CDRL_A001-A004.pdf

PDF 112 KB Posted

Attached to
Radio Frequency Amplifier Repair Federal contract opportunity
Solicitation number
FA851718Q0007
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Contract Data Requirements List A001-A004

View the file

Other files for this federal contract opportunity

Other files attached to Radio Frequency Amplifier Repair, newest first.
File Type Posted
PWS.pdf PDF
Packaging_Requirements.pdf PDF
FA851718Q0007.pdf PDF
Government_Furnished_Property.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM E. CONTRACT / PR NO.

FD20601800268

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Item Unique Identification (IUID) Marking Plan

3. SUBTITLE

None

4. AUTHORITY

DI-MGMT-81803

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS, PARA. 3.1.2

6. REQUIRING OFFICE

410 SCMS/GULA

7. DD 250 REQ

DD

8. APP CODE

See Block 16

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Sisneros, Charlette YNAME: 16 NOV 2017DATE:

Block 7: The engineer will be responsible for acceptance at the destination.

Block 10-13: The contractor shall submit a complete IUID Marking Plan within 20 business days after contract award.

The Government will review and determine acceptance or rejection and notify contractor within 10 business days of receipt. If rejected the contractor shall have 10 business days to correct any error and return a corrected IUID Marking Plan to the Government for review.

Block 14. Document submission shall be provided electronically via Microsoft Office word format (doc) or Portable Document Format (PDF) to the points of contact (POC)s listed below. Changes to the POC Distribution List shall be made by letter from the Procurement Contracting Officer (PCO) or the Alternate Contracting Officer (ACO) without further revision to this Contract Data Requirements List (CDRL).

CDRL POC Distribution List:

410 SCMS/GULA, Program Manager:

JENNIFER THOMAS

Email: Jennifer.Thomas.1@us.af.mil

410 SCMS/GUEA, Engineer:

CHARLETTE SISNEROS

Email: Charlette.Sisneros@us.af.mil

410 SCMS / GULA, Equipment Specialist:

KENNETH JONES

Email: Kenneth.Jones.6@us.af.mil

COORDINATORS:

410 SCMS/GULA

235 Byron St., Ste. 16A Robins AFB, GA 31098-1813

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Shannon, Roosevelt

410 SCMS / GULA

478-222-2158

H. DATE

20 DEC 2017

I. APPROVED BY

//DIGITALLY SIGNED//

VICIOSO.JOHAN.M.1294137579

410 SCMS / GUEA 478-327-2790 / 497-2790

J. DATE

20 DEC 2017

Page 1 of 4DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 04 Jan 2018

PREVIOUS EDITION MAY BE USED.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM E. CONTRACT / PR NO.

FD20601800268

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Item Unique Identification (IUID) Marking Activity, Validation and Verification Report

3. SUBTITLE

None

4. AUTHORITY

DI-MGMT-81804A

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS, PARA. 3.1.4

6. REQUIRING OFFICE

410 SCMS/GULA

7. DD 250 REQ

DD

8. APP CODE

See Block 16

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Sisneros, Charlette YNAME: 16 NOV 2017DATE:

Block 7: The engineer will be responsible for acceptance at the destination.

Block 10-13: The contractor shall submit an IUID Marking Activity, validation and verification Report 65 business days after the first National Stock Number (NSN) has been marked and semi-annually thereafter. The Government will review and determine acceptance or rejection and notify contractor within 10 business days of receipt. If rejected, the contractor shall have 10 business days to correct any errors and return a corrected IUID Marking Activity and Verification Report to the Government for review.

Block 14. Document submission shall be provided electronically via Microsoft Office word format (doc) or Portable Document Format (PDF) to the points of contact (POC)s listed below. Changes to the POC Distribution List shall be made by letter from the Procurement Contracting Officer (PCO) or the Alternate Contracting Officer (ACO) without further revision to this Contract Data Requirements List (CDRL).

CDRL POC Distribution List:

410 SCMS/GULA, Program Manager:

JENNIFER THOMAS

Email: Jennifer.Thomas.1@us.af.mil

410 SCMS/GUEA, Engineer:

CHARLETTE SISNEROS

Email: Charlette.Sisneros@us.af.mil

410 SCMS / GULA, Equipment Specialist:

KENNETH JONES

Email: Kenneth.Jones.6@us.af.mil

COORDINATORS:

410 SCMS/GULA

235 Byron St., Ste. 16A Robins AFB, GA 31098-1813

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Shannon, Roosevelt

410 SCMS / GULA

478-222-2158

H. DATE

20 DEC 2017

I. APPROVED BY

//DIGITALLY SIGNED//

VICIOSO.JOHAN.M.1294137579

410 SCMS / GUEA 478-327-2790 / 497-2790

J. DATE

20 DEC 2017

Page 2 of 4DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 04 Jan 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM E. CONTRACT / PR NO.

FD20601800268

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Counterfeit Prevention Plan (CPP)

3. SUBTITLE

None

4. AUTHORITY

DI-MISC-81832

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS, PARA. 3.3.1

6. REQUIRING OFFICE

410 SCMS/GULA

7. DD 250 REQ

DD

8. APP CODE

See Block 16

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Sisneros, Charlette YNAME: 16 NOV 2017DATE:

Block 10-12: Contractor shall deliver the CPP within 20 business days after contract award. Government comments will be provided to the contractor within 10 business days after receipt, with contractor re-submittal due 5 business days after receipt of comments. Updates to the CPP shall be provided to the Government within 15 business days after the initial counterfeit part(s) identification/notification.

Block 13: Updates to the CPP shall be provided within 15 business days after each additional counterfeit part(s) identification/notification.

Block 14. Document submission shall be provided electronically via Microsoft Office word format (doc) or Portable Document Format (PDF) to the points of contact (POC)s listed below. Changes to the POC Distribution List shall be made by letter from the Procurement Contracting Officer (PCO) or the Alternate Contracting Officer (ACO) without further revision to this Contract Data Requirements List (CDRL).

CDRL POC Distribution List:

410 SCMS/GULA, Program Manager:

JENNIFER THOMAS

Email: Jennifer.Thomas.1@us.af.mil

410 SCMS/GUEA, Engineer:

CHARLETTE SISNEROS

Email: Charlette.Sisneros@us.af.mil

410 SCMS/GULA, Item Manager:

ALEX TRIPP

Email: Alex.Tripp@us.af.mil

410 SCMS / GULA, Equipment Specialist:

KENNETH JONES

Email: Kenneth.Jones.6@us.af.mil

COORDINATORS:

410 SCMS/GULA

235 Byron St., Ste. 16A Robins AFB, GA 31098-1813

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Shannon, Roosevelt

410 SCMS / GULA

478-222-2158

H. DATE

20 DEC 2017

I. APPROVED BY

//DIGITALLY SIGNED//

VICIOSO.JOHAN.M.1294137579

410 SCMS / GUEA 478-327-2790 / 497-2790

J. DATE

20 DEC 2017

Page 3 of 4DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 04 Jan 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM E. CONTRACT / PR NO.

FD20601800268

F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Commercial Asset Visbility Air Force End Item Reporting

3. SUBTITLE

CAV AF

4. AUTHORITY

DI-MGMT-81634C

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS Paragraph 3.5.1

6. REQUIRING OFFICE

FA8517

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

See Block 16

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Himes, Amy LNAME: 20 DEC 2017DATE:

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 420 SCMS/GUNAB-Robins in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher.

The Contractor shall obtain a valid DOD PKI certificate to log into CAV AF. Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training will be provided by 420 SCMS/GUNAB-Robins, (478) 327-6603 or 6602.

4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.

Block 7: Enter the applicable code as listed in DOD 5010.12-M, Chapter 3. (Enter LT for Letter of Transmittal if not separately priced or DD if separately priced.)

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hours of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the funding base will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

COORDINATORS:

15. TOTAL

G. PREPARED BY

Shannon, Roosevelt

410 SCMS / GULA

478-222-2158

H. DATE

20 DEC 2017

I. APPROVED BY

//DIGITALLY SIGNED//

VICIOSO.JOHAN.M.1294137579

410 SCMS / GUEA 478-327-2790 / 497-2790

J. DATE

20 DEC 2017

Page 4 of 4DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 04 Jan 2018

File details come from the government source that posted it.