First Article Requirements
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1599540_EDL_REPORT_00001.pdf | ||
| 15-01067_CDRLs.pdf | ||
| 1925746_ITMDESC_REPORT_00001.pdf | ||
| 15-01067_DD_254_(1)_Signed.pdf | ||
| 1005611121_Instructions_for_DD_Form_2875_CAV_AF.pdf | ||
| Counterfeit_Prevention_SOW_Language.pdf | ||
| 2173047_PKGRQMT_REPORT.pdf | ||
| FA852217R0010solicitation.pdf | ||
| 1905361_UIIEC_REPORT_00001.pdf | ||
| TRNSPDATA_REPORT_CURRENT.pdf | ||
| 1915151_QAIRQMT_REPORT_00001.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRST ARTICLE REQUIREMENTS 1. DATE
04 MAY 2016(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)
2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER
97942 / 578R611H04
4. NSN
5865000076950EW
5. FIRST ARTICLE QUANTITY
THE FIRST ARTICLE IS 2 UNIT(S) OF LOT / ITEM 1
AND WILL BE: PART OF PRODUCTION QUANTITY X IN ADDITION TO PRODUCTION QUANTITY
6. ARTICLES
WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD
7. LONG LEAD TIME ITEMS
REQUIRED X NOT REQUIRED
(See FAR 52.209-3 OR -4, alternate II)
8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)
X REQUIRED NOT REQUIRED
"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."
9. TEST / INSPECTION REQUIREMENTS
A. X
X
CONTRACTOR TESTING
GOVERNMENT TESTING
Performance or other characteristics which the First Articles must meet are
Contract, Tech Data Package, and all QA provisions of vendor drawings
B. The detailed technical requirements for First Article approval tests are contained in
Contract, Tech Data Package, and Government approved test procedures
(Cite Spec and Para number)
C. X TEST PLAN REQUIRED
Number of days for government approval / disapproval 45 days.
D. Contractor's notification to ACO and
408th SCMS/GUEA
(Requesting Activity) of test time and location due 15 days prior to start of testing.
E. X TEST REPORT REQUIRED
(1) Forwarded to
408th SCMS/GUEA
Matthew.moorman.3@us.af.mil lisa.morris@robins.af.mil
(2) Government written notice of approval / disapproval due 60 days after receipt of contractor's report.
F. FIRST ARTICLE DELIVERY
(1) Due within 270 calendar days from date contract.
(2) Notify 10 calendar days prior to shipment.
(3) Delivered to government at
408th SCMS/GUEA
ATTN: Matt Moorman
280 Byron Street, BLDG 229
Robins AFB, GA 31098
(Set Forth Consignee and Address)
(4) Government written notice of approval / disapproval within 60 days after receipt of first article package.
G. Estimated cost of government testing / inspection evaluation.
$7,500.0000
Page 1 of 2AFMC IMT 260, 20020830, V-3 Version 2Generated by PRPS using Jasper Reports on 17 May 2017
FIRST ARTICLE REQUIREMENTS 1. DATE
04 MAY 2016(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)
10. DISPOSITION OF FIRST ARTICLES
Approved First Articles will be forwarded to
X 2 (insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor
X will be retained by LCMC/WNYEAA pending disposition instructions from the contractor.
First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.
X Disapproved First Articles
X will be returned to the contractor will be retained by pending disposition instructions from the contractor.
On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).
a. Approved First Articles will be returned to the contractor for shipment with production item.
b. Disposition of disapproved First Articles will remain the same as marked above.
Other Disposition:
11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL
a. Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, Air Force.
b. Offerors currently in production of the same or similar article for a Government, DoD, Air Force contract and who have received First Article approval under the existing contract.
c. Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.
d. Provided not more than months have elapsed since completion of the contract.
e. First Article testing will not be waived.
f. X See Remarks in block 12 below.
NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:
A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION
12. REMARKS
Moorman, Matthew BNAME: 04 MAY 2016DATE:
Only approved source that is allow to exempt first article requirements is Rodelco Electronics Corp. (CAGE: 59926) This exemption is only valid if units are produced within the next 3 years, or by 5/31/2019. Any other exemptions must be approved by Requirements office (AFLCMC/WNYEAA).
13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING TEST
(Name, Organization, Phone)
Morris, Lisa A
AFLCMC/WNYEAA
478-222-4362
472-4362
14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING
TEST (Name, Organization, Phone)
Morris, Lisa A
AFLCMC/WNYEAA
478-222-4362
472-4362
Page 2 of 2AFMC IMT 260, 20020830, V-3 Version 2Generated by PRPS using Jasper Reports on 17 May 2017
File details come from the government source that posted it.