2444243_CDRL1_REPORT_updated.pdf
PDF 173 KB Posted
- Attached to
- B-52 Multi-Mode Receiver (MMR-2020) Federal contract opportunity
- Solicitation number
- FA8539-18-R-0013
About this file
CDRLS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 18_00071PWS_Updated.pdf | ||
| FA853918R0013_______0001.pdf | ||
| AFMC807.pdf | ||
| DESCRIPTION.pdf | ||
| 18_00071PWSFINAL.pdf | ||
| FA853918R0013_FINAL.pdf | ||
| AFMC158.pdf | ||
| GFPFA853918R0013_1.pdf | ||
| CAVAFSOW.pdf | ||
| IUID.pdf | ||
| DDFORM1653.pdf | ||
| DRAWINGS.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
MMR-2020
E. CONTRACT / PR NO.
FD20601800071
F. CONTRACTOR
BAE Systems
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Commerical Asset Visibility Air Force (CAVAF)/Government Furnished Material Report
3. SUBTITLE
CAVAF
4. AUTHORITY
DI-MGMT-81634C
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Paragraph 4.4.4
6. REQUIRING OFFICE
FA8539
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Sostarich, Jonn WNAME: 02 MAR 2018DATE:
1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 420 SCMS/GUNAB-Robins in order to ascertain production status.
2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 9.0.4 or higher.
The Contractor shall obtain a valid DOD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.
3. Training will be provided by 420 SCMS/GUNAB-Robins, (478) 327-6603 or 6602.
4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.
Block 7: Enter the applicable code as listed in DOD 5010.12-M, Chapter 3. (Enter LT for Letter of Transmittal if not separately priced or DD if separately priced.)
Block 10:
a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hours of a supply or maintenance action occurrence IAW Contractor Users Guide.
b. The method of communication from the contractor to the funding base will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.
Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.
Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.
Block 13: Same as remarks regarding Block 10 above.
Farmer, Brittany LNAME: 02 MAR 2018DATE:
To be determined by CAVAF office.
COORDINATORS:
15. TOTAL
G. PREPARED BY
Farmer, Brittany L
407 SCMS / GULBB
478-327-5976
H. DATE
01 AUG 2018
I. APPROVED BY
//DIGITALLY SIGNED//
UNSWORTH.KAYCI.L.1298395122
407 SCMS / GUBA 478-926-0515 / 468-0515
J. DATE
01 AUG 2018
Page 1 of 8DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 01 Aug 2018
PREVIOUS EDITION MAY BE USED.
CMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 220 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 222202-2302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract. PR No. listed in Block E.
A. Contract Line Item No. B. Exhibit C. Category TDP__ TM__ Other_X_
D. System/Item
MMR2020 Radio Receiver E. Contract/PR NO.
FD2060-18-00071
F. Contractor
BAE (0D0D0)
1. Data Item No.
A002
2. Title of Data Item:
Item Unique Identification (IUID) Marking Plan
3. Subtitle:
4. Authority (Data Acquisition Document No.)
DI-MGMT-81803
5. Contract Reference PWS Para. 4.3.1.1
6. Requiring Office
407 SCMS/GUEAE
7. DD 250 Req
DD
9. Dist Statement Required
10. Frequency
SEE BLK 16
12. Date of First Submission
SEE BLK 16
14. Distribution
8. APP Code A
D 11. As of Date
SEE BLK 16
13. Date of Subsequent Submission
SEE BLK 16
a. Addressee b. Copies
Draft Final Reg Repro
16. REMARKS: FOR INVOICE
BLK 4. CONTRACTOR FORMAT IS ACCEPTABLE. THE MARKING PLAN CAN BE
TAILORED TO COVER THE FOLLOWING ELEMENTS AS A MINIMUM:
• GUIDELINE PER MIL-STD-130N
• MRI CONSTRUCT #1 WITH DATA IDENTIFIER 18S
• CREATE 2D IUID MATRIX NO SMALLER THAN A 0.18" x 0.42"
RECTANGLE LABEL OR A 0.35" x 0.25" SQUARE LABEL
• REFERENCE TO DWG 200945085 FOR SUGGESTED LABEL SIZE AND
MATERIAL SPECIFICATION
BLK 7. THE GOVERNMENT WILL ACCEPT THE RECEIVING REPORT THROUGH
WIDE AREA WORKFLOW (WAWF) SYSTEM. THE CONTRACTOR SHAL SUBMIT
IUID MARKING PLAN TO THE GOVERNEMENT ELECTRONICALLY VIA E-MAIL
FOR APPROVAL PRIOR TO IMPLEMENTATION. APPROVAL OF REPORT OR
COMMENTS SHALL BE FURNISHED WITH APPROVAL/REJECTION/COMMENT
REPORT WITHIN 10 BUSINESS DAYS OF RECEIPT
BLK 8, 10 – 14. A DRAFT COPY WILL BE SUBMITTED FOR A REVIEW WITHIN 30
BUSINESS DAYS AFTER CONTRACT AWARD. A FINAL COPY SUBMISSION WILL
BE WITHIN 10 BUSINESS DAYS AFTER GOVERNMENT APPROVAL
- ACCEPTOR INVOICE DODAAC FA8539, FOR INSPECTION/ACCEPTANCE
-EMAIL ADDRESS FOR RECIPIENT OF DATA
ENGINEER’S EMAIL ADDRESS:
Long.nguyen.6@us.af.mil
PROGRAM MANAGER’S EMAIL ADDRESS:
micaela.hamilton@us.af.mil
SEE BLK 16
407SCMS/GUEA 1 1
SEE BLK 16
15. TOTAL 1 1 0
G. PREPARED BY
Long Nguyen
H. DATE
15 Nov
I. APPROVED BY J. DATE
DD Form 1423-2, Aug 96 Previous editions are obsolete Page 2 of 8 Pages mailto:Long.nguyen.6@us.af.mil mailto:micaela.hamilton@us.af.mil
A. CONTRACT LINE ITEM NO.
B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
MMR-2020
E. CONTRACT / PR NO.
FD20601800071
F. CONTRACTOR
BAE Systems
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Engineering Change Proposal
3. SUBTITLE
ECP
4. AUTHORITY
DI-SESS-80639D
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Reference 4.3.1.12
6. REQUIRING OFFICE
407 SCMS/GUEA
7. DD 250 REQ
LT
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
ASREQ
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16Rem
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Nguyen, Long SNAME: 09 MAR 2018DATE:
BLK 4. CONTRACTOR FORMAT IS ACCEPTABLE.
BLK 7. SUBMIT EACH ECP WITH A LETTER OF TRANSMITTAL.
ACCEPTOR INVOICE DODAAC FA8539.
THE INVOICE/PAYMENT AND/OR RECEIPT/ACCEPTANCE DOCUMENT SHALL BE SUBMITTED VIA
IRAPT (WAWF) IN ORDER FOR THE CONTRACTOR TO RECEIVE CREDIT FOR DELIVERABLES.
https://www.dfas.mil/contractorsvendors/irapt.html
BLK 8. REQUIRE WRITTEN APPROVAL FROM THE GOVERNMENT PROCUREMENT CONTRACTING
OFFICER (PCO), ENGINEER OR PM.
BLK 10-14. SUBMIT ECP REQUEST TO WR-ALC CONTRACTING OFFICER, ENGINGEER OR PM:
PROGRAM MANAGER: ANTHONY SIMMONS - EMAIL: ANTHONY.SIMMONS.12@US.AF.MIL
CONTRACTING OFFICER: BENNIE SIMMONS - EMAIL: BENNIE.SIMMONS@US.AF.MIL
ENGINEER: LONG NGUYEN - EMAIL: LONG.NGUYEN.6@US.AF.MIL
FIRST SUBMISSION, GOVERNMENT WILL REVIEW AND PROVIDE APROVAL OR DISAPPROVAL WITH
COMMENTS WITHIN 15 CALENDAR DAYS.
THE CONTRACTOR SHALL REVISE AND RESUBMITT WITHIN 15 DAYS AFTER DISAPPROVAL WITH
COMMENTS.
FINAL SUBMISSION IS DUE NO LATER THAN 7 CALENDAR DAYS FROM THE RECEIPT OF
GOVERNMENT APPROVAL.
Farmer, Brittany LNAME: 02 MAR 2018DATE:
Remarks to be filled by the engineer.
COORDINATORS:
15. TOTAL
G. PREPARED BY
Farmer, Brittany L
407 SCMS / GULBB
478-327-5976
H. DATE
01 AUG 2018
I. APPROVED BY
//DIGITALLY SIGNED//
UNSWORTH.KAYCI.L.1298395122
407 SCMS / GUBA 478-926-0515 / 468-0515
J. DATE
01 AUG 2018
Page 3 of 8DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 01 Aug 2018
A. CONTRACT LINE ITEM NO.
B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
MMR-2020
E. CONTRACT / PR NO.
FD20601800071
F. CONTRACTOR
BAE Systems
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Item Unique Identification Marking Activity, Validation and Verification Report
3. SUBTITLE
IUID Marking Activity, Validation and Verification Report
4. AUTHORITY
DI-MGMT-81804
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Reference 4.4.2.2
6. REQUIRING OFFICE
407 SCMS/GULBB
7. DD 250 REQ
LT
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
ASREQ
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Nguyen, Long SNAME: 09 MAR 2018DATE:
BLK 4. CONTRACT FORMAT IS ACCEPTABLE
BLK 7. ELETRONIC SUBMISSIONS ARE ACCEPTABLE. ACCEPTOR INVOICE DODAAC FA8539
THE INVOICE/PAYMENT AND/OR RECEIPT/ACCEPTANCE DOCUMENT SHALL BE SUBMITTED VIA
IRAPT (WAWF) IN ORDER FOR THE CONTRACTOR TO RECEIVE CREDIT FOR DELIVERABLES.
https://www.dfas.mil/contractorsvendors/irapt.html
BLK 8. APPROVAL OF REPORT OR COMMENTS SHALL BE FURNISHED WITH APPROVAL/REJECTION
REPORT
BLK 10-14. SUBMIT REPORT TO WR-ALC CONTRACTING OFFICER, ENGINGEER OR PM
PROGRAM MANAGER: ANTHONY SIMMONS - EMAIL: ANTHONY.SIMMONS.12@US.AF.MIL
CONTRACTING OFFICER: BENNIE SIMMONS - EMAIL: BENNIE.SIMMONS@US.AF.MIL
ENGINEER: LONG NGUYEN - EMAIL: LONG.NGUYEN.6@US.AF.MIL
Farmer, Brittany LNAME: 02 MAR 2018DATE:
Remarks to be filled by engineer.
COORDINATORS:
15. TOTAL
G. PREPARED BY
Farmer, Brittany L
407 SCMS / GULBB
478-327-5976
H. DATE
01 AUG 2018
I. APPROVED BY
//DIGITALLY SIGNED//
UNSWORTH.KAYCI.L.1298395122
407 SCMS / GUBA 478-926-0515 / 468-0515
J. DATE
01 AUG 2018
Page 4 of 8DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 01 Aug 2018
A. CONTRACT LINE ITEM NO.
B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
MMR-2020
E. CONTRACT / PR NO.
FD20601800071
F. CONTRACTOR
BAE Systems
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Counterfeit Prevention Plan
3. SUBTITLE
CPP
4. AUTHORITY
DI-MISC-81832
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Reference 4.4.5
6. REQUIRING OFFICE
407 SCMS/GULBB
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
ASREQ
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Nguyen, Long SNAME: 09 MAR 2018DATE:
BLK 4. CONTRACT FORMAT IS ACCEPTABLE.
BLK 7. ELETRONIC SUBMISSIONS ARE ACCEPTABLE. ACCEPTOR INVOICE DODAAC FA8539
THE INVOICE/PAYMENT AND/OR RECEIPT/ACCEPTANCE DOCUMENT SHALL BE SUBMITTED VIA
IRAPT (WAWF) IN ORDER FOR THE CONTRACTOR TO RECEIVE CREDIT FOR DELIVERABLES.
https://www.dfas.mil/contractorsvendors/irapt.html
BLK 11-14: CPP AND/OR NOTIFICATION EMAIL WILL BE PROVIDED TO THE GOVERNMENT
CONTRACTING OFFICER OR PROGRAM MANAGER OR ENGINEER.
PROGRAM MANAGER: ANTHONY SIMMONS - EMAIL: ANTHONY.SIMMONS.12@US.AF.MIL
CONTRACTING OFFICER: BENNIE SIMMONS - EMAIL: BENNIE.SIMMONS@US.AF.MIL
ENGINEER: LONG NGUYEN - EMAIL: LONG.NGUYEN.6@US.AF.MIL
Farmer, Brittany LNAME: 02 MAR 2018DATE:
Remarks to be filled by the engineer.
COORDINATORS:
15. TOTAL
G. PREPARED BY
Farmer, Brittany L
407 SCMS / GULBB
478-327-5976
H. DATE
01 AUG 2018
I. APPROVED BY
//DIGITALLY SIGNED//
UNSWORTH.KAYCI.L.1298395122
407 SCMS / GUBA 478-926-0515 / 468-0515
J. DATE
01 AUG 2018
Page 5 of 8DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 01 Aug 2018
A. CONTRACT LINE ITEM NO.
B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
MMR-2020
E. CONTRACT / PR NO.
FD20601800071
F. CONTRACTOR
BAE Systems
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
Alert/Safe Report
3. SUBTITLE
Alert/Safe Report
4. AUTHORITY
DI-QCIC-80125B
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Reference 4.3.1.6
6. REQUIRING OFFICE
407 SCMS/GULBB
7. DD 250 REQ
LT
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
ASREQ
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
ASREQ
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Nguyen, Long SNAME: 09 MAR 2018DATE:
BLK 4. CONTRACT FORMAT IS ACCEPTABLE
BLK 7. ELCTRONIC SUBMISSION IS ACCEPTABLE. ACCEPTOR INVOICE DODAAC FA8539
THE INVOICE/PAYMENT AND/OR RECEIPT/ACCEPTANCE DOCUMENT SHALL BE SUBMITTED VIA
IRAPT (WAWF) IN ORDER FOR THE CONTRACTOR TO RECEIVE CREDIT FOR DELIVERABLES.
https://www.dfas.mil/contractorsvendors/irapt.html
BLK 11-14: THE RECORD OF REPORT SHALL BE SUBMITTED TO WR-ALC CONTRACTING OFFICER, PROGRAM MANAGER, AND ENGINEER:
PROGRAM MANAGER: ANTHONY SIMMONS - EMAIL: ANTHONY.SIMMONS.12@US.AF.MIL
CONTRACTING OFFICER: BENNIE SIMMONS - EMAIL: BENNIE.SIMMONS@US.AF.MIL
ENGINEER: LONG NGUYEN - EMAIL: LONG.NGUYEN.6@US.AF.MIL
THE GOVERNMENT WILL HAVE 30 CALENDAR DAYS TO REVIEW AND REPSOND WITH COMMENTS.
Farmer, Brittany LNAME: 02 MAR 2018DATE:
Remarks to be added by engineer.
COORDINATORS:
15. TOTAL
G. PREPARED BY
Farmer, Brittany L
407 SCMS / GULBB
478-327-5976
H. DATE
01 AUG 2018
I. APPROVED BY
//DIGITALLY SIGNED//
UNSWORTH.KAYCI.L.1298395122
407 SCMS / GUBA 478-926-0515 / 468-0515
J. DATE
01 AUG 2018
Page 6 of 8DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 01 Aug 2018
A. CONTRACT LINE ITEM NO.
B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
MMR-2020
E. CONTRACT / PR NO.
FD20601800071
F. CONTRACTOR
BAE Systems
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
Alert/Safe Response
3. SUBTITLE
Alert/Safe Response
4. AUTHORITY
DI-QCIC-80126B
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Reference 4.3.1.6
6. REQUIRING OFFICE
407 SCMS/GULBB
7. DD 250 REQ
LT
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
ASREQ
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Nguyen, Long SNAME: 09 MAR 2018DATE:
BLK 4. CONTRACT FORMAT IS ACCEPTABLE
BLK 7. ELCTRONIC SUBMISSION IS ACCEPTABLE. ACCEPTOR INVOICE DODAAC FA8539
THE INVOICE/PAYMENT AND/OR RECEIPT/ACCEPTANCE DOCUMENT SHALL BE SUBMITTED VIA
IRAPT (WAWF) IN ORDER FOR THE CONTRACTOR TO RECEIVE CREDIT FOR DELIVERABLES.
https://www.dfas.mil/contractorsvendors/irapt.html
BLK 11-14: THE RECORD OF STATUS AND DISPOSITION SHALL BE SUBMITTED TO WR-ALC
CONTRACTING OFFICER, PROGRAM MANAGER, AND ENGINEER:
PROGRAM MANAGER: ANTHONY SIMMONS - EMAIL: ANTHONY.SIMMONS.12@US.AF.MIL
CONTRACTING OFFICER: BENNIE SIMMONS - EMAIL: BENNIE.SIMMONS@US.AF.MIL
ENGINEER: LONG NGUYEN - EMAIL: LONG.NGUYEN.6@US.AF.MIL
THE GOVERNMENT WILL HAVE 30 CALENDAR DAYS TO REVIEW AND REPSOND WITH COMMENTS.
Farmer, Brittany LNAME: 02 MAR 2018DATE:
Remarks to be filled by engineer.
COORDINATORS:
15. TOTAL
G. PREPARED BY
Farmer, Brittany L
407 SCMS / GULBB
478-327-5976
H. DATE
01 AUG 2018
I. APPROVED BY
//DIGITALLY SIGNED//
UNSWORTH.KAYCI.L.1298395122
407 SCMS / GUBA 478-926-0515 / 468-0515
J. DATE
01 AUG 2018
Page 7 of 8DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 01 Aug 2018
A. CONTRACT LINE ITEM NO.
B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
MMR-2020
E. CONTRACT / PR NO.
FD20601800071
F. CONTRACTOR
BAE Systems
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
Quality Assessment Report
3. SUBTITLE
QAR
4. AUTHORITY
DI-QCIC-81187
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Reference 5.9
6. REQUIRING OFFICE
407 SCMS/GULBB
7. DD 250 REQ
LT
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Nguyen, Long SNAME: 09 MAR 2018DATE:
BLK 4. CONTRACTOR FORMAT IS ACCEPTABLE
BLK 7. ELECTRONIC SUBMISSIONS ARE ACCEPTABLE.
ACCEPTOR INVOICE DODAAC FA8539
THE INVOICE/PAYMENT AND/OR RECEIPT/ACCEPTANCE DOCUMENT SHALL BE SUBMITTED VIA
IRAPT (WAWF) IN ORDER FOR THE CONTRACTOR TO RECEIVE CREDIT FOR DELIVERABLES.
https://www.dfas.mil/contractorsvendors/irapt.html
BLK 11-14.
FIRST QUALITY ASSESSMENT REPORT SUBMISSION SHALL BE NO LATER THAN TWO (2) MONTHS
AFTER AWARD OF CONTRACT. SUBSEQUENT REPORT TO BE SUBMITTED IS WITHIN SEVEN
CALENDAR DAYS AFTER THE BEGINGING OF EACH MONTH. THE MONTHLY QUALITY ASSESSMENT
REPORT IS DUE FOR THE LIFE OF CONTRACT. THE GOVERNMENT WILL REVIEW AND REPSOND TO
THE CONTRACTOR WITHIN 14 CALENDAR DAYS.
SUBMIT REPORT TO WR-ALC CONTRACTING OFFICER, PROGRAM MANAGER, AND ENGINEER:
PROGRAM MANAGER: ANTHONY SIMMONS - EMAIL: ANTHONY.SIMMONS.12@US.AF.MIL
CONTRACTING OFFICER: BENNIE SIMMONS - EMAIL: BENNIE.SIMMONS@US.AF.MIL
ENGINEER: LONG NGUYEN - EMAIL: LONG.NGUYEN.6@US.AF.MIL
Farmer, Brittany LNAME: 02 MAR 2018DATE:
Remarks to be filled by the engineer.
COORDINATORS:
15. TOTAL
G. PREPARED BY
Farmer, Brittany L
407 SCMS / GULBB
478-327-5976
H. DATE
01 AUG 2018
I. APPROVED BY
//DIGITALLY SIGNED//
UNSWORTH.KAYCI.L.1298395122
407 SCMS / GUBA 478-926-0515 / 468-0515
J. DATE
01 AUG 2018
Page 8 of 8DD FORM 1423-1, FEB 2001 Version 2Generated by PRPS using Jasper Reports on 01 Aug 2018
File details come from the government source that posted it.