Special_Standards_of_Responsibility.pdf
PDF 11 KB Posted
- Attached to
- bldg 350 Roof Replacement Federal contract opportunity
- Solicitation number
- FA8501-15-R-0012
About this file
Special standards of responsibility
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SITE_VISIT_JULY_9TH713124133-0001.pdf | ||
| Q A_BUILDING_350_ROOF.docx | DOCX document | |
| FA8501-15-R-0012-0002.pdf | ||
| FA8501-15-R-0012-0001.pdf | ||
| Site_visit_.pdf | ||
| 001522.jpg | JPG image | |
| 003591.jpg | JPG image | |
| 43836.jpg | JPG image | |
| 003592.jpg | JPG image | |
| 44334.jpg | JPG image | |
| 001523.jpg | JPG image | |
| 43835.jpg | JPG image | |
| 015057.jpg | JPG image | |
| 000995.jpg | JPG image | |
| 43837.jpg | JPG image | |
| 015058.jpg | JPG image | |
| 43857.jpg | JPG image | |
| 003950.jpg | JPG image | |
| 004066.jpg | JPG image | |
| 003590.jpg | JPG image | |
| 003949.jpg | JPG image | |
| UHHZ080038A-Building_350_Specifications.pdf | ||
| SOW.pdf | ||
| FA8501-15-R-0012.pdf | ||
| AF66.xls | XLS spreadsheet | |
| APPENDIX_C.pdf | ||
| Bid_Schedule_(Blank).pdf | ||
| DAFARS_252.209-7992.pdf |
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No. UHHZ080038A, Replace Roof on Building 350
Minimum Requirements
1. Contractor shall employ a job foreman who is a certified installer of a qualified manufacturer for the following roof systems: PVC
Acceptable Documentation – Provide verification employment with Prime
– Provide copy of individual’s installation certifications
2. Manufacturer Qualifications – Manufacturer must be able to provide a 20 year No-Dollar-Limit warranty on material and labor for weather-tightness, finishes, high winds, and flashing components.
Acceptable Documentation – Provide a sample 20 year NDL warranty. (Installer’s certification must match manufacturer’s sample warranty)
3. Contractor must provide a Professional Engineer or Registered Architect registered in the State of Georgia with RRC who derives the majority of their income from roof design work to perform and seal all required Design Analysis and drawings.
Acceptable Documentation – Letter from AE firm with RRC or PE showing a working relationship with a copy of their professional seal.
4. Contractor must be capable of providing a UL certified lightning protection installer registered in the State of Georgia for Franklin Rod Systems on all lightning protection work.
Acceptable Documentation – Letter from UL certified lightning protection installer showing a working relationship with a copy of Georgia License.
File details come from the government source that posted it. Updated .