7557 SOW Mfr Cables_updated 14 Nov 19.docx

DOCX document 41 KB Posted

Attached to
Manufacture of Various Support Equipment Cables Federal contract opportunity
Solicitation number
FA8224-20-R-7557
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

View the file

Other files for this federal contract opportunity

Other files attached to Manufacture of Various Support Equipment Cables, newest first.
File Type Posted
Cable Manufacture_SynopsisSolicitation.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

(SOW)

FOR

CABLE MANUFACURING

309 Missile Maintenance Group (309 MMXG)

14 November 2019

TABLE OF CONTENTS

1. Description of Services 2

2. Basic Service 2

3. Government Furnished Property and Services 2

4. Appendix A 3

1.0 DESCRIPTION OF SERVICES:

The Contractor shall provide all management, tools, supplies, parts, equipment, and labor necessary to manufacture Cables for support equipment related to the 309th Missile Maintenance Squadron. All work shall be at the contractor’s facility. Cables are listed in APPENDIX A.

2.0 BASIC SERVICES:

2.1 The Contractor shall manufacture cables listed in Appendix A In Accordance With (IAW) the engineering drawings supplied by the government and shall obtain approval from Government Representative (GR) if modifications are necessary.

2.2 Upon award of contact and after material has been received, the contractor shall have 160 days to deliver ten (10) manufactured cables. This will be in consecutive of four (4) separate deliveries equaling 40 cables within 640 days. Earlier delivery is acceptable.

2.3 The contractor shall notify the GR upon completion of the manufactured cables and shall provide all shipment/transportation back to Hill AFB.

2.4 Prior to certification of payment, the GR shall perform a function test of all manufactured cables. If the item(s) fail the functional test, the contractor shall repair or replace the failed end item at no additional cost to the government.

3.0 GOVERNMENT FURNISHED PROPERTY AND SERVICES

3.1 The Government will provide the applicable drawings to the contractor via email. See solicitation for required request documentation.

3.2 The contractor shall be responsible for all required materials to manufacture cables IAW drawings.

3.3 The contractor shall be responsible for safeguarding all Government drawings provided for contractor use.

APPENDIX A

Item
Cable PN
Qty

Item

Cable Pin

Qty

1
502WH12002
1 Each
26
150549
1 Each
2
149760
1 Each
27
150562
1 Each
3
149761
1 Each
28
150563
1 Each
4
149762
1 Each
29
150575
1 Each
5
149763
1 Each
30
150580
1 Each
6
149764
1 Each
31
150581
1 Each
7
149765
1 Each
32
150582
1 Each
8
149766
1 Each
33
150583
1 Each
9
149767
1 Each
34
150584
1 Each
10
149768-001
1 Each
35
150585
1 Each
11
149768-002
1 Each
36
150586
1 Each
12
146769 with Box 149747
1 Each
37
150587
1 Each
13
149770
1 Each
38
150588
1 Each
14
149771
1 Each
39
150591
1 Each
15
149772
1 Each
40
150592
1 Each
16
149773
1 Each
17
149774
1 Each
18
149777
1 Each
19
149782
1 Each
20
149783
1 Each
21
149784
1 Each
22
149785
1 Each
23
149786
1 Each
24
149787 with Box 149789
1 Each
25
150548
1 Each
Total
40

image1.jpg

File details come from the government source that posted it. Updated .