About this file
Performance Work Statement
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| J A_redacted_00839.pdf | ||
| FA852413R00839_sol_draft.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HEADQUARTERS
WARNER ROBINS AIR LOGISTICS CENTER
ROBINS AIR FORCE BASE, GEORGIA 31098-1622
PERFORMANCE-BASED WORK STATEMENT (PWS)
Purchase Request: FD2060-12-00839
DATE: 1 Feb 13
TYPE WORK: This effort is for the remanufacture of the Fuel Tank Assembly applicable to the HH-60G Helicopters.
CONTENTS
SECTION TITLE PAGE
SECTION 1.0 DESCRIPTION OF SERVICES 1
SECTION 2.0 SERVICES SUMMARY 1
SECTION 3.0 REPORTING LOSS OF GOVERNMENT PROPERTY 2
SECTION 4.0 COMMERCIAL ASSET VISIBILITY AIR FORCE (CAVAF) 2
SECTION 5.0 GENERAL INFORMATION 2
SECTION 6.0 APPENDICES 7
DISTRIBUTION STATEMENT C: Distribution authorized to U.S. Government agencies and their contractors (Administrative or Operational Use; 21 August 2012). Other requests for this document shall be referred to 411 SCMS/GULD, Robins AFB, GA 31098-1670.
1.0 DESCRIPTION OF SERVICES
This PWS is for the depot level remanufacture of the Fuel Tank Assembly, National Stock Number (NSN) 1560-01-391-8409GC, Part Number HM020-008. The extent of remanufacture work required shall be determined by the initial inspection/ functional checkout and the disassembly/assembly required to return the Fuel Tank Assembly to a serviceable end item that shall efficiently serve its intended purpose. Each asset shall be repaired and returned to the Government in serviceable condition. Original design of the end item and parts thereof, or the design functional capabilities of the end item, shall not be changed, modified or altered unless such changes are authorized in writing by the Procuring Contracting Officer (PCO). The war fighter will benefit by having more aircraft available with a functional Fuel Tank Assembly to perform the Special Operation Forces (SOF) mission. The contractor shall meet the delivery schedule for all requirements through CAVAF reporting. The contractor shall report all mishaps to the Safety Office within four hours of mishap or incident.
2.0 SERVICES SUMMARY (SS)
Performance Objectives
PWS Para.
Performance Threshold
| Meet the delivery schedule for all requirements through CAVAF reporting |
| 3.3 |
4.1 4.1.1 4.1.2 4.1.2.1 4.1.2.2 After receipt of order and assets, contractor shall remanufacture and ship assets to the government within 90 days after arrival of assets at the contract facility. SURGE/MICAP items shall be shipped within 45 days. Turn Around Time (TAT) from receipt of item or after receipt of order, whichever is later. Only one schedule slippage allowed per quarter.
| Remanufacture/repair each asset and return to the Government in serviceable condition |
| 4.1.8 |
| There shall be no more than one (1) Product Quality deficiency Reporting (PQDR) annually during the period of performance of contract. |
| Report all mishaps to the Safety Office within four hours of mishap or incident |
| 4.6.2 |
| No more than one instance of late mishap notification per year |
3.0 REPORTING LOSS OF GOVERNMENT PROPERTY
3.1 Definitions as used in this clause. “Government property” is defined in the clause at FAR 52.245-1(a), Government Property. “Loss of Government property” means unintended, unforeseen, or accidental loss, damage, or destruction of Government property that reduces the Government’s expected economic benefits of the property. It does not include purposeful destructive testing, obsolescence, normal wear and tear, or manufacturing defects. “Loss of Government property” includes, but is not limited to (1) items that cannot be found after a reasonable search, (2) theft; (3) damage resulting in unexpected harm to property requiring repair to restore the item to usable condition; or (4) destruction resulting from incidents that render the item useless for its intended purpose or beyond economical repair. “Unit acquisition cost” means (1) for Government-furnished property, the dollar value assigned by the Government and identified in the contract; and (2) for Contractor-acquired property, the cost derived from the Contractor’s records that reflect consistently applied, generally acceptable accounting principles. Comment by Kathryn.Driskell: DELETE not needed if there is no GFP in requirement
3.2 Reporting loss of Government property. (1) The Contractor shall use the Defense Contract Management Agency (DCMA) eTools software application for reporting loss of Government property. Reporting value shall be at unit acquisition cost. The eTools “LTDD of Government Property” toolset can be accessed from the DCMA home page External Web Access Management application at http://www.dcma.mil/aboutetools.cfm. (2) Unless otherwise provided for in this contract, the requirements of paragraph (b)(1) of this clause do not apply to normal and reasonable inventory adjustments (i.e., losses of low-risk consumable material such as common hardware) as agreed to by the Contractor and the Government Property Administrator. Such losses are typically a product of normal process variation. The Contractor shall ensure that its property management system provides adequate management control measures, e.g., statistical process controls, as a means of managing such variation. (3) The Contractor shall report losses of Government property outside normal process variation, e.g., losses due to Theft; Inadequate storage; Lack of physical security; or “Acts of God.” (4) This reporting requirement does not change any liability provisions or other reporting requirements that may exist under this contract. Comment by Chris.Boarman.1: The latest PWS template states that these two paragraphs are mandatory for all contracts. These are for Gov property not GFP.
3.3 COMMERICAL ASSET VISIBILITY AF (CAVAF)
The contractor shall report using the Commercial Asset Visibility (CAVAF). (CDRL A001, Data Item Description, DI-MGMT-81634B). The contractor shall provide data related to the tasks and efforts conducted for each repairable unit. If CAVAF training is required, send an email to: 406scms.cav.af.ar@robins.af.mil. The contractor shall conduct production reporting on a daily or as transactions occur basis. The contractor shall obtain a valid DoD PKI certificate to log into CAVAF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required. (CDRL A001, DI-MGMT-81634B)
4.0 GENERAL INFORMATION
4.1 General Work Requirements. The contractor is required to perform depot level repair of the System assets. The contractor shall return the end items to serviceable condition within 90 workdays of receipt of asset and task order. If the repair action cannot be completed within 90 workdays, notification to the Government must be made within three (3) workdays of not meeting the delivery date. Notification shall include the reason for not meeting the delivery schedule, what the contractor will do to preclude the delay from happening again and the date the item will be returned to a serviceable condition. SURGE/MICAP items shall be shipped within 45 workdays TAT from receipt of item or after receipt of order, whichever is later. Only one schedule slippage allowed per quarter. The Fuel Tank Assembly is a mission critical item. After receipt of order and assets, contractor shall remanufacture and ship assets to the government within 90 days after arrival of assets at the contract facility.
4.1.1 Maintenance Records, Forms, and Publications. AFTO Form 349 Maintenance Data Collection Record is required and shall be IAW Technical Order (TO) 00-20-2, Maintenance Data Documentation. (CDRL A002, Data, DI-MISC-81371A/T)
4.1.2 Depot Maintenance Production Report. The contractor shall submit the report on the 10th calendar day after the end of each reporting period IAW the Contract Data Requirements List (CDRL). (CDRL A003, Data Item Description, DI-ALSS-80728A/T)
4.1.2.1 Material Inspection and Receiving Report. For all end items repaired and shipped under this contract, copies of DD Form 250 shall be made available via the Wide Area Workflow (WAWF) or copies shall be furnished to 411 SCMS/GULD
4.1.2.2 Notification of Long-lead Time Parts. Notification shall be provided to the government when long-lead time parts are required. In the event there is a need for long-lead time parts the contractor shall notify the government PCO within (10) workdays.
4.1.3 Condemnation and Repair. The contractor shall be required to repair all end items unless written direction is provided by the PCO through the Administrative Contracting Officer (ACO). Requests for condemnation shall be submitted in writing through the ACO to the PCO within ten (10) workdays following initial inspection/functional testing. Condemnations shall not be requested due to unavailability of replacement parts. Condemnations may only be granted if the item inducted for repair manifests one or more of the following conditions: (1) Physical damage that affects greater than 75 percent of the material within the end item (i.e., crushed), (2) Burn damage that affects greater than 80 percent of the internal electrical components and connections of the end item, (3) Repair cost exceeds 75 percent of the unit’s replacement cost, and (4) Beyond Economical Repair (BERs) has been determined. Furthermore, the PCO retains the right to request enlarged color photographs of any proposed condemned end item. These photographs shall clearly portray the extent of damage to the end item and/or effects of overheating. One photograph shall be of the entire end item showing the part number and serial number. The results of any electrical testing performed on the end item shall also be submitted for review. The contractor may be required to submit the proposed condemned end item to Government technical representative for evaluation, confirmation, and/or disposition instructions.
4.1.4 The Government is authorized to replace condemned end items with replacement reparable end items of the same NSN at no additional cost. The contractor is authorized reclamation from condemned units. The contractor shall request authorization from the PCO prior to reclaiming any items from the condemned unit.
4.1.5 Accessory and Component Reuse, Repair and Replacement. Expense parts of an end item determined unserviceable or missing shall be replaced with equivalent serviceable parts at no additional cost. Items received which are misidentified, misdirected or have Air Force recoverable subassemblies missing shall be reported through the ACO to the PCO, to 411 SCMS/GULD for disposition instructions. Missing repairable Expendability, Reparability, Recoverability Code (ERRC) T subassemblies or ERRC Code T subassemblies that are generated as part of the next higher assembly (NHA) and subsequently require condemnation, will be replaced by the government. The replacement item may be repairable or serviceable. The repair (if required) and the installation of the replacement item into the NHA will be accomplished at no additional cost IAW T.O. 00-25-234, General Shop Practices.
4.1.6 Upon approval by the Government, the contractor is authorized to cannibalize repairable Shop Replaceable Unit (SRU) necessary to accomplish timely repair to meet production schedule and/or accomplish repair of Mission Capable (MICAP) requirements. All cannibalized components will be returned to a pre-cannibalized condition. The contractor shall maintain a record of part numbers cannibalized including the serial number of the units from which the part was removed and installed.
4.1.7 Facility Requirements. The contractor shall provide a repair facility. The facility shall serve as the depot to carry out the repair and will include contractor owned test equipment, fixtures, adapters and workbenches needed for repair of the assets of this PWS.
4.1.8 Quality. The Contractor’s quality program shall be established and maintained IAW FAR 52.246-11, Higher-Level Contract Quality Requirement, or equivalent. The Contractor’s quality program shall meet the requirements of ISO 9001:2008, Quality Management Systems Requirements. When requested, the contractor shall assist the cognizant Contract Administration Office in evaluating Product Deficiency Reports (PQDRs) and exhibits for defects reported on items repaired under this contract to determine the root cause for deficiencies. These defects may be reported from field or depot organizations. Corrective action to prevent repeat discrepancies shall be an integral part of the contractor’s Quality Program. The contractor shall establish and maintain a program to accomplish the requirements set forth in Air Force T.O. 00-35D-54, USAF Deficiency Reporting, Investigation, and Resolution. There shall be no more than one (1) (PQDRs) annually during the performance of this contract repair effort.
4.2 Performance of Service During Crisis.
The Functional Commander/Director has determined, by placing in writing their decision, that this service is not Mission Essential (M-E) in accordance with DoDI 1100.22, Policy and Procedures for Determining Workforce Mix and DFARS 237.76, Continuation of Essential Contractor Services.
4.3 Inspection of Services Clause. The Federal Acquisition Regulation (FAR) 52.246-4, Inspection of Services - Fixed Price, gives the Government the right to inspect Contractor Performance.
4.4 Green Procurement Program (GPP). GPP is a mandatory federal acquisition program that focuses on the purchase and use of environmentally preferable products and services. GPP requirements apply to all acquisitions using U. S. Government appropriated funds, including services and new requirements. FAR 23.404(b), Agency Affirmative Procurement Program, applies and states the GPP requires 100% of EPA designated product purchases that are included in the Comprehensive Procurement Guidelines (CPG) list that contains recovered materials, unless the item cannot be acquired: (a) competitively within a reasonable timeframe; (b) meet appropriate performance standards, or (c) at a reasonable price. The prime contractor shall be responsible for ensuring that all subcontractors comply with this requirement.
4.5 Government/Industry Exchange Program (GIDEP).
4.5.1 The contractor shall develop, implement and participate in GIDEP Government/Industry Exchange Program Contractor Participation Requirements. The contractor shall be required to submit all appropriate data to GIDEP as it is generated IAW the Contract Data Requirements List (CDRL) of this contract. Part, component, material, equipment, manufacturing process deficiencies (actual or potential) shall be reported to GIDEP. The contractor shall maintain a record of the status and disposition of all Alert/Safe Alert Reports, (CDRL A004, DI-QCIC-80125B/T).
4.5.2 Contractor(s) shall screen each Alert or Safe Alert received from GIDEP to determine if the device or process for which the Alert is issued, is used in the manufacture of the unit and take appropriate action. Upon determination that an Alert/Safe Alert has implications to the units being manufactured, a response shall be submitted informing and specified organizations IAW CDRL. Subcontractors to the prime shall be notified of reports associated with the device, components or processes supplied by the subcontractor to the prime, (CDRL A005, DI-QCIC-80126B/T).
4.6 Safety Requirements. The contractor shall comply 100 percent of the time.
4.6.1 Contractor Compliance. Contractors shall comply with Occupational Safety and Health Act (OSHA) Public Law 91-596, OSHA Standard 29 CFR 1910, and OSHA Standard 29 CFR 1925 for the protection of their employees. To ensure the protection of Air Force personnel, assets and interests, the contractor shall be solely responsible for compliance with all federal, state and local laws, codes, ordinances, regulations, the Occupational, Safety and Health Act (Public Law 91-596) and the resulting OSHA Standards 29 CFR 1910 and OSHA Standards 29 CFR 1925, all Air Force Occupational Safety and Health (AFOSH) Standards, and any applicable local guidance. The contractor shall establish and maintain a safety and health program detailed in a written Contractor’s Safety and Health Plan. The Air Force is part of the OSHA Voluntary Protection Program (VPP). All shall familiarize themselves with the requirements of VPP. Information on the VPP can be accessed at http://www.osha.gov/dcsp/vpp/index.html. Additionally, the contractor is responsible for the safety and health of all subcontractor employees.
4.6.2 Mishap Notification. The contractor shall telephonically notify the Safety office within four (4) hours of all mishaps or incidents to DoD property entrusted by this contract operation. No more than one instance of late mishap notification per calendar year is acceptable. Follow all other reporting requirements as identified on the DD1423, CDRL A006 for Accident/Incident Report (Mishap Notification & Reporting) Data Acquisition Document Number DI-SAFT-81563. (DI-SAFT-81563, CDRL A006)
4.6.3 Mishap Investigation. If requested by the Government Procuring Contracting Officer (PCO) or Administrative Contracting Officer (ACO), the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenances and training records until released by the investigating safety office. If the government investigates the mishap, the contractor and the subcontractors shall cooperate fully and assist the government personnel until the investigation is completed.
4.7 Packaging.
(MIL-STD-2073-1d, 10 May 02, Standard Practice for Military Packaging and MIL-STD-129P (4), 19 Sep 07, Military Marking for Shipment and Storage). When shipping containers are received that meet the requirements of the AFMC Form 158, Packaging Requirements, and are suitable for return shipment of serviceable assets, they shall be reclaimed, stored and protected for reuse. Unserviceable containers shall be disposed of and replaced with new containers that meet the requirements of the AFMC Form 158, Packaging Requirements.
4.8 Item Unique Identification (IUID) Requirements.
The IUID Program requires each qualifying Air Force (AF) asset to be uniquely identified with a permanent marking that can sustain its information throughout the life of the asset. The program addresses two categories of assets—those already in the AF inventory and those currently under contract but not currently in the AF inventory. For assets under contract, IUID requirements are specified in Defense Federal Acquisition Regulation Supplement (DFARS) 252-211.7003, Item Identification and Valuation and Department of Defense (DoD) 4100.39-M, Federal Logistics Information System (FLIS). All assets subject to marking must be recorded in the DoD IUID Registry.
4.8.1 IUID Marking Plan. The Contractor’s IUID Marking Plan shall fully detail and document the strategy and scope to be used to meet MIL-STD-130, DoD Standard Practice Identification Marking of US Military Property. The plan must be approved by Government Engineer, Tahirah Washington, WR-ALC/GRUEC prior to implementation.
(DI-MGMT-81803, CDRL A007)
4.8.2 IUID Marking Activity and Verification Report. The contractor shall provide an IUID Marking Activity and Verification Report. A key attribute for the report is the Verification column which indicates pass/fail for each item’s Data Matrix Symbol Quality.
(DI-MGMT-81804, CDRL A008)
4.9 Procedure for Invoicing/Payment/Acceptance.
The multi-functional team (MFT) can request that data items be attached to acceptance forms through Wide Area Work Flow (WAWF) or submitted to government personnel as spelled out in the data Contract Data Requirements List (CDRL). To allow for payment of separately priced data items, the MFT must use WAWF for acceptance. Data CDRL will determine submittal requirements; however, both separately priced and non-separately priced items must be accepted in WAWF in order for the line item to be closed out in the contract. Information regarding Wide Area Work Flow-Receipt and Acceptance is available on the Internet at https://wawf.ef.mil.
4.10 Contractor Manpower Reporting Requirements.
Per reference SAF/AQ Memo, 13 Nov 12), “The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the USAF via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil (select Dept of the Air Force option if you you’re working an AF requirement). Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October* of each calendar year. Contractors may direct questions to the CMRA help desk.”
4.10.1 *Reporting Period: Contractors are required to input data by 31 October of each year. However, due to the delayed implementation, input of FY12 data is required by 31 Mar 13.
4.10.2 Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.
4.10.3 User Manuals: Data for Air Force service requirements must be input at the Air Force CMRA link. However, user manuals for government personnel and contractors are available at the CMRA link at http://www.ecmra.mil (select Dept of the Air Force option if you you’re working an AF requirement).
5.0 APPENDICES
APPENDIX A: REFERENCES
| Name of Publication |
| Sections that Apply |
| Date of Publication |
| Title of Publication |
| MIL-STD-129P |
| Entire |
| 19 Sep 07; Chg 4 |
| Military Marking for Shipment and Storage |
| MIL-STD-130N |
| Entire |
| 17 Dec 07 |
| DoD Standard Practice Identification Marking of US Military Property |
| MIL-STD-1686C |
| Entire |
| 25 Oct 95 |
| Electrostatic Discharge Control Program for Protection of Electrical & Electronics Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices) Metric used simultaneously |
| MIL-HDBK-263B |
| Entire |
| 31 Jul 94 |
| ESD Handbook for Protection of Electrical / Electronic Parts, Assemblies & Equipment (excluding electrically Initiated Explosives Devices) Metric MIL-STD-1686C and MIL-HDBK-263B Used simultaneously |
| DFARS 252.211–7003 |
| Entire |
| Jun 2011 |
| Item Identification and Valuation |
| MIL-STD-2073-1E |
| Entire |
| 07 JAN 11 |
| Standard Practice for Military Packaging |
| DFARS 237.76 |
| Entire |
| 24 Nov 10 |
| Continuation of Essential Contractor Services |
| DoDI 1100.22 |
| Entire |
| 12 Apr 10 |
| Policy and Procedures for Determining Workforce Mix. |
| FAR 23.404 |
| Paragraph “b” |
| 1 Oct 10 |
| Agency Affirmative Procurement Program |
| OSHA Public Law 91-596 |
| Entire |
| 1 Jan 04 |
| Occupational Safety and Health Act (OSHA) of 1970 |
Occupational Safety And Health Standards
| Part 1910 |
| 1 Jan 04 |
| Occupational Safety and Health Act (OSHA) of 1970 |
| Safety and Health Regulations for Service Contracts |
| Part 1925 |
| 30 Dec 71 |
| Occupational Safety and Health Act (OSHA) of 1970 |
| AFMC/CV Policy Letter |
| Entire |
| 1 Aug 07 |
| Conformance with Air Force Environmental Management System (EMS) Requirements for Contracts Performed on Air Force Installations |
| SAF Policy Letter |
| Entire |
| 11 Dec 06 |
| Conformance with Air Force Environmental Management System (EMS) Requirements for Contracts Performed on Air Force Installations |
| DoD 4100.39-M |
| Entire |
| May 2010; Chg Letter Oct 2010 |
| Federal Logistics Information System |
| FAR 52.245-1 |
| Entire |
| Aug 2010 |
| Government Property |
| FAR 52.246-4 |
| Entire |
| Aug 1996 |
| Inspection of Services-Fixed Price |
| FAR 52.246-11 |
| Entire |
| Feb 1999 |
| Higher-Level Contract Quality Requirement |
| NCSL 2540.3 |
| Entire |
| 3 AUG 06 |
| American National Standard All Calibration Laboratories and Measuring and Test Equipment General Requirements |
| T.O. 00-20-2 |
| Entire |
| Sep 2010 |
| Maintenance Data Documentation (PWS paragraph 4.1.1) |
| T.O. 00-25-234 |
| Entire |
| Aug 1998; Chg 39, 21 Jul 11 |
| General Shop Practice Requirement for the Repair Maintenance and Test of Electrical Equipment (PWS paragraph 4.1.5) |
| T.O. 00-35D-54 |
| Entire Document |
| 1 May 07 |
| USAF Deficiency Reporting, |
Investigation, and Resolution (PWS paragraph 4.1.8)
| DLAR 4155.24 |
| Entire |
| 20 Jul 93 |
| Product Quality Deficiency Report Program |
| ISO 9001:2008 |
| Entire |
| 1 DEC 08 |
| Quality Management Systems Requirements |
APPENDIX B: DEFINITIONS
ATP: Acceptance Test Procedure
Administrative Contracting Officer (ACO): The individual responsible for the overall administration of the contract.
Calibration: A comparison between two instruments, one of which is a standard of known accuracy, to detect and correlate or adjust any variation in the accuracy of the instruments being compared.
CAV AF: Commercial Asset Visibility Air Force
CDRL: Contract Data Requirements List
Component: A separate identifiable part of an end item which performs a function within the system or subsystem and is necessary for the proper operation of that end item.
Data: All management, engineering, and logistics information, reports and documentation which are required.
Depot Level Remanufacture or Maintenance Facility: An industrial type facility established to perform necessary remanufacture functions or modifications and maintenance in support of field and using organizations. This includes commercial contractors who are engaged in performing depot level work on weapon systems or equipment under a contract issued and managed by Air Force Materiel Command.
Disassembly: Teardown of the item or parts sufficient to permit the type and amount of inspection and work required.
ECP: Engineering Change Proposal
Expense Item: Low-cost parts, uneconomical to remanufacture.
End item: For the purpose of this work specification, end items are recoverable articles of equipment listed as a line item in the contract.
ERRC: Expendability, Repairability, Recoverability Code
IAW: In Accordance With
Inspect or Check: An examination of an item to determine identity, condition and proper installation.
LRU: Line Replaceable Unit
MICAP: Mission Capability
Operational Check: A functional test of an accessory, component, or system accomplished in its installed environment to ensure proper installation and operation.
Parts: Essential elements, components, or subassemblies of an item.
PKI: Public Key Infrastructure
PMS: Production Management Specialist
PQDR: Product Quality Deficiency Report
Procuring Contracting Officer (PCO): The individual authorized to enter into contracts for supplies and services on behalf of the government and who is responsible for the overall acquisition process.
Remanufacture: The restoration or replacement of parts or components of an item as necessitated by wear and tear, or damage or failure of part, in order to maintain the specific item in serviceable condition.
Remanufactured: An unserviceable item that can be remanufactured and restored to a serviceable condition.
Serviceable: An item capable of meeting the requirements and performing the function for which designed or modified, and meeting all test requirements established by the work specification.
SOF: Special Operations Forces
SRU: Shop Replaceable Unit
Technical Data: The instructions for removal, disassembly, inspection, remanufacture, adjustment, test, assembly and reinstallation of components and equipment.
TT&E: Teardown, Test, and Evaluation is performed by the contractor to determine the cause of failure prior to conducting actual remanufacture of the item.