120179-_Responses_to_Bidder_RFIs.pdf

PDF 10 KB Posted

Attached to
Construct Addition to Bldg 651 Federal contract opportunity
Solicitation number
FA8501-15-R-0008
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

RFI Answers

View the file

Other files for this federal contract opportunity

Other files attached to Construct Addition to Bldg 651, newest first.
File Type Posted
Q A_27_May_15.pdf PDF
FA8501-15-R-0008_Bldg_651_Amendment_0001.pdf PDF
Bldg_651.xlsx XLSX spreadsheet
Bldg_651_Site_Visit_List_of_Attendees.docx DOCX document
Attachment_1_B651_Appendix_1_Drawings.pdf PDF
FA8501-15-R-0008_Bldg_651_FINAL.pdf.pdf PDF
Attachment_2_B651_Final_Submittal_Drawings.pdf PDF
Attachment_3_120179_-_Building_651_Final_Specs_10-24-14.pdf PDF
Attachment_4_BASE_FACILITY_STANDARDS_22_Nov_2013.pdf PDF
Attachment_6_120179_-_App_C_UHHZ_120179.pdf PDF
Attachment_7_Wage_Determination.pdf PDF
Attachment_8_DAFARS_252.209-7992.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UHHZ130207, B2390 Addition

Revision 1 (Addendum) Page 1 of 2

21 May 2015

BIDDER RFI RESPONSES

FOR

PROJECT UHHZ 120179

CONSTRUCT ADDITION TO B651

Responses to bidder RFIs for the above project are as follows:

1. Will the seismic design criteria indicated on sheet S-101 of Project UHHZ 080356

Building 651 be acceptable for use in the analysis and design of the building addition?

Govt. Response: The original project was constructed 5+ yrs ago and the criteria may no longer be valid. The seismic design criteria will be the current criteria required by the

UFCs and IBC (your design A-E will verify requirements).

2. We respectfully ask that the bid due date be postponed to May 29 due to the holiday and

D/B projects take a little more time to estimate as basic drawings need to be produced for competitive estimate?

Govt. Response: The date will be extended to May 29, same time.

3. Are the insulation requirements for the addition the same as the existing building?

Govt. Response: The insulation requirements are identified in Section 01020, 7.2.3.

4. Can the Government provide flow test from the nearest Fire Hydrant for preliminary design and job costing?

Govt. Response: Yes, see attached.

5. Will a project sign be required with job information and if so, will a rendering of the addition be required?

Govt. Response: No to both questions.

6. Will a UL certification be required for the lightning protection? Or will a UL letter of acceptance be acceptable?

UHHZ130207, B2390 Addition

Revision 1 (Addendum) Page 2 of 2

Govt. Response: No, full certification will be required (Section 01020, 10.7).

7. Is the existing lightning protection up to code?

Govt. Response: For the purposes of the bid, contractors shall assume that the existing system meets the codes. Contractor will perform testing to verify adequacy of the existing system prior to the start of work.

8. Are any contaminated soils expected in the area of construction?

Govt. Response: Soil report by Thompson Engineering was included as a part of the specifications. Refer to pg. 4-1 (pdf pg. 89 of 236) for results.

9. Is cathodic protection required for underground metal piping at Robins AFB?

Govt. Response: Per Section 01020, paragraph 9.3 (pdf pg. 36 of 236), yes.

--- END ---