AirSpec.docx
DOCX document 18 KB Posted
- Attached to
- CARTRIDGE INITIATOR Federal contract opportunity
- Solicitation number
- FA821319R3080
About this file
Not Listed
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ID.pdf | ||
| FA821319R3080.zip | ZIP file | |
| CADPADimi.doc | DOC document | |
| FA821319R3080.pdf | ||
| CDRLS.pdf | ||
| REPSHIP11Mar14.doc | DOC document | |
| SOW.pdf | ||
| 158.pdf | ||
| SPIx003493943.pdf | ||
| JQRS.pdf | ||
| ADCSOW.doc | DOC document | |
| QALI.PDF |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AIRMUNITION SPECIFICATION
(version 15 Jun, 2016)
FD2020-18-50165
NSN 1377013820647ES / Alt NSN 1377015601520ES NSN 1377013820650ES / Alt NSN 1377015602165ES NSN 1377013820670ES / Alt NSN 1377015601521ES
1) The contractor shall provide an advanced Report of Shipment (REPSHIP) to consignee no later than 24 hours prior to the shipment arrival, and for ammunition shipments no later than two hours after shipment departure. A (REPSHIP) shall include the following data IAW ATTACHMENT 1.
2) Contractor shall contact their nearest Defense Contract Management Agency (DCMA) Office for transportation guidance and assistance for all Foreign Military Sales (FMS) deliveries prior to shipment; and ensure that the DCMA provides one information copy of completed Notice of Availability (NOA) including FMS case and requisition numbers by mail to: AFLCMC/EBHMB Attn: FMS Transportation 6043 Elm Lane, Hill AFB, UT 84056-5819, or Fax to: (801) 777-1089 or Email to ooalc.gacp.transportation@us.af.mil.
3) Department of Defense Identification Code (DODIC): See FD20201850165 NSNs and JHCS attachment
4) Ammunition Data Cards (ADC) shall be filled out; input in accordance with Attachment 2, Statement of Work – Ammunition Data Cards; and state quantity/serial number of lot acceptance test units in the remarks block. CDRL (DI-MISC-80043B)
5) Items shall be marked in accordance with CAD/PAD Item Marking Instruction Version 1.3., 19 APR 2016, reference attachment.
6) See FD20201850165 NSNs and JHCS attachment for Hazard Class information
7) Contracts involving ammunition and explosives (AE) will contain:
- DFARS Title 48 Part 252.223-7002, Safety Precautions for Ammunition and Explosives
- DFARS Title 48 Part 252.223-7003, Change in Place of Performance - Ammunition and Explosives Additionally, if the scope of work includes air shipment of explosives, the safety specification should require contractor compliance with:
- AFMAN 24-204(I), Preparing Hazardous Materials for Military Air Shipments
8) All Engineering Change Proposals (ECPs), Notice of Revisions (NORs), and Request For Variances (formerly RFD/RFWs) affecting the approved product baseline configuration, acceptance test procedures, or manufacturing process of any item(s) on this contract shall be in accordance with MIL-STD-3046. Major ECPs with NORs and Critical/Major RFVs shall be submitted to the responsible Government Engineering Authority for review/disposition by CCB. Minor/Administrative ECPs with NORs and Minor RFVs shall be processed by the: COGNIZANT GOVERNMENT ENGINEER
ECPs - CDRL (DI-SESS-80639D) NORs – CDRL (DI-SESS-80642D) RFVs - CDRL (DI-SESS-80640D)
Distribution Statement: B, Reason: ADMIN (Engineer - ref. DoD 5230.25)
9) Item(s) must pass both gross and fine leak checks. MIL-STD-883, Method 1014.13 may be used as guidance. The existing leak rate limit established for this item(s) will remain the same. Contractor shall generate a Lot Acceptance Test Plan (LATP/ATP) with an analysis or test results showing compliance for Hill AFB engineering approval at least 90 days prior to commencement of Lot Acceptance Testing allowing for 30 days approval time after submission. CDRL (DI-QCIC-80553A)
10) Electronic Systems to encompass system, subsystem, pieces parts and assemblies shall not contain any substitutes for Tin-Lead solder and finishes. The use of any Tin-Lead solder substitutes requires approval through PCO and cognizant engineer, REFERENCE: “Airworthiness Advisory (AA-08-02) Lead-Free Electronics” and GEIA-STD-0005-1 & 2.
11) Lot Acceptance Test Requirements are IAW latest government approved ATP. CONTRACTOR
12) The contractor shall furnish a Lot Acceptance Test/Inspection Report in the following system(s): WAWF CDRL: (DI-NDTI-80809B)
13) LOT ACCEPTANCE TEST: In the event of an end item failure, the contractor shall notify the PCO/ACO and Air Force Engineering Organization within 1 business day.
Air Force Engineering Organization: AFLCMC/EBHJ Organization Fax/E-mail: (801)777-2926 / devin.swanson@us.af.mil
14) In the event of test failure(s), a Failure Summary & Analysis Report with proposed corrective actions/recommendations is required. CDRL: (DI-SESS-80255A)
15) If Hexanitrostbene (HNS) explosive material is used in the manufacture of this item, the HNS shall meet the requirements of Government Document WS5003F (or latest revision), Purchase Description of HNS Explosive; and maximum particle size shall not exceed 250 microns.
16) The age of the energetic materials and components (i.e. ALL explosives, propellants, pyrotechnics, cartridges, and/or initiators) used in the manufacture of these items or sub- components shall not exceed 24 months based on the original manufacturing date. All energetic materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121 (http://www.pmddtc.state.gov/regulations_laws/itar.html). Raw (non-blended) ingredients & materials used in blended/mixed energetic materials such as, but not limited to: fuels, oxidizers, binders, curatives, sensitizers, plasticizers, stabilizers etc., shall not exceed 24 months since date of manufacture and comply with original manufacture’s Specification or MIL-STD. The government may waive the energetic and constituent material requirements listed above or portions thereof, on a case-by-case basis (when acceptable to the government) provided the contractor furnishes all details of the reason for the waiver and the age, lot numbers, traceability, and other pertinent information/ test data and Certificate of Analysis/ Conformance (COA/COC) of the subject materials or components. The waiver shall be submitted as a RFV and may be subject to, but not limited to, conditions such as sensitivity testing, stabilizer and analysis and/or dehumidification at vendor’s cost; therefore, vendor must plan accordingly.
17) Percussion primers shall have been certified /recertified by performing sensitivity (all-fire / no-fire) and dud testing per applicable specification within the past 24 months unless they are Navy certified and have a two year certification. Primers shall be stored in a temperature and humidity controlled environment and in a sealed container with desiccant from time or primer manufacturing, shipping, storage and through final installation in end item.
18) This item is designated as a Critical Safety Item (CSI). Documentation for critical characteristics may be found in the contract, TDP, assembly/inspection procedures or QALI. Other characteristics requiring inspection of special oversight from DCMA: SEE ATTACHED QALI
File details come from the government source that posted it.