A016 - Logistics Product Data.pdf

PDF 289 KB Posted

Attached to
T4000 and T4100 Engine Trailers Winch Modification Kit Federal contract opportunity
Solicitation number
FA8533-20-R-0020
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to T4000 and T4100 Engine Trailers Winch Modification Kit, newest first.
File Type Posted
FA8533-20-R-0020-0004.pdf PDF
A017 - Technical Manual Contract Requirements (TMCR).pdf PDF
FA8533-20-R0020 0003.pdf PDF
TM-86-01R.pdf PDF
CDRL - Technical Manual Contract Requirements (TMCR).pdf PDF
B004 - Technical Review Data Package - Revised.pdf PDF
A011 - Conference Agenda - Revised.pdf PDF
A005 - First Article Test Procedure - Revised.pdf PDF
A008 - Notice of Revision - Revised.pdf PDF
A015 - Engineering Data for Provisioning (EDFP).pdf PDF
A013 - Corrosion Prevention and Control Plan - Revised.pdf PDF
FA8533-20-R-0020-0002.pdf PDF
A004 - Technical Review Data Package - Revised.pdf PDF
A006 - Engineering Change Proposal - Revised.pdf PDF
A012 - Conference Minutes - Revised.pdf PDF
A014 - Product Base Line Index - Revised.pdf PDF
A009 - First Article Test Report - Revised.pdf PDF
A001 - System Safety Hazard Analysis Report - Revised.pdf PDF
SOW - Revised.pdf PDF
A002 - Monthly Status Report - Revised.pdf PDF
A003 - First Article Test Plan - Revised 2.pdf PDF
A007 - Request for Variance - Revised.pdf PDF
Engine Trailer Winch Modification Kit Technical Requirements - Revised.pdf PDF
A003 - First Article Test Plan - Revised.pdf PDF
FA8533-20-R-0020-0001.pdf PDF
FA8533-20-R-0020.pdf PDF
SOW.pdf PDF
A002 - Monthly Status Report.pdf PDF
A006 - Engineering Change Proposal.pdf PDF
A003 - First Article Test Plan.pdf PDF
A013 - Corrosion Prevention and Control Plan.pdf PDF
A009 - First Article Test Report.pdf PDF
A004 - Technical Review Data Package.pdf PDF
A005 - First Article Test Procedure.pdf PDF
A011 - Conference Agenda.pdf PDF
Engine Trailer Winch Modification Kit Technical Requirements.pdf PDF
A007 - Request for Variance.pdf PDF
A001 - System Safety Hazard Analysis Report.pdf PDF
Packaging Requirements-AFMC158.pdf PDF
A012 - Conference Minutes.pdf PDF
A008 - Notice of Revision.pdf PDF
A014 - Product Base Line Index.pdf PDF
B004 - Technical Review Data Package.pdf PDF
FA8533-20-R-0020.pdf PDF
A010 - Technical Drawing Package.pdf PDF
Show all 45

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page of Pages

C O N T R A C T D A T A R E Q U I R E M E N T S L I S T (1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C

C. CATEGORY

D. SYSTEM/ITEM

T4000/T4100 Engine Trailer Winch Mod

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A016

2. TITLE OF DATA ITEM

LOGISTICS PRODUCT DATA

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81758/T

5. CONTRACT REFERENCE

SOW PARA 3.5.2

6. REQUIRING OFFICE

406 SCMS/GULAB

7. DD250 REQ

See Block 16

9. DIST

STATEMENT

REQUIRED

See Block 16

10. FREQUENCY

As Required

12. DATE OF FIRST SUBMISSION

IAW AFMC Form 718

14. DISTRIBUTION

b. COPIES

8. APP CODE

See Block 16

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

As Required

a. ADDRESSEE Draft

Final

Reg Repro

16. REMARKS.

A. The Prime Provisioning Activity (PPA) is identified in Block 14.

B. Specific summaries to be delivered on this contract are:

(1)____Provisioning Parts List (PPL) Top Down Sequence (2)__X__Short Form Provisioning Parts List (SFPPL) (3)____Common and Bulk Items List (CBIL) (4)__X__Design Change Notices (DCN) (5)__X__Statement of Prior Submission (SPS) Hard Copy Only.

(6)_____Long Lead Items List (LLIL) Select one of the following:

______LLIL-SAIP (Items recommended for Spares Acquisition Integrated with Production and not later than 165 days prior to Contractor’s order need date or as determined at the PGC).

______LLIL-Interim Release (Items interim released by the contractor when interim release is authorized by the contract.

______LLIL-Recommended (Items recommended as LLIL).

C. Attachment: LMI Data Product Worksheet for Logistics Product Data.

D. Block 7: Acceptance/Rejection of the Logistics Product Data will be furnished within 90 calendar days after receipt by the PPA. Method of acceptance/rejection will be in accordance with contract requirements.

E. Block 8: Approval (written) is not required. However, the data item will be reviewed and accepted/rejected based on its conforming to the requirements of the DID within 90 days of receipt by the requiring office.

F. Block 9: Distribution statement _A_ applies.

G. Blocks 10, 11, 12, & 13:

(1) PPL, SFPPL, LLIL, CBIL: Date(s) to be reflected on the AFMC Form 718 (Atch 1 to the Initial Provisioning Performance Specification (IPPS)). See Paragraph 3.1 of the IPPS.

(2) DCN(s): See Paragraph 10 of the IPPS.

(3) SPS: When the IPPS is provided with the solicitation, an offeror’s SPS shall be as outlined by the solicitation. When the IPPS is furnished after award, the contractor shall furnish a SPS within thirty (30) days after receipt of the IPPS. See Paragraph 7 of the IPPS.

H. Logistics Product Data transmittal document will reflect, as a minimum, PCCN, SCC, PCC, Contract Number, Type Logistics Product Data, and Line Item Count.

I. Data element definitions will be in accordance with GEIA-HB-0007B and/or other data provided at the PGC by the PPA.

J. In the event Logistics Product Data submittal deliveries are to be made to a secured program specific electronic site (contractor or government), a transmittal notification will be concurrently forwarded to the PPA via email.

406SCMS/GULAB

1 0 235 Byron St.

Suite 19A

Robins AFB GA

31098-1670

15. TOTAL 1 0

G. PREPARED BY

WILLIAM J. U. BRYANT

H. DATE

14 August 2020

I. APPROVED BY

J. DATE

CONTRACT DATA REQUIREMENTS LIST
Form Approved
B. EXHIBIT
C
C. CATEGORY
E. CONTRACT/PR NO.
A016
DI-SESS-81758/T
See Block 16
See Block 16
As Required
See Block 16
N/A
Draft
G. PREPARED BY
2020-08-17T07:54:10-0400
GRIEPENBURG.DEIDRE.H.1289435464

File details come from the government source that posted it. Updated .