First_Article_Requirements.pdf

PDF 96 KB Posted

Attached to
F-16 Cable Assembly Federal contract opportunity
Solicitation number
FA8212-19-R-0011
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

First Article

View the file

Other files for this federal contract opportunity

Other files attached to F-16 Cable Assembly, newest first.
File Type Posted
FA821219R0011_______0002.pdf PDF
FA821219R0011_______0001.pdf PDF
Quality_Assurance_Provisions_and_Special_Inspection_Requirements.pdf PDF
Qualifaction_Requirements.pdf PDF
Engineering_Data_List.pdf PDF
Engineering_Data_Requirements.pdf PDF
FA821219R0011.pdf PDF
Item_Description.pdf PDF
Transportation_Data.pdf PDF
SOW_Packaging.docx DOCX document
Green_Procurement.pdf PDF
Contract_Data_Requirements_List_(CDRL).pdf PDF
Bid_Set_Request.pdf PDF
Bid_Set_Letter.doc DOC document
Packaging_Requirements.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRST ARTICLE REQUIREMENTS 1. DATE

07 MAY 2018(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)

2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER

94117 / 8395676-2

4. NSN

6150015558887WF

5. FIRST ARTICLE QUANTITY

THE FIRST ARTICLE IS 1 UNIT(S) OF LOT / ITEM 1

AND WILL BE: X PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY

6. ARTICLES

WILL X WILL NOT SERVE AS A MANUFACTURING STANDARD

7. LONG LEAD TIME ITEMS

REQUIRED X NOT REQUIRED

(See FAR 52.209-3 OR -4, alternate II)

8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)

X REQUIRED NOT REQUIRED

"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."

9. TEST / INSPECTION REQUIREMENTS

A.

X

CONTRACTOR TESTING

GOVERNMENT TESTING

Performance or other characteristics which the First Articles must meet are

Conformance with all drawings and "Attachment A", cable mating test to be performed.

B. The detailed technical requirements for First Article approval tests are contained in

Drawings and "Attachment A"

(Cite Spec and Para number)

C. TEST PLAN REQUIRED

Number of days for government approval / disapproval days.

D. Contractor's notification to ACO and

(Requesting Activity) of test time and location due days prior to start of testing.

E. X TEST REPORT REQUIRED

(1) Forwarded to

Deliver concurrent with FA asset.

(2) Government written notice of approval / disapproval due 120 days after receipt of contractor's report.

F. FIRST ARTICLE DELIVERY

(1) Due within 180 calendar days from date contract.

(2) Notify 30 calendar days prior to shipment.

(3) Delivered to government at

See Block 12

(Set Forth Consignee and Address)

(4) Government written notice of approval / disapproval within 120 days after receipt of first article package.

G. Estimated cost of government testing / inspection evaluation.

$1,500.0000

Page 1 of 2AFMC IMT 260, 20020830, V-3 Version 2Generated by PRPS using Jasper Reports on 14 Nov 2018

FIRST ARTICLE REQUIREMENTS 1. DATE

07 MAY 2018(AFMCI 64-110, AFMCI 23-102 and FAR Part 9, Sub Part 9.3)(Additional Instructions on Page 3)

10. DISPOSITION OF FIRST ARTICLES

X Approved First Articles will be forwarded to

Supply

(insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.

First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.

X Disapproved First Articles will be returned to the contractor

X will be retained by MXDEB pending disposition instructions from the contractor.

X On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).

a. Approved First Articles will be returned to the contractor for shipment with production item.

b. Disposition of disapproved First Articles will remain the same as marked above.

Other Disposition:

11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL

a. X Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, X Air Force.

b. X Offerors currently in production of the same or similar article for a Government, DoD, X Air Force contract and who have received First Article approval under the existing contract.

c. X Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, X Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.

d. X Provided not more than 36 months have elapsed since completion of the contract.

e. First Article testing will not be waived.

f. X See Remarks in block 12 below.

NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:

A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION

12. REMARKS

Lucas, Timothy JNAME: 07 MAY 2018DATE:

First aritcle inspection is required to verify OSS&E baseline is maintained for this critical application part. The OSS&E risk associated with failure of the item outweighs the cost of FAT.

The first article requirements will be waived for the OEM, BAE Systems, Cage 94117.

Contiuation of Block 9.F.(3). Delivered to the government at:

SHIP TO: FB2029

809 MXSS/MXDEB

BLDG 849

ATTN: NON ACCOUNTABLE BAY

TRANSPORTATION OFFICE

HILL AFB, UT 84056-5713

Mark For: First Article Do Not Post Tim Lucas; 416 SCMS/GUEAA, 801-775-4528

13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING TEST

(Name, Organization, Phone)

Lucas, Timothy J

416 SCMS / GU E A A

801-775-4528

775-4528

14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING

TEST (Name, Organization, Phone)

Curtis Blanco

416 SCMS/GUEAA

801-777-4768

777-4768

Page 2 of 2AFMC IMT 260, 20020830, V-3 Version 2Generated by PRPS using Jasper Reports on 14 Nov 2018

File details come from the government source that posted it.