QALI.pdf

PDF 98 KB Posted

Attached to
Reefing Line Cutter Federal contract opportunity
Solicitation number
FA821320R3003
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document contains a quality assurance letter of instruction and planning requirements for a federal contract to produce reefing line cutters. The contractor must follow 17 defined inspection points for the manufacturing and testing of the reefing line cutters. Inspection points include verifying explosive weight and leak testing according to approved test plans. The contractor must also correctly label radiographic films, select samples for lot acceptance testing, and calibrate all test equipment used. Additional requirements include reviewing ammunition data cards, ensuring correct paperwork for packaging and shipping, and notifying the project engineer of any additional DCMA requirements. The related federal contract opportunity is a solicitation from the Department of the Air Force to provide reefing line cutters identified as national stock numbers 1377013322379ES and 1377013339143ES for the pricing of $0.00 each.

View the file

Other files for this federal contract opportunity

Other files attached to Reefing Line Cutter, newest first.
File Type Posted
REPSHIP.doc DOC document
EDL 01-332-2379.pdf PDF
SPI F01-052-8209.pdf PDF
Packaging SOW.pdf PDF
Packaging.pdf PDF
CADPAD Item Marking Instruction.pdf PDF
CDRLSFY20.pdf PDF
AIR SPEC.pdf PDF
JFQR.pdf PDF
EDL 01-333-9143.pdf PDF
ADCSOW.pdf PDF
FA821320R3003.pdf PDF
BidSets.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name CAGE code

DCMA QAR Reviewer

Date Review Completed

Date Issued to Contractor

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.

All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)

Monitor - R: Will monitor testing, may reduce to verification

Notify - N: By phone or email

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

Concurrence Signature by QAR/DCMA:

QAR/DCMA

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer

Date

Sheet1

Contract No: 20-50039, 20-50040
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: ACES II Cutters
DODIC: MD90 and MD91
undefined: V
undefined_2: V
undefined_3: V
undefined_4: M
undefined_5: W
undefined_6: V
undefined_7: V
undefined_8: V
undefined_9: N
undefined_10:
undefined_11:
undefined_12:
Text19: Roberts Research Laboratories
Text20: 60880
Text21:
Text22:
Text23:
Text24: 1.Inspection
Text25: 2. Leak Test
Text26: 3. X-Ray/N-Ray
Text27: 4. LAT Sample Selection
Text28: 5. LAT
Text29: 6. Preparation for Shipment
Text30: 7. AMMO Data Card Review
Text31: 8. Shippers (DD250, DD1149, Reports)
Text32: 9. Additional Requirements
Text33:
Text34:
Text35:
Text36: 1. Verify that the Explosive Weight is identified and meets drawing and hazard classification requirements.

2. Verify gross/fine leak checks are performed per ATP requirements

3. Ensure film labeling correct. Ensure radiographic film readable / well-defined. DCMA not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer, original lot no., and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Notify and obtain approval from the Project Engineer for any additional requirements imposed by DCMA.

2018-05-04T07:50:39-0600
HANCEY.ALLEN.R.1386816111
Text46: 29 April 2019
Text49:
Type name_1:
Type name_4:
Part Number:
Noun: C1-1.15 and C1-4.0

File details come from the government source that posted it. Updated .