Attachment__3_CDRLs_A001-A011.pdf
PDF 134 KB Posted
- Attached to
- C-130H ALCS Engineering Services Federal contract opportunity
- Solicitation number
- FA8538-17-R-0006
About this file
Attachment #3 CDRLs A001-A011
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment__1_LCU_Consolidated_GFP_Attachment_Version_1.0_-_Copy.pdf | ||
| Attachment__2_Performance_Work_Statement.docx | DOCX document | |
| Attachment__9_Transportation_Data.pdf | ||
| Attachment__4_Packaging_Requirements.pdf | ||
| FA853817R0006.pdf | ||
| Attachment__5_QASP.pdf | ||
| Attachment__8_Instructions_for_DD2875.pdf | ||
| Attachment__6_Wage_Determination.pdf | ||
| Attachment__7_DD2875_SAAR.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
Redesign of the Advanced Lighting Control System (
E. CONTRACT / PR NO.
FD20601700027
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Technical Report - Study/Services
3. SUBTITLE
N/A
4. AUTHORITY
DI-MISC-80508B/T
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Para 4.2, 4.5
6. REQUIRING OFFICE
409 SCMS/GUEA
7. DD 250 REQ
DD
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
See Block 16
11. AS OF DATE
N/A
12. DATE OF FIRST
SUBMISSION
See BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Bethel, David LNAME: 03 JAN 2017DATE:
Block 4: Contractor format is acceptable contingent upon approval by the Government.
Block 8: Government approval/disapproval will be provided within 10 working days of receipt of each submittal. If disapproved, the contractor shall resubmit within 10 working days of receipt of Government comments.
Block 9: Distribution authorized to the Department of Defense and U.S. DoD contractors only, administrative or operational use, 28 Jul 2016. Other requests shall be referred to the lead engineer, 409 SCMS Robins AFB, GA 31098- 1670, ATTN: David L. Bethel.
Block 10 : The contractor shall submit the approved report only once.
Block 12 : The contractor shall submit the approved report within 30 working days following government review and comments.
Block 14b: Submission shall be made in .pdf or MS Word format to david.bethel.2@us.af.mil and jonathan.ringley@us.af.mil
COORDINATORS:
Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 17 JAN 2017 david.bethel.2@us.af.mil jonathan.ringley@us.af.mil
1 1 0
1 1 015. TOTAL
G. PREPARED BY
Miller, Larry T
409 SCMS / GUMBB
478-327-3605
H. DATE
18 JAN 2017
I. APPROVED BY
//DIGITALLY SIGNED//
RINGLEY.JONATHAN.R.1264500881
409 C130 / ENB 478-926-2333 / 468-2333
J. DATE
17 JAN 2017
Page 1 of 11DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 19 Jan 2017
PREVIOUS EDITION MAY BE USED.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
Redesign of the Advanced Lighting Control System (
E. CONTRACT / PR NO.
FD20601700027
F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
Test Plan
3. SUBTITLE
N/A
4. AUTHORITY
DI-NDTI-80566A/T
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Para 4.2, 4.6.1.1, 4.6.1.3
6. REQUIRING OFFICE
409 SCMS/GUEA
7. DD 250 REQ
DD
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
See Block 16
11. AS OF DATE
N/A
12. DATE OF FIRST
SUBMISSION
See BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
See BLK 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Bethel, David LNAME: 03 JAN 2017DATE:
Block 8: Government approval/disapproval will be provided within 10 working days of receipt of each submittal. If disapproved, the contractor shall resubmit within 10 working days of receipt of Government comments.
Block 9: Distribution authorized to the Department of Defense and U.S. DoD contractors only, administrative or operational use, 28 Jul 2016. Other requests shall be referred to the lead engineer, 409 SCMS Robins AFB, GA 31098- 1670, ATTN: David L. Bethel.
Block 10: The contractor shall submit the approved plan only once. However there are two plans DT&E test plan and the ATP test plan.
Block 12: The contractor shall submit the plan within 5 working days following the Integrated Master Schedule (IMS) Test Plan milestones.
Block 13: If the Government requires any rewrite/correction to the plan, the contractor will have 5 working days to resubmit.
Block 14b: Submission shall be made in .pdf or MS Word format to david.bethel.2@us.af.mil and jonathan.ringley@us.af.mil
COORDINATORS:
Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 17 JAN 2017 david.bethel.2@us.af.mil jonathan.ringley@us.af.mil
1 1 0
1 1 015. TOTAL
G. PREPARED BY
Miller, Larry T
409 SCMS / GUMBB
478-327-3605
H. DATE
18 JAN 2017
I. APPROVED BY
//DIGITALLY SIGNED//
RINGLEY.JONATHAN.R.1264500881
409 C130 / ENB 478-926-2333 / 468-2333
J. DATE
17 JAN 2017
Page 2 of 11DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 19 Jan 2017
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
Redesign of the Advanced Lighting Control System (
E. CONTRACT / PR NO.
FD20601700027
F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Test Report
3. SUBTITLE
N/A
4. AUTHORITY
DI-NDTI- 80809B/T
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Para 4.2, 4.6.1.2, 4.6.1.4
6. REQUIRING OFFICE
409 SCMS/GUEA
7. DD 250 REQ
DD
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
See Block 16
11. AS OF DATE
N/A
12. DATE OF FIRST
SUBMISSION
See BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
See BLK 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Bethel, David LNAME: 03 JAN 2017DATE:
Block 8: Government approval/disapproval will be provided within 10 working days of receipt of each submittal. If disapproved, the contractor shall resubmit within 10 working days of receipt of Government comments.
Block 9: Distribution authorized to the Department of Defense and U.S. DoD contractors only, administrative or operational use, 28 Jul 2016. Other requests shall be referred to the lead engineer, 409 SCMS Robins AFB, GA 31098- 1670, ATTN: David L. Bethel.
Block 10: The contractor shall submit the approved report only once. However there are two reports DT&E test report and the ATP test report.
Block 12: The contractor shall submit the report within 5 working days following the Integrated Master Schedule (IMS) Test report milestones.
Block 13: If the Government requires any rewrite/correction to the report, the contractor will have 5 working days to resubmit.
Block 14b: Submission shall be made in .pdf or MS Word format to david.bethel.2@us.af.mil and jonathan.ringley@us.af.mil
COORDINATORS:
Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 17 JAN 2017 david.bethel.2@us.af.mil jonathan.ringley@us.af.mil
1 1 0
1 1 015. TOTAL
G. PREPARED BY
Miller, Larry T
409 SCMS / GUMBB
478-327-3605
H. DATE
18 JAN 2017
I. APPROVED BY
//DIGITALLY SIGNED//
RINGLEY.JONATHAN.R.1264500881
409 C130 / ENB 478-926-2333 / 468-2333
J. DATE
17 JAN 2017
Page 3 of 11DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 19 Jan 2017
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
Redesign of the Advanced Lighting Control System (
E. CONTRACT / PR NO.
FD20601700027
F. CONTRACTOR
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Conference Agenda
3. SUBTITLE
N/A
4. AUTHORITY
DI-ADMN-81249B/T
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Para 4.2, 4.7.4, 4.8.5, 4.8.5.1, 4.8.5.2
6. REQUIRING OFFICE
409 SCMS/GUEA
7. DD 250 REQ
DD
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
See Block 16
11. AS OF DATE
N/A
12. DATE OF FIRST
SUBMISSION
See BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
See BLK 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Bethel, David LNAME: 05 JAN 2017DATE:
Block 4: Contractor format is acceptable contingent upon approval by the Government.
Block 8: Government approval/disapproval will be provided within 5 working days of receipt of each submittal. If disapproved, the contractor shall resubmit within 5 working days of receipt of Government comments.
Block 9: Distribution authorized to the Department of Defense and U.S. DoD contractors only, administrative or operational use, 28 Jul 2016. Other requests shall be referred to the lead engineer, 409 SCMS Robins AFB, GA 31098- 1670, ATTN: David L. Bethel.
Block 10, 12 & 13: The contractor shall submit the agenda 10 working days prior to all conferences, reviews and meetings.
Block 14b: Submission shall be made in .pdf or MS Word format to david.bethel.2@us.af.mil and jonathan.ringley@us.af.mil
COORDINATORS:
Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 17 JAN 2017 david.bethel.2@us.af.mil jonathan.ringley@us.af.mil
1 1 0
1 1 015. TOTAL
G. PREPARED BY
Miller, Larry T
409 SCMS / GUMBB
478-327-3605
H. DATE
18 JAN 2017
I. APPROVED BY
//DIGITALLY SIGNED//
RINGLEY.JONATHAN.R.1264500881
409 C130 / ENB 478-926-2333 / 468-2333
J. DATE
17 JAN 2017
Page 4 of 11DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 19 Jan 2017
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
Redesign of the Advanced Lighting Control System (
E. CONTRACT / PR NO.
FD20601700027
F. CONTRACTOR
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
Conference Minutes
3. SUBTITLE
N/A
4. AUTHORITY
DI-ADMN-81250B/T
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Para4.2, 4.7.3, 4.7.4, 4.8.5, 4.8.5.1, 4.8.5.2
6. REQUIRING OFFICE
409 SCMS/GUEA
7. DD 250 REQ
DD
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
See Block 16
11. AS OF DATE
N/A
12. DATE OF FIRST
SUBMISSION
See BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
See BLK 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Bethel, David LNAME: 03 JAN 2017DATE:
Block 8: Government approval/disapproval will be provided within 5 working days of receipt of each submittal. If disapproved, the contractor shall resubmit within 5 working days of receipt of Government comments.
Block 9: Distribution authorized to the Department of Defense and U.S. DoD contractors only, administrative or operational use, 28 Jul 2016. Other requests shall be referred to the lead engineer, 409 SCMS Robins AFB, GA 31098- 1670, ATTN: David L. Bethel.
Block 10, 12, 13: Conference minutes shall be submitted not more than 5 working days after completion of any Government design reviews, IPTs or Technical reviews. The specific date of these meetings will be determined by the Integrated Master Schedule.
Block 14b: Submission shall be made in .pdf or MS Word format to david.bethel.2@us.af.mil and jonathan.ringley@us.af.mil
COORDINATORS:
Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 17 JAN 2017 david.bethel.2@us.af.mil jonathan.ringley@us.af.mil
1 1 0
1 1 015. TOTAL
G. PREPARED BY
Miller, Larry T
409 SCMS / GUMBB
478-327-3605
H. DATE
18 JAN 2017
I. APPROVED BY
//DIGITALLY SIGNED//
RINGLEY.JONATHAN.R.1264500881
409 C130 / ENB 478-926-2333 / 468-2333
J. DATE
17 JAN 2017
Page 5 of 11DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 19 Jan 2017
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
Redesign of the Advanced Lighting Control System (
E. CONTRACT / PR NO.
FD20601700027
F. CONTRACTOR
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
Status Report
3. SUBTITLE
N/A
4. AUTHORITY
DI-MGMT-80368A/T
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Para 4.0, 4.2, 4.4.3, 4.8.4
6. REQUIRING OFFICE
409 SCMS/GUEA
7. DD 250 REQ
DD
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
MTHLY
11. AS OF DATE
N/A
12. DATE OF FIRST
SUBMISSION
See BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
See BLK 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Bethel, David LNAME: 06 JAN 2017DATE:
Block 4: Contractor format is acceptable contingent upon approval by the Government.
Block 8: Government approval/disapproval will be provided within 5 working days of receipt of each submittal. If disapproved, the contractor shall resubmit within 5 working days of receipt of Government comments.
Block 9: Distribution authorized to the Department of Defense and U.S. DoD contractors only, administrative or operational use, 28 Jul 2016. Other requests shall be referred to the lead engineer, 409 SCMS Robins AFB, GA 31098- 1670, ATTN: David L. Bethel.
Block 12: First submission should been 30 calender days after contract award.
Bock 13: Subsequent submissions should be in intervals of every 30 calender day after initial report.
Block 14b: Submission shall be made in .pdf or MS Word format to david.bethel.2@us.af.mil and jonathan.ringley@us.af.mil
COORDINATORS:
Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 17 JAN 2017 david.bethel.2@us.af.mil jonathan.ringley@us.af.mil
1 1 0
1 1 015. TOTAL
G. PREPARED BY
Miller, Larry T
409 SCMS / GUMBB
478-327-3605
H. DATE
18 JAN 2017
I. APPROVED BY
//DIGITALLY SIGNED//
RINGLEY.JONATHAN.R.1264500881
409 C130 / ENB 478-926-2333 / 468-2333
J. DATE
17 JAN 2017
Page 6 of 11DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 19 Jan 2017
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
Redesign of the Advanced Lighting Control System (
E. CONTRACT / PR NO.
FD20601700027
F. CONTRACTOR
1. DATA ITEM NO.
A007
2. TITLE OF DATA ITEM
Product Drawings/Models & Associated Lists
3. SUBTITLE
N/A
4. AUTHORITY
DI-SESS-81000E/T
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Para 4.2, 4.4.2, 4.4.3, 4.7.1, 4.7.2
6. REQUIRING OFFICE
409 SCMS/GUEA
7. DD 250 REQ
DD
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
See Block 16
11. AS OF DATE
N/A
12. DATE OF FIRST
SUBMISSION
See BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
See BLK 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Bethel, David LNAME: 06 JAN 2017DATE:
1.Air Force drawings 9626025 Rev G, 9579776 Rev M and 9579777 rev B (CAGE 98752) are a part of this CDRL.
A copy of the drawings may be requested through the Procurement Contracting officer
2.METADATA SHALL BE IN ACCORDANCE WITH 9579776 PARAGRAPH 10 OPTION ONE
3. Please reference EDATS control number 2016-77 on all correspondence related to this effort
SEE CONTINUATION SHEETS,
document FD2060-17-00027 ALCS A007 Drawing Requirements.docx
Vendor Item Control Drawings shall be used to specify the requirements for purchased items when such items have been approved for use in the design and are used without alteration, selection or source qualification (testing of an item prior to procurement action to ensure that it satisfies the specified requirements). Reference paragraph 7.1 of DI-SESS- 81000E.
COORDINATORS:
Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 17 JAN 2017 david.bethel.2@us.af.mil jonathan.ringley@us.af.mil
1 1 0
1 1 015. TOTAL
G. PREPARED BY
Miller, Larry T
409 SCMS / GUMBB
478-327-3605
H. DATE
18 JAN 2017
I. APPROVED BY
//DIGITALLY SIGNED//
RINGLEY.JONATHAN.R.1264500881
409 C130 / ENB 478-926-2333 / 468-2333
J. DATE
17 JAN 2017
Page 7 of 11DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 19 Jan 2017
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
Redesign of the Advanced Lighting Control System (
E. CONTRACT / PR NO.
FD20601700027
F. CONTRACTOR
1. DATA ITEM NO.
A008
2. TITLE OF DATA ITEM
Integrated Master Schedule
3. SUBTITLE
N/A
4. AUTHORITY
DI-MGMT-81650/T
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Para 4.2, 4.8.1
6. REQUIRING OFFICE
409 SCMS/GUEA
7. DD 250 REQ
DD
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
1 XTIME
11. AS OF DATE
N/A
12. DATE OF FIRST
SUBMISSION
See BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
See BLK 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Bethel, David LNAME: 03 JAN 2017DATE:
Block 8: Government approval/disapproval will be provided within 5 working days of receipt of each submittal. If disapproved, the contractor shall resubmit within 5 working days of receipt of Government comments.
Block 9: Distribution authorized to the Department of Defense and U.S. DoD contractors only , administrative or operational use, 28 Jul 2016. Other requests shall be referred to the lead engineer, 409 SCMS Robins AFB, GA 31098- 1670, ATTN: David L. Bethel.
Block 12, 13: The contractor shall deliver the IMS at the Kickoff Meeting. The contractor shall submit updates no later than 15 calendar days after identification of change to the schedule.
COORDINATORS:
Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 17 JAN 2017 david.bethel.2@us.af.mil jonathan.ringley@us.af.mil
1 1 0
1 1 015. TOTAL
G. PREPARED BY
Miller, Larry T
409 SCMS / GUMBB
478-327-3605
H. DATE
18 JAN 2017
I. APPROVED BY
//DIGITALLY SIGNED//
RINGLEY.JONATHAN.R.1264500881
409 C130 / ENB 478-926-2333 / 468-2333
J. DATE
17 JAN 2017
Page 8 of 11DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 19 Jan 2017
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
Redesign of the Advanced Lighting Control System (
E. CONTRACT / PR NO.
FD20601700027
F. CONTRACTOR
1. DATA ITEM NO.
A009
2. TITLE OF DATA ITEM
Alert/Safe Alert
3. SUBTITLE
N/A
4. AUTHORITY
DI-QCIC-80125B/T
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Para 4.2, 4.11
6. REQUIRING OFFICE
409 SCMS/GUEA
7. DD 250 REQ
DD
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
ASREQ
11. AS OF DATE
O
12. DATE OF FIRST
SUBMISSION
1 DAC
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Bethel, David LNAME: 03 JAN 2017DATE:
Block 4: Format shall be presented on DD Form 1938 or electronically.
Block 8: Government approval/disapproval will be provided within 10 working days of receipt of each submittal. If disapproved, the contractor shall resubmit within 10 working days of receipt of Government comments.
Block 9: Distribution Approved for Public release; distribution is unlimited.
Block 12: The Contractor shall inform 409 SCMS/GUEA and subcontractors of any Alert/Safe-Alert report received from GIDEP that is applicable to the contract.
Block 14b: Submission shall be made in .pdf or MS Word format to david.bethel.2@us.af.mil and jonathan.ringley@us.af.mil
COORDINATORS:
Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 17 JAN 2017 david.bethel.2@us.af.mil jonathan.ringley@us.af.mil
1 1 0
1 1 015. TOTAL
G. PREPARED BY
Miller, Larry T
409 SCMS / GUMBB
478-327-3605
H. DATE
18 JAN 2017
I. APPROVED BY
//DIGITALLY SIGNED//
RINGLEY.JONATHAN.R.1264500881
409 C130 / ENB 478-926-2333 / 468-2333
J. DATE
17 JAN 2017
Page 9 of 11DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 19 Jan 2017
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
Redesign of the Advanced Lighting Control System (
E. CONTRACT / PR NO.
FD20601700027
F. CONTRACTOR
1. DATA ITEM NO.
A010
2. TITLE OF DATA ITEM
Response to an Alert/Safe Alert
3. SUBTITLE
N/A
4. AUTHORITY
DI-QCIC-80126B/T
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Para 4.2, 4.11
6. REQUIRING OFFICE
409 SCMS/GUEA
7. DD 250 REQ
DD
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
ASREQ
11. AS OF DATE
O
12. DATE OF FIRST
SUBMISSION
1 DAC
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Bethel, David LNAME: 03 JAN 2017DATE:
Block 4: The GIDEP Response format shall be at the contractors discretion.
Block 8: Government approval/disapproval will be provided within 10 working days of receipt of each submittal. If disapproved, the contractor shall resubmit within 10 working days of receipt of Government comments.
Block 9: Distribution approved for public release; distribution is unlimited.
Block 12: The Contractor shall inform 409 SCMS/GUEA, subcontractors and report applicable information into GIDEP of any nonconforming supplies or services.
Block 14b: Submission shall be made in .pdf or MS Word format to david.bethel.2@us.af.mil and jonathan.ringley@us.af.mil
COORDINATORS:
Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 17 JAN 2017 david.bethel.2@us.af.mil jonathan.ringley@us.af.mil
1 1 0
1 1 015. TOTAL
G. PREPARED BY
Miller, Larry T
409 SCMS / GUMBB
478-327-3605
H. DATE
18 JAN 2017
I. APPROVED BY
//DIGITALLY SIGNED//
RINGLEY.JONATHAN.R.1264500881
409 C130 / ENB 478-926-2333 / 468-2333
J. DATE
17 JAN 2017
Page 10 of 11DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 19 Jan 2017
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
Redesign of the Advanced Lighting Control System (
E. CONTRACT / PR NO.
FD20601700027
F. CONTRACTOR
1. DATA ITEM NO.
A011
2. TITLE OF DATA ITEM
Environmental Health and Safety Plan
3. SUBTITLE
N/A
4. AUTHORITY
DI-ENVR 81375/T
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS Para 4.2, 5.5.3
6. REQUIRING OFFICE
409 SCMS/GUEA
7. DD 250 REQ
DD
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
1 XTIME
11. AS OF DATE
O
12. DATE OF FIRST
SUBMISSION
90 DAC
13. DATE OF SUBSEQUENT
SUBMISSION
N/A
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Bethel, David LNAME: 03 JAN 2017DATE:
Block 4: Contractor format is acceptable contingent upon approval by the Government.
Block 8: Government approval/disapproval will be provided within 20 working days of receipt of each submittal. If disapproved, the contractor shall resubmit within 10 working days of receipt of Government comments.
Block 9: Distribution approved for public release; distribution is unlimited.
Block 14b: Submission shall be made in .pdf or MS Word format to david.bethel.2@us.af.mil and jonathan.ringley@us.af.mil
COORDINATORS:
Kirkland, Ruth H 409 C130 / ENA 478-926-6379 / 468-6379 17 JAN 2017 david.bethel.2@us.af.mil jonathan.ringley@us.af.mil
1 1 0
1 1 015. TOTAL
G. PREPARED BY
Miller, Larry T
409 SCMS / GUMBB
478-327-3605
H. DATE
18 JAN 2017
I. APPROVED BY
//DIGITALLY SIGNED//
RINGLEY.JONATHAN.R.1264500881
409 C130 / ENB 478-926-2333 / 468-2333
J. DATE
17 JAN 2017
Page 11 of 11DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 19 Jan 2017