Q A_CrashFire_02.10.2016.pdf

PDF 34 KB Posted

Attached to
Fire Training Facility Winterization and Spring Start Up Maintenance Federal contract opportunity
Solicitation number
FA8601-16-R-0012
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

Questions and Answers 02/10/2016

View the file

Other files for this federal contract opportunity

Other files attached to Fire Training Facility Winterization and Spring Start Up Maintenance, newest first.
File Type Posted
5_-_PWS_Fire_Training_Facility_(A).pdf PDF
7_-_Labor_Rate_Worksheet.xlsx XLSX spreadsheet
3_-_Instructions_to_Offerors.pdf PDF
4_-_Evaluation_Factors_-_Crash_Fire_Training_Facility.pdf PDF
1_-_Crash_Fire_CLINS.pdf PDF
6_-_Wage_Determintation_16-R-0012.pdf PDF
2_-_Crash_Fire_Clauses.pdf PDF
Labor_Rate_Worksheet.xlsx XLSX spreadsheet
CrashFireToOfferorsAttach2_9Nov.docx DOCX document
Wage_Determintation_16-R-0012.pdf PDF
CLINS_Fire_Training_Facility.doc DOC document
PWS_Fire_Training_Facility_(A).doc DOC document
Evaluation_Factors_-_Crash_Fire_Training_Facility.docx DOCX document
Crash_Fire_Clauses.docx DOCX document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers:

Q1. Is this a follow-on requirement? If so, could you please provide the incumbent contract number for this opportunity? If not, is this a new requirement?

A1. This is a follow-on requirement. The incumbent contract # is FA8601-13-P-0246

Q2. Item 3 in Instruction to offerors states the offer shall consist of two separate volumes bound in a 3 ring binder. Can these be placed within the same 3 ring binder as long as they are clearly separated by tabs and cover sheets?

A2. Yes, this is acceptable, but not preferred.

Q3. Are hard copies still required if we send an electronic one of both volumes?

A3. Yes. However, one must be received on time to be considered. The mailed copy must be post marked prior to the due date and time to be considered.

File details come from the government source that posted it. Updated .