AIR SPEC.pdf
PDF 223 KB Posted
- Attached to
- Reefing Line Cutter Federal contract opportunity
- Solicitation number
- FA821320R3003
About this file
This document outlines the technical requirements for two reefing line cutter products being solicited by the Department of the Air Force Materiel Command Lifecycle Management Center located at Hill Air Force Base. Key details include:
-
The contractor shall provide the reefing line cutters identified as National Stock Numbers 1377013322379ES and 1377013339143ES. Specific requirements cover packaging, shipping, quality assurance, testing procedures, material age limits, and critical safety item documentation. The contractor must also comply with Defense Federal Acquisition Regulation Supplement clauses related to ammunition and explosives.
-
Lot acceptance testing must be conducted according to approved test plans submitted at least 90 days prior to testing. Test reports shall be furnished through the Wide Area Workflow receiving system. Failure analyses and corrective actions are required in the event of test failures.
-
Raw materials for energetic components may not be more than 24 months old unless a waiver is approved by the government. All materials must be traceable to original DoD-qualified manufacturers. Percussion primers require certification or recertification testing within 24 months.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| REPSHIP.doc | DOC document | |
| EDL 01-332-2379.pdf | ||
| SPI F01-052-8209.pdf | ||
| Packaging SOW.pdf | ||
| Packaging.pdf | ||
| CADPAD Item Marking Instruction.pdf | ||
| QALI.pdf | ||
| CDRLSFY20.pdf | ||
| JFQR.pdf | ||
| EDL 01-333-9143.pdf | ||
| ADCSOW.pdf | ||
| FA821320R3003.pdf | ||
| BidSets.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AIRMUNITION SPECIFICATION
FD2020-20-50039 (AF)
FD2020-20-50040 (FMS)
NSN: 1377-01-332-2379ES (1)
1377-01-333-9143ES (2)
1. The contractor shall provide an advanced Report of Shipment (REPSHIP) to the consignee no later than 24 hours prior to the shipment arrival, and for ammunition shipments no later than two hours after shipment departure. CDRL not required.
2. Contractor shall contact their nearest Defense Contract Management Agency (DCMA) Office for transportation guidance and assistance for all Foreign Military Sales (FMS) deliveries prior to shipment; and ensure that the DCMA provides one information copy of completed Notice of
Availability (NOA) including FMS case and requisition numbers by mail to:
AFLCMC/EBHMB Attn: FMS Transportation 6043 Elm Lane, Hill AFB, UT 84056-5819, or
Fax to: (801) 777-1089 or Email to ooalc.gacp.transportation@us.af.mil.
3. Department of Defense Identification Code (DODIC): (1) MD90 & (2) MD91
4. Ammunition Data Cards (ADC) shall be filled out; input in accordance with Attachment 2, Statement of Work – Ammunition Data Cards; and state quantity/serial number of lot acceptance test units in the remarks block. One hard copy of the ADC shall accompany shipments to each shipping location. CDRL (DI-MISC-80043B)
5. Items shall be marked in accordance with CAD/PAD Item Marking Instruction Version 1.5, 1
May 2019, reference attachment.
6. Shelf Life Code marking NOT required per MIL-STD-129R.
7. Hazard Classification Information: (1) 1377013322379ES/(2) 1377013339143ES
Hazard Class/Division: 1.4
Storage Compatibility Group: S
DOT Marking/EX Number: (1) EX1992090123 (2) EX1993090084
DOT Shipping Labels: Explosive 1.4S
UN Number: UN0070
UN Proper Shipping Name: Cutters, Cable, Explosive
Net Explosive Weight (NEW): 0.0024
New Unit of Measurement: pounds mailto:ooalc.gacp.transportation@us.af.mil
NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or IHC. If
NEW is altered to adjust item performance and is greater than the weight listed, an ECP shall be submitted to the government prior to manufacturing or at least 60 days prior to shipping and shall include the SDS (formerly MSDS) and applicable supporting documentation.
8. All Engineering Change Proposals (ECPs), Notice of Revisions (NORs), and Request For
Variances (RFVs, formerly RFD/RFWs) affecting the approved product baseline configuration, acceptance test procedures, or manufacturing process of any item(s) on this contract shall be in accordance with EIA-649-B. Major ECPs with NORs and Critical/Major RFVs shall be submitted to the responsible Government Engineering Authority for review/disposition by CCB.
Minor/Administrative ECPs with NORs and Minor RFVs shall be processed by the Government
Engineer.
ECPs -- CDRL (DI-SESS-80639D)
NORs – CDRL (DI-SESS-80642D)
RFVs – CDRL (DI-SESS-80640D)
Distribution Statement: B, Reason: Admin/Operational use only.
9. Item(s) must pass both gross and fine leak checks. MIL-STD-883K, Method 1014.15 may be used as guidance. The existing leak rate limit established for this item(s) will remain the same.
Contractor shall generate a Lot Acceptance Test Plan (LATP/ATP) with an analysis or test results showing compliance for Hill AFB engineering approval at least 90 days prior to commencement of Lot Acceptance Testing, allowing for 30 days approval time after submission. CDRL (DI-QCIC-80553A)
10. Lot Acceptance Test Requirements are: IAW latest Government approved ATP, Contractor
11. The contractor shall furnish a Lot Acceptance Test/Inspection Report in the following System:
Irapt/WAWF, CDRL (DI-NDTI-80809B)
12. LOT ACCEPTANCE TEST: In the event of an end item failure, the contractor shall notify the
PCO/ACO and Air Force Engineering Organization within 1 business day.
Air Force Engineering Organization: AFLCMC/EBHJ
E-mail: allen.hancey@us.af.mil
13. In the event of test failure(s), a Failure Analysis and Corrective Action Report with proposed corrective actions/recommendations is required. CDRL: (DI-SESS-80255A)
14. The age of the energetic materials and components (i.e. ALL explosives, propellants, pyrotechnics, cartridges, and/or initiators) used in the manufacture of these items or sub-components shall not exceed 24 months based on the original manufacturing date. All energetic materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121
(http://www.pmddtc.state.gov/regulations_laws/itar.html).
15. Raw (non-blended) ingredients & materials used in blended/mixed energetic materials such as, but not limited to: fuels, oxidizers, binders, curatives, sensitizers, plasticizers, stabilizers etc., shall not exceed 24 months since date of manufacture and comply with original manufacture’s
Specification or MIL-STD. The government may waive the energetic and constituent material requirements listed above or portions thereof, on a case-by-case basis (when acceptable to the government) provided the contractor furnishes all details of the reason for the variance and the age, lot numbers, traceability, and other pertinent information/ test data and Certificate of
Analysis/ Conformance (COA/COC) of the subject materials or components. The variance shall be submitted as a RFV and may be subject to, but not limited to, conditions such as sensitivity testing, stabilizer and analysis and/or dehumidification at vendor’s cost; therefore, vendor must plan accordingly. RFV not required provided vendor has approved energetic material and constituent management and recertification plan approved by HAFB technical authority for this specific contract and contract is executed with materials in compliance with said plan.
Recertification test data for materials shall be provided by vendor upon request at no additional charge to the government. All raw ingredients, materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121.
16. Percussion primers shall have been certified/recertified by performing sensitivity (all-fire/no fire) and dud testing per applicable specification within the past 24 months unless they are Navy certified and have a 2 year certification. Primers shall be stored in a temperature and humidity controlled environment and in a sealed container with desiccant from time of primer manufacturing, shipping, storage and through final installation in end item. All primers shll be
X-rayed in top and side views for critical defects prior to use.
17. This item is designated as a Critical Safety Item (CSI). Documentation for critical characteristics may be found in the contract, TDP, assembly/inspection procedures or QALI.
MRB approval authority shall be retained by government engineer. Other characteristics requiring inspection or special oversight from DCMA: see attached QALI
18. Counterfeit Mitigation Clause –DFARS Title 48 252.246-7007 applies. CDRL (DI-MISC-
81832)
19. Contracts involving ammunition and explosives (AE) will contain:
-DFARS Title 48 Part 252.223-7002, Safety Precautions for Ammunition and Explosives
-DFARS Title 48 Part 252-223-7003, Change in Place of Performance – Ammunition and
Explosives
Additionally, if the scope of work includes air shipment of explosives, the safety specification should require contractor compliance with: AFMAN 24-204(I), Preparing Hazardous Materials for Military Air Shipments.
File details come from the government source that posted it. Updated .