09_QALI_50102.pdf

PDF 91 KB Posted

Attached to
B-1 Fire Extinguisher Cartridges Federal contract opportunity
Solicitation number
FA8213-21-Q-3004
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to B-1 Fire Extinguisher Cartridges, newest first.
File Type Posted
07C_F01-631-9588.pdf PDF
01_Air_Spec.pdf PDF
12_COMBINED_FIRST_ARTICLE_DOCUMENTS.pdf PDF
13_JFQR_01-336-6648.pdf PDF
08_CADPAD_Item_Marking_Instruction.pdf PDF
07B_F01-631-9582.pdf PDF
07A_F01-255-2382.pdf PDF
03_ADC_SOW.pdf PDF
02_REPSHIP.pdf PDF
FA821321Q3004_______0001.pdf PDF
11_CDRLs.pdf PDF
04_Packaging_SOW.pdf PDF
FA821321Q3004.pdf PDF
10_Repair_and_Rework.pdf PDF
06_COMBINED_EDLS.pdf PDF
05_COMBINED_ITEM_DESCRIPTIONS.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name CAGE code

DCMA QAR Reviewer

Date Review Completed

Date Issued to Contractor

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.

All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)

Monitor - R: Will monitor testing, may reduce to verification

Notify - N: By phone or email

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

Concurrence Signature by QAR/DCMA:

QAR/DCMA

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer

Date

Sheet1

Contract No: 21-50102
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: B-1B Fire Extinguisher
DODIC: MY53
undefined: V
undefined_2: V
undefined_3: M
undefined_4: W
undefined_5: V
undefined_6: V
undefined_7: V
undefined_8: N
undefined_9:
undefined_10:
undefined_11:
undefined_12:
Text19: Kidde, Applied Energy, PSEMC-AZ
Text20: 61423, 57597, 54181
Text21:
Text22:
Text23:
Text24: 1.Inspection
Text25: 2. Leak Test
Text26: 3. LAT Sample Selection
Text27: 4. LAT
Text28: 5. Preparation for Shipment
Text29: 6. AMMO Data Card Review
Text30: 7. Shippers (DD250, DD1149, Reports)
Text31: 8. Additional Requirements
Text32:
Text33:
Text34:
Text35:
Text36: 1. Verify that the Explosive Weight is identified and meets drawing and hazard classification requirements.

2. Verify gross/fine leak checks are performed per ATP requirements

3. Randomly select LAT units per latest government approved ATP.

4. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.

5. Ensure Paperwork is correct.

6. Verify all energetic materials: list original manufacturer, original lot no., and latest certification/recertification date < 24 months.

7. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

8. Notify and obtain approval from the Project Engineer for any additional requirements imposed by DCMA.

2020-07-01T13:18:02-0600
TANNER.MATTHEW.W.1379435919
Text46: 2020-07-01
Text49:
Type name_1:
Type name_4:
Part Number:
Noun: 877597-1, 201240, 2-102060-1

File details come from the government source that posted it. Updated .