CLEAQALI.pdf
PDF 106 KB Posted
- Attached to
- CHARGE ASSEMBLY Federal contract opportunity
- Solicitation number
- FA8213-18-R-3076
About this file
CLEA QALI
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CLEAGFPFA821318R3076_1.pdf | ||
| SPI009313590.pdf | ||
| REPSHIP11Mar14.pdf | ||
| CLEAEDL.pdf | ||
| Bidsets18-50247.doc | DOC document | |
| JFQRShapeChargeAssembly.pdf | ||
| SOWforPackagingPreservation.pdf | ||
| FD2020-18-50247CDRLS.pdf | ||
| ADCSOWJan2018Final.pdf | ||
| CADPAD_IMI.pdf | ||
| ItemDescriptionCLEA.pdf | ||
| ReworkES7034.doc | DOC document | |
| FA821318R3076.pdf | ||
| AIRSPECFD2020-18-50247.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Name
CAGE code
DCMA QAR Reviewer
Date Review Completed
Date Issued to Contractor
PR No. FD2020-
Date Contract Awarded
Final Delivery Date (FDD)
Program Name
DODIC
Part Number
The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.
All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.
Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)
Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable
Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)
Monitor - R: Will monitor testing, may reduce to verification
Notify - N: By phone or daily schedule 24( R ) - 48 ( NR ) hours in advance
Prepared by:
Date
THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.
QUALITY ASSURANCE LETTER OF INSTRUCTION
Planning Requirements
COMMENTS
NOTICE
Engineer
Sheet1
| Contract No: 18-50247 |
| Date Contract Awarded: |
| Final Delivery Date FDD: |
| Program Name: LGM30 |
| DODIC: 995-4999-2 |
| undefined: V |
| undefined_2: V |
| undefined_3: V |
| undefined_4: M |
| undefined_5: W |
| undefined_6: V |
| undefined_7: M |
| undefined_8: M |
| undefined_9: V |
| undefined_10: |
| undefined_11: |
| undefined_12: |
| Text19: |
| Text20: |
| Text21: |
| Text22: |
| Text23: |
| Text24: 1.Inspection |
| Text25: 2. Leak Test |
| Text26: 3. X-Ray/N-Ray |
| Text27: 4. LAT Sample Selection |
| Text28: 5. LAT |
| Text29: 6. Preparation for Shipment |
| Text30: 7. AMMO Data Card Review |
| Text31: 8. Shippers (DD250, DD1149, Reports) |
| Text32: 9. Additional Requirements |
| Text33: |
| Text34: |
| Text35: |
| Text36: 1. Explosive Weight |
2. Verify all applicable leak testing is included in ATP and leak testing is performed.
3. Ensure film labeling correct. Ensure radiographic film readable/well-defined.
4. Randomly select LAT units per latest government approved ATP.
5. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.
6. Ensure Paperwork is correct.
7. Verify all energetic materials: list original manufacturer, original lot no.
8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)
9. Any additional requirements imposed by DCMA shall be approved by Project Engineer
| 2017-07-21T09:26:22-0600 | |
| JOHNSON.AVERY.STEVEN.1457505112 |
| Text46: 21 JULY 2017 |
| Part Number: KY89 |
| Noun: |
File details come from the government source that posted it.