Contract_Data_Requirements_List_(CDRL).pdf
PDF 165 KB Posted
- Attached to
- F-16 Cable Assembly Federal contract opportunity
- Solicitation number
- FA8212-19-R-0011
About this file
CDRLS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA821219R0011_______0002.pdf | ||
| FA821219R0011_______0001.pdf | ||
| Qualifaction_Requirements.pdf | ||
| Engineering_Data_List.pdf | ||
| Engineering_Data_Requirements.pdf | ||
| FA821219R0011.pdf | ||
| First_Article_Requirements.pdf | ||
| Green_Procurement.pdf | ||
| Bid_Set_Request.pdf | ||
| Bid_Set_Letter.doc | DOC document | |
| Packaging_Requirements.pdf | ||
| Item_Description.pdf | ||
| Transportation_Data.pdf | ||
| SOW_Packaging.docx | DOCX document | |
| Quality_Assurance_Provisions_and_Special_Inspection_Requirements.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved 0MB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions searching existing data sources, gathering and maintaining the data needed, end completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports 0701-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of aw no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please DO NOT RE1'URN your form to the above address. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No.
listed in Block B.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
A
C. CATEGORY: NDTI
TDP TM OTHER _____________________________
D. SYSTEM/ITEM (GUB-18-089)
Cable Assy, Special Purpose, Electrical
E. CONTRACT/PR NO.
FD2020- 19-00444
F. CONTRACTOR
1. DATA ITEM NO.
AOO 1
2. TITLE OF DATA ITEM
Test/Inspection Report
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80809B/T
5. CONTRACT REFERENCE
CLIN for Data
6. REQUIRING OFFICE
416 SCMS/GIJEAA
7. DD 250 REQ
DD
9. 01ST STATEMENT
REQUIRED
10. FREQUENCY
ONE TIME
12. DATE OF FIRST SUBMISSION
SEE BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
B. APP CODE
A
11. AS OF DATE
SEE BLK 16
13. DATE OF SUBSEQUENT
SUBMISSION
SEE BLK 16
Draft Final
Reg
Repro
16. REMARKS
NOTE: Changes to office symbols and/or e-mail addresses, when necessary shall be made by letter through the CO/ACO without further revision to this CDRL.
1. BLK 4: Contractor's format is acceptable. Paragraph 10.2 of DI-NDTI-80809B is clarified as follows:
a. All dimensions and tolerances specified on the manufacturing data shall be listed in one column, with the actual corresponding reading obtained from the inspection of the part listed in another column.
b. Materials utilized in the manufacture of "First Article" item shall be identified and certified along with a copy of material purchase requests as conforming to applicable data requirements.
c. Material processing, including finish requirements (plating, heat treatment, welding, inspecting, anodize, painting, etc.) utilized in the manufacture of "First Article" item shall be identified and certified as conforming to applicable requirements. A copy of the purchase order certifying the process accomplished at other than contractor facility shall be included.
d. Other requirements as called out on Engineering Data Requirement (OO-ALC Form 462).
2. The Distribution Statement, Export Control Warning and Destruction Notice shall be placed on the first sheet of each document and located in a conspicuous location.
BLK 9: DISTPJBUTION STATEMENT "B" Distribution authorized to U.S.
Government agencies only. (Test & Evaluation) (6 November 2018). Other requests for this document shall be referred to (416 SCMS/GUEAA, Hill AFB, UT 84056-5825).
EXPORT CONTROL WARNING: All technical documents/data (printed, digital/electronic) that are determined to contain export-controlled technical data, shall be marked with the following statement:
416 SCMS/ 1
GTJEAA
6070 Gum LN
Bldg. 1213
Hill AFB, UT 84056-5825
SEE BLK 16
15.TOTAL 0 1 0
G. PREPARED B
Nila Dagsen
H. DATE
6 Nov 2018
I. APP J.DATE
6 Nov 2018
17. PRICE GROUP
NSP
18. ESTIMATED
TOTAL PRICE
0.00
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 2 Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
I A. CONTRACT LINE ITEM NO.I B. EXHIBIT I C. CATEGORY:
NDTI
A TOP TM OTHER
D. SYSTEM/ITEM (GUB-18-089) E. CONTRACT/PR NO. F. CONTRACTOR
Cable Assy, Special Purpose, Electrical FD2020-19-00444
16. REMARKS (Continued)
EXPORT CONTROL WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended.
Violations of these export laws are subject to severe criminal penalties. Disseminate JAW provisions of DoD Directive 5230.25.
DESTRUCTION NOTICE: For classified documents, follow the procedures in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, or DoD 5200.1 -R, Information Security Program Chapter VI. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
3. BLKs 10, 11, 12, 13, 14:
a. For Contractor Testing - submit JAW the current delivery schedule.
b. For Government Testing - Report to assist in "First Article" testing by the Air Force shall be submitted concurrently with the "First Article" item either in the packaging of the shipping container or separately if the report will not fit within the container packaging unfolded. When shipped in the "First Article" container, the report shall be enclosed in a paper or plastic envelope.
c. SHIP TO: Non-Accountable Bay Transportation Officer Building 849 West Hill AFB, UT 84056-5999
MARK FOR: 809 MXSSIMXDEB
7278 4th Street (Bldg. 100, Bay D) Hill AFB, UT 84056-5205
NOTE: If report is shipped separate from "First Article" item, send report to "MARK FOR" address listed above.
d. Contractor shall deliver the Test/Inspection Report via e-mail to the following e-mail address: timothy.lucas.3us.af.mil
DD FORM 1423-1, FEB 2001 Page 2 Of 2 Pages
File details come from the government source that posted it.