AN/ALE-47 Countermeasures Dispenser System (CMDS) Production 3. 1 Federal contract opportunity
Solicitation number
FA8523-14-R-30059
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Exhibit A.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

FORM APPROVED

OBM No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your paperwork to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP X TM OTHER

D. SYSTEM / ITEM

AN/ALE-47 Production-3.1

E. CONTRACT / PR NO.

FD2060-14-30059

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Reliability Test Plan

3. SUBTITLE

Environmental Stress Screening (ESS) Procedures

4. AUTHORITY (Data Acquisition Document No.)

DI-NDTI-81585A/T

5. CONTRACT REFERENCE

SOW Para 2.2.1

6. REQUIRING OFFICE

Technical - Air Force

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

ONE/R

12. DATE OF FIRST SUBMISSION

5 MO ARO

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft Final

Reg Repro

16. REMARKS

Block 4: Provide paper copy (if required by Block 14) on 8.5 inch x 11 inch, 3 hole punched paper, duplex printed. Provide soft copy in Microsoft Word file format.

Documents shall be written using one or more applications in Microsoft Office Professional. DI-NDTI-81585A paragraphs 3.n through 3.r not required.

Block 7: After data approval by the Requiring Office, submit a combination Receiving Report/Invoice in Wide Area Workflow (WAWF) to only the office in Block 6 to account for previously submitted data.

Blocks 8 and 13: The Requiring Office will provide approval or disapproval/comments within 45 days of receipt (first submission), and within 30 days of receipt thereafter.

The Contractor shall revise and resubmit within 30 days of disapproval/comments receipt. Extent of approval requirements include format and content. Submit final within 14 days of draft approval.

Block 9: See "Document Control" page located at the end of the CDRLs for applicable distribution statements.

Block 14: See separate sheet marked “Mail List” for full address. Deliver “Draft” and "Repro" copies via Email. “Reg” copies mean paper copy.

PCO L/O 0 L/O

JPO - Navy 0 0 0 JPO - Air Force 0 0 0 Technical - Navy 0 0 0 Technical - Air Force 1 0 1

15. TOTAL 1 0 1

G. PREPARED BY

H. DATE

I. APPROVED BY J. DATE

DD FORM 1423-1, JUN 90

1007/183

Previous editions are obsolete. Page 1 of 14 Pages

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP – Technical Data Package; TM – Technical Manual; Other – other category of data, such as “Provisioning,” “Configuration Management”, etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears in data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. Fir technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addresses and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through

15. Examples are: Tailoring of documents cited in Item 4;

Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition – Data which is not otherwise essential to the contractor’s performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price – Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to producing and delivering such data items to the Government.

b. Group II. Definition – Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with required to depth of content, format, frequency of submittal, preparation, control, or quantity of the data item.

Estimated Price – Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition – Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price – Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition – Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price – Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required.

The estimated data prices shall not include any amount for rights in data. The Government’s right to use the data shall be governed by the pertinent provisions of the contract.

DD Form 1423-1 Reverse, JUN 90

FORM APPROVED

OBM No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your paperwork to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.

C. CATEGORY:

TDP X TM OTHER

D. SYSTEM / ITEM

AN/ALE-47 Production-3.1

E. CONTRACT / PR NO.

A002

2. TITLE OF DATA ITEM

Status Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80368A

5. CONTRACT REFERENCE

SOW para. 2.2.1, 2.5

6. REQUIRING OFFICE

JPO - Air Force

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

Mthly

12. DATE OF FIRST SUBMISSION

See Block 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft Final

Reg Repro

16. REMARKS

Block 4: Provide paper copy (if required by Block 14) on 8.5 inch x 11 inch, 3 hole punched paper, duplex printed. Provide soft copy in Microsoft Word file format.

Documents shall be written using one or more applications in Microsoft Office Professional.

Block 7: After data approval by the Requiring Office, submit a combination Receiving Report/Invoice in Wide Area Workflow (WAWF) to only the office in Block 6 to account for previously submitted data.

Block 9: See "Document Control" page located at the end of the CDRLs for applicable distribution statements.

Blocks 11, 12 & 13: The first report shall be submitted by the 15th of the second full month after contract award to cover from contract award through the first full month.

The Contractor shall submit subsequent reports on the 15th of each month to cover the full previous month, and continue until final production hardware delivery is completed.

Block 14: See separate sheet marked “Mail List” for full address. Deliver “Draft” and "Repro" copies via Email. “Reg” copies mean paper copy.

PCO 0 0 1

JPO - Navy 0 0 1 JPO - Air Force 0 0 1 Technical - Navy 0 0 1 Technical - Air Force 0 0 1

15. TOTAL 0 0 5

Previous editions are obsolete. Page 2 of 14 Pages

Item C. Mark (X) appropriate category: TDP – Technical Data Package; TM – Technical Manual; Other – other category of data, such as “Provisioning,” “Configuration Management”, etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears in data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. Fir technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addresses and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through

15. Examples are: Tailoring of documents cited in Item 4;

Clarification of submittal dates in Items 12 and 13; Explanation of listed on the DD Form 1423.

a. Group I. Definition – Data which is not otherwise essential to the contractor’s performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price – Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to producing and delivering such data items to the Government.

b. Group II. Definition – Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with required to depth of content, format, frequency of submittal, preparation, control, or quantity of the data item.

Estimated Price – Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition – Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price – Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition – Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price – Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required.

The estimated data prices shall not include any amount for rights in data. The Government’s right to use the data shall be governed by

FORM APPROVED

OBM No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your paperwork to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.

C. CATEGORY:

TDP X TM OTHER

D. SYSTEM / ITEM

AN/ALE-47 Production-3.1

E. CONTRACT / PR NO.

A003

2. TITLE OF DATA ITEM

Technical Report – Study/Services

3. SUBTITLE

Lead-Free Control Plan

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80508B

5. CONTRACT REFERENCE

SOW para. 2.4

6. REQUIRING OFFICE

Technical – Air Force

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

One/R

12. DATE OF FIRST SUBMISSION

6 MO ARO

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft Final

Reg Repro

16. REMARKS

Block 4: Provide paper copy (if required by Block 14) on 8.5 inch x 11 inch, 3 hole punched paper. Provide soft copy in Microsoft Word file format. Documents shall be written using one or more applications in Microsoft Office Professional.

Block 7: After data approval by the Requiring Office, submit a combination Receiving Report/Invoice in Wide Area Workflow (WAWF) to only the office in Block 6 to account for previously submitted data.

Blocks 8 and 13: The Requiring Office will provide approval or disapproval/comments within 45 days of receipt (first submission), and within 30 days of receipt thereafter.

The Contractor shall revise and resubmit within 30 days of disapproval/comments receipt. Extent of approval requirements include format and content. Submit final within 14 days of draft approval.

Block 9: See "Document Control" page located at the end of the CDRLs for applicable distribution statements.

Block 14: See separate sheet marked “Mail List” for full address. Deliver “Draft” and "Repro" copies via Email. “Reg” copies mean paper copy

PCO L/O 0 L/O

JPO - Navy 0 0 0 JPO - Air Force 0 0 0

15. TOTAL 1 0 1

Previous editions are obsolete. Page 3 of 14 Pages

Item C. Mark (X) appropriate category: TDP – Technical Data Package; TM – Technical Manual; Other – other category of data, such as “Provisioning,” “Configuration Management”, etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears in data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. Fir technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addresses and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through

15. Examples are: Tailoring of documents cited in Item 4;

Clarification of submittal dates in Items 12 and 13; Explanation of listed on the DD Form 1423.

a. Group I. Definition – Data which is not otherwise essential to the contractor’s performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price – Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to producing and delivering such data items to the Government.

b. Group II. Definition – Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with required to depth of content, format, frequency of submittal, preparation, control, or quantity of the data item.

Estimated Price – Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition – Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price – Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition – Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price – Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required.

The estimated data prices shall not include any amount for rights in data. The Government’s right to use the data shall be governed by

FORM APPROVED

OBM No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your paperwork to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.

C. CATEGORY:

TDP X TM OTHER

D. SYSTEM / ITEM

AN/ALE-47 Production-3.1

E. CONTRACT / PR NO.

A004

2. TITLE OF DATA ITEM

Production Status Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81255

5. CONTRACT REFERENCE

SOW para 2.5.4

6. REQUIRING OFFICE

JPO - Air Force

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

Mthly

12. DATE OF FIRST SUBMISSION

See Block 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft Final

Reg Repro

16. REMARKS

Block 4: Provide paper copy (if required by Block 14) on 8.5 inch x 11 inch, 3 hole punched paper, duplex printed. Provide soft copy in Microsoft Word file format.

Documents shall be written using one or more applications in Microsoft Office Professional. Contractor format acceptable when approved by Requiring Office (see also Block 12).

Block 7: After data approval by the Requiring Office, submit a combination Receiving Report/Invoice in Wide Area Workflow (WAWF) to only the office in Block 6 to account for previously submitted data.

Block 9: See "Document Control" page located at the end of the CDRLs for applicable distribution statements.

Blocks 12 & 13: Contractor shall submit their proposed format 60 calendar days ARO.

Formal submittal shall begin on the 15th of the month preceeding the first production article and monthly thereafter, and continue until final production hardware delivery is completed.

Block 14: See separate sheet marked “Mail List” for full address. Deliver “Draft” and "Repro" copies via Email. “Reg” copies mean paper copy.

PCO 0 0 1

JPO - Navy 0 0 1 JPO - Air Force 0 0 1

Technical - Air Force 0 0 0

15. TOTAL 0 0 3

Previous editions are obsolete. Page 4 of 14 Pages

Item C. Mark (X) appropriate category: TDP – Technical Data Package; TM – Technical Manual; Other – other category of data, such as “Provisioning,” “Configuration Management”, etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears in data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. Fir technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addresses and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through

15. Examples are: Tailoring of documents cited in Item 4;

Clarification of submittal dates in Items 12 and 13; Explanation of listed on the DD Form 1423.

a. Group I. Definition – Data which is not otherwise essential to the contractor’s performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price – Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to producing and delivering such data items to the Government.

b. Group II. Definition – Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with required to depth of content, format, frequency of submittal, preparation, control, or quantity of the data item.

Estimated Price – Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition – Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price – Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition – Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price – Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required.

The estimated data prices shall not include any amount for rights in data. The Government’s right to use the data shall be governed by

FORM APPROVED

OBM No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your paperwork to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.

C. CATEGORY:

TDP X TM OTHER

D. SYSTEM / ITEM

AN/ALE-47 Production-3.1

E. CONTRACT / PR NO.

A005

2. TITLE OF DATA ITEM

Integrated Master Schedule (IMS)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81650

5. CONTRACT REFERENCE

SOW Para 2.5

6. REQUIRING OFFICE

JPO - Air Force

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

Qtrly

12. DATE OF FIRST SUBMISSION

2 MO ARO

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

N/A

11. AS OF DATE

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft Final

Reg Repro

16. REMARKS

Block 4: Provide paper copy (if required by Block 14) on 8.5 inch x 11 inch, 3 hole punched paper, duplex printed. Provide soft copy in Microsoft Word file format.

Documents shall be written using one or more applications in Microsoft Office Professional.

Block 7: After data approval by the Requiring Office, submit a combination Receiving Report/Invoice in Wide Area Workflow (WAWF) to only the office in Block 6 to account for previously submitted data.

Block 9: See "Document Control" page located at the end of the CDRLs for applicable distribution statements.

Blocks 11 & 13: Subsequent submittals shall be due by the 15th of the month to cover the events from the previous quarter.

Block 14: See separate sheet marked “Mail List” for full address. Deliver “Draft” and "Repro" copies via Email. “Reg” copies mean paper copy.

PCO 0 0 1

JPO - Navy 0 0 1 JPO - Air Force 0 0 1

Technical - Air Force 0 0 0

Previous editions are obsolete. Page 5 of 14 Pages

Item C. Mark (X) appropriate category: TDP – Technical Data Package; TM – Technical Manual; Other – other category of data, such as “Provisioning,” “Configuration Management”, etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears in data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. Fir technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addresses and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through

15. Examples are: Tailoring of documents cited in Item 4;

Clarification of submittal dates in Items 12 and 13; Explanation of listed on the DD Form 1423.

a. Group I. Definition – Data which is not otherwise essential to the contractor’s performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price – Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to producing and delivering such data items to the Government.

b. Group II. Definition – Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with required to depth of content, format, frequency of submittal, preparation, control, or quantity of the data item.

Estimated Price – Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition – Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price – Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition – Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price – Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required.

The estimated data prices shall not include any amount for rights in data. The Government’s right to use the data shall be governed by

FORM APPROVED

OBM No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your paperwork to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.

C. CATEGORY:

TDP X TM OTHER

D. SYSTEM / ITEM

AN/ALE-47 Production-3.1

E. CONTRACT / PR NO.

A006

2. TITLE OF DATA ITEM

Conference Agenda

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81249A

5. CONTRACT REFERENCE

See Block 16

6. REQUIRING OFFICE

JPO - Air Force

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

One/R

12. DATE OF FIRST SUBMISSION

See Block 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft Final

Reg Repro

16. REMARKS

Block 4: Provide paper copy (if required by Block 14) on 8.5 inch x 11 inch, 3 hole punched paper, duplex printed. Provide soft copy in Microsoft Word file format.

Documents shall be written using one or more applications in Microsoft Office Professional.

Block 6: SOW para. 2.5.1, 2.5.2, 2.5.3, 2.8.5.1, 2.8.5.2

Block 7: After data approval by the Requiring Office, submit a combination Receiving Report/Invoice in Wide Area Workflow (WAWF) to only the office in Block 6 to account for previously submitted data.

Blocks 8 and 13: The Requiring Office will provide approval or disapproval/comments within 5 business days of receipt (first submission), and within 3 business days of receipt thereafter. The Contractor shall revise and resubmit within 3 business days of disapproval/comments receipt. Extent of approval requirements include content.

Submit final within 7 days of draft approval.

Block 9: See "Document Control" page located at the end of the CDRLs for applicable distribution statements.

Block 12: Deliver the agenda not later than 15 business days before each conference.

Block 14: See separate sheet marked “Mail List” for full address. Deliver “Draft” and "Repro" copies via Email. “Reg” copies mean paper copy.

PCO 1 0 1

JPO - Navy 1 0 1 JPO - Air Force 1 0 1 Technical - Navy 1 0 1

15. TOTAL 5 0 5

Previous editions are obsolete. Page 6 of 14 Pages

Item C. Mark (X) appropriate category: TDP – Technical Data Package; TM – Technical Manual; Other – other category of data, such as “Provisioning,” “Configuration Management”, etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears in data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. Fir technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addresses and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through

15. Examples are: Tailoring of documents cited in Item 4;

Clarification of submittal dates in Items 12 and 13; Explanation of listed on the DD Form 1423.

a. Group I. Definition – Data which is not otherwise essential to the contractor’s performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price – Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to producing and delivering such data items to the Government.

b. Group II. Definition – Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with required to depth of content, format, frequency of submittal, preparation, control, or quantity of the data item.

Estimated Price – Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition – Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price – Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition – Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price – Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required.

The estimated data prices shall not include any amount for rights in data. The Government’s right to use the data shall be governed by

FORM APPROVED

OBM No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503. Please DO NOT RETURN your paperwork to either of these addresses. Send completed form to the government Issuing Contracting Officer for the Contract/PR No. in Block E.

C. CATEGORY:

TDP X TM OTHER

D. SYSTEM / ITEM

AN/ALE-47 Production-3.1

E. CONTRACT / PR NO.

A007

2. TITLE OF DATA ITEM

Conference Minutes

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81250A

5. CONTRACT REFERENCE

See Block 16

6. REQUIRING OFFICE

JPO - Air Force

7. DD 250 REQ

LT

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

One/R

12. DATE OF FIRST SUBMISSION

See Block 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

Draft Final

Reg Repro

16. REMARKS

Block 4: Provide paper copy (if required by Block 14) on 8.5 inch x 11 inch, 3 hole punched paper, duplex printed. Provide soft copy in Microsoft Word file format.

Documents shall be written using one or more applications in Microsoft Office Professional.

Block 6: SOW para. 2.5.1, 2.5.2, 2.5.3, 2.8.5.1, 2.8.5.2

Block 7: After data approval by the Requiring Office, submit a combination Receiving Report/Invoice in Wide Area Workflow (WAWF) to only the office in Block 6 to account for previously submitted data.

Blocks 8 and 13: The Requiring Office will provide approval or disapproval/comments within 5 business days of receipt (first submission), and within 3 business days of receipt thereafter. The Contractor shall revise and resubmit within 5 business days of disapproval/comments receipt. Extent of approval requirements include content.

Submit final within 7 days of draft approval.

Block 9: See "Document Control" page located at the end of the CDRLs for applicable distribution statements.

Block 12: Submit draft no later than 10 business days after each conference.

Block 14: See separate sheet marked “Mail List” for full address. Deliver “Draft” and "Repro" copies via Email. “Reg” copies mean paper copy. In addition, the Contractor shall send one copy to each attendee of the conference. Not to exceed 30 copies.

PCO 1 0 1

JPO - Navy 1 0 1 JPO - Air Force 1 0 1

15. TOTAL 5 0 5

Previous editions are obsolete. Page 7 of 14 Pages

Item C. Mark (X) appropriate category: TDP – Technical Data Package; TM – Technical Manual; Other – other category of data, such as “Provisioning,” “Configuration Management”, etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears in data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. Fir technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addresses and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through

15. Examples are: Tailoring of documents cited in Item 4;

Clarification of submittal dates in Items 12 and 13; Explanation of listed on the DD Form 1423.

a. Group I. Definition – Data which is not otherwise essential to the contractor’s performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price – Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to producing and delivering such data items to the Government.

b. Group II. Definition – Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with required to depth of content, format, frequency of submittal, preparation, control, or quantity of the data item.

Estimated Price – Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the…