QALI.PDF
PDF 161 KB Posted
- Attached to
- CARTRIDGE INITIATOR Federal contract opportunity
- Solicitation number
- FA821319R3080
About this file
Not Listed
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ID.pdf | ||
| FA821319R3080.zip | ZIP file | |
| CADPADimi.doc | DOC document | |
| 158.pdf | ||
| SPIx003493943.pdf | ||
| AirSpec.docx | DOCX document | |
| JQRS.pdf | ||
| ADCSOW.doc | DOC document | |
| FA821319R3080.pdf | ||
| CDRLS.pdf | ||
| REPSHIP11Mar14.doc | DOC document | |
| SOW.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE LETTER OF INSTRUCTION
Plannina Reauirements
Contract No. FD2020-18-50165 Contractor Name Date Contract Awarded CAGE code
Final Delivery Date (FOO) DCMA OAR Reviewer Program Name Date Review Completed
Part Number Date Issued to Contractor DODIC SP83, SP81 and SP82
Noun The contractor is required to impose the listed below OCMA Inspection Points Into the appropriate Work Orders.
All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identifled on folders.
Mandatory. M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)
Witness. w: GSI required to auend, may reduce level of effort after 50% of production lots found acceptable verification • V: Stamp and/or Signature required unless noted otherwse (may be done by written verification) Monitor. R: Will monitor testing, may reduce to verification
Notify. N: By phone or daily schedule 24( R ) - 48 ( NR ) hours in advance
COMMENTS
1.lnspection Iv I 1. Explosive Weight
2. Leal< Test IM I 2. Verify ATP contains both gross and fine leak checks, and gross leak and fine leak checks are performed.
3. X-Ray/N-Ray Iv I 3. Ensure film labeling correct. Ensure radiographic film
4. LAT Sample Selection IM I readable/well-defined. DCMA not required to interpret
5. LAT lw
6. Preparation for Shipment Iv
7. AMMO Data Card Review !M
8. Shippers (DD250, DD1149, Reports) IM
I
I
I
I film.
I 4. Randomly select LAT units per latest government approved ATP.
I
5. Prior to LAT ensure proper calibration and validation of all
I test equipment. Testing should occur in accordance with latest government approved ATP.
I p . 6. Ensure aperwork 1s correct.
I 7. Verify all energetic materials: list original manufacturer, I original lot no., and latest certification/recertification date < 24 months.
I 8. Ensure Paperwork is correct. Verify Packaging, I Packing, Preservation & Marking (PPP&M)
Additior1al requirements: (DCMA reserves the right to impose addit ional inspection points as deemed necessary.)
Prepared by: �� ,/ � c.!::J..6-/1<::
Date
,.., "'�,M� i12rl ,�-Approved by: V • PP
Engirfeer Date
Concurrence Signature by QAR/DCMA:
Date I QAR/DCMA
NUIICE
THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.
File details come from the government source that posted it.