This competitive solicitation is for one-way transfers and B1B time delays. The Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base is seeking proposals for line items including the one-way transfers and delays ranging from 0.3 to 3.2 seconds. Proposals are due by various dates in 2022 as indicated in the schedule. The solicitation incorporates various FAR and DFARS clauses pertaining to small business participation goals, pre- and post-award representations, proprietary data rights, and other standard federal contracting terms. Qualified sources for the products must be approved by award date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 13 FA821321R3009 AMEND 3.pdf | ||
| 05 FA821321R3009 Solicitation AMEND 1.pdf | ||
| FA821321R3009 Solicitation.pdf | ||
| FA821321R3009 Attachments.PDF |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
J
2. AMENDMENT/MODIFICATION NO.
FA8213-21-R-3009-0002
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO.
FD20202150063
5. PROJECT NO (If applicable)
FA821321R3009
6. ISSUED BY CODE
DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING
AFLCMC EBHK
6072 FIR AVENUE BLDG 1233
HILL AIR FORCE BASE UT 84056-5820
BUYER: Patrick Robello/AFLCMC patrick.robello.1@us.af.mil Phone: (801) 775- 2371
7. ADMINISTERED BY (If other than item 6) CODEFA8213
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA821321R3009
9B. DATED (SEE ITEM 11)
12-NOV-2020
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
ROUTINE.
EXPEDITED DELIVERY AT NO ADDITIONAL COST TO THE GOVERNMENT IS AUTHORIZED.
Sources: Pacific Scientific Energetics Material Co. (PSEMC CA); cage: (06331) Chemring Energetic Devices (CED); cage: (93455)
Clause 52.232-18 "Subject to Availability of Funds" is applicable.
Restricted to qualified sources. In order to be considered for award, the contractor shall be an approved source by the time of award.
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
FA8213-21-R-3009-0002
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of the AMendment is to:
1. Change primary contact from Jesse Whinham to Patrick Robello
FROM: 8-JAN-2021 TO: 8-JAN-2021
2. ALl other Terms and Condiditons Remain the same
This is a conformed copy of the solicitation.
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
DCMA and DFAS are required to withhold payment IAW DFAR 252.227-7030 until CDRL A001, A005, A006, B001 & B002 have been delivered and/or approved by Hill AFB.
One-Way Transfer
All Contractors Must Submit FA Item No.
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-167-6621 6036200-01
NSN: 1377-01-220-3746 ES
1 WAY TRANSFER
DODIC: MH61
Manufacturer Part Number 06331 816890-1 93455 6036200-01 Priority: R ROUTINE.
Applicability: B1-B ;
Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:
Serial Number Required Exempt From Foreign Disclosure
First Article Test Plan
All Contractors Must Submit FA Item No.
0001AA
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
NSN: FATP
TEST PLAN IAW DD 1423-1 ATTACHED HERETO
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
First Article Test Plan
All Contractors Must Submit FA Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri Required Delivery
+ IAW1423 1 LO *30 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
First Article
All Contractors Must Submit FA Item No.
0001AB
Firm Fixed Price Quantity U/I Unit Price Amount
3 EA
NSN: FA
FIRST ARTICLE
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri Required Delivery
+ TBC 3 EA *90 Calendar Days
Proposed Delivery
+ TBC 3 EA
First Article Test Report
All Contractors Must Submit FA Item No.
0001AC
First Article Test Report
All Contractors Must Submit FA Not Separately Priced Quantity U/I Unit Price
1 LO NSP
NSN: FATR
TEST REPORT IAW DD 1423-1 ATTACHED HERETO
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Type / Ship To Quantity (U/I) *ARO Completion of First Article Testing
_ Req No / Pri
Required Delivery
+ IAW1423 1 LO *30 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
One-Way Transfer
Item No.
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-167-6621 6036200-01
NSN: 1377-01-220-3746 ES
1 WAY TRANSFER
DODIC: MH61
Manufacturer Part Number 06331 816890-1 93455 6036200-01 Priority: R ROUTINE.
Applicability: B1-B ;
Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:
Serial Number Required Exempt From Foreign Disclosure
Physical Item Markings IAW CAD/PAD Item Marking Instructions version 1.5 dated 1 May 2019.
Applicable SPI Number: F012418149
One-Way Transfer
Item No.
0002AA
Firm Fixed Price Quantity U/I Unit Price Amount
312 EA
PROD
PRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVE
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri Required Delivery
B FV2037 312 EA 30 JUN 2022
Proposed Delivery
B FV2037 312 EA
Transportation Chargeable To: F2DCAE0294NP05 5713011 H81 LCHN 355100 4E27A1 462FD 78070F 503000 F03000
One-Way Transfer
Item No.
0002AB
Firm Fixed Price Quantity U/I Unit Price Amount
581 EA
NSN: PROD
PRODUCTION ARTICLE - SAME AS BASIC LINE ITEM ABOVE
Priority: R ROUTINE.
One-Way Transfer
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri Required Delivery
C FV2172 581 EA 30 JUN 2022
Proposed Delivery
C FV2172 581 EA
Transportation Chargeable To: F2DCAE0294NP05 5713011 H81 LCHN 355100 4E27A1 462FD 78070F 503000 F03000
1.60 Second Time Delay
All Contractors Must Submit FA Item No.
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-356-8732 ES 816852-11
NSN: 1377-01-229-7600 ES
TIME DELAY, 1.60 SEC
DODIC: MU17
Manufacturer Part Number 06331 816852-11 93455 6106600 Priority: R ROUTINE.
Applicability: None ;
Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:
First Article Test Plan
All Contractors Must Submit FA Item No.
0003AA
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
NSN: FATP
TEST PLAN IAW DD 1423-1 ATTACHED HERETO
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri Required Delivery
+ IAW1423 1 LO *30 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
First Article
All Contractors Must Submit FA Item No.
0003AB
Firm Fixed Price Quantity U/I Unit Price Amount
10 EA
NSN: FA
FIRST ARTICLE
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
First Article
All Contractors Must Submit FA Type / Ship To Quantity (U/I) *ARO Completion of
First Article Testing _ Req No / Pri
Required Delivery
+ TBC 10 EA *90 Calendar Days
Proposed Delivery
+ TBC 10 EA
First Article Test Report
All Contractors Must Submit FA Item No.
0003AC
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
NSN: FATR
TEST REPORT IAW DD 1423-1 ATTACHED HERETO
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri Required Delivery
+ IAW1423 1 LO *30 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
1.60 Second Time Delay
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
24 EA
GROUP STOCK NO P/N CAGE
1.60 Second Time Delay
Group 001 Alternate 1377-01-356-8732 ES 816852-11
NSN: 1377-01-229-7600 ES
TIME DELAY, 1.60 SEC
DODIC: MU17
Manufacturer Part Number 06331 816852-11 93455 6106600 Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:
Serial Number Required Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
B FV2037 24 EA 30 JUN 2022
Proposed Delivery
B FV2037 24 EA
Physical Item Markings IAW CAD/PAD Item Marking Instructions version 1.5 dated 1 May 2019.
Applicable SPI Number: F012340719
Transportation Chargeable To: F2DCAE0294NP05 5713011 H81 LCHN 355100 4E27A1 462FD 78070F 503000 F03000
3.20 Second Time Delay
All Contractors Must Submit FA Item No.
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-356-8734 ES 6106800
3.20 Second Time Delay
All Contractors Must Submit FA
NSN: 1377-01-232-1677 ES
INITIATOR,CARTRIDGE ACTUATED
DODIC: MU16
Manufacturer Part Number 06331 816852-2 93455 6106800 Priority: R ROUTINE.
Applicability: None ;
Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:
Serial Number Required
First Article Test Plan
All Contractors Must Submit FA Item No.
0005AA
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
NSN: FATP
TEST PLAN IAW DD1423-1 ATTACHED HERETO
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri Required Delivery
+ IAW1423 1 LO *30 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
First Article
All Contractors Must Submit FA Item No.
0005AB
Firm Fixed Price Quantity U/I Unit Price Amount
First Article
All Contractors Must Submit FA
10 EA
NSN: FA
FIRST ARTICLE
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri Required Delivery
+ TBC 10 EA *90 Calendar Days
Proposed Delivery
+ TBC 10 EA
First Article Test Report
All Contractors Must Submit FA Item No.
0005AC
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
NSN: FATR
TEST REPORT IAW DD 1423-1 ATTACHED HERETO
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Type / Ship To Quantity (U/I) *ARO Completion of First Article Testing
_ Req No / Pri
Required Delivery
First Article Test Report
All Contractors Must Submit FA + IAW1423 1 LO *30 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
3.20 Second Time Delay
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
24 EA
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-356-8734 ES 6106800
NSN: 1377-01-232-1677 ES
INITIATOR,CARTRIDGE ACTUATED
DODIC: MU16
Manufacturer Part Number 06331 816852-2 93455 6106800 Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:
Serial Number Required Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
B FV2037 24 EA 30 JUN 2022
Proposed Delivery
B FV2037 24 EA
Physical Item Markings IAW CAD/PAD Item Marking Instructions version 1.5 dated 1 May 2019.
Applicable SPI Number: F012340719
Transportation Chargeable To: F2DCAE0294NP05 5713011 H81 LCHN 355100 4E27A1 462FD 78070F 503000 F03000
1.00 Second Time Delay
All Contractors Must Submit FA Item No.
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-356-8731 ES 6106500
NSN: 1377-01-232-1960 ES
INITIATOR,CARTRIDGE ACTUATED
DODIC: MU15
Manufacturer Part Number 06331 816852-10 93455 6106500 Priority: R ROUTINE.
Applicability: None ;
Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:
Serial Number Required
First Article Test Plan
All Contractors Must Submit FA Item No.
0007AA
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
NSN: FATP
TEST PLAN IAW DD1423-1 ATTACHED HERETO
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri
First Article Test Plan
All Contractors Must Submit FA + IAW1423 1 LO *30 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
First Article
All Contractors Must Submit FA Item No.
0007AB
Firm Fixed Price Quantity U/I Unit Price Amount
10 EA
NSN: FA
FIRST ARTICLE
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri Required Delivery
+ TBC 10 EA *90 Calendar Days
Proposed Delivery
+ TBC 10 EA
First Article Test Report
All Contractors Must Submit FA Item No.
0007AC
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
NSN: FATR
TEST REPORT IAW DD 1423-1 ATTACHED HERETO
Limitations of Liability: Other Than High Value Item
First Article Test Report
All Contractors Must Submit FA
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Applicability: None ;
Type / Ship To Quantity (U/I) *ARO Completion of First Article Testing
_ Req No / Pri
Required Delivery
+ IAW1423 1 LO *30 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
1.00 Second Time Delay
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
24 EA
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-356-8731 ES 6106500
NSN: 1377-01-232-1960 ES
INITIATOR,CARTRIDGE ACTUATED
DODIC: MU15
Manufacturer Part Number 06331 816852-10 93455 6106500 Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:
Serial Number Required Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
1.00 Second Time Delay
B FV2037 24 EA 30 JUN 2022
Proposed Delivery
B FV2037 24 EA
Physical Item Markings IAW CAD/PAD Item Marking Instructions version 1.5 dated 1 May 2019.
Applicable SPI Number: F012340719
Transportation Chargeable To: F2DCAE0294NP05 5713011 H81 LCHN 355100 4E27A1 462FD 78070F 503000 F03000
0.70 Second Time Delay
All Contractors Must Submit FA Item No.
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-356-8735 ES 6106300
NSN: 1377-01-234-0719 ES
TIME DELAY, .70 SEC (1)
DODIC: MU19
Manufacturer Part Number 06331 816851-11 93455 6106300 Priority: R ROUTINE.
Applicability: None ;
Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:
Serial Number Required
First Article Test Plan
All Contractors Must Submit FA Item No.
0009AA
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
NSN: FATP
TEST PLAN IAW DD 1423-1 ATTACHED HERETO
First Article Test Plan
All Contractors Must Submit FA
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri Required Delivery
+ IAW1423 1 LO *30 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
First Article
All Contractors Must Submit FA Item No.
0009AB
Firm Fixed Price Quantity U/I Unit Price Amount
10 EA
NSN: FA
FIRST ARTICLE
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri Required Delivery
+ TBC 10 EA *90 Calendar Days
Proposed
+ TBC 10 EA
First Article Test Report
All Contractors Must Submit FA Item No.
0009AC
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
FATR
TEST REPORT IAW DD 1423-1 ATTACHED HERETO
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Type / Ship To Quantity (U/I) *ARO Completion of First Article Testing
_ Req No / Pri
Required Delivery
+ IAW1423 1 LO *30 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
0.70 Second Time Delay
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
14 EA
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-356-8735 ES 6106300
NSN: 1377-01-234-0719 ES
TIME DELAY, .70 SEC (1)
DODIC: MU19
Manufacturer Part Number 06331 816851-11 93455 6106300
0.70 Second Time Delay
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:
Serial Number Required Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
B FV2037 14 EA 30 JUN 2022
Proposed Delivery
B FV2037 14 EA
Physical Item Markings IAW CAD/PAD Item Marking Instructions version 1.5 dated 1 May 2019.
Applicable SPI Number: F012340719
Transportation Chargeable To: F2DCAE0294NP05 5713011 H81 LCHN 355100 4E27A1 462FD 78070F 503000 F03000
0.50 Second Time Delay
All Contractors Must Submit FA Item No.
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-356-5593 ES 6106200
NSN: 1377-01-234-0821 ES
DELAY ELEMENT,CARTRIDGE
DODIC: MU80
Manufacturer Part Number 06331 816851-4 93455 6106200 Priority: R ROUTINE.
Applicability: None ;
Buy American Act/Balance of Payments Program
0.50 Second Time Delay
All Contractors Must Submit FA IUID Required: Yes Physical Item Markings:
Serial Number Required
First Article Test Plan
All Contractors Must Submit FA Item No.
0011AA
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
NSN: FATP
TEST PLAN IAW DD 1423-1 ATTACHED HERETO
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri Required Delivery
+ IAW1423 1 LO *30 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
First Article
All Contractors Must Submit FA Item No.
0011AB
Firm Fixed Price Quantity U/I Unit Price Amount
10 EA
NSN: FA
FIRST ARTICLE
First Article
All Contractors Must Submit FA
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri Required Delivery
+ TBC 10 EA *90 Calendar Days
Proposed Delivery
+ TBC 10 EA
First Article Test Report
All Contractors Must Submit FA Item No.
0011AC
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
NSN: FATR
TEST REPORT IAW DD 1423-1 ATTACHED HERETO
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Type / Ship To Quantity (U/I) *ARO Completion of
First Article Testing _ Req No / Pri
Required Delivery
+ IAW1423 1 LO *30 Calendar Days
Proposed
+ IAW1423 1 LO
0.50 Second Time Delay
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
48 EA
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-356-5593 ES 6106200
NSN: 1377-01-234-0821 ES
DELAY ELEMENT,CARTRIDGE
DODIC: MU80
Manufacturer Part Number 06331 816851-4 93455 6106200 Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:
Serial Number Required Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
B FV2037 48 EA 30 JUN 2022
Proposed Delivery
B FV2037 48 EA
Physical Item Markings IAW CAD/PAD Item Marking Instructions version 1.5 dated 1 May 2019.
Applicable SPI Number: F012340719
Transportation Chargeable To: F2DCAE0294NP05 5713011 H81 LCHN 355100 4E27A1 462FD 78070F 503000 F03000
0.30 Second Time Delay
All Contractors Must Submit FA Item No.
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-356-5592 ES 6106100
NSN: 1377-01-234-0822 ES
DELAY ELEMENT,CARTRIDGE
DODIC: MU79
Manufacturer Part Number 06331 816851-2 93455 6106100 Priority: R ROUTINE.
Applicability: None ;
Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:
Serial Number Required
First Article Test Plan
All Contractors Must Submit FA Item No.
0013AA
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
NSN: FATP
TEST PLAN IAW DD 1423-1 ATTACHED HERETO
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Applicability: None ;
Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri Required Delivery
+ IAW1423 1 LO *30 Calendar Days
Proposed
+ IAW1423 1 LO
First Article
All Contractors Must Submit FA Item No.
0013AB
Firm Fixed Price Quantity U/I Unit Price Amount
10 EA
NSN: FA
FIRST ARTICLE
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri Required Delivery
+ TBC 10 EA *90 Calendar Days
Proposed Delivery
+ TBC 10 EA
First Article Test Report
All Contractors Must Submit FA Item No.
0013AC
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
NSN: FATR
TEST REPORT IAW DD 1423-1 ATTACHED HERETO
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) *ARO Completion of
First Article Testing _ Req No / Pri
First Article Test Report
All Contractors Must Submit FA + IAW1423 1 LO *30 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
0.30 Second Time Delay
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
24 EA
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-356-5592 ES 6106100
NSN: 1377-01-234-0822 ES
DELAY ELEMENT,CARTRIDGE
DODIC: MU79
Manufacturer Part Number 06331 816851-2 93455 6106100 Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:
Serial Number Required Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
B FV2037 24 EA 30 JUN 2022
Proposed Delivery
B FV2037 24 EA
Physical Item Markings IAW CAD/PAD Item Marking Instructions version 1.5 dated 1 May 2019.
Applicable SPI Number: F012340822
Transportation Chargeable To: F2DCAE0294NP05 5713011 H81 LCHN 355100 4E27A1 462FD 78070F 503000 F03000
2.40 Second Time Delay
All Contractors Must Submit FA Item No.
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-356-8733 ES 6106700
NSN: 1377-01-234-4044 ES
INITIATOR,CARTRIDGE ACTUATED
DODIC: MU18
Manufacturer Part Number 06331 816852-12 93455 6106700 Priority: R ROUTINE.
Applicability: None ;
Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:
Serial Number Required
First Article Test Plan
All Contractors Must Submit FA Item No.
0015AA
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
NSN: FATP
TEST PLAN IAW DD 1423-1 ATTACHED HERETO
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri
First Article Test Plan
All Contractors Must Submit FA + IAW1423 1 LO *30 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
First Article
All Contractors Must Submit FA Item No.
0015AB
Firm Fixed Price Quantity U/I Unit Price Amount
10 EA
NSN: FA
FIRST ARTICLE
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri
Required Delivery
+ TBC 10 EA *90 Calendar Days
Proposed Delivery
+ TBC 10 EA
First Article Test Report
All Contractors Must Submit FA Item No.
0015AC
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
NSN: FATR
TEST REPORT IAW DD 1423-1 ATTACHED HERETO
First Article Test Report
All Contractors Must Submit FA
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Type / Ship To Quantity (U/I) *ARO Completion of First Article Testing
_ Req No / Pri
Required Delivery
+ IAW1423 1 LO *30 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
2.40 Second Time Delay
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
24 EA
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-356-8733 ES 6106700
NSN: 1377-01-234-4044 ES
INITIATOR,CARTRIDGE ACTUATED
DODIC: MU18
Manufacturer Part Number 06331 816852-12 93455 6106700 Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:
2.40 Second Time Delay
Type / Ship To Quantity (U/I) On or Before _ Req No / Pri Required Delivery
B FV2037 24 EA 30 JUN 2022
Proposed Delivery
B FV2037 24 EA
Physical Item Markings IAW CAD/PAD Item Marking Instructions version 1.5 dated 1 May 2019.
Applicable SPI Number: F012340719
Transportation Chargeable To: F2DCAE0294NP05 5713011 H81 LCHN 355100 4E27A1 462FD 78070F 503000 F03000
0.70 Second Time Delay
All Contractors Must Submit FA Item No.
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-356-8730 ES 6106400
NSN: 1377-01-234-6208 ES
INITIATOR,CARTRIDGE ACTUATED
DODIC: MU93
Manufacturer Part Number 06331 816851-12 93455 6106400 Priority: R ROUTINE.
Applicability: None ;
Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:
Serial Number Required
First Article Test Plan
All Contractors Must Submit FA Item No.
0017AA
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
NSN: FATP
First Article Test Plan
All Contractors Must Submit FA
TEST PLAN IAW DD 1423-1 ATTACHED HERETO
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri Required Delivery
+ IAW1423 1 LO *30 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
First Article
All Contractors Must Submit FA Item No.
0017AB
Firm Fixed Price Quantity U/I Unit Price Amount
10 EA
NSN: FA
FIRST ARTICLE
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri Required Delivery
+ TBC 10 EA *90 Calendar Days
Proposed
First Article
All Contractors Must Submit FA
+ TBC 10 EA
First Article Test Report
All Contractors Must Submit FA Item No.
0017AC
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
NSN: FATR
TEST REPORT IAW DD 1423-1 ATTACHED HERETO
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Type / Ship To Quantity (U/I) *ARO Completion of First Article Testing
_ Req No / Pri
Required Delivery
+ IAW1423 1 LO *30 Calendar Days
Proposed Delivery
+ IAW1423 1 LO
0.70 Second Time Delay
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
36 EA
GROUP STOCK NO P/N CAGE
Group 001 Alternate 1377-01-356-8730 ES 6106400
NSN: 1377-01-234-6208 ES
INITIATOR,CARTRIDGE ACTUATED
DODIC: MU93
Manufacturer Part Number 06331 816851-12 93455 6106400
0.70 Second Time Delay
Priority: R ROUTINE.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Applicability: None ;
Buy American Act/Balance of Payments Program IUID Required: Yes Physical Item Markings:
Serial Number Required Type / Ship To Quantity (U/I) On or Before _ Req No / Pri
Required Delivery
B FV2037 36 EA 30 JUN 2022
Proposed Delivery
B FV2037 36 EA
Physical Item Markings IAW CAD/PAD Item Marking Instructions version 1.5 dated 1 May 2019.
Applicable SPI Number: F012340719
Transportation Chargeable To: F2DCAE0294NP05 5713011 H81 LCHN 355100 4E27A1 462FD 78070F 503000 F03000
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
DATA IAW DD 1423-1 ATTACHED HERE TO
Buy American Act/Balance of Payments Program
SHIP TO / PLACE OF PERFORMANCE
TYPE/CODE: + IAW1423
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: + TBC
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: B FV2037
72 ABW LGRSMK
7150 PATROL ROAD
TINKER AIR FORCE BASE OK 73145-5000
UNITED STATES
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: C FV2172
649 MUNS MXW
6024 PINE LANE
BLDG 1377 BAY 2
HILL AIR FORCE BASE UT 84056-5707
UNITED STATES
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
PART I - THE SCHEDULE
SECTION C
DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
SPECIFICATIONS, STANDARDS AND DRAWINGS (MAY 1993)
(IAW FAR 11.201)
Specifications, standards or drawings (as applicable) are furnished/listed below or are listed in Section J herein. The contractor shall perform in accordance with those specifications and/or the attachments listed in Section J:
ITEM NR SPECIFICATIONS, STANDARDS AND/OR ATTACHMENTS
PART I - THE SCHEDULE
SECTION E
INSPECTION AND ACCEPTANCE
52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)
(IAW FAR 46.302)
52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
(IAW FAR 46.311, DFARS 246.202-4(1))
(a) The Contractor shall comply with the higher-level quality standard(s) listed below. [If more than one standard is listed, the offeror shall indicate its selection by checking the appropriate block.]*
Title Number Date Tailoring *See Individual Line Item Schedule
52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)
(IAW FAR 46.316)
INSPECTION AND ACCEPTANCE (SEP 1999)
(IAW FAR 46.401(b), FAR 46.503)
Government Contract Quality Assurance Inspection and Acceptance will be at (Final):
[CONTRACTOR FILL-IN]
Item No(s): See schedule for items with the following code(s) listed below :
Inspection Code and Address:
Government Contract Quality Assurance Inspection and Acceptance will be at destination(s) specified herein (Final).
Item No(s): 0001AA, 0001AC, 0003AA, 0003AC, 0005AA, 0005AC, 0007AA, 0007AC, 0009AA, 0009AC, 0011AA, 0011AC, 0013AA, 0013AC, 0015AA, 0015AC, 0017AA, 0017AC
PART I - THE SCHEDULE
SECTION F
DELIVERIES OR PERFORMANCE
52.211-8 TIME OF DELIVERY (JUN 1997)
(IAW FAR 11.404(a)(2))
DELIVERY FOR EACH ITEM IS ANNOTATED IN THE SCHEDULE (PART I SECTION B) UNDER EACH LINE ITEM.
52.211-8 TIME OF DELIVERY -- ALTERNATE I (APR 1984)
(IAW FAR 11.404(a)(2))
(b) the Government will make award by .
52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)
(IAW FAR 11.703(b))
52.242-15 STOP-WORK ORDER (AUG 1989)
(IAW FAR 42.1305(b)(1))
52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)
(IAW FAR 42.1305(c))
52.247-29 F.O.B. ORIGIN (FEB 2006)
(IAW FAR 47.303-1(c))
52.247-34 F.O.B. DESTINATION (NOV 1991)
(IAW FAR 47.303-6(c))
HAZARDOUS CLASSIFICATION (MAY 1998)
(IAW FAR 47.305-9(c))
For the purpose of identifying commodity description and freight classification of explosives and other dangerous supplies, the following applies.
Hazardous Classification Line Item 0001
Hazardous Class Division 1.4 Storage Compatibility Group S
DOT Marking FUZES, DETONATING DOT Class 1.4S DOT Label 1.4S
UN Serial No 0367 UN Proper Ship Name FUZES, DETONATING
Freight Classification Line Item 0002
Hazardous Class Division 1.4 Storage Compatibility Group S
DOT Marking FUZES, DETONATING DOT Class 1.4S DOT Label 1.4S
UN Serial No 0367 UN Proper Ship Name FUZES, DETONATING
Freight Classification Line Item 0003
Hazardous Class Division 1.4 Storage Compatibility Group S
DOT Marking FUZES, DETONATING DOT Class 1.4S DOT Label EXPLOSIVE 1.4S
UN Serial No 0367 UN Proper Ship Name FUZES, DETONATING
Freight Classification Line Item 0004
Hazardous Class Division 1.4 Storage Compatibility Group S
DOT Marking FUZES, DETONATING DOT Class 1.4S DOT Label EXPLOSIVE 1.4S
UN Serial No 0367 UN Proper Ship Name FUZES, DETONATING
Freight Classification Line Item 0005
Hazardous Class Division 1.4 Storage Compatibility Group S
DOT Marking FUZES, DETONATING DOT Class 1.4S DOT Label EXPLOSIVE 1.4S
UN Serial No 0367
UN Proper Ship Name FUZES, DETONATING Freight Classification
Line Item 0006 Hazardous Class Division 1.4
Storage Compatibility Group S DOT Marking FUZES, DETONATING
DOT Class 1.4S DOT Label EXPLOSIVE 1.4S
UN Serial No 0367 UN Proper Ship Name FUZES, DETONATING
Freight Classification Line Item 0007
Hazardous Class Division 1.4 Storage Compatibility Group S
DOT Marking FUZES, DETONATING DOT Class 1.4S DOT Label EXPLOSIVE 1.4S
UN Serial No 0367 UN Proper Ship Name FUZES, DETONATING
Freight Classification Line Item 0008
Hazardous Class Division 1.4 Storage Compatibility Group S
DOT Marking FUZES, DETONATING DOT Class 1.4S DOT Label EXPLOSIVE 1.4S
UN Serial No 0367 UN Proper Ship Name FUZES, DETONATING
Freight Classification Line Item 0009
Hazardous Class Division 1.4 Storage Compatibility Group S
DOT Marking FUZES, DETONATING DOT Class 1.4S DOT Label EXPLOSIVE 1.4S
UN Serial No 0367 UN Proper Ship Name FUZES, DETONATING
Freight Classification Line Item 0010
Hazardous Class Division 1.4 Storage Compatibility Group S
DOT Marking FUZES, DETONATING DOT Class 1.4S DOT Label EXPLOSIVE 1.4S
UN Serial No 0367 UN Proper Ship Name FUZES, DETONATING
Freight Classification Line Item 0011
Hazardous Class Division 1.4 Storage Compatibility Group S
DOT Marking FUZES, DETONATING DOT Class 1.4S DOT Label EXPLOSIVE 1.4S
UN Serial No 0367 UN Proper Ship Name FUZES, DETONATING
Freight Classification Line Item 0012
Hazardous Class Division 1.4
Storage Compatibility Group S DOT Marking FUZES, DETONATING
DOT Class 1.4S DOT Label EXPLOSIVE 1.4S
UN Serial No 0367 UN Proper Ship Name FUZES, DETONATING
Freight Classification Line Item 0013
Hazardous Class Division 1.4 Storage Compatibility Group S
DOT Marking FUZES, DETONATING DOT Class 1.4S DOT Label EXPLOSIVE 1.4S
UN Serial No 0367 UN Proper Ship Name FUZES, DETONATING
Freight Classification Line Item 0014
Hazardous Class Division 1.4 Storage Compatibility Group S
DOT Marking FUZES, DETONATING DOT Class 1.4S DOT Label EXPLOSIVE 1.4S
UN Serial No 0367 UN Proper Ship Name FUZES, DETONATING
Freight Classification Line Item 0015
Hazardous Class Division 1.4 Storage Compatibility Group S
DOT Marking FUZES, DETONATING DOT Class 1.4S DOT Label EXPLOSIVE 1.4S
UN Serial No 0367 UN Proper Ship Name FUZES, DETONATING
Freight Classification Line Item 0016
Hazardous Class Division 1.4 Storage Compatibility Group S
DOT Marking FUZES, DETONATING DOT Class 1.4S DOT Label EXPLOSIVE 1.4S
UN Serial No 0367 UN Proper Ship Name FUZES, DETONATING
Freight Classification Line Item 0017
Hazardous Class Division 1.4 Storage Compatibility Group S
DOT Marking FUZES, DETONATING DOT Class 1.4S DOT Label EXPLOSIVE 1.4S
UN Serial No 0367 UN Proper Ship Name FUZES, DETONATING
Freight Classification Line Item 0018
Hazardous Class Division 1.4 Storage Compatibility Group S
DOT Marking FUZES, DETONATING DOT Class 1.4S DOT Label EXPLOSIVE 1.4S
UN Serial No 0367 UN Proper Ship Name FUZES, DETONATING
Freight Classification
PART I - THE SCHEDULE
SECTION G
CONTRACT ADMINISTRATION DATA
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(IAW DFARS 232.7004(b), PGI 232.7004(b)(1), DFARS 212.301(f)(liii))
(a) Definitions. As used in this clause— “Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow
(WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the Central Contractor Registration at https://www.acquisition.gov ; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/ .
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
__COMBO (INVOICE + RECEIVING REPORT________
Note: If a “Combo” document type is identified but not supportable by the Contractor’s business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
_See Schedule_________________________________
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC See Block #14 of the award document, Schedule A Issue By DoDAAC See Block #7 of the award document, Schedule A Admin DoDAAC See Block #12 of the award document, Schedule A Inspect By DoDAAC See Schedule Ship To Code See Contract Line Item
Ship From Code Mark For Code See Contract Line Item Service Approver (DoDAAC) Service Acceptor (DoDAAC) Accept at Other DoDAAC LPO DoDAAC DCAA Auditor DoDAAC Other DoDAAC(s) (*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g.
timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
Dirk.Williams@Hill.af.mil
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
Dirk.Williams@Hill.af.mil
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
(The above Clause/Provision has been modified.)
ACCOUNTING AND APPROPRIATION DATA (AUG 1998)
Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable
AA 57 13011 . H8 1 LC HN 355105 000000 00000 78070F 503000 F03000 $0.00
AB 57 13011 . H8 1 LC HN 355102 4E27A1 63681…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .