Updated__Blank_Pricing_Exhibit.xls
XLS spreadsheet 284 KB Posted
- Attached to
- Area B Custodial Services Federal contract opportunity
- Solicitation number
- FA8601-15-R-0008
About this file
This updated pricing exhibit recalculates the option to extend services on Est Contract Value tab in the attached excel spreadsheet.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation_Information_(Hard_Copy_Delivery_Information).docx | DOCX document | |
| Ammendment_1.docx | DOCX document | |
| Area_B_Custodial_Q A.docx | DOCX document | |
| 1449_for_Solicitation.pdf | ||
| Evaluation_Factors_Document.docx | DOCX document | |
| NEW_Appendix_C_-_CAFMs_(10-14-14).pdf | ||
| Wage_Determination.pdf | ||
| Additional_Instructions_to_Offerors.docx | DOCX document | |
| Area_B_PWS_10-14-14_FINAL_for_Solicitation.doc | DOC document | |
| NEW_Appendix_C_-_Data_Sheets_(Floor_Plans)_(10-14-14).pdf | ||
| FINAL__Blank_Pricing_Exhibit.xls | XLS spreadsheet | |
| FNIAL_Appendix_B_(Estimated_Sq._Footage).xls | XLS spreadsheet |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Headings
| Pricing Exhibit: Dated 14 October 2014 | |||||||||
| A plus/minus 10 percent variance in square footage is hereby allowed per Level of service throughout the entire contract performance period without modifications to the contract price. | |||||||||
| An hypothetical example for completing the bid schedule for unit priceis provided below: | |||||||||
| SERVICE | Contract QTY | Contract UNIT OF ISSUE | EST QTY SF PER OCCURRENCE | EST MONTHLY SQ | TOTAL EST SF | PRICE PER SF | MONTHLY PRICE | YEARLY PRICE FOR SERVICE | |
| Provide Level 1, Facility Cleaning | 12 | MO | 53,000.00 | 455,800.00 | 5,469,600.0000 | $ 1,833.3333 | $ 22,000.0000 | ||
| EXAMPLE: | Offeror determines it takes $22,000 per year to complete the task shown above. | ||||||||
| To determine Price per square foot: | |||||||||
| $22000 divided by 5469600 (total Est SF) = $0.0040 per SF | |||||||||
| $.0040 would be entered into Price Per SF | |||||||||
| The monthly price and yearly price for service | |||||||||
| would be entered for the applicable CLIN on the SF 1449 | |||||||||
| ATCH 5 - BID SCHEDULE |
Base 5-1 - 6-30-10
| Atch 5 - Exhibit A - Bid Schedule - Area B Custodial Services - FA8601-10-C-0018 4-13-2010 | |||||||||
| Base POP: | 1 May - 30 June 2010 | ||||||||
| Column A | Column B | Column C | Column D | Column E | Column F | Column G | Column H | Column J | Column K |
| CONTRACT EXHIBIT LINE ITEM NUMBER | SERVICE | Contract QTY | Contract UNIT OF ISSUE | EST QTY SF PER OCCURRENCE | EST MONTHLY SQ | TOTAL EST SF | PRICE PER SF | MONTHLY/UNIT PRICE | TOTAL YEARLY PRICE FOR SERVICE |
| 1 | NON-PERSONAL SERVICES: Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Custodial Services at Wright-Patterson, AFB IAW Performance Work Statement. | ||||||||
| 2 | Provide Level 1, Facility Cleaning | 2 | MO | 72,374.63 | 622,421.82 | 1,244,843.6360 | 0.013115 | $ 8,163.0621 | $ 16,326.1243 |
| 3 | Provide Level 1, Restroom/Locker Room Cleaning | 2 | MO | 5,446.16 | 118,181.67 | 236,363.3440 | 0.023339 | $ 2,758.2420 | $ 5,516.4841 |
| 4 | Provide Level 1, Periodic Cleaning Floor Maintenance (1 time per year) | 1 | LS | 8,593.86 | 8,593.86 | 8,593.8600 | 0.053070 | $ 456.0762 | $ 456.0762 |
| 5 | Provide Level 2, Facility Cleaning | 2 | MO | 1,830,739.90 | 7,872,181.57 | 15,744,363.1400 | 0.003440 | $ 27,080.3046 | $ 54,160.6092 |
| 6 | Provide Level 2, Restroom/Locker Room Cleaning | 2 | MO | 59,531.5400 | 642,940.6320 | 1,285,881.2640 | 0.008735 | $ 5,616.0864 | $ 11,232.1728 |
| 7 | Provide Level 2, Periodic Cleaning Floor Maintenance (1 time per year) | 1 | LS | 249,963.89 | 249,963.89 | 249,963.8900 | 0.011040 | $ 2,759.6013 | $ 2,759.6013 |
| ELINS 0008-0010 - RESERVED | $ - 0 | $ - 0 | |||||||
| 11 | Provide Level 4, Facility Cleaning Fitness Center | 2 | MO | 38,443.85 | 330,617.11 | 661,234.2200 | 0.005485 | $ 1,813.4348 | $ 3,626.8697 |
| 12 | Provide Level 4, Restroom/Locker Room Cleaning - Fitness Center | 5 | MO | 1,003.33 | 26,086.58 | 286,952.3800 | 0.044034 | $ 1,148.6965 | $ 8,040.8755 |
| 13 | Provide Level 4, Periodic - Floor - Cleaning - Fitness Center (1 time per year) | 1 | LS | 30,234.11 | 30,234.11 | 30,234.1100 | 0.017433 | $ 527.0712 | $ 527.0712 |
| Atch 5 - Exhibit A - Bid Schedule - Area B Custodial Services - FA8601-10-C-0018 4-13-2010 | |||||||||
| Base POP: | 1 May - 30 June 2010 | ||||||||
| CONTRACT EXHIBIT LINE ITEM NUMBER | SERVICE | Contract QTY | Contract UNIT OF ISSUE | EST QTY SF PER OCCURRENCE | EST MONTHLY SQ | TOTAL EST SF | PRICE PER SF | MONTHLY/UNIT PRICE | TOTAL YEARLY PRICE FOR SERVICE |
| 14 | Provide Level 4, Facility Cleaning youth Center/ Teen Center / School Age Program | 2 | MO | 33,213.74 | 720,738.16 | 1,441,476.3160 | 0.006450 | $ 4,648.7611 | $ 9,297.5222 |
| 15 | Provide Level 4, Restroom/Locker Room Cleaning Youth Center/Teen Center/ School Age Program | 2 | MO | 1,454.21 | 31,556.36 | 63,112.7140 | 0.037949 | $ 1,197.5322 | $ 2,395.0644 |
| 16 | Provide Level 4,Periodic - Floor - Cleaning Youth Center/Teen Center/ School Age Program (2 times per year) | 1 | LS | 5,968.07 | 11,936.1400 | 0.030060 | $ 358.8004 | ||
| ELINS 17-19 - RESERVED | |||||||||
| 20 | Snow Removal (25 days) | 0 | DA | 32,076.00 | 801,900.00 | 801,900.0000 | 0.004171 | $ 133.7889 | $ - 0 |
| Base Total | $ 114,697.2713 | ||||||||
| Monthly/Unit Price and Total Yearly Price for Service should be entered on the SF 1449. |
Base 7-1 - 9-30-10
| 0 | |||||||||
| Base POP: | 1 July 2010 - 30 September 2010 | ||||||||
| Column A | Column B | Column C | Column D | Column E | Column F | Column G | Column H | Column J | Column K |
| CONTRACT EXHIBIT LINE ITEM NUMBER | SERVICE | Contract QTY | Contract UNIT OF ISSUE | EST QTY SF PER OCCURRENCE | EST MONTHLY SQ | TOTAL EST SF | PRICE PER SF | MONTHLY/UNIT PRICE | TOTAL YEARLY PRICE FOR SERVICE |
| 1 | NON-PERSONAL SERVICES: Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Custodial Services at Wright-Patterson, AFB IAW Performance Work Statement. | ||||||||
| 2 | Provide Level 1, Facility Cleaning | 3 | MO | 72,374.63 | 622,421.82 | 1,867,265.4540 | 0.007510 | $ 4,674.3879 | $ 14,023.1636 |
| 3 | Provide Level 1, Restroom/Locker Room Cleaning | 3 | MO | 5,446.16 | 118,181.67 | 354,545.0160 | 0.023339 | $ 2,758.2420 | $ 8,274.7261 |
| 4 | Provide Level 1, Periodic Cleaning Floor Maintenance (1 time per year) | 1 | LS | 8,593.86 | 8,593.86 | 8,593.8600 | 0.053070 | $ 456.0762 | $ 456.0762 |
| 5 | Provide Level 2, Facility Cleaning | 3 | MO | 1,830,739.90 | 7,872,181.57 | 23,616,544.7100 | 0.003597 | $ 28,316.2371 | $ 84,948.7113 |
| 6 | Provide Level 2, Restroom/Locker Room Cleaning | 3 | MO | 59,531.5400 | 642,940.6320 | 1,928,821.8960 | 0.008735 | $ 5,616.0864 | $ 16,848.2593 |
| 7 | Provide Level 2, Periodic Cleaning Floor Maintenance (1 time per year) | 1 | LS | 249,963.89 | 249,963.89 | 249,963.8900 | 0.011040 | $ 2,759.6013 | $ 2,759.6013 |
| ELINS 0008-0010 - RESERVED | $ - 0 | $ - 0 | |||||||
| 11 | Provide Level 4, Facility Cleaning Fitness Center | 3 | MO | 38,443.85 | 330,617.11 | 991,851.3300 | 0.005982 | $ 1,977.7516 | $ 5,933.2547 |
| 12 | Provide Level 4, Restroom/Locker Room Cleaning - Fitness Center | 7 | MO | 1,003.33 | 26,086.58 | 286,952.3800 | 0.044034 | $ 1,148.6965 | $ 8,040.8755 |
| 13 | Provide Level 4, Periodic - Floor - Cleaning - Fitness Center (1 time per year) | 1 | LS | 30,234.11 | 30,234.11 | 30,234.1100 | 0.017433 | $ 527.0712 | $ 527.0712 |
| 0 | |||||||||
| Base POP: | 1 July 2010 - 30 September 2010 | ||||||||
| CONTRACT EXHIBIT LINE ITEM NUMBER | SERVICE | Contract QTY | Contract UNIT OF ISSUE | EST QTY SF PER OCCURRENCE | EST MONTHLY SQ | TOTAL EST SF | PRICE PER SF | MONTHLY/UNIT PRICE | TOTAL YEARLY PRICE FOR SERVICE |
| 14 | Provide Level 4, Facility Cleaning youth Center/ Teen Center / School Age Program | 3 | MO | 33,213.74 | 720,738.16 | 2,162,214.4740 | 0.007334 | $ 5,285.6054 | $ 15,856.8161 |
| 15 | Provide Level 4, Restroom/Locker Room Cleaning Youth Center/Teen Center/ School Age Program | 3 | MO | 1,454.21 | 31,556.36 | 94,669.0710 | 0.037949 | $ 1,197.5322 | $ 3,592.5966 |
| 16 | Provide Level 4,Periodic - Floor - Cleaning Youth Center/Teen Center/ School Age Program (2 times per year) | 1 | LS | 5,968.07 | 11,936.1400 | 0.030060 | $ 358.8004 | ||
| ELINS 17-19 - RESERVED | |||||||||
| 20 | Snow Removal (25 days) | 0 | DA | 32,076.00 | 801,900.00 | 801,900.0000 | 0.004171 | $ 133.7889 | $ - 0 |
| Base Total | $ 161,619.9522 | ||||||||
| Monthly/Unit Price and Total Yearly Price for Service should be entered on the SF 1449. |
Opt 1 10-1 thru 10-31-10
| 0 | |||||||||
| Opt 1 POP: | 1 October 2010 - 30 September 2011 | ||||||||
| Column A | Column B | Column C | Column D | Column E | Column F | Column G | Column H | Column J | Column K |
| CONTRACT EXHIBIT LINE ITEM NUMBER | SERVICE | Contract QTY | Contract UNIT OF ISSUE | EST QTY SF PER OCCURRENCE | EST MONTHLY SQ | TOTAL EST SF | PRICE PER SF | MONTHLY/UNIT PRICE | TOTAL YEARLY PRICE FOR SERVICE |
| 1001 | NON-PERSONAL SERVICES: Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Custodial Services at Wright-Patterson, AFB IAW Performance Work Statement. | ||||||||
| 1002 | Provide Level 1, Facility Cleaning | 1 | MO | 35,003.63 | 301,031.22 | 301,031.22 | 0.013115 | $ 3,948.0244 | $ 3,948.0244 |
| 1003 | Provide Level 1, Restroom/Locker Room Cleaning | 1 | MO | 999.09 | 21,680.25 | 21,680.25 | 0.023339 | $ 505.9954 | $ 505.9954 |
| 1004 | Provide Level 1, Periodic Cleaning Floor Maintenance (1 time per year) | 1 | LS | 1,874.75 | 1,874.75 | 1,874.7500 | 0.053070 | $ 99.4930 | $ 99.4930 |
| 1005 | Provide Level 2, Facility Cleaning | 1 | MO | 1,952,413.04 | 8,395,376.07 | 8,395,376.07 | 0.003440 | $ 28,880.0937 | $ 28,880.0937 |
| 1006 | Provide Level 2, Restroom/Locker Room Cleaning | 1 | MO | 65,898.2300 | 711,700.8840 | 711,700.88 | 0.008735 | $ 6,216.7072 | $ 6,216.7072 |
| 1007 | Provide Level 2, Periodic Cleaning Floor Maintenance (1 time per year) | 1 | LS | 369,831.53 | 369,831.53 | 369,831.5300 | 0.011040 | $ 4,082.9401 | $ 4,082.9401 |
| ELINS 0008-0010 - RESERVED | $ - 0 | $ - 0 | |||||||
| 1011 | Provide Level 4, Facility Cleaning Fitness Center | 1 | MO | 46,611.29 | 400,857.09 | 400,857.09 | 0.005485 | $ 2,198.7012 | $ 2,198.7012 |
| 1012 | Provide Level 4, Restroom/Locker Room Cleaning - Fitness Center | 1 | MO | 1,288.95 | 33,512.70 | 33,512.70 | 0.044034 | $ 1,475.6982 | $ 1,475.6982 |
| 1013 | Provide Level 4, Periodic - Floor - Cleaning - Fitness Center (1 time per year) | 1 | LS | 35,606.78 | 35,606.78 | 35,606.7800 | 0.017433 | $ 620.7330 | $ 620.7330 |
| 0 | |||||||||
| Opt 1 POP: | 1 October 2010 - 30 September 2011 | ||||||||
| CONTRACT EXHIBIT LINE ITEM NUMBER | SERVICE | Contract QTY | Contract UNIT OF ISSUE | EST QTY SF PER OCCURRENCE | EST MONTHLY SQ | TOTAL EST SF | PRICE PER SF | MONTHLY/UNIT PRICE | TOTAL YEARLY PRICE FOR SERVICE |
| 1014 | Provide Level 4, Facility Cleaning youth Center/ Teen Center / School Age Program | 1 | MO | 33,213.74 | 720,738.1580 | 720,738.16 | 0.006450 | $ 4,648.7611 | $ 4,648.7611 |
| 1015 | Provide Level 4, Restroom/Locker Room Cleaning Youth Center/Teen Center/ School Age Program | 1 | MO | 1,454.21 | 31,556.3570 | 31,556.36 | 0.037949 | $ 1,197.5322 | $ 1,197.5322 |
| 1016 | Provide Level 4,Periodic - Floor - Cleaning Youth Center/Teen Center/ School Age Program (2 times per year) | 1 | LS | 7,422.28 | 14,844.5600 | 0.030060 | $ - 0 | $ 446.2275 | |
| ELINS 1017-1019 - RESERVED | |||||||||
| 1020 | Snow Removal (25 days) | 25 | DAY | 32,076.00 | 801,900.00 | 0.004171 | $ 133.7889 | $ 3,344.7249 | |
| Opt I Total | $ 57,665.6319 |
Opt 1 11-1 thru 2-28-11
| 4 | |||||||||
| Opt 1 POP: | 1 November 2010 - 30 September 2011 | ||||||||
| Column A | Column B | Column C | Column D | Column E | Column F | Column G | Column H | Column J | Column K |
| CONTRACT EXHIBIT LINE ITEM NUMBER | SERVICE | Contract QTY | Contract UNIT OF ISSUE | EST QTY SF PER OCCURRENCE | EST MONTHLY SQ | TOTAL EST SF | PRICE PER SF | MONTHLY/UNIT PRICE | TOTAL YEARLY PRICE FOR SERVICE |
| 1001 | NON-PERSONAL SERVICES: Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Custodial Services at Wright-Patterson, AFB IAW Performance Work Statement. | ||||||||
| 1002 | Provide Level 1, Facility Cleaning | 4 | MO | 34,311.13 | 295,075.72 | 1,180,302.87 | 0.014052 | $ 4,146.4040 | $ 16,585.6160 |
| 1003 | Provide Level 1, Restroom/Locker Room Cleaning | 4 | MO | 5,291.61 | 114,827.94 | 459,311.75 | 0.023339 | $ 2,679.9692 | $ 10,719.8769 |
| 1004 | Provide Level 1, Periodic Cleaning Floor Maintenance (1 time per year) | 1 | LS | 10,368.49 | 10,368.49 | 10,368.4900 | 0.053070 | $ 550.2558 | $ 550.2558 |
| 1005 | Provide Level 2, Facility Cleaning | 4 | MO | 1,900,767.45 | 8,173,300.04 | 32,693,200.14 | 0.003597 | $ 29,399.3602 | $ 117,597.4409 |
| 1006 | Provide Level 2, Restroom/Locker Room Cleaning | 4 | MO | 60,724.0600 | 655,819.8480 | 2,623,279.39 | 0.008735 | $ 5,728.5864 | $ 22,914.3455 |
| 1007 | Provide Level 2, Periodic Cleaning Floor Maintenance (1 time per year) | 1 | LS | 360,529.24 | 360,529.24 | 360,529.2400 | 0.011040 | $ 3,980.2428 | $ 3,980.2428 |
| 1008 | Provide Level 3, Facility Cleaning | 4 | MO | 35,003.63 | 759,578.7710 | 3,038,315.08 | 0.008557 | $ 6,499.72 | $ 25,998.8622 |
| 1009 | Provide Level 3, Restroom/Locker Cleaning | 4 | MO | 626.03 | 13,584.8510 | 54,339.40 | 0.063339 | $ 860.45 | $ 3,441.8035 |
| 1010 | Provide Level 3, Periodic Cleaning Floor Maintenance (2 times per year) | 2 | LS | 1,874.75 | 3,749.50 | 3,749.5000 | 0.030060 | $ 112.71 | $ 112.7100 |
| 1011 | Provide Level 4, Facility Cleaning Fitness Center | 4 | MO | 52,195.47 | 448,881.04 | 1,795,524.17 | 0.005982 | $ 2,685.2064 | $ 10,740.8256 |
| 1012 | Provide Level 4, Restroom/Locker Room Cleaning - Fitness Center | 4 | MO | 6,914.94 | 210,214.18 | 840,856.70 | 0.044034 | $ 9,256.5710 | $ 37,026.2841 |
| 1013 | Provide Level 4, Periodic - Floor - Cleaning - Fitness Center (1 time per year) | 1 | LS | 46,816.95 | 46,816.95 | 46,816.95 | 0.017433 | $ 816.1599 | $ 816.1599 |
| 0 | |||||||||
| Opt 1 POP: | 1 November 2010 - 30 September 2011 | ||||||||
| CONTRACT EXHIBIT LINE ITEM NUMBER | SERVICE | Contract QTY | Contract UNIT OF ISSUE | EST QTY SF PER OCCURRENCE | EST MONTHLY SQ | TOTAL EST SF | PRICE PER SF | MONTHLY/UNIT PRICE | TOTAL YEARLY PRICE FOR SERVICE |
| 1014 | Provide Level 4, Facility Cleaning youth Center/ Teen Center / School Age Program | 11 | MO | 33,213.74 | 720,738.1580 | 7,928,119.74 | 0.007336 | $ 5,287.3351 | $ 58,160.6864 |
| 1015 | Provide Level 4, Restroom/Locker Room Cleaning Youth Center/Teen Center/ School Age Program | 11 | MO | 1,454.21 | 31,556.3570 | 347,119.93 | 0.037949 | $ 1,197.5322 | $ 13,172.8541 |
| 1016 | Provide Level 4,Periodic - Floor - Cleaning Youth Center/Teen Center/ School Age Program (2 times per year) | 2 | LS | 7,422.28 | $ 7,422.2800 | 14,844.5600 | 0.030060 | $ 223.1137 | $ 446.2275 |
| ELINS 1017-1019 - RESERVED | |||||||||
| 1020 | Snow Removal (25 days) | 25 | DAY | 43,123.00 | 1,078,075.00 | 0.004171 | $ 133.7889 | $ 4,496.6508 | |
| Opt I Total | $ 326,760.8418 |
Opt 1 3-1 thru 5-31-11
| 0 | |||||||||
| Opt 1 POP: | 1 November 2010 - 30 September 2011 | ||||||||
| Column A | Column B | Column C | Column D | Column E | Column F | Column G | Column H | Column J | Column K |
| CONTRACT EXHIBIT LINE ITEM NUMBER | SERVICE | Contract QTY | Contract UNIT OF ISSUE | EST QTY SF PER OCCURRENCE | EST MONTHLY SQ | TOTAL EST SF | PRICE PER SF | MONTHLY/UNIT PRICE | TOTAL YEARLY PRICE FOR SERVICE |
| 1001 | NON-PERSONAL SERVICES: Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Custodial Services at Wright-Patterson, AFB IAW Performance Work Statement. | ||||||||
| 1002 | Provide Level 1, Facility Cleaning | 7 | MO | 34,311.13 | 295,075.72 | 2,065,530.03 | 0.014052 | $ 4,146.4040 | $ 29,024.8279 |
| 1003 | Provide Level 1, Restroom/Locker Room Cleaning | 7 | MO | 5,566.51 | 120,793.27 | 845,552.87 | 0.023339 | $ 2,819.1941 | $ 19,734.3584 |
| 1004 | Provide Level 1, Periodic Cleaning Floor Maintenance (1 time per year) | 1 | LS | 10,643.39 | 10,643.39 | 10,643.3900 | 0.053070 | $ 564.8447 | $ 564.8447 |
| 1005 | Provide Level 2, Facility Cleaning | 7 | MO | 2,035,206.90 | 8,751,389.67 | 61,259,727.69 | 0.003597 | $ 31,478.7486 | $ 220,351.2405 |
| 1006 | Provide Level 2, Restroom/Locker Room Cleaning | 7 | MO | 60,185.13 | 649,999.4040 | 4,549,995.83 | 0.008735 | $ 5,677.7448 | $ 39,744.2136 |
| 1007 | Provide Level 2, Periodic Cleaning Floor Maintenance (1 time per year) | 1 | LS | 355,574.17 | 355,574.17 | 355,574.1700 | 0.011040 | $ 3,925.5388 | $ 3,925.5388 |
| 1008 | Provide Level 3, Facility Cleaning | 7 | MO | 35,003.63 | 759,578.7710 | 5,317,051.40 | 0.008557 | $ 6,499.72 | $ 45,498.0088 |
| 1009 | Provide Level 3, Restroom/Locker Cleaning | 7 | MO | 626.03 | 13,584.8510 | 95,093.96 | 0.063339 | $ 860.45 | $ 6,023.1561 |
| 1010 | Provide Level 3, Periodic Cleaning Floor Maintenance (2 times per year) | 2 | LS | 1,874.75 | 1,874.7500 | 3,749.5000 | 0.030060 | $ 56.35 | $ 112.7100 |
| 1011 | Provide Level 4, Facility Cleaning Fitness Center | 7 | MO | 52,195.47 | 448,881.04 | 3,142,167.29 | 0.005982 | $ 2,685.2064 | $ 18,796.4448 |
| 1012 | Provide Level 4, Restroom/Locker Room Cleaning - Fitness Center | 7 | MO | 6,914.94 | 210,214.18 | 1,471,499.23 | 0.044034 | $ 9,256.5710 | $ 64,795.9972 |
| 1013 | Provide Level 4, Periodic - Floor - Cleaning - Fitness Center (1 time per year) | 1 | LS | 46,816.95 | 46,816.95 | 46,816.95 | 0.017433 | $ 816.1599 | $ 816.1599 |
| 0 | |||||||||
| Opt 1 POP: | 1 November 2010 - 30 September 2011 | ||||||||
| CONTRACT EXHIBIT LINE ITEM NUMBER | SERVICE | Contract QTY | Contract UNIT OF ISSUE | EST QTY SF PER OCCURRENCE | EST MONTHLY SQ | TOTAL EST SF | PRICE PER SF | MONTHLY/UNIT PRICE | TOTAL YEARLY PRICE FOR SERVICE |
| 1014 | Provide Level 4, Facility Cleaning youth Center/ Teen Center / School Age Program | 7 | MO | 33,213.74 | 720,738.1580 | 5,045,167.11 | 0.007336 | $ 5,287.3351 | $ 37,011.3459 |
| 1015 | Provide Level 4, Restroom/Locker Room Cleaning Youth Center/Teen Center/ School Age Program | 7 | MO | 1,454.21 | 31,556.3570 | 220,894.50 | 0.037949 | $ 1,197.5322 | $ 8,382.7253 |
| 1016 | Provide Level 4,Periodic - Floor - Cleaning Youth Center/Teen Center/ School Age Program (2 times per year) | 2 | LS | 7,422.28 | 7,422.2800 | 14,844.5600 | 0.030060 | $ 223.1137 | $ 446.2275 |
| ELINS 1017-1019 - RESERVED | |||||||||
| 1020 | Snow Removal (25 days) | 25 | DAY | 43,123.00 | 1,078,075.00 | 0.004171 | $ 179.87 | $ 4,496.6508 | |
| 1021 | Provide Level 1, Facility Cleaning BRAC | 7 | MO | 3,476.00 | 29,893.60 | 209,255.20 | 0.014052 | $ 420.0649 | $ 2,940.4541 |
| 1022 | Provide Level 1, Restroom/Locker Room Cleaning BRAC | 7 | MO | 1,608.00 | 34,893.60 | 244,255.20 | 0.023339 | $ 814.3817 | $ 5,700.6721 |
| 1023 | Provide Level 1, Periodic - Floor Cleaning BRAC (1 time per year) | 1 | LS | 1,608.00 | 1,608.00 | 1,608.0000 | 0.053070 | $ 85.3366 | $ 85.3366 |
| 1024 | Provide Level 2, Facility Cleaning BRAC | 7 | MO | 436,776.00 | 1,878,136.80 | 13,146,957.60 | 0.003597 | $ 6,755.6581 | $ 47,289.6065 |
| 1025 | Provide Level 2, Restroom/Locker Room Cleaning BRAC | 7 | MO | 5,845.00 | 63,126.0000 | 441,882.00 | 0.008735 | $ 551.4056 | $ 3,859.8393 |
| 1026 | Provide Level 2, Periodic - Floor Cleaning BRAC (1 time per year) | 1 | LS | 192,215.00 | 192,215.00 | 192,215.0000 | 0.011040 | $ 2,122.0536 | $ 2,122.0536 |
| 1027 | Provide Level 3, Facility Cleaning BRAC | 7 | MO | 80,882.00 | 1,755,139.4000 | 12,285,975.80 | 0.008557 | $ 15,018.73 | $ 105,131.0949 |
| 1028 | Provide Level 3, Restroom/Loceker Room Cleaning BRAC | 7 | MO | 3,395.00 | 73,671.5000 | 515,700.50 | 0.063339 | $ 4,666.28 | $ 32,663.9540 |
| 1029 | Provide Level 3, Periodic - Floor Cleaning BRAC (2 times per year) | 2 | LS | 29,524.00 | 29,524.0000 | 59,048.0000 | 0.030060 | $ 887.49 | $ 1,774.9829 |
| 1030 | Snow Removal BRAC (25 days) | 25 | DAY | 7,254.00 | 181,350.00 | 0.004171 | $ 30.26 | $ 756.4109 | |
| Opt I Total | $ 502,664.9043 |
Opt 1 6-1 thru 9-30-11
| 0 | |||||||||
| Opt 1 POP: | 1 November 2010 - 30 September 2011 | ||||||||
| Column A | Column B | Column C | Column D | Column E | Column F | Column G | Column H | Column J | Column K |
| CONTRACT EXHIBIT LINE ITEM NUMBER | SERVICE | Contract QTY | Contract UNIT OF ISSUE | EST QTY SF PER OCCURRENCE | EST MONTHLY SQ | TOTAL EST SF | PRICE PER SF | MONTHLY/UNIT PRICE | TOTAL YEARLY PRICE FOR SERVICE |
| 1001 | NON-PERSONAL SERVICES: Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Custodial Services at Wright-Patterson, AFB IAW Performance Work Statement. | ||||||||
| 1002 | Provide Level 1, Facility Cleaning | 4 | MO | 34,963.98 | 300,690.23 | 1,202,760.91 | 0.014052 | $ 4,146.4040 | $ 16,585.6160 |
| 1003 | Provide Level 1, Restroom/Locker Room Cleaning | 4 | MO | 6,149.32 | 133,440.24 | 533,760.98 | 0.023339 | $ 2,679.9692 | $ 10,719.8768 |
| 1004 | Provide Level 1, Periodic Cleaning Floor Maintenance (1 time per year) | 1 | LS | 11,226.20 | 11,226.20 | 11,226.2000 | 0.053070 | $ 542.4439 | $ 542.4439 |
| 1005 | Provide Level 2, Facility Cleaning | 4 | MO | 1,897,279.24 | 8,158,300.73 | 32,633,202.93 | 0.003597 | $ 29,665.9642 | $ 118,663.8568 |
| 1006 | Provide Level 2, Restroom/Locker Room Cleaning | 4 | MO | 59,702.32 | 644,785.0560 | 2,579,140.22 | 0.008735 | $ 5,752.7011 | $ 23,010.8044 |
| 1007 | Provide Level 2, Periodic Cleaning Floor Maintenance (1 time per year) | 1 | LS | 356,434.36 | 356,434.36 | 356,434.3600 | 0.011040 | $ 3,973.1379 | $ 3,973.1379 |
| 1008 | Provide Level 3, Facility Cleaning | 4 | MO | 35,003.63 | 759,578.7710 | 3,038,315.08 | 0.008557 | $ 6,499.72 | $ 25,998.8622 |
| 1009 | Provide Level 3, Restroom/Locker Cleaning | 4 | MO | 626.03 | 13,584.8510 | 54,339.40 | 0.063339 | $ 860.45 | $ 3,441.8035 |
| 1010 | Provide Level 3, Periodic Cleaning Floor Maintenance (2 times per year) | 2 | LS | 1,874.75 | 1,874.7500 | 3,749.5000 | 0.030060 | $ 56.35 | $ 112.7100 |
| 1011 | Provide Level 4, Facility Cleaning Fitness Center | 4 | MO | 52,195.47 | 448,881.04 | 1,795,524.17 | 0.005982 | $ 2,397.9271 | $ 9,591.7084 |
| 1012 | Provide Level 4, Restroom/Locker Room Cleaning - Fitness Center | 4 | MO | 6,914.94 | 210,214.18 | 840,856.70 | 0.044034 | $ 1,725.4318 | $ 6,901.7272 |
| 1013 | Provide Level 4, Periodic - Floor - Cleaning - Fitness Center (1 time per year) | 1 | LS | 46,816.95 | 46,816.95 | 46,816.95 | 0.017433 | $ 620.7330 | $ 620.7330 |
| 0 | |||||||||
| Opt 1 POP: | 1 November 2010 - 30 September 2011 | ||||||||
| CONTRACT EXHIBIT LINE ITEM NUMBER | SERVICE | Contract QTY | Contract UNIT OF ISSUE | EST QTY SF PER OCCURRENCE | EST MONTHLY SQ | TOTAL EST SF | PRICE PER SF | MONTHLY/UNIT PRICE | TOTAL YEARLY PRICE FOR SERVICE |
| 1014 | Provide Level 4, Facility Cleaning youth Center/ Teen Center / School Age Program | 4 | MO | 33,213.74 | 720,738.1580 | 2,882,952.63 | 0.007336 | $ 5,287.3351 | $ 21,149.3405 |
| 1015 | Provide Level 4, Restroom/Locker Room Cleaning Youth Center/Teen Center/ School Age Program | 4 | MO | 1,454.21 | 31,556.3570 | 126,225.43 | 0.037949 | $ 1,197.5322 | $ 4,790.1288 |
| 1016 | Provide Level 4,Periodic - Floor - Cleaning Youth Center/Teen Center/ School Age Program (2 times per year) | 2 | LS | 7,422.28 | 7,422.2800 | 14,844.5600 | 0.030060 | $ 223.1137 | $ 446.2275 |
| ELINS 1017-1019 - RESERVED | |||||||||
| 1020 | Snow Removal (25 days) | 25 | DAY | 46,051.00 | 1,151,275.00 | 0.004171 | $ 133.79 | $ 3,344.7225 | |
| 1021 | Provide Level 1, Facility Cleaning BRAC | 4 | MO | 3,476.00 | 29,893.60 | 119,574.40 | 0.014052 | $ 420.0649 | $ 1,680.2595 |
| 1022 | Provide Level 1, Restroom/Locker Room Cleaning BRAC | 4 | MO | 1,608.00 | 34,893.60 | 139,574.40 | 0.023339 | $ 814.3817 | $ 3,257.5269 |
| 1023 | Provide Level 1, Periodic - Floor Cleaning BRAC (1 time per year) | 1 | LS | 1,608.00 | 1,608.00 | 1,608.0000 | 0.053070 | $ 85.3366 | $ 85.3366 |
| 1024 | Provide Level 2, Facility Cleaning BRAC | 4 | MO | 430,221.00 | 1,849,950.30 | 7,399,801.20 | 0.003597 | $ 6,755.6581 | $ 27,022.6324 |
| 1025 | Provide Level 2, Restroom/Locker Room Cleaning BRAC | 4 | MO | 4,389.00 | 47,401.2000 | 189,604.80 | 0.008735 | $ 551.4056 | $ 2,205.6224 |
| 1026 | Provide Level 2, Periodic - Floor Cleaning BRAC (1 time per year) | 1 | LS | 184,551.00 | 184,551.00 | 184,551.0000 | 0.011040 | $ 2,122.0536 | $ 2,122.0536 |
| 1027 | Provide Level 3, Facility Cleaning BRAC | 4 | MO | 87,437.00 | 1,897,382.9000 | 7,589,531.60 | 0.008557 | $ 15,018.73 | $ 60,074.9200 |
| 1028 | Provide Level 3, Restroom/Loceker Room Cleaning BRAC | 4 | MO | 4,851.00 | 105,266.7000 | 421,066.80 | 0.063339 | $ 4,666.28 | $ 18,665.1200 |
| 1029 | Provide Level 3, Periodic - Floor Cleaning BRAC (2 times per year) | 2 | LS | 37,188.00 | 37,188.0000 | 74,376.0000 | 0.030060 | $ 887.49 | $ 1,774.9800 |
| 1030 | Snow Removal BRAC (25 days) | 25 | DAY | 7,254.00 | 181,350.00 | 0.004171 | $ 30.26 | $ 756.4109 | |
| Opt I Total | $ 367,538.5616 |
Opt 2 10-1-11 thru 10-31-11
| Exhibit A - Bid Schedule - Area B Custodial Services - FA8601-10-C-0018 REV 10/1/11 | |||||||||
| Opt 2 POP: | 1 October 2011 - 30 September 2012 | ||||||||
| Column A | Column B | Column C | Column D | Column E | Column F | Column G | Column H | Column J | Column K |
| CONTRACT EXHIBIT LINE ITEM NUMBER | SERVICE | Contract QTY | Contract UNIT OF ISSUE | EST QTY SF PER OCCURRENCE | EST MONTHLY SQ | TOTAL EST SF | PRICE PER SF | MONTHLY/UNIT PRICE | TOTAL YEARLY PRICE FOR SERVICE |
| 2001 | NON-PERSONAL SERVICES: Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Custodial Services at Wright-Patterson, AFB IAW Performance Work Statement, dated 1 May 2009. Period of Performance: Base: 01 October 2011 thru 30 September 2012. | ||||||||
| 2002 | Provide Level 1, Facility Cleaning | 1 | MO | 34,963.98 | 300,690.23 | 300,690.2280 | 0.014052 | 4,146.4040 | 4,146.4040 |
| 2003 | Provide Level 1, Restroom/Locker Room Cleaning | 1 | MO | 6,149.32 | 133,440.24 | 133,440.2440 | 0.023339 | 2,679.9692 | 2,679.9692 |
| ELIN 2004 Reserved | |||||||||
| 2005 | Provide Level 2, Facility Cleaning | 1 | MO | 1,897,279.24 | 8,158,300.73 | 8,158,300.7320 | 0.003597 | 29,665.9642 | 29,665.9642 |
| 2006 | Provide Level 2, Restroom/Locker Room Cleaning | 1 | MO | 59,702.32 | 644,785.0560 | 644,785.0560 | 0.008735 | 5,752.7011 | 5,752.7011 |
| ELIN 2007 Reserved | |||||||||
| 2008 | Provide Level 3, Facility Cleaning | 1 | MO | 35,003.63 | 759,578.7710 | 759,578.77 | 0.008557 | $ 6,499.72 | 6,499.7155 |
| 2009 | Provide Level 3, Restroom/Locker Cleaning | 1 | MO | 626.03 | 13,584.8510 | 13,584.85 | 0.063339 | $ 860.45 | 860.4509 |
| ELIN 2010 Reserved | 0.0000 | ||||||||
| 2011 | Provide Level 4, Facility Cleaning Fitness Center | 1 | MO | 52,195.47 | 448,881.04 | 448,881.0420 | 0.005982 | 2,397.9271 | 2,397.9271 |
| 2012 | Provide Level 4, Restroom/Locker Room Cleaning - Fitness Center | 1 | MO | 6,914.94 | 210,214.18 | 210,214.1760 | 0.044034 | 1,725.4318 | 1,725.4318 |
| Exhibit A - Bid Schedule - Area B Custodial Services - FA8601-10-C-0018 REV 10/1/11 | PRIORITY BUILDING SERVICES | ||||||||
| Opt 2 POP: | 1 October 2011 - 30 September 2012 | ||||||||
| CONTRACT EXHIBIT LINE ITEM NUMBER | SERVICE | Contract QTY | Contract UNIT OF ISSUE | EST QTY SF PER OCCURRENCE | EST MONTHLY SQ | TOTAL EST SF | PRICE PER SF | MONTHLY/UNIT PRICE | TOTAL YEARLY PRICE FOR SERVICE |
| ELIN 2013 Reserved | |||||||||
| 2014 | Provide Level 4, Facility Cleaning youth Center/ Teen Center / School Age Program | 1 | MO | 33,213.74 | 720,738.1580 | 720,738.1580 | 0.007336 | 5,287.3351 | 5,287.3351 |
| 2015 | Provide Level 4, Restroom/Locker Room Cleaning Youth Center/Teen Center/ School Age Program | 1 | MO | 1,454.21 | 31,556.3570 | 31,556.3570 | 0.037949 | 1,197.5322 | 1,197.5322 |
| ELIN 2016 Reserved | |||||||||
| ELINS 2017-2019 - RESERVED | |||||||||
| 2020 | Snow Removal (25 days) | 25 | DAY | 46,051.00 | 1,151,275.0000 | 0.004171 | $ 133.79 | 3,344.7225 | |
| 2021 | Provide Level 1, Facility Cleaning BRAC | 1 | MO | 3,476.00 | 29,893.60 | 29,893.60 | 0.014052 | $ 420.0649 | 420.0649 |
| 2022 | Provide Level 1, Restroom/Locker Room Cleaning BRAC | 1 | MO | 1,608.00 | 34,893.60 | 34,893.60 | 0.023339 | $ 814.3817 | 814.3817 |
| 2023 | Provide Level 1, Periodic - Floor Cleaning BRAC (1 time per year) | 1 | LS | 1,608.00 | 1,608.00 | 1,608.0000 | 0.053070 | $ 85.3366 | 85.3366 |
| 2024 | Provide Level 2, Facility Cleaning BRAC | 1 | MO | 430,221.00 | 1,849,950.30 | 1,849,950.30 | 0.003597 | $ 6,755.6581 | 6,755.6581 |
| 2025 | Provide Level 2, Restroom/Locker Room Cleaning BRAC | 1 | MO | 4,389.00 | 47,401.2000 | 47,401.20 | 0.008735 | $ 551.4056 | 551.4056 |
| 2026 | Provide Level 2, Periodic - Floor Cleaning BRAC (1 time per year) | 1 | LS | 184,551.00 | 184,551.00 | 184,551.0000 | 0.011040 | $ 2,122.0536 | 2,122.0536 |
| 2027 | Provide Level 3, Facility Cleaning BRAC | 1 | MO | 87,437.00 | 1,897,382.9000 | 1,897,382.90 | 0.008557 | $ 15,018.73 | 15,018.7300 |
| 2028 | Provide Level 3, Restroom/Loceker Room Cleaning BRAC | 1 | MO | 4,851.00 | 105,266.7000 | 105,266.70 | 0.063339 | $ 4,666.28 | 4,666.2800 |
| 2029 | Provide Level 3, Periodic - Floor Cleaning BRAC (2 times per year) | 2 | LS | 37,188.00 | 37,188.0000 | 74,376.0000 | 0.030060 | $ 887.49 | 1,774.9800 |
| 2030 | Snow Removal BRAC (25 days) | 25 | DAY | 7,254.00 | 181,350.00 | 0.004171 | $ 30.26 | 756.5000 | |
| Opt II Total | 96,523.5441 |
Opt 2 11-1-11 thru 9-30-12
| Exhibit A - Bid Schedule - Area B Custodial Services - FA8601-10-C-0018 REV 11/1/11 | |||||||||
| Opt 2 POP: | 1 October 2011 - 30 September 2012 | ||||||||
| Column A | Column B | Column C | Column D | Column E | Column F | Column G | Column H | Column J | Column K |
| CONTRACT EXHIBIT LINE ITEM NUMBER | SERVICE | Contract QTY | Contract UNIT OF ISSUE | EST QTY SF PER OCCURRENCE | EST MONTHLY SQ | TOTAL EST SF | PRICE PER SF | MONTHLY/UNIT PRICE | TOTAL YEARLY PRICE FOR SERVICE |
| 2001 | NON-PERSONAL SERVICES: Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Custodial Services at Wright-Patterson, AFB IAW Performance Work Statement, dated 1 May 2009. Period of Performance: Base: 01 October 2011 thru 30 September 2012. | ||||||||
| 2002 | Provide Level 1, Facility Cleaning | 11 | MO | 34,963.98 | 300,690.23 | 3,307,592.5080 | 0.014052 | 4,146.4040 | 45,610.4440 |
| 2003 | Provide Level 1, Restroom/Locker Room Cleaning | 11 | MO | 6,149.32 | 133,440.24 | 1,467,842.6840 | 0.023339 | 2,679.9692 | 29,479.6612 |
| ELIN 2004 Reserved | |||||||||
| 2005 | Provide Level 2, Facility Cleaning | 11 | MO | 1,876,211.53 | 8,067,709.58 | 88,744,805.3690 | 0.003597 | 29,665.9642 | 326,325.6062 |
| 2006 | Provide Level 2, Restroom/Locker Room Cleaning | 11 | MO | 58,822.32 | 635,281.0560 | 6,988,091.6160 | 0.008735 | 5,752.7011 | 63,279.7121 |
| ELIN 2007 Reserved | |||||||||
| 2008 | Provide Level 3, Facility Cleaning | 11 | MO | 35,991.34 | 781,012.0780 | 8,591,132.86 | 0.008557 | $ 6,499.72 | 71,496.9200 |
| 2009 | Provide Level 3, Restroom/Locker Cleaning | 11 | MO | 626.03 | 13,584.8510 | 149,433.36 | 0.063339 | $ 860.45 | 9,464.9500 |
| ELIN 2010 Reserved | |||||||||
| 2011 | Provide Level 4, Facility Cleaning Fitness Center | 11 | MO | 52,195.47 | 448,881.04 | 4,937,691.4620 | 0.005982 | 2,397.9271 | 26,377.1981 |
| 2012 | Provide Level 4, Restroom/Locker Room Cleaning - Fitness Center | 11 | MO | 6,914.94 | 210,214.18 | 2,312,355.9360 | 0.044034 | 1,725.4318 | 18,979.7498 |
| Exhibit A - Bid Schedule - Area B Custodial Services - FA8601-10-C-0018 REV 11/1/11 | PRIORITY BUILDING SERVICES | ||||||||
| Opt 2 POP: | 1 October 2011 - 30 September 2012 | ||||||||
| CONTRACT EXHIBIT LINE ITEM NUMBER | SERVICE | Contract QTY | Contract UNIT OF ISSUE | EST QTY SF PER OCCURRENCE | EST MONTHLY SQ | TOTAL EST SF | PRICE PER SF | MONTHLY/UNIT PRICE | TOTAL YEARLY PRICE FOR SERVICE |
| ELIN 2013 Reserved | |||||||||
| 2014 | Provide Level 4, Facility Cleaning youth Center/ Teen Center / School Age Program | 11 | MO | 33,213.74 | 720,738.1580 | 7,928,119.7380 | 0.007336 | 5,287.3351 | 58,160.6861 |
| 2015 | Provide Level 4, Restroom/Locker Room Cleaning Youth Center/Teen Center/ School Age Program | 11 | MO | 1,454.21 | 31,556.3570 | 347,119.9270 | 0.037949 | 1,197.5322 | 13,172.8542 |
| ELIN 2016 Reserved | |||||||||
| ELINS 2017-2019 - RESERVED | |||||||||
| 2020 | Snow Removal (25 days) | 25 | DAY | 46,051.00 | 1,151,275.0000 | 0.004171 | $ 133.79 | 3,344.7225 | |
| 2021 | Provide Level 1, Facility Cleaning BRAC | 11 | MO | 3,476.00 | 29,893.60 | 328,829.60 | 0.014052 | $ 420.0649 | 4,620.7139 |
| 2022 | Provide Level 1, Restroom/Locker Room Cleaning BRAC | 11 | MO | 1,608.00 | 34,893.60 | 383,829.60 | 0.023339 | $ 814.3817 | 8,958.1987 |
| 2023 | Provide Level 1, Periodic - Floor Cleaning BRAC (1 time per year) | 1 | LS | 1,608.00 | 1,608.00 | 1,608.0000 | 0.053070 | $ 85.3366 | 85.3366 |
| 2024 | Provide Level 2, Facility Cleaning BRAC | 11 | MO | 449,367.00 | 1,932,278.10 | 21,255,059.10 | 0.003597 | $ 6,755.6581 | 74,312.2391 |
| 2025 | Provide Level 2, Restroom/Locker Room Cleaning BRAC | 11 | MO | 3,825.00 | 41,310.0000 | 454,410.00 | 0.008735 | $ 551.4056 | 6,065.4616 |
| 2026 | Provide Level 2, Periodic - Floor Cleaning BRAC (1 time per year) | 1 | LS | 203,133.00 | 203,133.00 | 203,133.0000 | 0.011040 | $ 2,122.0536 | 2,122.0536 |
| 2027 | Provide Level 3, Facility Cleaning BRAC | 11 | MO | 87,644.00 | 1,901,874.8000 | 20,920,622.80 | 0.008557 | $ 15,018.73 | 165,206.0300 |
| 2028 | Provide Level 3, Restroom/Loceker Room Cleaning BRAC | 11 | MO | 5,415.00 | 117,505.5000 | 1,292,560.50 | 0.063339 | $ 4,666.28 | 51,329.0800 |
| 2029 | Provide Level 3, Periodic - Floor Cleaning BRAC (2 times per year) | 2 | LS | 37,959.00 | 37,959.0000 | 75,918.0000 | 0.030060 | $ 887.49 | 1,774.9800 |
| 2030 | Snow Removal BRAC (25 days) | 25 | DAY | 7,254.00 | 181,350.00 | 0.004171 | $ 30.26 | 756.5000 | |
| Opt II Total | 980,923.0977 |
Opt 3
| 0 | |||||||||
| Opt 3 POP: | 1 October 2012 - 30 September 2013 | ||||||||
| Column A | Column B | Column C | Column D | Column E | Column F | Column G | Column H | Column J | Column K |
| CONTRACT EXHIBIT LINE ITEM NUMBER | SERVICE | Contract QTY | Contract UNIT OF ISSUE | EST QTY SF PER OCCURRENCE | EST MONTHLY SQ | TOTAL EST SF | PRICE PER SF | MONTHLY/UNIT PRICE | YEARLY PRICE FOR SERVICE |
| 3001 | NON-PERSONAL SERVICES: Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Custodial Services at Wright-Patterson, AFB IAW Performance Work Statement. | ||||||||
| 3002 | Provide Level 1, Facility Cleaning | 12 | MO | 36,041.02 | 309,952.77 | 3,719,433.2640 | 0.014052 | 4,146.40 | $ 49,756.80 |
| 3003 | Provide Level 1, Restroom/Locker Room Cleaning | 12 | MO | 7,480.23 | 162,320.99 | 1,947,851.8920 | 0.023339 | 2,679.97 | $ 32,159.64 |
| 3004 | ELIN 2004 Reserved | ||||||||
| 3005 | Provide Level 2, Facility Cleaning | 12 | MO | 1,804,548.16 | 7,759,557.09 | 93,114,685.0560 | 0.003597 | 29,665.96 | $ 355,991.52 |
| 3006 | Provide Level 2, Restroom/Locker Room Cleaning | 12 | MO | 57,684.27 | 622,990.1160 | 7,475,881.3920 | 0.008735 | 5,752.70 | $ 69,032.40 |
| 3007 | ELIN 2007 Reserved | ||||||||
| 3008 | Provide Level 3, Facility Cleaning | 12 | MO | 40,711.34 | 883,436.0780 | 10,601,232.94 | 0.008557 | 6,499.72 | $ 77,996.64 |
| 3009 | Provide Level 3, Restroom/Locker Cleaning | 12 | MO | 0.00 | 0.0000 | 0.00 | 0.063339 | 860.45 | $ 10,325.40 |
| 3010 | ELIN 2010 Reserved | ||||||||
| 3011 | Provide Level 4, Facility Cleaning Fitness Center | 12 | MO | 52,195.47 | 448,881.04 | 5,386,572.5040 | 0.005982 | 2,397.93 | $ 28,775.16 |
| 3012 | Provide Level 4, Restroom/Locker Room Cleaning - Fitness Center | 12 | MO | 6,914.94 | 210,214.18 | 2,522,570.1120 | 0.044034 | 1,725.43 | $ 20,705.16 |
| 0 | |||||||||
| Opt 3 POP: | 1 October 2012 - 30 September 2013 | ||||||||
| CONTRACT EXHIBIT LINE ITEM NUMBER | SERVICE | Contract QTY | Contract UNIT OF ISSUE | EST QTY SF PER OCCURRENCE | EST MONTHLY SQ | TOTAL EST SF | PRICE PER SF | MONTHLY/UNIT PRICE | TOTAL YEARLY PRICE FOR SERVICE |
| 3013 | ELIN 2013 Reserved | ||||||||
| 3014 | Provide Level 4, Facility Cleaning youth Center/ Teen Center / School Age Program | 12 | MO | 33,450.12 | 725,867.6040 | 8,710,411.2480 | 0.007336 | 5,287.34 | $ 63,448.08 |
| 3015 | Provide Level 4, Restroom/Locker Room Cleaning Youth Center/Teen Center/ School Age Program | 12 | MO | 1,454.21 | 31,556.3570 | 378,676.2840 | 0.037949 | 1,197.53 | $ 14,370.36 |
| 3016 | ELIN 2016 Reserved | ||||||||
| ELINS 2017-2019 - RESERVED | |||||||||
| 3020 | Snow Removal (25 days) | 25 | DAY | 40,363.00 | 1,009,075.0000 | 0.004171 | 168.35 | $ 4,208.75 | |
| 3021 | Provide Level 1, Facility Cleaning BRAC | 12 | MO | 3,476.00 | 29,893.60 | 358,723.20 | 0.014052 | $ 420.0649 | $ 5,040.7784 |
| 3022 | Provide Level 1, Restroom/Locker Room Cleaning BRAC | 12 | MO | 1,608.00 | 34,893.60 | 418,723.20 | 0.023339 | $ 814.3817 | $ 9,772.5808 |
| 3023 | Provide Level 1, Periodic - Floor Cleaning BRAC (1 time per year) | 1 | LS | 1,608.00 | 1,608.00 | 1,608.0000 | 0.053070 | $ 85.3366 | $ 85.3366 |
| 3024 | Provide Level 2, Facility Cleaning BRAC | 12 | MO | 438,914.00 | 1,887,330.20 | 22,647,962.40 | 0.003597 | $ 6,788.7267 | $ 81,464.7208 |
| 3025 | Provide Level 2, Restroom/Locker Room Cleaning BRAC | 12 | MO | 5,945.00 | 64,206.0000 | 770,472.00 | 0.008735 | $ 560.8394 | $ 6,730.0729 |
| 3026 | Provide Level 2, Periodic - Floor Cleaning BRAC (1 time per year) | 1 | LS | 193,658.00 | 193,658.00 | 193,658.0000 | 0.011040 | $ 2,137.9843 | $ 2,137.9843 |
| 3027 | Provide Level 3, Facility Cleaning BRAC | 12 | MO | 80,882.00 | 1,755,139.4000 | 21,061,672.80 | 0.008557 | $ 15,018.73 | $ 180,224.7341 |
| 3028 | Provide Level 3, Restroom/Locker Room Cleaning BRAC | 12 | MO | 3,395.00 | 73,671.5000 | 884,058.00 | 0.063339 | $ 4,666.28 | $ 55,995.3497 |
| 3029 | Provide Level 3, Periodic - Floor Cleaning BRAC (2 times per year) | 2 | LS | 29,524.00 | 29,524.0000 | 59,048.0000 | 0.030060 | $ 887.49 | $ 1,774.9829 |
| 3030 | Snow Removal BRAC (25 days) | 25 | DAY | 7,324.00 | 183,100.00 | 0.004171 | 30.55 | $ 763.75 | |
| Opt III Total | $ 1,070,760.20 |
Base
| Exhibit A-Bid Schedule - Area B Custodial Services Dated 1 January 2015 | ||||||||||
| Base POP: | 1 January 2015 - 30 September 2015 | |||||||||
| CONTRACT EXHIBIT LINE ITEM NUMBER | SERVICE | CONTRACT QTY | CONTRACT UNIT OF ISSUE | EST QTY SF PER OCCURRENCE | MULTIPLIER | EST MONTHLY SQ | TOTAL EST SF | PRICE PER SF | MONTHLY/ UNIT PRICE | TOTAL YEARLY PRICE FOR SERVICE |
| 0001 | NON-PERSONAL SERVICES: Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Custodial Services at Wright-Patterson, AFB IAW Performance Work Statement. | |||||||||
| 0002 | Provide Level 1, Facility Cleaning | 9 | MO | 39,195.20 | 8.6 | 337,078.72 | 3,033,708.48 | $0.00 | $0.00 | |
| 0003 | Provide Level 1, Restroom/Locker Room Cleaning | 9 | MO | 5,235.54 | 21.7 | 113,611.22 | 1,022,500.96 | $0.00 | $0.00 | |
| 0004 | Provide Level 1, Periodic - Floor Cleaning | 1 | LS | 1,574.31 | 1.0 | 1,574.31 | 1,574.31 | $0.00 | $0.00 | |
| 0005 | Provide Level 2, Facility Cleaning | 9 | MO | 2,204,451.14 | 4.3 | 9,479,139.90 | 85,312,259.12 | $0.00 | $0.00 | |
| 0006 | Provide Level 2, Restroom/Locker Room Cleaning | 9 | MO | 62,148.27 | 10.8 | 671,201.32 | 6,040,811.84 | $0.00 | $0.00 | |
| 0007 | Provide Level 2, Periodic - Floor Cleaning | 1 | LS | 173,699.71 | 1.0 | 173,699.71 | 173,699.71 | $0.00 | $0.00 | |
| 0008 | Provide Level 3, Facility Cleaning | 9 | MO | 93,420.18 | 21.7 | 2,027,217.91 | 18,244,961.15 | $0.00 | $0.00 | |
| 0009 | Provide Level 3, Restroom/Locker Room Cleaning | 9 | MO | 6,145.51 | 21.7 | 133,357.57 | 1,200,218.10 | $0.00 | $0.00 | |
| 0010 | Provide Level 3, Periodic - Floor Cleaning | 2 | LS | 71,193.98 | 2.0 | 71,193.98 | 142,387.96 | $0.00 | $0.00 | |
| 0011 | Provide Level 4, Facility Cleaning Fitness Center | 9 | MO | 43,719.43 | 8.6 | 375,987.10 | 3,383,883.88 | $0.00 | $0.00 | |
| 0012 | Provide Level 4, Restroom/Locker Room Cleaning - Fitness Center | 9 | MO | 6,659.32 | 30.4 | 202,443.33 | 1,821,989.95 | $0.00 | $0.00 | |
| 0013 | Provide Level 4, Periodic - Floor Cleaning Fitness Center | 1 | LS | 0.00 | 1.0 | 0.00 | 0.0000 | $0.00 | $0.00 | |
| 0014 | ELIN 0014 Reserved | |||||||||
| 0015 | ELIN 0015 Reserved | |||||||||
| 0016 | ELIN 0016 Reserved | |||||||||
| ELINS 0017-0019 - RESERVED | ||||||||||
| 0020 | Snow Removal | 25 | DAY | 46,479.00 | 1.0 | 1,161,975.00 | $0.00 | $0.00 | ||
| Option Base Total | $ - 0 |
Opt 1
| Exhibit A-Bid Schedule - Area B Custodial Services Dated 1 Jnauary 2015 | ||||||||||
| Opt 1 POP: | 1 October 2015 - 30 September 2016 | |||||||||
| CONTRACT EXHIBIT LINE ITEM NUMBER | SERVICE | CONTRACT QTY | CONTRACT UNIT OF ISSUE | EST QTY SF PER OCCURRENCE | MULTIPLIER | EST MONTHLY SQ | TOTAL EST SF | PRICE PER SF | MONTHLY/ UNIT PRICE | TOTAL YEARLY PRICE FOR SERVICE |
| 1001 | NON-PERSONAL SERVICES: Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Custodial Services at Wright-Patterson, AFB IAW Performance Work Statement. | |||||||||
| 1002 | Provide Level 1, Facility Cleaning | 12 | MO | 39,195.20 | 8.6 | 337,078.72 | 4,044,944.64 | $0.00 | $0.00 | |
| 1003 | Provide Level 1, Restroom/Locker Room Cleaning | 12 | MO | 5,235.54 | 21.7 | 113,611.22 | 1,363,334.62 | $0.00 | $0.00 | |
| 1004 | Provide Level 1, Periodic - Floor Cleaning | 1 | LS | 1,574.31 | 1.0 | 1,574.31 | 1,574.31 | $0.00 | $0.00 | |
| 1005 | Provide Level 2, Facility Cleaning | 12 | MO | 2,204,451.14 | 4.3 | 9,479,139.90 | 113,749,678.82 | $0.00 | $0.00 | |
| 1006 | Provide Level 2, Restroom/Locker Room Cleaning | 12 | MO | 62,148.27 | 10.8 | 671,201.32 | 8,054,415.79 | $0.00 | $0.00 | |
| 1007 | Provide Level 2, Periodic - Floor Cleaning | 1 | LS | 173,699.71 | 1.0 | 173,699.71 | 173,699.71 | $0.00 | $0.00 | |
| 1008 | Provide Level 3, Facility Cleaning | 12 | MO | 93,420.18 | 21.7 | 2,027,217.91 | 24,326,614.87 | $0.00 | $0.00 | |
| 1009 | Provide Level 3, Restroom/Locker Room Cleaning | 12 | MO | 6,145.51 | 21.7 | 133,357.57 | 1,600,290.80 | $0.00 | $0.00 | |
| 1010 | Provide Level 3, Periodic - Floor Cleaning | 2 | LS | 71,193.98 | 2.0 | 71,193.98 | 142,387.96 | $0.00 | $0.00 | |
| 1011 | Provide Level 4, Facility Cleaning Fitness Center | 12 | MO | 43,719.43 | 8.6 | 375,987.10 | 4,511,845.18 | $0.00 | $0.00 | |
| 1012 | Provide Level 4, Restroom/Locker Room Cleaning - Fitness Center | 12 | MO | 6,659.32 | 30.4 | 202,443.33 | 2,429,319.94 | $0.00 | $0.00 | |
| 1013 | Provide Level 4, Periodic - Floor Cleaning Fitness Center | 1 | LS | 0.00 | 1.0 | 0.00 | 0.0000 | $0.00 | $0.00 | |
| 1014 | ELIN 1014 Reserved | |||||||||
| 1015 | ELIN 1015 Reserved | |||||||||
| 1016 | ELIN 1016 Reserved | |||||||||
| ELINS 1017-1019 - RESERVED | ||||||||||
| 1020 | Snow Removal | 25 | DAY | 46,479.00 | 1.0 | 1,161,975.00 | $0.00 | $0.00 | ||
| Option 1 Total | $ - 0 |
Opt 2
| Exhibit A-Bid Schedule - Area B Custodial Services Dated 1 January 2015 | ||||||||||
| Opt 2 POP: | 1 October 2016 - 30 September 2017 | |||||||||
| CONTRACT EXHIBIT LINE ITEM NUMBER | SERVICE | CONTRACT QTY | CONTRACT UNIT OF ISSUE | EST QTY SF PER OCCURRENCE | MULTIPLIER | EST MONTHLY SQ | TOTAL EST SF | PRICE PER SF | MONTHLY / UNIT PRICE | TOTAL YEARLY PRICE FOR SERVICE |
| 2001 | NON-PERSONAL SERVICES: Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Custodial Services at Wright-Patterson, AFB IAW Performance Work Statement. | |||||||||
| 2002 | Provide Level 1, Facility Cleaning | 12 | MO | 39,195.20 | 8.6 | 337,078.72 | 4,044,944.64 | $0.00 | $0.00 | |
| 2003 | Provide Level 1, Restroom/Locker Room Cleaning | 12 | MO | 5,235.54 | 21.7 | 113,611.22 | 1,363,334.62 | $0.00 | $0.00 | |
| 2004 | Provide Level 1, Periodic - Floor Cleaning | 1 | LS | 1,574.31 | 1.0 | 1,574.31 | 1,574.31 | $0.00 | $0.00 | |
| 2005 | Provide Level 2, Facility Cleaning | 12 | MO | 2,204,451.14 | 4.3 | 9,479,139.90 | 113,749,678.82 | $0.00 | $0.00 | |
| 2006 | Provide Level 2, Restroom/Locker Room Cleaning | 12 | MO | 62,148.27 | 10.8 | 671,201.32 | 8,054,415.79 | $0.00 | $0.00 | |
| 2007 | Provide Level 2, Periodic - Floor Cleaning | 1 | LS | 173,699.71 | 1.0 | 173,699.71 | 173,699.71 | $0.00 | $0.00 | |
| 2008 | Provide Level 3, Facility Cleaning | 12 | MO | 93,420.18 | 21.7 | 2,027,217.91 | 24,326,614.87 | $0.00 | $0.00 | |
| 2009 | Provide Level 3, Restroom/Locker Room Cleaning | 12 | MO | 6,145.51 | 21.7 | 133,357.57 | 1,600,290.80 | $0.00 | $0.00 | |
| 2010 | Provide Level 3, Periodic - Floor Cleaning | 2 | LS | 71,193.98 | 2.0 | 71,193.98 | 142,387.96 | $0.00 | $0.00 | |
| 2011 | Provide Level 4, Facility Cleaning Fitness Center | 12 | MO | 43,719.43 | 8.6 | 375,987.10 | 4,511,845.18 | $0.00 | $0.00 | |
| 2012 | Provide Level 4, Restroom/Locker Room Cleaning - Fitness Center | 12 | MO | 6,659.32 | 30.4 | 202,443.33 | 2,429,319.94 | $0.00 | $0.00 | |
| 2013 | Provide Level 4, Periodic - Floor Cleaning Fitness Center | 1 | LS | 0.00 | 1.0 | 0.00 | 0.0000 | $0.00 | $0.00 | |
| 2014 | ELIN 2014 Reserved | |||||||||
| 2015 | ELIN 2015 Reserved | |||||||||
| 2016 | ELIN 2016 Reserved | |||||||||
| ELINS 2017-2019 - RESERVED | ||||||||||
| 2020 | Snow Removal | 25 | DAY | 46,479.00 | 1.0 | 1,161,975.00 | $0.00 | $0.00 | ||
| Option 2 Total | $ - 0 |
Option 3
| Exhibit A-Bid Schedule - Area B Custodial Services Dated 1 January 2015 | ||||||||||
| Opt 3 POP: | 1 October 2017 - 30 September 2018 | |||||||||
| CONTRACT EXHIBIT LINE ITEM NUMBER | SERVICE | CONTRACT QTY | CONTRACT UNIT OF ISSUE | EST QTY SF PER OCCURRENCE | MULTIPLIER | EST MONTHLY SQ | TOTAL EST SF | PRICE PER SF | MONTHLY/ UNIT PRICE | TOTAL YEARLY PRICE FOR SERVICE |
| 3001 | NON-PERSONAL SERVICES: Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Custodial Services at Wright-Patterson, AFB IAW Performance Work Statement. | |||||||||
| 3002 | Provide Level 1, Facility Cleaning | 12 | MO | 39,195.20 | 8.6 | 337,078.72 | 4,044,944.64 | $0.00 | $0.00 | |
| 3003 | Provide Level 1, Restroom/Locker Room Cleaning | 12 | MO | 5,235.54 | 21.7 | 113,611.22 | 1,363,334.62 | $0.00 | $0.00 | |
| 3004 | Provide Level 1, Periodic - Floor Cleaning | 1 | LS | 1,574.31 | 1.0 | 1,574.31 | 1,574.31 | $0.00 | $0.00 | |
| 3005 | Provide Level 2, Facility Cleaning | 12 | MO | 2,204,451.14 | 4.3 | 9,479,139.90 | 113,749,678.82 | $0.00 | $0.00 | |
| 3006 | Provide Level 2, Restroom/Locker Room Cleaning | 12 | MO | 62,148.27 | 10.8 | 671,201.32 | 8,054,415.79 | $0.00 | $0.00 | |
| 3007 | Provide Level 2, Periodic - Floor Cleaning | 1 | LS | 173,699.71 | 1.0 | 173,699.71 | 173,699.71 | $0.00 | $0.00 | |
| 3008 | Provide Level 3, Facility Cleaning | 12 | MO | 93,420.18 | 21.7 | 2,027,217.91 | 24,326,614.87 | $0.00 | $0.00 | |
| 3009 | Provide Level 3, Restroom/Locker Room Cleaning | 12 | MO | 6,145.51 | 21.7 | 133,357.57 | 1,600,290.80 | $0.00 | $0.00 | |
| 3010 | Provide Level 3, Periodic - Floor Cleaning | 2 | LS | 71,193.98 | 2.0 | 71,193.98 | 142,387.96 | $0.00 | $0.00 | |
| 3011 | Provide Level 4, Facility Cleaning Fitness Center | 12 | MO | 43,719.43 | 8.6 | 375,987.10 | 4,511,845.18 | $0.00 | $0.00 | |
| 3012 | Provide Level 4, Restroom/Locker Room Cleaning - Fitness Center | 12 | MO | 6,659.32 | 30.4 | 202,443.33 | 2,429,319.94 | $0.00 | $0.00 | |
| 3013 | Provide Level 4, Periodic - Floor Cleaning Fitness Center | 1 | LS | 0.00 | 1.0 | 0.00 | 0.0000 | $0.00 | $0.00 | |
| 3014 | ELIN 3014 Reserved | |||||||||
| 3015 | ELIN 3015 Reserved | |||||||||
| 3016 | ELIN 3016 Reserved | |||||||||
| ELINS 3017-3019 - RESERVED | ||||||||||
| 3020 | Snow Removal | 25 | DAY | 46,479.00 | 1.0 | 1,161,975.00 | $0.00 | $0.00 | ||
| Option 3 Total | $ - 0 |
Opt 4
| Exhibit A-Bid Schedule - Area B Custodial Services Dated 1 January 2015 | ||||||||||
| Opt 4 POP: | 1 October 2018 - 30 September 2019 | |||||||||
| CONTRACT EXHIBIT LINE ITEM NUMBER | SERVICE | CONTRACT QTY | CONTRACT UNIT OF ISSUE | EST QTY SF PER OCCURRENCE | MULTIPLIER | EST MONTHLY SQ | TOTAL EST SF | PRICE PER SF | MONTHLY/ UNIT PRICE | TOTAL YEARLY PRICE FOR SERVICE |
| 4001 | NON-PERSONAL SERVICES: Provide all supervision, personnel, equipment, transportation, material, and other items and services necessary to perform Custodial Services at Wright-Patterson, AFB IAW Performance Work Statement. | |||||||||
| 4002 | Provide Level 1, Facility Cleaning | 12 | MO | 39,195.20 | 8.6 | 337,078.72 | 4,044,944.64 | $0.00 | $0.00 | |
| 4003 | Provide Level 1, Restroom/Locker Room Cleaning | 12 | MO | 5,235.54 | 21.7 | 113,611.22 | 1,363,334.62 | $0.00 | $0.00 | |
| 4004 | Provide Level 1, Periodic - Floor Cleaning | 1 | LS | 1,574.31 | 1.0 | 1,574.31 | 1,574.31 | $0.00 | $0.00 | |
| 4005 | Provide Level 2, Facility Cleaning | 12 | MO | 2,204,451.14 | 4.3 | 9,479,139.90 | 113,749,678.82 | $0.00 | $0.00 | |
| 4006 | Provide Level 2, Restroom/Locker Room Cleaning | 12 | MO | 62,148.27 | 10.8 | 671,201.32 | 8,054,415.79 | $0.00 | $0.00 | |
| 4007 | Provide Level 2, Periodic - Floor Cleaning | 1 | LS | 173,699.71 | 1.0 | 173,699.71 | 173,699.71 | $0.00 | $0.00 | |
| 4008 | Provide Level 3, Facility Cleaning | 12 | MO | 93,420.18 | 21.7 | 2,027,217.91 | 24,326,614.87 | $0.00 | $0.00 | |
| 4009 | Provide Level 3, Restroom/Locker Room Cleaning | 12 | MO | 6,145.51 | 21.7 | 133,357.57 | 1,600,290.80 | $0.00 | $0.00 | |
| 4010 | Provide Level 3, Periodic - Floor Cleaning | 2 | LS | 71,193.98 | 2.0 | 71,193.98 | 142,387.96 | $0.00 | $0.00 | |
| 4011 | Provide Level 4, Facility Cleaning Fitness Center | 12 | MO | 43,719.43 | 8.6 | 375,987.10 | 4,511,845.18 | $0.00 | $0.00 | |
| 4012 | Provide Level 4, Restroom/Locker Room Cleaning - Fitness Center | 12 | MO | 6,659.32 | 30.4 | 202,443.33 | 2,429,319.94 | $0.00 | $0.00 | |
| 4013 | Provide Level 4, Periodic - Floor Cleaning Fitness Center | 1 | LS | 0.00 | 1.0 | 0.00 | 0.0000 | $0.00 | $0.00 | |
| 4014 | ELIN 4014 Reserved | |||||||||
| 4015 | ELIN 4015 Reserved | |||||||||
| 4016 | ELIN 4016 Reserved | |||||||||
| ELINS 4017-4019 - RESERVED | ||||||||||
| 4020 | Snow Removal | 25 | DAY | 46,479.00 | 1.0 | 1,161,975.00 | $0.00 | $0.00 | ||
| Option 4 Total | $ - 0 |
Est Contract Value
| Exhibit A-Pricing Exhibit - Area B Custodial Services Dated 1 January 2015 | |||
| Period Of Performance (POP) | POP Length | CLINS | NOTIONAL PROPOSED PRICE |
| Base | 9 Months | 0001-0020 | $ - 0 |
| Option I | 12 Months | 1001-1020 | $ - 0 |
| Option II | 12 Months | 2001-2020 | $ - 0 |
| Option III | 12 Months | 3001-3020 | $ - 0 |
| Option IV | 12 Months | 4001-4020 | $ - 0 |
| Total Proposed Price for Base Period & Options I through IV | $ - 0 | ||
| Evaluated Value of Maximum 6-Month Option to Extend Services IAW FAR 52.217-8 | $ - 0 | ||
| Total Evaluated Price (TEP) | $ - 0 | ||
| EXAMPLE |
File details come from the government source that posted it. Updated .