2052221_CDRL1_REPORT.pdf

PDF 128 KB Posted

Attached to
Solicitation Federal contract opportunity
Solicitation number
FA8538-17-R-0007
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

CDRL

View the file

Other files for this federal contract opportunity

Other files attached to Solicitation, newest first.
File Type Posted
2062832_TRNSPDATA_REPORT.pdf PDF
17-00024_(RDU_EFI_QASP.pdf_-__-_01-24-2017.pdf PDF
WAGEDET.txt TXT text file
17-00024_(RDU_EFI)_PWS.pdf PDF
17-00024_Consolidated_GFP_V1.pdf PDF
2062830_PKGRQMT_REPORT.pdf PDF
DD2875_SAAR.pdf PDF
FA853817R0007.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

LED BACKLIGHT RDU and EFI Redesign

E. CONTRACT / PR NO.

FD20601700024

F. CONTRACTOR

L-3 COMMUNICATIONS CORPORATION

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Integrated Master Schedule

3. SUBTITLE

IMS

4. AUTHORITY

DI-MGMT-81650/T

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS Para 4.3

6. REQUIRING OFFICE

409 SCMS/GUEA

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

MTHLY

11. AS OF DATE

N/A

12. DATE OF FIRST

SUBMISSION

30 DAC

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Hardaway, Christopher JNAME: 19 OCT 2016DATE:

Block 8: Government approval/disapproval will be provided within 5 business days of receipt of each submittal. If disapproved, the contractor shall resubmit within 5 business days of receipt of Government comments.

Block 9: Distribution authorized to the Department of Defense and U.S. DoD contractors only, administrative or operational use, 28 Jul 2016. Other requests shall be referred to:

409 SCMS/GUEA

235 Byron Street Suite 19A Robins AFB, GA 31098

Block 10, 12, 13: The contractor shall deliver the IMS 30 Days After Contract (DAC)award. The contractor shall submit updates no later than 15 days after identification of a change.

BLK 14A: Electronic media delivery is preferred choice utilizing standard Microsoft Office or Adobe applications to christopher.hardaway@us.af.mil and jonathan.ringley@us.af.mil. Delivery shall be provided via CD/DVD ROM when electronic submittal is not possible to:

409 SCMS/GUEA

235 Byron Street Suite 19A Robins AFB, GA 31098

COORDINATORS:

Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 09 JAN 2017

SEE BLK 16 1 1 0

1 1 015. TOTAL

G. PREPARED BY

Allen, Carl B

409 SCMS / GUMBB

478-327-3603

H. DATE

10 JAN 2017

I. APPROVED BY

//DIGITALLY SIGNED//

RINGLEY.JONATHAN.R.1264500881

409 C130 / ENB 478-926-2333 / 468-2333

J. DATE

09 JAN 2017

Page 1 of 9DD FORM 1423-1, FEB 2001 Version 3Generated by PRPS using Jasper Reports on 24 Jan 2017

PREVIOUS EDITION MAY BE USED.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

LED BACKLIGHT RDU and EFI Redesign

E. CONTRACT / PR NO.

FD20601700024

F. CONTRACTOR

L-3 COMMUNICATIONS CORPORATION

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Conference Agenda

3. SUBTITLE

Discussion Brief

4. AUTHORITY

DI-ADMN-81249B/T

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS Para 4.3, 4.4

6. REQUIRING OFFICE

409 SCMS/GUEA

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

11. AS OF DATE

N/A

12. DATE OF FIRST

SUBMISSION

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Hardaway, Christopher JNAME: 19 OCT 2016DATE:

Block 4: Contractor format is acceptable contingent upon approval by the Government.

Block 8: Government approval/disapproval will be provided within 5 business days of receipt of each submittal. If disapproved, the contractor shall resubmit within 5 business days of receipt of Government comments.

Block 9: Distribution authorized to the Department of Defense and U.S. DoD contractors only, administrative or operational use, 28 Jul 2016. Other requests shall be referred to:

409th SCMS/GUEA 235 Byron Street Suite 19A Robins AFB, GA 31098

Block 10, 12 & 13: The contractor shall submit the approved agenda within 10 business days prior to all conferences, reviews, and meetings.

BLK 14A: Electronic media delivery is preferred choice utilizing standard Microsoft Office or Adobe applications to christopher.hardaway@us.af.mil and jonathan.ringley@us.af.mil. Delivery shall be provided via CD/DVD ROM when electronic submittal is not possible to:

409 SCMS/GUEA

235 Byron Street Suite 19A Robins AFB, GA 31098

COORDINATORS:

Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 09 JAN 2017

See BLK 16 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Allen, Carl B

409 SCMS / GUMBB

478-327-3603

H. DATE

10 JAN 2017

I. APPROVED BY

//DIGITALLY SIGNED//

RINGLEY.JONATHAN.R.1264500881

409 C130 / ENB 478-926-2333 / 468-2333

J. DATE

09 JAN 2017

Page 2 of 9DD FORM 1423-1, FEB 2001 Version 3Generated by PRPS using Jasper Reports on 24 Jan 2017

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

LED BACKLIGHT RDU and EFI Redesign

E. CONTRACT / PR NO.

FD20601700024

F. CONTRACTOR

L-3 COMMUNICATIONS CORPORATION

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Conference Minutes

3. SUBTITLE

Technical Interchange Meetings (TIMs)/ Design Reviews

4. AUTHORITY

DI-ADMN-81250B/T

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS Para 4.3, 4.4

6. REQUIRING OFFICE

409 SCMS/GUEA

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

11. AS OF DATE

N/A

12. DATE OF FIRST

SUBMISSION

See BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

See BLK 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Hardaway, Christopher JNAME: 22 SEP 2016DATE:

Block 8: Government approval/disapproval will be provided within 10 business days of receipt of each submittal. If disapproved, the contractor shall resubmit within 5 business days of receipt of Government comments.

Block 9: Distribution authorized to the Department of Defense and U.S. DoD contractors only, administrative or operational use, 28 Jul 2016. Other requests shall be referred to:

409th SCMS/GUEA 235 Byron Street Suite 19A Robins AFB, GA 31098

Block 10, 12, 13: Conference minutes shall be submitted not more than 10 business days after completion of any Government design reviews, TIMs, IPTs or Technical review.

Block 14b: Submission shall be made in .pdf or MS Word format to christopher.hardaway@us.af.mil. , jonathan.ringley@us.af.mil

Delivery shall be provided via CD/DVD ROM or on-line access when email submittal is not possible.

COORDINATORS:

Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 09 JAN 2017

See BLK 16 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Allen, Carl B

409 SCMS / GUMBB

478-327-3603

H. DATE

10 JAN 2017

I. APPROVED BY

//DIGITALLY SIGNED//

RINGLEY.JONATHAN.R.1264500881

409 C130 / ENB 478-926-2333 / 468-2333

J. DATE

09 JAN 2017

Page 3 of 9DD FORM 1423-1, FEB 2001 Version 3Generated by PRPS using Jasper Reports on 24 Jan 2017

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

LED BACKLIGHT RDU and EFI Redesign

E. CONTRACT / PR NO.

FD20601700024

F. CONTRACTOR

L-3 COMMUNICATIONS CORPORATION

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Status Report

3. SUBTITLE

Status and Management

4. AUTHORITY

DI-MGMT-80368A/T

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS Para 4.3.2, 4.9

6. REQUIRING OFFICE

409 SCMS/GUEA

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

MTHLY

11. AS OF DATE

N/A

12. DATE OF FIRST

SUBMISSION

See Blk 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Blk 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Hardaway, Christopher JNAME: 19 OCT 2016DATE:

Block 4: Contractor format is acceptable contingent upon approval by the Government.

Block 8: Government approval/disapproval will be provided within 10 business days of receipt of each submittal. If disapproved, the contractor shall resubmit within 10 business days of receipt of Government comments.

Block 9: Distribution authorized to the Department of Defense and U.S. DoD contractors only, administrative or operational use, 28 Jul 2016. Other requests shall be referred to 409th SCMS/GUEA 235 Byron Street, Suite 19A Robins AFB, GA 31098.

Block 10: The contractor shall report technical, schedule, and cost status on a monthly basis.

Block 10,12 & 13: The contractor shall submit the approved report within 30 business days following government review and comments.

Block 14a: Submission shall be made in .pdf or MS Word format to christopher.hardway@us.af.mil jonathan.ringley@us.af.mil

COORDINATORS:

Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 09 JAN 2017

See BLK 16 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Allen, Carl B

409 SCMS / GUMBB

478-327-3603

H. DATE

10 JAN 2017

I. APPROVED BY

//DIGITALLY SIGNED//

RINGLEY.JONATHAN.R.1264500881

409 C130 / ENB 478-926-2333 / 468-2333

J. DATE

09 JAN 2017

Page 4 of 9DD FORM 1423-1, FEB 2001 Version 3Generated by PRPS using Jasper Reports on 24 Jan 2017

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

LED BACKLIGHT RDU and EFI Redesign

E. CONTRACT / PR NO.

FD20601700024

F. CONTRACTOR

L-3 COMMUNICATIONS CORPORATION

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM

Design Review Information Package

3. SUBTITLE

DRIP

4. AUTHORITY

DI-SESS-81757A/T

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS Para 4.4

6. REQUIRING OFFICE

409 SCMS/GUEA

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

11. AS OF DATE

N/A

12. DATE OF FIRST

SUBMISSION

See BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

See BLK 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Hardaway, Christopher JNAME: 19 OCT 2016DATE:

Block 4: Contractor format is acceptable contingent upon approval by the Government.

Block 8: Government approval/disapproval will be provided within 10 business days of receipt of each submittal. If disapproved, the contractor shall resubmit within 10 business days of receipt of Government comments.

Block 9: Distribution authorized to the Department of Defense and U.S. DoD contractors only, administrative or operational use, 28 Jul 2016. Other requests shall be referred to

409 SCMS/GUEA,

235 Byron Street Suite 19A Robins AFB, GA 31098.

Block 10, 12 & 13: Submission shall be IAW the approved IMS.

BLK 14a: Electronic media delivery is preferred choice utilizing standard Microsoft Office or Adobe applications to christopher.hardaway@us.af.mil and jonathan.ringley@us.af.mil Delivery shall be provided via CD/DVD ROM when electronic submittal is not possible to

409 SCMS/GUEA

235 Byron Street Suite 19A Robins AFB, GA 31098

COORDINATORS:

Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 09 JAN 2017

See BLK 16 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Allen, Carl B

409 SCMS / GUMBB

478-327-3603

H. DATE

10 JAN 2017

I. APPROVED BY

//DIGITALLY SIGNED//

RINGLEY.JONATHAN.R.1264500881

409 C130 / ENB 478-926-2333 / 468-2333

J. DATE

09 JAN 2017

Page 5 of 9DD FORM 1423-1, FEB 2001 Version 3Generated by PRPS using Jasper Reports on 24 Jan 2017

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

LED BACKLIGHT RDU and EFI Redesign

E. CONTRACT / PR NO.

FD20601700024

F. CONTRACTOR

L-3 COMMUNICATIONS CORPORATION

1. DATA ITEM NO.

A006

2. TITLE OF DATA ITEM

Test Plan

3. SUBTITLE

T&E Plan/Procedures

4. AUTHORITY

DI-NDTI-80566A/T

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS Para 4.5.1

6. REQUIRING OFFICE

409 SCMS/GUEA

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

ASREQ

11. AS OF DATE

N/A

12. DATE OF FIRST

SUBMISSION

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Hardaway, Christopher JNAME: 05 JAN 2017DATE:

Block 4: Contractor format is acceptable contingent upon approval by the Government.

Block 8: Government approval/disapproval will be provided within 10 business days of receipt of each submittal. If disapproved, the contractor shall resubmit within 10 business days of receipt of Government comments.

Block 9: Distribution authorized to the Department of Defense and U.S. DoD contractors only, administrative or operational use, 28 Jul 2016. Other requests shall be referred to;

409 SCMS/GUEA,

235 Byron Street Suite 19A Robins AFB, GA 31098.

Block 10, 12 & 13: Submission shall be IAW the approved IMS.

BLK 14a: Electronic media delivery is preferred choice utilizing standard Microsoft Office or Adobe applications to christopher.hardaway@us.af.mil and jonathan.ringley@us.af.mil Delivery shall be provided via CD/DVD ROM when electronic submittal is not possible to;

409 SCMS/GUEA

235 Byron Street Suite 19A Robins AFB, GA 31098.

COORDINATORS:

Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 09 JAN 2017

SEE BLK 16 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Allen, Carl B

409 SCMS / GUMBB

478-327-3603

H. DATE

10 JAN 2017

I. APPROVED BY

//DIGITALLY SIGNED//

RINGLEY.JONATHAN.R.1264500881

409 C130 / ENB 478-926-2333 / 468-2333

J. DATE

09 JAN 2017

Page 6 of 9DD FORM 1423-1, FEB 2001 Version 3Generated by PRPS using Jasper Reports on 24 Jan 2017

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

LED BACKLIGHT RDU and EFI Redesign

E. CONTRACT / PR NO.

FD20601700024

F. CONTRACTOR

L-3 COMMUNICATIONS CORPORATION

1. DATA ITEM NO.

A007

2. TITLE OF DATA ITEM

Test/Inspection Report

3. SUBTITLE

T&E Report

4. AUTHORITY

DI-NDTI-80809B/T

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS Para 4.5.1

6. REQUIRING OFFICE

409 SCMS/GUEA

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

ASREQ

11. AS OF DATE

N/A

12. DATE OF FIRST

SUBMISSION

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Hardaway, Christopher JNAME: 19 OCT 2016DATE:

Block 4: Contractor format is acceptable contingent upon approval by the Government.

Block 8: Government approval/disapproval will be provided within 10 business days of receipt of each submittal. If disapproved, the contractor shall resubmit within 10 business days of receipt of Government comments.

Block 9: Distribution authorized to the Department of Defense and U.S. DoD contractors only, administrative or operational use, 28 Jul 2016. Other requests shall be referred to;

409 SCMS/GUEA,

235 Byron Street Suite 19A Robins AFB, GA 31098.

Block 10, 12 & 13: Submission shall be IAW the approved IMS.

BLK 14a: Electronic media delivery is preferred choice utilizing standard Microsoft Office or Adobe applications to christopher.hardaway@us.af.mil and jonathan.ringley@us.af.mil Delivery shall be provided via CD/DVD ROM when electronic submittal is not possible to;

409 SCMS/GUEA

235 Byron Street Suite 19A Robins AFB, GA 31098.

COORDINATORS:

Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 09 JAN 2017

SEE BLK 16 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Allen, Carl B

409 SCMS / GUMBB

478-327-3603

H. DATE

10 JAN 2017

I. APPROVED BY

//DIGITALLY SIGNED//

RINGLEY.JONATHAN.R.1264500881

409 C130 / ENB 478-926-2333 / 468-2333

J. DATE

09 JAN 2017

Page 7 of 9DD FORM 1423-1, FEB 2001 Version 3Generated by PRPS using Jasper Reports on 24 Jan 2017

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

LED BACKLIGHT RDU and EFI Redesign

E. CONTRACT / PR NO.

FD20601700024

F. CONTRACTOR

L-3 COMMUNICATIONS CORPORATION

1. DATA ITEM NO.

A008

2. TITLE OF DATA ITEM

Technical Report

3. SUBTITLE

Reliability Prediction Report

4. AUTHORITY

DI-MISC-80508B/T

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS Para 4.5.5

6. REQUIRING OFFICE

409 SCMS/GUEA

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

11. AS OF DATE

N/A

12. DATE OF FIRST

SUBMISSION

SEE BLK 16

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLK 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Hardaway, Christopher JNAME: 19 OCT 2016DATE:

Block 4: Contractor format is acceptable contingent upon approval by the Government.

Block 8: Government approval/disapproval will be provided within 10 business days of receipt of each submittal. If disapproved, the contractor shall resubmit within 10 business days of receipt of Government comments.

Block 9: Distribution authorized to the Department of Defense and U.S. DoD contractors only, administrative or operational use, 28 Jul 2016. Other requests shall be referred to;

409 SCMS/GUEA,

235 Byron Street Suite 19A Robins AFB, GA 31098.

Block 10, 12 & 13: Submission shall be IAW the approved IMS.

BLK 14a: Electronic media delivery is preferred choice utilizing standard Microsoft Office or Adobe applications to christopher.hardaway@us.af.mil and jonathan.ringley@us.af.mil Delivery shall be provided via CD/DVD ROM when electronic submittal is not possible to;

409 SCMS/GUEA

235 Byron Street Suite 19A Robins AFB, GA 31098.

COORDINATORS:

Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 09 JAN 2017

See Blk 16 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Allen, Carl B

409 SCMS / GUMBB

478-327-3603

H. DATE

10 JAN 2017

I. APPROVED BY

//DIGITALLY SIGNED//

RINGLEY.JONATHAN.R.1264500881

409 C130 / ENB 478-926-2333 / 468-2333

J. DATE

09 JAN 2017

Page 8 of 9DD FORM 1423-1, FEB 2001 Version 3Generated by PRPS using Jasper Reports on 24 Jan 2017

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

LED BACKLIGHT RDU and EFI Redesign

E. CONTRACT / PR NO.

FD20601700024

F. CONTRACTOR

L-3 COMMUNICATIONS CORPORATION

1. DATA ITEM NO.

A009

2. TITLE OF DATA ITEM

Technical Report

3. SUBTITLE

Safety and Health Plan

4. AUTHORITY

DI-MISC-80508B/T

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS Para 5.5.3

6. REQUIRING OFFICE

409 SCMS/GUEA

7. DD 250 REQ

LT

8. APP CODE

A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

11. AS OF DATE

N/A

12. DATE OF FIRST

SUBMISSION

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Hardaway, Christopher JNAME: 19 OCT 2016DATE:

Contractor shall submit a Safety Analysis Report to the Procuring Contracting Officer (PCO) and the Safety Office, 78 ABW/SEG within thirty (30) days after contract award. Written Government acceptance/rejection will be within 10 working days after receipt of Plan from the Contractor. Contractor final submission shall be submitted within 10 working days of receiving Government comments. Acceptance by the Government is required prior to formal distribution.

BLOCK 9: Distribution authorized to the Department of Defense and U.S. DoD contractors only. Other requests shall be referred to the contract management team, AFSC/PZAAB, 235 Byron Street, Suite 19A, Robins AFB, GA 31098.

BLOCK 13: If during the performance of this contract, changes to the Safety and Health Plan are required, submit the revised Safety and Health Plan to AFSC/PZAAB and the Safety Office, 78 ABW/SEG.

BLK 14a: Electronic media delivery is preferred choice utilizing standard Microsoft Office or Adobe applications to christopher.hardaway@us.af.mil and jonathan.ringley@us.af.mil.

COORDINATORS:

Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 09 JAN 2017

See BLK 16 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Allen, Carl B

409 SCMS / GUMBB

478-327-3603

H. DATE

10 JAN 2017

I. APPROVED BY

//DIGITALLY SIGNED//

RINGLEY.JONATHAN.R.1264500881

409 C130 / ENB 478-926-2333 / 468-2333

J. DATE

09 JAN 2017

Page 9 of 9DD FORM 1423-1, FEB 2001 Version 3Generated by PRPS using Jasper Reports on 24 Jan 2017

File details come from the government source that posted it. Updated .