CDRLs1900021.pdf
PDF 121 KB Posted
- Attached to
- TEMPERATURE TRANSMITTER Federal contract opportunity
- Solicitation number
- FA8524-19-R-0005
About this file
CDRLs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CAVAF.docx | DOCX document | |
| Packaging.pdf | ||
| Transportation.pdf | ||
| DD2875.pdf | ||
| PWS.docx | DOCX document | |
| FA852419R0005.pdf | ||
| GFP.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).
Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM E. CONTRACT / PR NO.
FD20601900021
F. CONTRACTOR
1. DATA ITEM NO.
A001
2. TITLE OF DATA ITEM
Commercial Asset Visibility Air Force End Item Reporting
3. SUBTITLE
CAV AF
4. AUTHORITY
DI-MGMT-81634C
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS paragraph 4.3.2.1
6. REQUIRING OFFICE
FA8524
7. DD 250 REQ
LT
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
See Block 16
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Himes, Amy LNAME: 21 JUN 2018DATE:
1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 420 SCMS/GUNAB-Robins in order to ascertain production status.
2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher.
The Contractor shall obtain a valid DOD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.
3. Training will be provided by 420 SCMS/GUNAB-Robins, (478) 327-6603 or 6602.
4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.
Block 7: Enter the applicable code as listed in DOD 5010.12-M, Chapter 3. (Enter LT for Letter of Transmittal if not separately priced or DD if separately priced.)
Block 10:
a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hours of a supply or maintenance action occurrence IAW Contractor Users Guide.
b. The method of communication from the contractor to the funding base will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.
Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.
Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.
Block 13: Same as remarks regarding Block 10 above.
COORDINATORS:
15. TOTAL
G. PREPARED BY
Altman, Tasha T
411 SCMS / GULD
478-926-7066
H. DATE
29 JUN 2018
I. APPROVED BY
//DIGITALLY SIGNED//
STEWART.TODD.RICHARD.1071073277
411 SCMS / GULB 478-926-3258 / 468-3258
J. DATE
28 JUN 2018
Page 1 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 03 Aug 2018
PREVIOUS EDITION MAY BE USED.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM E. CONTRACT / PR NO.
FD20601900021
F. CONTRACTOR
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
CONTRACT DEPOT MAINTENANCE PRODUCTION
REPORT
3. SUBTITLE
PRODUCTION REPORT
4. AUTHORITY
DI-PSSS-81995
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS PARA4.5
6. REQUIRING OFFICE
411 SCMS/GULAB
7. DD 250 REQ
DD
8. APP CODE
See Block 16
9. DIST STATEMENT
REQUIRED
A
10. FREQUENCY
MTHLY
11. AS OF DATE
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Pierce, Christie NNAME: 17 MAY 2018DATE:
Block 4: Contractor format acceptable via electronic media. Data item to be used as a guide for content.
Block 11: Based on receipt of first repairable asset.
Block 12: 30 days after first assets are inducted at the repair facility, the contractor shall start providing this report.
Block 13: The report shall be submitted via email by the 10th calendar day after each reporting period. Email addresses available upon request.
COORDINATORS:
Email:
411 SCMS/GULAA Program Manager (PM) Provided on Contract Award
0 1 0 email:
411 SCMS/PMS:
Christie.Pierce@us.af.mil PMS provided on contract award
0 1 0
0 2 015. TOTAL
G. PREPARED BY
Altman, Tasha T
411 SCMS / GULD
478-926-7066
H. DATE
29 JUN 2018
I. APPROVED BY
//DIGITALLY SIGNED//
STEWART.TODD.RICHARD.1071073277
411 SCMS / GULB 478-926-3258 / 468-3258
J. DATE
28 JUN 2018
Page 2 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 03 Aug 2018
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM E. CONTRACT / PR NO.
FD20601900021
F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
ITEM UNIQUE IDENTIFICATION
3. SUBTITLE
IUID MARKING PLAN
4. AUTHORITY
DI-MGMT-81803
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS PARA 4.3.1.2.2
6. REQUIRING OFFICE
411 SCMS/GULAA
7. DD 250 REQ
DD
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
See Block 16
11. AS OF DATE
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Pierce, Christie NNAME: 17 MAY 2018DATE:
Block 4:Contractor format acceptable on electronic media, Data Item to be used as a guide for content.
Block 7:Acepptance via WAWF under DODAAC:FA8524.
Block 8:The government will have 15 calendar days to review and provide comments, subsequently the Contractor will have 15 calendar days to correct and resubmit.
Block 11 and 12:The Contractor shall submit the marking plan IAW DFARS 211.274-2 and DFARS 252.211.7003 30 days after contract award.
Block 13:Subsequent submission is only necessary as revisions occur.
Block 14: Procuring Officer(s) email along with Integrated Product Team email list will be provided as required.
COORDINATORS:
Email:
411 SCMS/GULAA Program Manager (PM)/COR provided on contract Award
1 1 0
Email:
AFLCMC/WIUEA Engineer Christopher.Traylor.1@us.af.
mil
1 1 0
Email:
AFSC/PZAAA Contracting Officer (PCO) provided on contract award
0 1 0
Email:
DCMA/ACO
0 1 0
2 4 015. TOTAL
G. PREPARED BY
Altman, Tasha T
411 SCMS / GULD
478-926-7066
H. DATE
29 JUN 2018
I. APPROVED BY
//DIGITALLY SIGNED//
STEWART.TODD.RICHARD.1071073277
411 SCMS / GULB 478-926-3258 / 468-3258
J. DATE
28 JUN 2018
Page 3 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 03 Aug 2018
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM E. CONTRACT / PR NO.
FD20601900021
F. CONTRACTOR
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
ITEM UNIQUE IDENTIFICATION
3. SUBTITLE
IUID MARKING ACTIVITY AND VERIFICATION
REPORT
4. AUTHORITY
DI-MGMT-81804A
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS PARA 4.3.1.2.3
6. REQUIRING OFFICE
411 SCMS/GULAA
7. DD 250 REQ
DD
8. APP CODE
See Block 16
9. DIST STATEMENT
REQUIRED
E
10. FREQUENCY
QRTLY
11. AS OF DATE
CA
12. DATE OF FIRST
SUBMISSION
30 DAC
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Pierce, Christie NNAME: 17 MAY 2018DATE:
Block 4: Contractor format acceptable on electronic media. Data Item to be used as a guide for content.
Block 7:Acceptance via WAWF under DODDAC: FA8524 Block 11,12,13: The IUID Marking/Verification Report shall be submitted quarterly verifying the implementation of the IUID Marking Plan. First submission shall be submitted 30 calendar days after contract award. The assets reported can be shipped/delivered to the DoD prior to the submittal of this report.
Block 14: Procuring Officer(s) email along with Integrated Product Team email list will be provided as required.
COORDINATORS:
Email:
411 SCMS/GULAA Program Manager (PM)/COR provided on contract award
0 1 0
Email:
AFLCMC/WIUEA Engineer Christopher.Traylor.1@us.af.
mil
1 1 0
Email:
AFSC/PZAAA Contracting Officer(PCO) provided on Contract Award
0 1 0
Email:
DCMA/ACO
0 1 0
1 4 015. TOTAL
G. PREPARED BY
Altman, Tasha T
411 SCMS / GULD
478-926-7066
H. DATE
29 JUN 2018
I. APPROVED BY
//DIGITALLY SIGNED//
STEWART.TODD.RICHARD.1071073277
411 SCMS / GULB 478-926-3258 / 468-3258
J. DATE
28 JUN 2018
Page 4 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 03 Aug 2018
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM E. CONTRACT / PR NO.
FD20601900021
F. CONTRACTOR
1. DATA ITEM NO.
A005
2. TITLE OF DATA ITEM
COUNTERFEIT PREVENTION PLAN
3. SUBTITLE
CPP
4. AUTHORITY
DI-MISC-81832 CPP
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS PARA 4.3.2.2
6. REQUIRING OFFICE
411 SCMS/GULAA
7. DD 250 REQ
DD
8. APP CODE
A
9. DIST STATEMENT
REQUIRED
C
10. FREQUENCY
See Block 16
11. AS OF DATE
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Pierce, Christie NNAME: 17 MAY 2018DATE:
Block 4 and 5: Contractor format acceptable via electronic media. Data Item to be used as a guide for formatting purposes. Contractor shall submit a Counterfeit Prevention Plan IAW the type of parts being sourced.
Block 7:The contractor shall submit the report via WAWF. Contractor shall submit the Receiving Report upon final submission to DODAAC FA8524 in WAWF.
Block8,10-12: Contractor shall submit a Counterfeit Prevention plan within 15 calendar days after contract award.
Written Government acceptance/comments will be within 15 calendar days of receiving Government comments.
Acceptance by the Government is required prior to formal distribution.
Block11,13: If, during the performance of this contract, changes to the Counterfeit Prevention Plan are required, submit the revised Counterfeit Prevention Plan to the 411 SCMS/GULAA. Procedures identified for blocks 8,10-12 will apply.
Block 14: email addresses of the Integrated Product Team (IPT) will be provided upon request.
COORDINATORS:
Email:
411 SCMS/GULAA Program Manager (PM) provided on contract award
1 1 0
Email:
AFLCMC/WIUEA Engineer Christopher.Traylor.1@us.af.
mil
1 1 0
Email:
AFSC/PZAAA Contracting Officer(PCO) provided on contract award
0 1 0
Email:
DCMA/ACO
0 1 0
2 4 015. TOTAL
G. PREPARED BY
Altman, Tasha T
411 SCMS / GULD
478-926-7066
H. DATE
29 JUN 2018
I. APPROVED BY
//DIGITALLY SIGNED//
STEWART.TODD.RICHARD.1071073277
411 SCMS / GULB 478-926-3258 / 468-3258
J. DATE
28 JUN 2018
Page 5 of 6DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 03 Aug 2018
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM E. CONTRACT / PR NO.
FD20601900021
F. CONTRACTOR
1. DATA ITEM NO.
A006
2. TITLE OF DATA ITEM
GOVERNMENT PROPERTY INVENTORY REPORT
3. SUBTITLE
GP INVENTORY REPORT
4. AUTHORITY
DI-MGMT-80441C
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
PWS PARA 3.3
6. REQUIRING OFFICE
411 SCMS/GULAA
7. DD 250 REQ
DD
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
E
10. FREQUENCY
ANNLY
11. AS OF DATE
SEE BLOCK 16
12. DATE OF FIRST
SUBMISSION
SEE BLOCK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Pierce, Christie NNAME: 17 MAY 2018DATE:
Block 4: contractor format acceptable provided the electronic report is in the specified file type detailed in the DID. Use the DID for reference and specific report requirements.
Block 7:Submit the report via email to the IPT with DD Form 250 via WAWF for acceptance under DoDAAC: FA8524.
Block 11: One year after contract award.
Block 12 and 13: The contractor shall submit the report within 10 business days of the expiration of the basic year and annually from then on based on the date of contract award.
Block 14: IPT members names and email addresses will be provided as required.
COORDINATORS:
Email:
411 SCMS/GULAA Program Manager (PM)/COR provided on contract award
0 1 0
Email:
AFLCMC/WIUEA Engineer Christopher.Traylor.1@us.af.
mil
1 1 0
Email:
DCMA/ACO
0 1 0
1 3 015. TOTAL
G. PREPARED BY
Altman, Tasha T
411 SCMS / GULD
478-926-7066
H. DATE
29 JUN 2018
I. APPROVED BY
//DIGITALLY SIGNED//
STEWART.TODD.RICHARD.1071073277
411 SCMS / GULB 478-926-3258 / 468-3258
J. DATE
28 JUN 2018