Attachment4SubcontractingPlanChecklist.pdf
PDF 1 MB Posted
- Attached to
- Miscellaneous Federal contract opportunity
- Solicitation number
- FA8523-16-R-0007
About this file
Subcontracting Checklist
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA852316R0007_______0002.pdf | ||
| FA852316R0007_______0001.pdf | ||
| 16-60702_D.O_1_SOW_Rev_0.pdf | ||
| Attachment3SecurityClassificationGuide.pdf | ||
| attachment2SOW.pdf | ||
| Attachment1CDRL.pdf | ||
| FA852316R0007(29_feb_).pdf | ||
| attachment5-FORM158.pdf | ||
| attachment6DD254_00.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AFSC/AFLCMC Individual Subcontracting Plan Checklist and Review
Solicitation/Contract Number: Date:
Contractor:
Buyer/PCO
Office Symbol & Phone:
If the contractor is participating in the Comprehensive Subcontracting Plan Test Program, individual plans are NOT required.
The cumulative value of the basic contract and options is used to determine whether a subcontracting plan is required.
Options require separate goals. See FAR 52.219-9(c) and 19.704(c).
If there is a Master Subcontracting Plan in effect for this contractor, items 4 through 11 below do not apply. Note: Master plans are effective for three years after approval by the contracting officer, but contractors must maintain and update the plans as necessary.
Changes must be approved by the contracting officer. See FAR 19.704(b).
Is this a commercial plan? Yes No See Far 19.704(d).
The PCO/buyer will review the subcontracting plan and coordinate as required with the contractor and the cognizant contract administration office.
After review, the PCO/buyer will complete/sign the checklist and provide the original checklist and a copy of the subcontracting plan to the local Air
Force Small Business Office (SB). The SB will review the plan and obtain advice and recommendation from the SBA Procurement Center
Representative (PCR). After review and coordination, the SB will notify the PCO/buyer of the results of the review before the start of negotiations.
Y=acceptable; U=not acceptable; N=not included; NI=needs improvement; N/A=does not apply
Does Plan Include: PCO SB SBA Reference
1. Total Contract Dollars: $ % Sub % Total
FAR 52.219-9(d)(2), 19.704(a)(2), 19.705 Total Subcontracting Dollars:
Contract
Contract
(Insert proposed goals)
Total $ to SB FAR 52.219-9(d)(2), 19.704(a)(2), 19.705
Total $ to SDB FAR 52.219-9(d)(2), 19.704(a)(2), 19.705 (includes 8a)
Total $ to WOSB FAR 52.219-9(d)(2), 19.704(a)(2), 19.705
$ to Service Disabled VOSB FAR 52.219-9(d)(2), 19.704(a)(2), 19.705
Total $ to Veteran OSB FAR 52.219-9(d)(2), 19.704(a)(2), 19.705
Total $ to HUBZone SB FAR 52.219-9(d)(2), 19.704(a)(2), 19.705
For current DoD goals, please visit the U.S. DoD Office of Small Business Programs website (http://www.acq.osd.mil/osbp/about/plans.shtml).
http://www.acq.osd.mil/osbp/about/plans.shtml Michelle.Syth Typewritten Text
Michelle.Syth Typewritten Text
Michelle.Syth Typewritten Text
Michelle.Syth Typewritten Text
Does Plan Include: PCO SB SBA Reference
2. Goals listed as a Percentage of Total subcontract value.
FAR 52.219-9(d)(1), 19.704(a)(1), 19.705
Goals listed as a Percentage of Total contract value.
AFFARS
5319.704(a)(1)
3. A description of the principal supplies/services to be subcontracted with sufficient detail to evaluate whether or not SB can do the work.
(Identify large business, nonprofit, and not-for-profit work.)
FAR 52.219-9(d)(3), 19.704(a)(3), 19.705
4. A description of the method used to develop goals.
FAR 52.219-9(d)(4), 19.704(a)(4), 19.705
5. A description of the method used to locate potential suppliers.
FAR 52.219-9(d)(5), 19.704(a)(5), 19.705
6. Do the goals include indirect costs?
FAR 52.219-9(d)(6), 19.704(a)(6), 19.705
If indirect costs are included in the goals, does the plan include a description FAR 52.219-9(d)(6), 19.704(a)(6), 19.705 of the cost allocation method?
7. Name and duties of contractor’s subcontracting plan administrator.
FAR 52.219-9(d)(7), 19.704(a)(7), 19.705
8. Description of the efforts the offeror will make to assure that SBs have an equitable opportunity to compete for subcontracts.
FAR 52.219-9(d)(8), 19.704(a)(8), 19.705
9. Flow Down assurances.
FAR 52.219-9(d)(9), 19.704(a)(9), 19.705
Appropriate subcontract clauses will be used.
FAR 52.219-9(d)(9), 19.704(a)(9), 19.705
Subcontractors will be required to submit a similar plan.
FAR 52.219-9(d)(9), 19.704(a)(9), 19.705
10. Assurance prime contractor will submit required reports and cooperate in studies and surveys.
FAR 52.219-
9(d)(10), 19.704(a)(10), 19.705
11. Recitation of types of records maintained to show compliance with plan.
FAR 52.219-
9(d)(11), 19.704(a)(11), 19.705
12. If the SDB goal for the basic contract is less than 5%, is approval one level above contracting officer attached?
DFARS 219.705-4
13. For modifications, is approval attached if the SDB goal is less than 5%? (If
SDB goal was below 5% for the basic contract and the reasons have not changed, a new approval is not required)
DFARS 219.705-4
14. Has information and coordination from the ACO been obtained?
FAR 19.706,
DFARS
219.706(a)(i)
System for Award Management (SAM): To enhance small business outreach, the contractor should be encouraged to use the SAM
Search tool at the SAM website (https://www.SAM.gov/) and the SBA Dynamic Small Business Search (DSBS) tool at the SBA website (http://dsbs.sba.gov/dsbs/search/dsp_dsbs.cfm).
https://www.sam.gov/ Michelle.Syth Typewritten Text
Michelle.Syth Typewritten Text
Michelle.Syth Typewritten Text
Michelle.Syth Typewritten Text
Michelle.Syth Typewritten Text
Michelle.Syth Typewritten Text
Michelle.Syth Typewritten Text Y = acceptable; U = not acceptable; N = not included; NI = needs improvement; N/A = does not apply http://dsbs.sba.gov/dsbs/search/dsp_dsbs.cfm
Buyer/PCO Comments:
Buyer/PCO Signature and Date:
SB Comments:
Air Force Small Business Office Signature and Date:
SBA PCR Comments:
If box is checked, SBA does not have a copy of the current Master Subcontracting Plan on File. Please provide one.
SBA Procurement Center Representative Signature and Date:
SBA will internally report this subcontracting plan, as submitted, as acceptable not acceptable modified on _____________ to be acceptable before award.
SBA may contact the PCO/buyer regarding status of the subcontracting plan at time of award.
Please remember the Contracting Officer’s post-award responsibilities which are listed in FAR 19.705-6.
Version: 10/01/2014
| Date: |
| SolicitationContract Number 1: |
| SolicitationContract Number 2: |
| SolicitationContract Number 3: |
| Office Symbol Phone: |
| Total Contract Total to SDB includes 8a: |
| BuyerPCO CommentsRow1: |
| SB CommentsRow1: |
| SBA PCR CommentsRow1: |
| to be acceptable before award: |
| Dropdown4: [ ] |
| Dropdown5: [ ] |
| Dropdown6: [ ] |
| Dropdown7: [ ] |
| Dropdown8: [ ] |
| Dropdown9: [ ] |
| Dropdown10: [ ] |
| Dropdown11: [ ] |
| Dropdown12: [ ] |
| Dropdown13: [ ] |
| Dropdown14: [ ] |
| Dropdown15: [ ] |
| Dropdown16: [ ] |
| Dropdown17: [ ] |
| Dropdown18: [ ] |
| Dropdown19: [ ] |
| Dropdown20: [ ] |
| Dropdown21: [ ] |
| Dropdown23: [ ] |
| Dropdown24: [ ] |
| Dropdown25: [ ] |
| Dropdown26: [ ] |
| Dropdown27: [ ] |
| Dropdown28: [ ] |
| Dropdown29: [ ] |
| Dropdown30: [ ] |
| Dropdown31: [ ] |
| Dropdown32: [ ] |
| Dropdown33: [ ] |
| Dropdown34: [ ] |
| Dropdown35: [ ] |
| Dropdown36: [ ] |
| Dropdown37: [ ] |
| Dropdown38: [ ] |
| Dropdown39: [ ] |
| Dropdown40: [ ] |
| Dropdown41: [ ] |
| Dropdown42: [ ] |
| Dropdown43: [ ] |
| Dropdown44: [ ] |
| Dropdown45: [ ] |
| Dropdown46: [ ] |
| Dropdown47: [ ] |
| Dropdown48: [ ] |
| Dropdown49: [ ] |
| Dropdown50: [ ] |
| Dropdown51: [ ] |
| Dropdown52: [ ] |
| Dropdown53: [ ] |
| Dropdown54: [ ] |
| Dropdown55: [ ] |
| Dropdown56: [ ] |
| Dropdown57: [ ] |
| Dropdown58: [ ] |
| Dropdown59: [ ] |
| Dropdown60: [ ] |
| Dropdown61: [ ] |
| Dropdown62: [ ] |
| Dropdown63: [ ] |
| Dropdown64: [ ] |
| Dropdown65: [ ] |
| Dropdown66: [ ] |
| Dropdown67: [ ] |
| Dropdown68: [ ] |
| Dropdown69: [ ] |
| Dropdown70: [ ] |
| Dropdown71: [ ] |
| Dropdown72: [ ] |
| Dropdown73: [ ] |
| Check Box77: Off |
| Check Box79: Off |
| Check Box80: Off |
| Group81: Off |
| CLEAR FORM: |
| EMAIL FORM: |
| Check Box86: Off |
| SUBTOTTOSB: 0.0 |
| TOTALKTDOLLARS: 0.0 |
| TOTALSUBKTDOLLARS: 0.0 |
| TotalKTtoSB: |
| TOTALTOSB: 0 |
| TOTALDOLLARSTOSDB: 0 |
| PERCENTSUBTOSDB: 0.0 |
| PERCENTSUBTOWOSB: 0.0 |
| PERCENTKTTOWOSB: |
| TOTALDOLLARSTOWOSB: 0 |
| PERCENTSUBTOSDVOSB: 0.0 |
| PERCENTKTTOSDVOSB: |
| TOTALDOLLARSTOVOSB: 0 |
| PERCENTSUBTOVOSB: 0.0 |
| PERCENTKTTOVOSB: |
| TOTALDOLLARSTOSDVOSB: 0 |
| TOTALDOLLARSTOHUBZONE: 0 |
| PERCENTSUBTOHUBZONE: 0.0 |
| Text87: |
| Check Box1: Off |
| Text2: **Fill in green cells first** |
| PRINT: |
File details come from the government source that posted it. Updated .