QALIcombined.pdf
PDF 267 KB Posted
- Attached to
- B-1 F-15 One-Way Transfer Federal contract opportunity
- Solicitation number
- FA821318R3075
About this file
Attachments: QALIs
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA821318R3075_______0001.pdf | ||
| SPIscombined.pdf | ||
| EXHIBITA.pdf | ||
| Attachments_1-4_Combined.pdf | ||
| FA821318R3075.pdf | ||
| IDscombined.pdf | ||
| NEWCDRLScombined.pdf | ||
| BidSetscombined.pdf | ||
| EDLcombined.pdf | ||
| GFP.pdf | ||
| ES7034.doc | DOC document | |
| 158Packagingcombined.pdf | ||
| AIRSPECScombined.pdf | ||
| JQRscombined.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
Contractor Name CAGE code
DCMA QAR Reviewer
Date Review Completed
Date Issued to Contractor
PR No. FD2020-
Date Contract Awarded
Final Delivery Date (FDD)
Program Name
DODIC
Part Number
The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.
All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.
Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)
Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable
Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)
Monitor - R: Will monitor testing, may reduce to verification
Notify - N: By phone or daily schedule 24( R ) - 48 ( NR ) hours in advance
Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)
Prepared by:
Date
Concurrence Signature by QAR/DCMA:
QAR/DCMA
THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.
QUALITY ASSURANCE LETTER OF INSTRUCTION
Planning Requirements
COMMENTS
NOTICE
Engineer
Sheet1
Contract No: 19-50004, 19-50005 (FMS)
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: F-15/B-1B
DODIC: 6036200-01, 816890-1
undefined: V undefined_2: M undefined_3: V undefined_4: M undefined_5: W undefined_6: V undefined_7: M undefined_8: M undefined_9:
undefined_10:
undefined_11:
undefined_12:
Text19:
Text20:
Text21:
Text22:
Text23:
Text24: 1.Inspection
Text25: 2. Leak Test
Text26: 3. X-Ray/N-Ray
Text27: 4. LAT Sample Selection
Text28: 5. LAT
Text29: 6. Preparation for Shipment
Text30: 7. AMMO Data Card Review
Text31: 8. Shippers (DD250, DD1149, Reports)
Text32: 9. Additional Requirements
Text33:
Text34:
Text35:
Text36: 1. Explosive Weight
2. Verify ATP contains both gross and fine leak checks, and gross leak and fine leak checks are performed.
3. Ensure film labeling correct. Ensure radiographic film readable/well-defined. DCMA not required to interpret film.
4. Randomly select LAT units per latest government approved ATP.
5. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.
6. Ensure Paperwork is correct.
7. Verify all energetic materials: list original manufacturer, original lot no., and latest certification/recertification date < 24 months.
8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)
9. Any additional requirements imposed by DCMA shall be approved by Project Engineer
2017-04-20T14:16:16-0600
TIDWELL.QUINN.RAY.1241451913
Text46: 28 Apr 2018
Text49:
Type name_1:
Type name_4:
Part Number: MH61
Noun:
The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.
Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)
Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable
Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)
Notify - N: By phone or email
Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)
Sheet1
Contract No: 19-50008
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: B-1
DODIC: MJ93, MU15, MU16, MU17, MU18, MU19, MU79, MU80
undefined: V undefined_2: V undefined_3: V undefined_4: M undefined_5: W undefined_6: V undefined_7: V undefined_8: V undefined_9: N undefined_10:
undefined_11:
undefined_12:
Text19: PSEMC, CED
Text20: 06331, 93455
Text21:
Text22:
Text23:
Text24: 1.Inspection
Text25: 2. Leak Test
Text26: 3. X-Ray/N-Ray
Text27: 4. LAT Sample Selection
Text28: 5. LAT
Text29: 6. Preparation for Shipment
Text30: 7. AMMO Data Card Review
Text31: 8. Shippers (DD250, DD1149, Reports)
Text32: 9. Additional Requirements
Text33:
Text34:
Text35:
Text36: 1. Verify that the Explosive Weight is identified and meets drawing and hazard classification requirements.
2. Verify gross/fine leak checks are performed per ATP requirements
3. Ensure film labeling correct. Ensure radiographic film readable / well-defined. DCMA not required to interpret film.
4. Randomly select LAT units per latest government approved ATP.
5. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.
6. Ensure Paperwork is correct.
7. Verify all energetic materials: list original manufacturer, original lot no., and latest certification/recertification date < 24 months.
8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)
9. Notify and obtain approval from the Project Engineer for any additional requirements imposed by DCMA.
2018-03-06T15:30:48-0700
TANNER.MATTHEW.W.1379435919
Text46: 2018-03-06
Text49:
Type name_1:
Type name_4:
Part Number:
Noun: 816851-2/4/11/12, 816852-2/10/11/12, 6106100, 6106200, 6106300, 6106400, 6106500, 6106600, 6106700, 6106800
The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.
Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)
Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable
Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)
Notify - N: By phone or daily schedule 24( R ) - 48 ( NR ) hours in advance
Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)
Sheet1
Contract No: 19-50004, 19-50005 (FMS)
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: F-15/B-1B
DODIC: 6036200-01, 816890-1
undefined: V undefined_2: M undefined_3: V undefined_4: M undefined_5: W undefined_6: V undefined_7: M undefined_8: M undefined_9:
undefined_10:
undefined_11:
undefined_12:
Text19:
Text20:
Text21:
Text22:
Text23:
Text24: 1.Inspection
Text25: 2. Leak Test
Text26: 3. X-Ray/N-Ray
Text27: 4. LAT Sample Selection
Text28: 5. LAT
Text29: 6. Preparation for Shipment
Text30: 7. AMMO Data Card Review
Text31: 8. Shippers (DD250, DD1149, Reports)
Text32: 9. Additional Requirements
Text33:
Text34:
Text35:
Text36: 1. Explosive Weight
2. Verify ATP contains both gross and fine leak checks, and gross leak and fine leak checks are performed.
3. Ensure film labeling correct. Ensure radiographic film readable/well-defined. DCMA not required to interpret film.
4. Randomly select LAT units per latest government approved ATP.
5. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.
6. Ensure Paperwork is correct.
7. Verify all energetic materials: list original manufacturer, original lot no., and latest certification/recertification date < 24 months.
8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)
9. Any additional requirements imposed by DCMA shall be approved by Project Engineer
2017-04-20T14:16:16-0600
TIDWELL.QUINN.RAY.1241451913
Text46: 28 Apr 2018
Text49:
Type name_1:
Type name_4:
Part Number: MH61
Noun:
File details come from the government source that posted it.