosphate, 1 ounce (1/3 cup) household detergent, 1 quart 5 percent sodium hypochlorite solution and 3 quarts of warm water. Rinse thoroughly with fresh water.
c. Moisture content of the wood shall not exceed 12 percent as measured by a moisture meter in accordance with ASTM D4444, Method A, unless otherwise authorized.
SECTION 09 90 00 Page 16
d. Wood surfaces adjacent to surfaces to receive water-thinned paints shall be primed and/or touched up before applying water-thinned paints.
e. Cracks and Nailheads: Set and putty stop nailheads and putty cracks after the prime coat has dried.
f. Cosmetic Repair of Minor Defects:
(1) Knots and Resinous Wood and Fire, Smoke, Water, and Color Marker Stained Existing Coated Surface: Prior to application of coating, cover knots and stains with two or more coats of 3-pound-cut shellac varnish, plasticized with 5 ounces of castor oil per gallon .
Scrape away existing coatings from knotty areas, and sand before treating. Prime before applying any putty over shellacked area.
(2) Open Joints and Other Openings: Fill with whiting putty, linseed oil putty. Sand smooth after putty has dried.
(3) Checking: Where checking of the wood is present, sand the surface, wipe and apply a coat of pigmented orange shellac. Allow to dry before paint is applied.
3.6 APPLICATION
3.6.1 Coating Application
Painting practices shall comply with applicable federal, state and local laws enacted to insure compliance with Federal Clean Air Standards. Apply coating materials in accordance with SSPC PA 1 . SSPC PA 1 methods are applicable to all substrates, except as modified herein.
At the time of application, paint shall show no signs of deterioration.
Uniform suspension of pigments shall be maintained during application.
Unless otherwise specified or recommended by the paint manufacturer, paint may be applied by brush, roller, or spray. Use trigger operated spray nozzles for water hoses. Rollers for applying paints and enamels shall be of a type designed for the coating to be applied and the surface to be coated. Wear protective clothing and respirators when applying oil-based paints or using spray equipment with any paints.
Paints, except water-thinned types, shall be applied only to surfaces that are completely free of moisture as determined by sight or touch.
Thoroughly work coating materials into joints, crevices, and open spaces.
Special attention shall be given to insure that all edges, corners, crevices, welds, and rivets receive a film thickness equal to that of adjacent painted surfaces.
Each coat of paint shall be applied so dry film shall be of uniform thickness and free from runs, drops, ridges, waves, pinholes or other voids, laps, brush marks, and variations in color, texture, and finish.
Hiding shall be complete.
Touch up damaged coatings before applying subsequent coats. Interior areas shall be broom clean and dust free before and during the application of coating material.
SECTION 09 90 00 Page 17
Apply paint to new fire extinguishing sprinkler systems including valves, piping, conduit, hangers, supports, miscellaneous metal work, and accessories. Shield sprinkler heads with protective coverings while painting is in progress. Remove sprinkler heads which have been painted and replace with new sprinkler heads. For piping in unfinished spaces, provide primed surfaces with one coat of red alkyd gloss enamel to a minimum dry film thickness of 1.0 mil . Unfinished spaces include attic spaces, spaces above suspended ceilings, crawl spaces, pipe chases, mechanical equipment room, and space where walls or ceiling are not painted or not constructed of a prefinished material. For piping in finished areas, provide prime surfaces with two coats of paint to match adjacent surfaces, except provide valves and operating accessories with one coat of red alkyd gloss enamel. Upon completion of painting, remove protective covering from sprinkler heads.
a. Drying Time: Allow time between coats, as recommended by the coating manufacturer, to permit thorough drying, but not to present topcoat adhesion problems. Provide each coat in specified condition to receive next coat.
b. Primers, and Intermediate Coats: Do not allow primers or intermediate coats to dry more than 30 days, or longer than recommended by manufacturer, before applying subsequent coats. Follow manufacturer's recommendations for surface preparation if primers or intermediate coats are allowed to dry longer than recommended by manufacturers of subsequent coatings. Each coat shall cover surface of preceding coat or surface completely, and there shall be a visually perceptible difference in shades of successive coats.
c. Finished Surfaces: Provide finished surfaces free from runs, drops, ridges, waves, laps, brush marks, and variations in colors.
d. Thermosetting Paints: Topcoats over thermosetting paints (epoxies and urethanes) should be applied within the overcoating window recommended by the manufacturer.
3.6.2 Two-Component Systems
Two-component systems shall be mixed in accordance with manufacturer's instructions. Any thinning of the first coat to ensure proper penetration and sealing shall be as recommended by the manufacturer for each type of substrate.
3.6.3 Coating Systems
a. Systems by Substrates: Apply coatings that conform to the respective specifications listed in the following Tables:
Table
Division 3. Exterior Concrete Paint Table Division 4. Exterior Concrete Masonry Units Paint Table Division 5. Exterior Metal, Ferrous and Non-Ferrous Paint Table Division 6. Exterior Wood; Dressed Lumber, Paneling, Decking, Shingles Paint Table Division 9: Exterior Stucco Paint Table Division 10. Exterior Cloth Coverings and Bituminous Coated Surfaces Paint Table
SECTION 09 90 00 Page 18
Table Division 3. Interior Concrete Paint Table Division 4. Interior Concrete Masonry Units Paint Table Division 5. Interior Metal, Ferrous and Non-Ferrous Paint Table Division 6. Interior Wood Paint Table Division 9: Interior Plaster, Gypsum Board, Textured Surfaces Paint Table
b. Minimum Dry Film Thickness (DFT): Apply paints, primers, varnishes, enamels, undercoats, and other coatings to a minimum dry film thickness of 1.5 mil each coat unless specified otherwise in the Tables. Coating thickness where specified, refers to the minimum dry film thickness.
c. Coatings for Surfaces Not Specified Otherwise: Coat surfaces which have not been specified, the same as surfaces having similar conditions of exposure.
d. Existing Surfaces Damaged During Performance of the Work, Including New Patches In Existing Surfaces: Coat surfaces with the following:
(1) One coat of primer.
(2) One coat of undercoat or intermediate coat.
(3) One topcoat to match adjacent surfaces.
e. Existing Coated Surfaces To Be Painted: Apply coatings conforming to the respective specifications listed in the Tables herein, except that pretreatments, sealers and fillers need not be provided on surfaces where existing coatings are soundly adhered and in good condition. Do not omit undercoats or primers.
3.7 COATING SYSTEMS FOR METAL
Apply coatings of Tables in Division 5 for Exterior and Interior.
a. Apply specified ferrous metal primer on the same day that surface is cleaned, to surfaces that meet all specified surface preparation requirements at time of application.
b. Inaccessible Surfaces: Prior to erection, use one coat of specified primer on metal surfaces that will be inaccessible after erection.
c. Shop-primed Surfaces: Touch up exposed substrates and damaged coatings to protect from rusting prior to applying field primer.
d. Surface Previously Coated with Epoxy or Urethane: Apply MPI 101, 1.5 mils DFT immediately prior to application of epoxy or urethane coatings.
e. Pipes and Tubing: The semitransparent film applied to some pipes and tubing at the mill is not to be considered a shop coat, but shall be overcoated with the specified ferrous-metal primer prior to application of finish coats.
f. Exposed Nails, Screws, Fasteners, and Miscellaneous Ferrous Surfaces.
On surfaces to be coated with water thinned coatings, spot prime exposed nails and other ferrous metal with latex primer MPI 107 .
SECTION 09 90 00 Page 19
3.8 COATING SYSTEMS FOR CONCRETE AND CEMENTITIOUS SUBSTRATES
Apply coatings of Tables in Division 3, 4 and 9 for Exterior and Interior.
3.9 PIPING IDENTIFICATION
Piping Identification, Including Surfaces In Concealed Spaces: Provide in accordance with MIL-STD-101 . Place stenciling in clearly visible locations. On piping not covered by MIL-STD-101 , stencil approved names or code letters, in letters a minimum of 1/2 inch high for piping and a minimum of 2 inches high elsewhere. Stencil arrow-shaped markings on piping to indicate direction of flow using black stencil paint.
3.10 INSPECTION AND ACCEPTANCE
In addition to meeting previously specified requirements, demonstrate mobility of moving components, including swinging and sliding doors, cabinets, and windows with operable sash, for inspection by the Contracting Officer. Perform this demonstration after appropriate curing and drying times of coatings have elapsed and prior to invoicing for final payment.
3.11 WASTE MANAGEMENT
As specified in the Waste Management Plan and as follows. Do not use kerosene or any such organic solvents to clean up water based paints.
Properly dispose of paints or solvents in designated containers. Close and seal partially used containers of paint to maintain quality as necessary for reuse. Store in protected, well-ventilated, fire-safe area at moderate temperature. Place materials defined as hazardous or toxic waste in designated containers. Set aside extra paint for future color matches or reuse by the Government.
3.12 PAINT TABLES
All DFT's are minimum values. Acceptable products are listed in the MPI Green Approved Products List, available at http://www.specifygreen.com/APL/ProductIdxByMPInum.asp .
3.12.1 EXTERIOR PAINT TABLES
DIVISION 3: EXTERIOR CONCRETE PAINT TABLE
A. New and uncoated existing concrete;
vertical surfaces, including undersides of balconies and soffits but excluding tops of slabs:
1. Latex New; MPI EXT 3.1A-G6 (Gloss) / Existing; MPI REX 3.1A-G6 (Gloss) Primer: Intermediate: Topcoat:
MPI 119 MPI 119 MPI 119
System DFT: 3.5 mils
Primer as recommended by manufacturer. Topcoat: Coating to match adjacent surfaces.
SECTION 09 90 00 Page 20
DIVISION 4: EXTERIOR CONCRETE MASONRY UNITS PAINT TABLE
A. New concrete masonry on uncoated surface:
1. Latex New; MPI EXT 4.2A-G6 (Gloss) / Existing; MPI REX 4.2A-G6 (Gloss) Block Filler: Primer: Intermediate: Topcoat:
MPI 4 N/A MPI 119 MPI 119
System DFT: 11 mils
Topcoat: Coating to match adjacent surfaces.
DIVISION 5: EXTERIOR METAL, FERROUS AND NON-FERROUS PAINT TABLE
STEEL / FERROUS SURFACES
A. New Steel that has been hand or power tool cleaned to SSPC SP 2 or
SSPC SP 3
1. Alkyd New; MPI EXT 5.1Q-G6 (Gloss) / Existing; MPI REX 5.1D-G6 Primer: Intermediate: Topcoat:
MPI 23 MPI 9 MPI 9
System DFT: 5.25 mils
B. New Steel that has been blast-cleaned to SSPC SP 6/NACE No.3 :
1. Alkyd New; MPI EXT 5.1D-G6 (Gloss) / Existing; MPI REX 5.1D-G6 Primer: Intermediate: Topcoat:
MPI 79 MPI 9 MPI 9
System DFT: 5.25 mils
C. Existing steel that has been spot-blasted to SSPC SP 6/NACE No.3 :
1. Surface previously coated with alkyd or latex:
MPI REX 5.1C-G6 (Gloss) Spot Primer: Intermediate: Topcoat:
MPI 79 MPI 164 MPI 164
System DFT: 5 mils
EXTERIOR GALVANIZED SURFACES
D. New Galvanized surfaces:
1. Waterborne Primer / Waterborne Light Industrial Coating MPI EXT 5.3J-G6 (Gloss) Primer: Intermediate: Topcoat:
MPI 134 MPI 164 MPI 164
System DFT: 4.5 mils
E. Galvanized surfaces with slight coating deterioration; little or no rusting:
1. Waterborne Light Industrial Coating MPI REX 5.3J-G5 (Semigloss) Primer: Intermediate: Topcoat:
SECTION 09 90 00 Page 21
EXTERIOR GALVANIZED SURFACES
MPI 134 N/A MPI 163
System DFT: 4.5 mils
F. Galvanized surfaces with severely deteriorated coating or rusting:
1. Waterborne Light Industrial Coating MPI REX 5.3L-G6(Gloss) Primer: Intermediate: Topcoat:
MPI 101 MPI 108 MPI 164
System DFT: 8.5 mils
EXTERIOR SURFACES, OTHER METALS (NON-FERROUS)
G. Surfaces adjacent to painted surfaces; Mechanical, Electrical, Fire extinguishing sprinkler systems including valves, conduit, hangers, supports, and miscellaneous metal items not otherwise specified except floors, hot metal surfaces, and new prefinished equipment. Match surrounding finish:
1. Waterborne Light Industrial Coating MPI EXT 5.1C-G6(Gloss) Primer: Intermediate: Topcoat:
MPI 79 MPI 164 MPI 164
System DFT: 5 mils
3.12.2 INTERIOR PAINT TABLES
DIVISION 3: INTERIOR CONCRETE PAINT TABLE
A. New and uncoated existing and Existing, previously painted Concrete, vertical surfaces, not specified otherwise:
1. New; MPI INT 3.1A-G5 (Semigloss) / Existing; MPI RIN 3.1A-G5 (Semigloss) Primer: Intermediate: Topcoat:
MPI 50 MPI 54 MPI 54
System DFT: 4 mils
B. New and uncoated existing and Existing, previously painted Concrete in toilets, restrooms, and other high-humidity areas not otherwise specified except floors:
1. Waterborne Light Industrial Coating New; MPI INT 3.1L-G5(Semigloss) / Existing; MPI RIN 3.1C-G5(Semigloss) Primer: Intermediate: Topcoat:
MPI 153 MPI 153 MPI 153
System DFT: 4.8 mils
DIVISION 4: INTERIOR CONCRETE MASONRY UNITS PAINT TABLE
A. New and uncoated Existing Concrete masonry:
1. Institutional Low Odor / Low VOC Latex New; MPI INT 4.2E-G5 (Semigloss) Filler Primer: Intermediate: Topcoat:
MPI 4 N/A MPI 147 MPI 147
System DFT: 4 mils
SECTION 09 90 00 Page 22
DIVISION 4: INTERIOR CONCRETE MASONRY UNITS PAINT TABLE
B. Existing, previously painted Concrete masonry:
1. Institutional Low Odor / Low VOC Latex Existing; MPI RIN 4.2L-G5 (Semigloss) Spot Primer: Intermediate: Topcoat:
MPI 50 MPI 147 MPI 147
System DFT: 4 mils
DIVISION 5: INTERIOR METAL, FERROUS AND NON-FERROUS PAINT TABLE
INTERIOR STEEL / FERROUS SURFACES
A. Metal, Mechanical, Electrical, Fire extinguishing sprinkler systems including valves, conduit, hangers, supports, Surfaces adjacent to painted surfaces (Match surrounding finish), and miscellaneous metal items not otherwise specified except floors, hot metal surfaces, and new prefinished equipment:
1. Alkyd MPI INT 5.1E-G6 (Gloss) Primer: Intermediate: Topcoat:
MPI 79 MPI 48 MPI 48
System DFT: 5.25 mils
B. Miscellaneous non-ferrous metal items not otherwise specified except floors, hot metal surfaces, and new prefinished equipment. Match surrounding finish:
1. Alkyd MPI INT 5.4J-G6 (Gloss) Primer: Intermediate: Topcoat:
MPI 95 MPI 48 MPI 48
System DFT: 5 mils
DIVISION 9: INTERIOR PLASTER, GYPSUM BOARD, TEXTURED SURFACES PAINT
TABLE
A. New and Existing, previously painted Plaster and Wallboard not otherwise specified:
1. Latex New; MPI INT 9.2A-G2 (Flat) / Existing; RIN 9.2A-G2 (Flat) Primer: Intermediate: Topcoat:
MPI 50 MPI 44 MPI 44
System DFT: 4 mils
B. New and Existing, previously painted Plaster and Wallboard in toilets, restrooms, and other high humidity areas not otherwise specified:
1. Waterborne Light Industrial Coating New; MPI INT 9.2L-G5(Semigloss) / Existing; MPI RIN 9.2L-G5 (Semigloss) Primer: Intermediate: Topcoat:
MPI 50 MPI 153 MPI 153
System DFT: 4 mils
-- End of Section --
SECTION 09 90 00 Page 23
SECTION 27 10 00
BUILDING TELECOMMUNICATIONS CABLING SYSTEM
08/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .