AIRSPECFD2020-18-50247.docx
DOCX document 19 KB Posted
- Attached to
- CHARGE ASSEMBLY Federal contract opportunity
- Solicitation number
- FA8213-18-R-3076
About this file
AIR SPEC FD2020-18-50247
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CLEAGFPFA821318R3076_1.pdf | ||
| SPI009313590.pdf | ||
| REPSHIP11Mar14.pdf | ||
| CLEAEDL.pdf | ||
| ADCSOWJan2018Final.pdf | ||
| CADPAD_IMI.pdf | ||
| ItemDescriptionCLEA.pdf | ||
| ReworkES7034.doc | DOC document | |
| FA821318R3076.pdf | ||
| Bidsets18-50247.doc | DOC document | |
| JFQRShapeChargeAssembly.pdf | ||
| CLEAQALI.pdf | ||
| SOWforPackagingPreservation.pdf | ||
| FD2020-18-50247CDRLS.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AIRMUNITION SPECIFICATION
FD2020-18-50247
NSN: 1336-00-931-3590ES
1. The contractor shall provide an advanced Report of Shipment (REPSHIP) to the consignee no later than 24 hours prior to the shipment arrival, and for ammunition shipments no later than two hours after shipment departure. A (REPSHIP) shall include all the following data in accordance with ATTACHMENT 1.
2. Department of Defense Identification Code (DODIC):
3. Government Furnished Material:
Stock Number: 1420-01-480-1667 Part Number: 91-00001 Noun: Part 3, Seething Quantity: 6600
4. Contractor shall provide a Government Furnished Material (GFM) consumption report as described in CDRL (DI-MGMT-80438B) – this applies to new production. GFM shall be identified by NSN, lot number, and serial number where possible. Reporting to commence upon receipt of GFM and then every _30_(reporting frequency). Item Manager Email Address: nikole.reeder@us.af.mil
5. Items shall be marked in accordance with CAD/PAD Item Marking Instruction Version 1.3, 19 Apr 2016, reference attachment.
6. Shelf Life Code marking NOT required per MIL-STD-129.
7. Hazard Classification Information:
Hazard Class/Division: 1.2 Storage Compatibility Group: D DOT Marking/Proper Shipping Name: EX2008110058 DOT Class/Hazard Class: 1.2D DOT Label/Shipping Label: Explosive 1.2D UN Serial No.: UN0102 UN Proper Shipping Name/UN No: Cord, Detonating Net Explosive Weight per item (NEW): 0.003000 NEW Unit of Measurement: lbs.
NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or IHC. . If NEW is altered to adjust item performance and is greater than the weight listed, an ECP shall be submitted to the government prior to manufacturing or at least 60 days prior to shipping and shall include the SDS (formerly MSDS) and applicable supporting documentation.
8. All Engineering Change Proposals (ECPs), Notice of Revisions (NORs), and Request For Variances (RFVs formerly RFD/RFWs) affecting the approved product baseline configuration, acceptance test procedures, or manufacturing process of any item(s) on this contract shall be in accordance with EIA-649-B. Major ECPs with NORs and Critical/Major RFVs shall be submitted to the responsible Government Engineering Authority for review/disposition by CCB. Minor/Administrative ECPs with NORs and Minor RFVs shall be processed by the: COGNIZANT GOVERNMENT ENGINEER
| ECPs -- CDRL (DI-SESS-80639D) |
| NORs – CDRL (DI-SESS-80642D) |
| RFVs – CDRL (DI-SESS-80640D) |
Distribution Statement: B_, Reason: _Admin and operational use only__(ref. DoD 5230.24)
9. Lot Acceptance Test Requirements are: IAW latest Gov. approved ATP
10. The contractor shall furnish a Lot Acceptance Test/Inspection Report in the following system(s): WAWF
CDRL: (DI-NDTI-80809B)
11. LOT ACCEPTANCE TEST: In the event of an end item failure, the contractor shall notify the PCO/ACO and Air Force Engineering Organization within 1 business day.
Air Force Engineering Organization: AFLCMC/EBHJ Organization Fax/E-mail: avery.johnson.3@us.af.mil
12. In the event of test failure(s), a Failure Analysis and Corrective Action Report with proposed corrective actions/recommendations is required. CDRL: (DI-SESS-81315B)
13. The age of the energetic materials and components (i.e. ALL explosives, propellants, pyrotechnics, cartridges, and/or initiators) used in the manufacture of these items or sub-components shall not exceed 24_ months based on the original manufacturing date. All energetic materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121 (http://www.pmddtc.state.gov/regulations_laws/itar.html).
14. Raw (non-blended) ingredients & materials used in blended/mixed energetic materials such as, but not limited to: fuels, oxidizers, binders, curatives, sensitizers, plasticizers, stabilizers etc., shall not exceed _24_ months since date of manufacture and comply with original manufacture’s Specification or MIL-STD. The government may waive the energetic and constituent material requirements listed above or portions thereof, on a case-by-case basis (when acceptable to the government) provided the contractor furnishes all details of the reason for the waiver and the age, lot numbers, traceability, and other pertinent information/ test data and Certificate of Analysis/ Conformance (COA/COC) of the subject materials or components. The waiver shall be submitted as a RFV and may be subject to, but not limited to, conditions such as sensitivity testing, stabilizer and analysis and/or dehumidification at vendor’s cost; therefore, vendor must plan accordingly. RFV not required provided vendor has approved energetic material and constituent management and recertification plan approved by HAFB technical authority for this specific contract and contract is executed with materials in compliance with said plan. Recertification test data for materials shall be provided by vendor upon request at no additional charge to the government. All raw ingredients, materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121.
15. This item is designated as a Critical Safety Item (CSI). Documentation for critical characteristics may be found in the contract, TDP, assembly/inspection procedures or QALI. MRB approval authority shall be retained by government engineer. Other characteristics requiring inspection or special oversight from DCMA: See attached QALI
16. Approval from government engineer is required prior to rework and repair of nonconforming material (see Attachment clause ES7034)
17. First Article Test/Inspection Report IAW AFMC form 260 CDRL (DI-NDTI-80603A) FAT-Government Test/Inspection, Non-explosive items only) or FAT-Contractor Test)
18. First Article Test Plan and Procedures CDRL (DI-NDTI-81307A)
19. Contracts involving ammunition and explosives (AE) will contain:
- DFARS Title 48 Part 252.223-7002, Safety Precautions for Ammunition and Explosives
- DFARS Title 48 Part 252.223-7003, Change in Place of Performance - Ammunition and Explosives Additionally, if the scope of work includes air shipment of explosives, the safety specification should require contractor compliance with:
- AFMAN 24-204(I), Preparing Hazardous Materials for Military Air Shipments
File details come from the government source that posted it.